CN211930122U - Traction device is laid with cable to construction of wisdom piping lane - Google Patents

Traction device is laid with cable to construction of wisdom piping lane Download PDF

Info

Publication number
CN211930122U
CN211930122U CN202020926532.9U CN202020926532U CN211930122U CN 211930122 U CN211930122 U CN 211930122U CN 202020926532 U CN202020926532 U CN 202020926532U CN 211930122 U CN211930122 U CN 211930122U
Authority
CN
China
Prior art keywords
clamping
cable
rod
plate
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020926532.9U
Other languages
Chinese (zh)
Inventor
孙则树
罗文强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202020926532.9U priority Critical patent/CN211930122U/en
Application granted granted Critical
Publication of CN211930122U publication Critical patent/CN211930122U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a cable laying traction device for intelligent pipe gallery construction, which relates to the technical field of cable laying, and comprises a main cabin body, a clamping mechanism, a moving mechanism and a pulling mechanism, wherein the clamping mechanism comprises an upper plate, a lower plate, a clamping plate and a slide bar, the slide bar passes through the upper plate and is connected to the clamping plate to vertically move, a clamping spring is arranged between the upper plate and the clamping plate, and the cable passing through the main cabin body is clamped by virtue of elasticity; the moving mechanism is arranged on the outer side of the main bin body, the whole device is driven to move by means of the roller of the moving mechanism, and the damping assembly is arranged, so that the moving is more stable; the pull rod of the pulling mechanism is connected with the slide rod, so that an operator can conveniently clamp and operate the slide rod, and the pull handle of the pulling mechanism is connected with the main bin body and matched with the moving mechanism, so that the operator can conveniently pull and operate the slide rod. The utility model discloses can realize pulling cable in batches, convenient, stable pulls the cable to required position.

Description

Traction device is laid with cable to construction of wisdom piping lane
Technical Field
The utility model relates to a cable laying technical field, more specifically say, relate to a traction device is laid with cable to wisdom piping lane construction.
Background
The intelligent pipe gallery is a facility which is built under the city and used for accommodating urban engineering pipelines, is a type of urban infrastructure, is an efficient intensive urban underground pipeline arrangement form and is used for serving municipal underground engineering for production and life of people. When carrying out municipal works, need lay cable, electric wire in wisdom piping lane inside.
The traditional laying mode adopts manual work to lay, and in the laying process, traction needs to be carried out from one end, and the common traction mode is traction through manual work. The cable is generally a rope-like cable formed by twisting several or several groups of conductors (at least two in each group), each group of conductors being insulated from each other and often twisted around a center, the entire outer surface being covered with a highly insulating covering, the overall weight of which is relatively heavy. And manual traction is adopted, so that the working intensity is high and the working efficiency is low. In order to reduce the workload of operators, a traction device is generally used for traction of cables, but the existing traction device is inconvenient to use in an intelligent pipe gallery.
Through retrieval, the Chinese patent application number: 2019113038353, the name of invention creation is: a high-efficiency traction device for a street lamp cable is disclosed as 2020, 4, 21 and comprises a base, wherein supporting plates are vertically fixed on two sides of the upper end surface of the base, a plurality of groups of traction assemblies are horizontally arranged between the supporting plates on two sides, each traction assembly comprises a driving shaft and a driven shaft, two ends of each driving shaft and two ends of each driven shaft are rotatably mounted on the supporting plates through bearing seats, traction wheels which are matched with each other are fixed on the driving shaft and the driven shaft, and a plurality of grooves with different sizes are formed in the traction wheels; the top of the supporting plate is fixedly provided with a top plate, and the top plate is provided with a lifting mechanism for driving the driven shaft to move up and down for clamping a cable. However, the number of the cables clamped in the application is limited, so that a plurality of cables with the same specification cannot be pulled conveniently, and the cables cannot be pulled to move to the required position.
Disclosure of Invention
1. Technical problem to be solved by the utility model
Based on only rely on manpower traction cable to waste time and energy among the wisdom piping lane, and the problem that current draw gear used in the piping lane inconveniently, the utility model provides a draw gear is laid to wisdom piping lane construction cable, the utility model discloses can realize traction cable in batches, and the device can remove, is convenient for traction cable to required position.
2. Technical scheme
In order to achieve the above purpose, the utility model provides a technical scheme does:
the utility model discloses a cable laying traction device for intelligent pipe gallery construction, which comprises a main cabin body, a clamping mechanism and a moving mechanism; the clamping mechanism comprises a clamping plate and a sliding rod, the clamping plate is connected with the sliding rod and moves back and forth in the main bin body along with the sliding rod; the cable penetrates through the main bin body and is clamped and fixed through the clamping mechanism; the moving mechanism is arranged outside the main bin body and bears the movement of the main bin body.
Furthermore, the clamping mechanism further comprises an upper plate, a lower plate and a clamping spring, the upper plate and the lower plate are respectively arranged on two sides of the main bin body, a hole is formed in the upper plate, the sliding rod penetrates through the hole, the clamping plate is fixed to one end, close to the lower plate, of the sliding rod, the clamping spring is sleeved on the sliding rod and is arranged between the upper plate and the clamping plate, and the clamping plate is abutted to the lower plate.
Furthermore, the two groups of clamping mechanisms are respectively positioned at two sides of the main bin body, one ends of the sliding rods at two sides extend out of the holes of the upper plate and are connected through the pulling mechanism, and the pulling mechanism controls the clamping mechanisms to clamp.
Furthermore, the main bin body is provided with a plurality of baffles along the width direction, each baffle is provided with a plurality of auxiliary holes along the length direction, and auxiliary rollers are arranged in the auxiliary holes.
Furthermore, a rubber pad is laid on one surface of the clamping plate close to the lower plate.
Furthermore, the moving mechanism comprises a connecting block, a roller and a roller; the connecting block sets up in the main storehouse body outside, has seted up the spread groove in it, and the gyro wheel passes through the roller bearing to be installed in the spread groove, and the cover has the rubber sleeve on this gyro wheel.
Furthermore, a damping assembly is arranged in the moving mechanism and comprises sliding holes formed in two sides of the connecting block, the rolling shaft can move along the sliding holes, connecting holes are formed in two ends of the rolling shaft, one end of a supporting rod of the damping assembly is fixed to one end of each sliding hole, and the other end of the supporting rod penetrates through the connecting holes and is fixed to the other end of each sliding hole; the support rod is sleeved with a damping spring.
Furthermore, the pulling mechanism comprises a pull rod, a connecting rod and a side connecting rod; the two groups of clamping mechanisms are arranged on two sides of the main bin body, each group comprises two slide bars, the top ends of the two slide bars are connected through a connecting rod, and the connecting rods on the two sides are connected through pull rods; one end of the side connecting rod is fixed on the pull rod, and the other end of the side connecting rod is fixed at the end of the connecting rod.
Furthermore, the pulling mechanism further comprises two side plates and two pulling handles, the two side plates are fixed at two ends of the top surface of the main bin body and connected through the pulling handles, side sliding holes are formed in the side plates, and the pulling rods penetrate through the side sliding holes.
3. Advantageous effects
Adopt the technical scheme provided by the utility model, compare with existing well-known technique, have following apparent effect:
(1) based on only relying on manpower traction cable to waste time and energy among the wisdom piping lane, and the inconvenient problem that uses in the piping lane of current draw gear, the utility model discloses a draw gear is laid to wisdom piping lane construction cable, and its main internal energy of storehouse bears many cables, improves the device's traction efficiency, cooperates its inside supplementary gyro wheel, makes smooth and easy the internal removal of main storehouse of cable.
(2) The utility model discloses a traction device is laid with cable to wisdom piping lane construction, be provided with the upper plate, hypoplastron and splint, the slide bar passes the upper plate and is connected to splint, and the cover has the centre gripping spring, when the cable need remove, control splint separately with the hypoplastron can, when the cable need press from both sides tightly, needn't control the device, splint are close to hypoplastron clamping cable with the help of the power of spring, and the both ends of the main storehouse body all are equipped with splint, the one side of splint is provided with the rubber pad, through the centre gripping of both sides and the effect of rubber pad, can more stable centre gripping cable.
(3) The utility model discloses a traction device is laid with cable to wisdom piping lane construction is provided with moving mechanism, bears the weight of the main storehouse body and removes in the piping lane, is provided with the rubber sleeve on its gyro wheel, and is provided with damping spring on the gyro wheel, makes the steady removal of the main storehouse body, and the centre gripping that can guarantee the cable is more stable.
(4) The utility model discloses a cable laying traction device for intelligent pipe gallery construction, the clamping plates and the sliding rods on the two sides are connected through the pulling mechanism, and the operating personnel pulls the pull rod of the pulling mechanism to control the movement of the clamping plates in the vertical direction, thereby controlling the clamping of the cable; the pulling handle of the pulling mechanism is pushed to control the main bin body to move horizontally, so that the cable is pulled, and the operation method is simple and convenient.
Drawings
Fig. 1 is a front view of the cable laying traction device for intelligent pipe gallery construction of the present invention;
fig. 2 is a side view of the cable laying traction device for intelligent pipe gallery construction of the present invention;
fig. 3 is a top view of the cable laying traction device for intelligent pipe gallery construction according to the present invention;
fig. 4 is the utility model discloses a wisdom is cable for piping lane construction and lays draw gear well damper assembly schematic diagram.
The reference numerals in the schematic drawings illustrate:
1. a main bin body; 2. a baffle plate; 3. an auxiliary hole; 4. an auxiliary roller; 5. a clamping mechanism; 51. an upper plate; 52. a lower plate; 53. a rubber pad; 54. a splint; 55. a slide bar; 56. a clamping spring; 6. a moving mechanism; 61. connecting blocks; 62. connecting grooves; 63. a roller; 64. a rubber sleeve; 65. a roller; 66. a shock absorbing assembly; 661. a slide hole; 662. connecting holes; 663. a strut; 664. a damping spring; 7. a pulling mechanism; 71. a pull rod; 72. a side plate; 73. a sideslip hole; 74. pulling a handle; 75. a connecting rod; 76. a side link.
Detailed Description
For a further understanding of the present invention, reference will be made to the following detailed description taken in conjunction with the accompanying drawings and examples.
Example 1
With reference to fig. 1 and 2, the cable laying traction device for intelligent pipe gallery construction of this embodiment includes main cabin body 1, clamping mechanism 5, moving mechanism 6 and pulling mechanism 7. A plurality of baffles 2 which are parallel to each other are fixed in the main bin body 1 along the width direction, a plurality of auxiliary holes 3 are formed in each baffle 2 along the length direction, and auxiliary rollers 4 are arranged in the auxiliary holes 3 and rotate in the vertical direction along the shafts of the auxiliary rollers; the cable penetrates into the main cabin body 1 from between the baffles 2 and smoothly moves in the main cabin body 1 by means of the auxiliary roller 4.
The two clamping mechanisms 5 are respectively positioned at two sides of the main cabin body 1, each clamping mechanism 5 comprises an upper plate 51, a lower plate 52, a clamping plate 54, a sliding rod 55 and a clamping spring 56, the upper plate 51 and the lower plate 52 are respectively arranged above and below two sides of the main cabin body 1, the clamping plate 54 is positioned between the upper plate 51 and the lower plate 52, a hole is formed in the upper plate 51, one end of the sliding rod 55 penetrates through the hole to be connected to the clamping plate 54, the height of the other end of the sliding rod 55 exceeds that of the upper plate 51, and the clamping spring 56 is sleeved on the sliding rod 55 and positioned between the upper plate 51 and the clamping plate 54; in order to ensure sufficient friction between the clamping plate 54 and the cable to clamp the cable, a rubber pad 53 is provided on the side of the clamping plate 54 adjacent to the lower plate 52.
Referring to fig. 3, in order to ensure the stability and operability of the clamping, each clamping mechanism 5 is provided with two sliding rods 55 respectively disposed at both ends of the clamping plate 54, and one ends of the plurality of sliding rods 55 beyond the upper plate 51 are connected by the pulling mechanism 7. Specifically, the pulling mechanism 7 comprises a pull rod 71, a connecting rod 75 and a side connecting rod 76, the ends of two sliding rods 55 located in the same clamping mechanism 5 are connected by the connecting rod 75, two ends of the pull rod 71 are respectively connected to the middle sections of the connecting rods 75 on two sides, one end of the side connecting rod 76 is connected to the end of the connecting rod 75, and the other end is connected to the pull rod 71, so that a triangular structure is formed, the pulling mechanism 7 is stably connected with the clamping mechanism 5, and clamping work is completed; and the lower side of the pull rod 71 is provided with anti-skid grains, so that the pull rod 71 can be controlled more stably and conveniently by operators.
The clamping plates 54 on the two sides of the main bin body 1 in the embodiment are controlled by one pull rod 71 through the slide rods 55 on the four corners of the main bin body and the connecting rods 75 connected with the slide rods, so that the synchronous action in the vertical direction is realized, an operator only needs to control the pull rod 71 to clamp and release cables, the operation is simple and convenient, the clamping is stable, and the clamping of a plurality of cables can be realized at one time.
With reference to fig. 2 and 4, the moving mechanism 6 is disposed outside the main cabin body 1 to support the main cabin body 1 to move, and includes a connecting block 61, a roller 63, a roller 65 and a damping assembly 66, the connecting block 61 is fixed at four corners of the main cabin body 1, a connecting groove 62 is disposed in the connecting groove, the roller 63 is mounted in the connecting groove 62 through the roller 65 to support the main cabin body 1 to move, and a rubber sleeve 64 is sleeved on the roller 63 to improve the stability during moving.
The damping components 66 are arranged on two sides of the roller 65 and comprise sliding holes 661, connecting holes 662, supporting rods 663 and damping springs 664; the sliding holes 661 are arranged on two sides of the connecting block 61, the roller 65 can move along the sliding holes 661 in the vertical direction, the connecting holes 662 are arranged at two ends of the roller 65, one end of the support rod 663 is fixed at one end of the sliding hole 661, and the other end of the support rod 663 penetrates through the connecting holes 662 and is fixed at the other end of the sliding hole 661; the strut 663 is sleeved with a damping spring 664. When the ground is uneven, the rolling shaft 65 moves along the vertical direction, and the vibration of the main bin body 1 is reduced through the damping spring 664, so that the stability of the main bin body 1 during moving is further improved, and the stable clamping cable is guaranteed.
Example 2
The cable laying traction device for intelligent pipe gallery construction in this embodiment is basically the same as that in embodiment 1, except that the pulling mechanism 7 further includes a side plate 72 and a pulling handle 74.
Referring to fig. 1 and 2, the two side plates 72 are fixed to the top of the main cabin 1 at a certain distance, the top ends of the two side plates 72 are connected by a pull handle 74, the side plates 72 are provided with side sliding holes 73, and the pull rod 71 passes through the side sliding holes 73 and can move up and down in the side sliding holes 73.
The operation personnel on the one hand can drive the whole device to move to the required position through the pull handle 74 to finish the traction work, on the other hand, the pull handle 74 is used for helping, the clamping work is finished by the more convenient control pull rod 71, and the whole operation is simple and labor-saving.
Example 3
The cable laying and traction method for intelligent pipe gallery construction in the embodiment uses the traction device in the embodiment 2, and comprises the following steps:
step one, pulling the connecting rod 75 upwards to separate the clamping plate 54 from the lower plate 52, placing the cable between two adjacent baffle plates 2, and enabling the cable to pass through the whole main cabin body 1;
step two, the connecting rod 75 is put down, the clamping plate 54 is close to the lower plate 52 under the action of the clamping spring 56, and the cable is clamped and fixed; manually holding the pull handle 74 to move the entire device to a desired position;
and step three, after the destination is reached, the connecting rod 75 is pulled upwards, and the whole device is pushed to move continuously, so that the cable is separated from the device.
When the cable passes through the whole main cabin body 1, the cable can be clamped by the clamping plates 54 positioned at the two sides of the main cabin body 1, and the clamping plates 54 at the two sides synchronously act under the control of one pull rod 71, so that the cable can be stably clamped and quickly released.
The present invention and its embodiments have been described above schematically, and the description is not limited thereto, and what is shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. Therefore, if the person skilled in the art receives the teaching of the present invention, without departing from the inventive spirit of the present invention, the person skilled in the art should also design the similar structural modes and embodiments without creativity to the technical solution, and all shall fall within the protection scope of the present invention.

Claims (9)

1. The utility model provides a draw gear is laid with cable to wisdom piping lane construction, includes the main storehouse body (1), its characterized in that: the device also comprises a clamping mechanism (5) and a moving mechanism (6); the clamping mechanism (5) comprises a clamping plate (54) and a sliding rod (55), wherein the clamping plate (54) is connected with the sliding rod (55) and moves in a reciprocating manner in the main bin body (1) along with the sliding rod (55); the cable penetrates through the main bin body (1) and is clamped and fixed through the clamping mechanism (5); the moving mechanism (6) is arranged outside the main cabin body (1) and is used for bearing the main cabin body (1) to move.
2. The cable laying and pulling device for intelligent pipe gallery construction according to claim 1, characterized in that: the clamping mechanism (5) further comprises an upper plate (51), a lower plate (52) and clamping springs (56), the upper plate (51) and the lower plate (52) are respectively arranged on two sides of the main cabin body (1), holes are formed in the upper plate (51), the sliding rods (55) penetrate through the holes, the clamping plates (54) are fixed at one ends, close to the lower plate (52), of the sliding rods (55), the clamping springs (56) are sleeved on the sliding rods (55) and arranged between the upper plate (51) and the clamping plates (54), and the clamping plates (54) are abutted to the lower plate (52).
3. The cable laying and pulling device for intelligent pipe gallery construction according to claim 2, characterized in that: the clamping mechanisms (5) are provided with two groups, the two groups are respectively positioned at two sides of the main cabin body (1), one ends of the sliding rods (55) at two sides extend out of holes of the upper plate (51) and are connected through the pulling mechanism (7), and the pulling mechanism (7) controls the clamping mechanisms (5) to clamp.
4. The cable laying and pulling device for intelligent pipe gallery construction according to claim 3, characterized in that: the main bin body (1) is provided with a plurality of baffles (2) along the width direction, each baffle (2) is provided with a plurality of auxiliary holes (3) along the length direction, and auxiliary rollers (4) are arranged in the auxiliary holes (3).
5. The cable laying and pulling device for intelligent pipe gallery construction according to claim 4, characterized in that: and a rubber pad (53) is laid on one surface of the clamping plate (54) close to the lower plate (52).
6. The cable laying and pulling device for intelligent pipe gallery construction according to claim 5, characterized in that: the moving mechanism (6) comprises a connecting block (61), a roller (63) and a roller (65); the connecting block (61) is arranged outside the main bin body (1), a connecting groove (62) is formed in the connecting block, the roller (63) is installed in the connecting groove (62) through a roller (65), and a rubber sleeve (64) is sleeved on the roller (63).
7. The cable laying and pulling device for intelligent pipe gallery construction according to claim 6, characterized in that: the moving mechanism (6) is also internally provided with a damping assembly (66), the damping assembly (66) comprises sliding holes (661) formed in two sides of the connecting block (61), the rolling shaft (65) can move along the sliding holes (661), two ends of the rolling shaft are provided with connecting holes (662), one end of a supporting rod (663) of the damping assembly (66) is fixed at one end of the sliding hole (661), and the other end of the supporting rod penetrates through the connecting holes (662) and is fixed at the other end of the sliding hole (661); the support rod (663) is sleeved with a damping spring (664).
8. The cable laying and pulling device for intelligent pipe gallery construction according to claim 7, characterized in that: the pulling mechanism (7) comprises a pull rod (71), a connecting rod (75) and a side connecting rod (76); two groups of clamping mechanisms (5) are arranged on two sides of the main cabin body (1), each group comprises two slide bars (55), the top ends of the two slide bars (55) are connected through a connecting rod (75), and the connecting rods (75) on the two sides are connected through a pull rod (71); one end of the side connecting rod (76) is fixed on the pull rod (71), and the other end is fixed at the end of the connecting rod (75).
9. The cable laying and pulling device for intelligent pipe gallery construction according to claim 8, characterized in that: pulling mechanism (7) still include curb plate (72) and pull handle (74), curb plate (72) be provided with two, fix at main storehouse body (1) top surface both ends, connect by pull handle (74) again, seted up sideslip hole (73) on curb plate (72), pull rod (71) pass in sideslip hole (73).
CN202020926532.9U 2020-05-26 2020-05-26 Traction device is laid with cable to construction of wisdom piping lane Active CN211930122U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020926532.9U CN211930122U (en) 2020-05-26 2020-05-26 Traction device is laid with cable to construction of wisdom piping lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020926532.9U CN211930122U (en) 2020-05-26 2020-05-26 Traction device is laid with cable to construction of wisdom piping lane

Publications (1)

Publication Number Publication Date
CN211930122U true CN211930122U (en) 2020-11-13

Family

ID=73320201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020926532.9U Active CN211930122U (en) 2020-05-26 2020-05-26 Traction device is laid with cable to construction of wisdom piping lane

Country Status (1)

Country Link
CN (1) CN211930122U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111431100A (en) * 2020-05-26 2020-07-17 中国十七冶集团有限公司 A kind of cable laying traction device and traction method for smart pipe gallery construction
CN118300003A (en) * 2024-06-05 2024-07-05 山东卓力电器有限公司 Outdoor cable branch box

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111431100A (en) * 2020-05-26 2020-07-17 中国十七冶集团有限公司 A kind of cable laying traction device and traction method for smart pipe gallery construction
CN118300003A (en) * 2024-06-05 2024-07-05 山东卓力电器有限公司 Outdoor cable branch box

Similar Documents

Publication Publication Date Title
CN110803589B (en) Cable winding and unwinding and hoisting integrated combination vehicle
CN211930122U (en) Traction device is laid with cable to construction of wisdom piping lane
CN107013080A (en) A kind of power network electric pole erection construction method
CN207209811U (en) A kind of cable channel cover plate carrier
CN107601345A (en) A kind of anti-skidding power equipment installation lifting apparatus
CN114473344A (en) Auxiliary positioning device for welding large-diameter reinforcement cage based on building construction
CN209104652U (en) A combined device for transfer and installation of indoor armored switchgear
CN205241171U (en) Play crane with adjustable transformer substation storage cell's Z type is exclusively used in
CN210558505U (en) Environment-friendly energy-saving type pay-off device for wireless communication technology
CN204508689U (en) A kind of apparatus for automatically lifting of field work power transformation box
CN211034762U (en) Cable retractable and lifting integrated vehicle
CN202962978U (en) Pipeline alkali removal machine
CN111431100A (en) A kind of cable laying traction device and traction method for smart pipe gallery construction
CN209366214U (en) Trolleys for transporting electrical equipment
CN207404766U (en) A kind of anti-skidding power equipment installation lifting apparatus
CN205048321U (en) Portable storehouse face illumination beacon
CN212609417U (en) A functional mobile cable trench cover opening car
CN111071859B (en) Cable penetrating device and penetrating method
CN118554335B (en) Cable laying bracket
CN211619666U (en) Cable take-up and pay-off device for electric power construction
CN202094530U (en) Moving pulley for reeling and unreeling overhead cables in bypass operation
CN107337113A (en) A kind of cable channel cover plate carrier
CN217984464U (en) Direction device mechanism for cable laying
CN210366370U (en) Cable coiling device for electric power engineering construction
CN213770875U (en) A power line collection device for cable laying and its auxiliary mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant