CN211902387U - Conversion structure of gate valve of underground mine water pump pipeline - Google Patents

Conversion structure of gate valve of underground mine water pump pipeline Download PDF

Info

Publication number
CN211902387U
CN211902387U CN202020438053.2U CN202020438053U CN211902387U CN 211902387 U CN211902387 U CN 211902387U CN 202020438053 U CN202020438053 U CN 202020438053U CN 211902387 U CN211902387 U CN 211902387U
Authority
CN
China
Prior art keywords
pipeline
water pump
pipe
drainage
underground mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020438053.2U
Other languages
Chinese (zh)
Inventor
苟大彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Mining Co Ltd
Original Assignee
Pangang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Mining Co Ltd filed Critical Pangang Group Mining Co Ltd
Priority to CN202020438053.2U priority Critical patent/CN211902387U/en
Application granted granted Critical
Publication of CN211902387U publication Critical patent/CN211902387U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

本实用新型涉及井下矿山水泵装备领域,尤其是一种灵活实现排水调节,从而保证排水顺利进行的井下矿山水泵管道闸阀转换结构,包括第一管道,第一管道的一端设置有第一水泵,包括第二管道,第二管道一端设置有第二水泵,第一管道与第二管道之间通过连接管连通,连接管一端通过第一管道电转换阀与第一管道连通,连接管另一端通过第二管道电转换阀与第二管道连通。在实际使用时,可以通过第一管道电转换阀以及第二管道电转换阀的灵活切换进行应对,从而实现紧急移动或者增加水泵排水。同时,该井下矿山水泵管道闸阀转换结构也能确保任何情况井下排水设施均可以正常使用,排水能力始终不降低。本实用新型尤其适用于井下矿山排水系统之中。

Figure 202020438053

The utility model relates to the field of underground mine water pump equipment, in particular to a gate valve conversion structure for an underground mine water pump pipeline which can flexibly realize drainage regulation to ensure smooth drainage, comprising a first pipeline, and one end of the first pipeline is provided with a first water pump, comprising: The second pipe, one end of the second pipe is provided with a second water pump, the first pipe and the second pipe are connected through a connecting pipe, one end of the connecting pipe is connected with the first pipe through the first pipe electric conversion valve, and the other end of the connecting pipe is connected with the first pipe. The two-pipe electrical conversion valve communicates with the second pipe. In actual use, it can be dealt with by flexible switching of the first pipeline electric conversion valve and the second pipeline electric conversion valve, so as to realize emergency movement or increase water pump drainage. At the same time, the gate valve conversion structure of the underground mine pump pipeline can also ensure that the underground drainage facilities can be used normally in any situation, and the drainage capacity will not be reduced. The utility model is especially suitable for the underground mine drainage system.

Figure 202020438053

Description

井下矿山水泵管道闸阀转换结构Conversion structure of gate valve of underground mine water pump pipeline

技术领域technical field

本实用新型涉及井下矿山水泵装备领域,尤其是一种井下矿山水泵管道闸阀转换结构。The utility model relates to the field of underground mine water pump equipment, in particular to an underground mine water pump pipeline gate valve conversion structure.

背景技术Background technique

排水管道的管径要与水泵能力以及与总设计排水能力相匹配。水泵的选型要依据扬程、排量和匹配的管径以及电动机类型、电压等综合分析确定。一般井下矿山主要排水设备应包括工作水泵、备用水泵和检修水泵。工作水泵应能在20h内排出一昼夜正常涌水量;工作水泵和备用水泵应能在20h内排出一昼夜设计最大涌水量。备用水泵能力不小于工作水泵能力的50%;检修水泵能力不小于工作水泵能力的25%。就应设工作排水管路和备用排水管路而言,一般工作排水管路应能配合工作水泵在20h内排出一昼夜正常涌水量;全部排水管路应能配合工作水泵和备用水泵在20h内排出一昼夜设计最大涌水量。任意一条排水管路检修时,其他排水管路应能完成正常排水任务。The diameter of the drainage pipe should match the capacity of the pump and the total designed drainage capacity. The selection of the water pump should be determined according to the comprehensive analysis of lift, displacement and matching pipe diameter, as well as motor type and voltage. Generally, the main drainage equipment in underground mines should include working water pumps, standby water pumps and maintenance water pumps. The working water pump should be able to discharge the normal water influx of one day and night within 20 hours; the working water pump and the standby water pump should be able to discharge the maximum designed water inflow volume for one day and night within 20 hours. The capacity of the standby water pump is not less than 50% of the capacity of the working water pump; the capacity of the maintenance water pump is not less than 25% of the capacity of the working water pump. As far as the working drainage pipeline and the standby drainage pipeline should be set up, the general working drainage pipeline should be able to cooperate with the working water pump to discharge the normal water inflow in one day and night within 20 hours; all the drainage pipelines should be able to cooperate with the working water pump and the standby water pump to discharge within 20 hours. The maximum water inflow is designed for one day and night. When any one of the drainage pipelines is overhauled, the other drainage pipelines should be able to complete the normal drainage tasks.

但是,现有的排水系统在工作排水管路或者备用排水管路任意管路出现偶然停运故障及管道意外损坏,以及雨季水仓容量不足导致的淹没水泵危险时,往往难以解决由此带来的安全以及排水问题,难以有效保证排水的顺利进行。However, the existing drainage system is often difficult to solve when the working drainage pipeline or any pipeline of the standby drainage pipeline has accidental shutdown failure and accidental damage to the pipeline, as well as the danger of submerged water pumps caused by insufficient sump capacity in the rainy season. It is difficult to effectively ensure the smooth progress of drainage.

实用新型内容Utility model content

本实用新型所要解决的技术问题是提供一种灵活实现排水调节,从而保证排水顺利进行的井下矿山水泵管道闸阀转换结构。The technical problem to be solved by the utility model is to provide a gate valve switching structure of the underground mine water pump pipeline which can flexibly realize the drainage adjustment, thereby ensuring the smooth drainage of the underground mine water pump.

本实用新型解决其技术问题所采用的技术方案是:井下矿山水泵管道闸阀转换结构,包括第一管道,所述第一管道的一端设置有第一水泵,包括第二管道,所述第二管道一端设置有第二水泵,所述第一管道与第二管道之间通过连接管连通,其中,连接管一端通过第一管道电转换阀与第一管道连通,连接管另一端通过第二管道电转换阀与第二管道连通。The technical solution adopted by the present utility model to solve the technical problem is as follows: a gate valve conversion structure of an underground mine water pump pipeline includes a first pipeline, and one end of the first pipeline is provided with a first water pump, including a second pipeline, and the second pipeline One end is provided with a second water pump, and the first pipeline and the second pipeline are connected through a connecting pipe, wherein one end of the connecting pipe is connected with the first pipeline through the first pipeline electrical conversion valve, and the other end of the connecting pipe is electrically connected through the second pipeline. The switching valve communicates with the second conduit.

进一步的是,所述第一管道电转换阀为三通转换闸阀。Further, the first pipeline electrical switching valve is a three-way switching gate valve.

进一步的是,所述第二管道电转换阀为三通转换闸阀。Further, the second pipeline electrical switching valve is a three-way switching gate valve.

进一步的是,所述第一水泵的进水口和第二水泵的进水口设置于同一水平面上。Further, the water inlet of the first water pump and the water inlet of the second water pump are arranged on the same horizontal plane.

本实用新型的有益效果是:在实际使用时,由于第一管道和第二管道之间为并联,当任意管路出现偶然停运故障及管道意外损坏,亦或出现雨季水仓容量不足导致的淹没水泵危险时,都可以通过第一管道电转换阀以及第二管道电转换阀的灵活切换进行应对,从而实现紧急移动或者增加水泵排水。同时,该井下矿山水泵管道闸阀转换结构也能确保任何情况井下排水设施均可以正常使用,排水能力始终不降低。本实用新型尤其适用于井下矿山排水系统之中。The beneficial effect of the utility model is: in actual use, due to the parallel connection between the first pipeline and the second pipeline, when any pipeline has accidental shutdown failure and accidental damage to the pipeline, or the water tank capacity is insufficient in the rainy season. When the water pump is in danger of being submerged, it can be dealt with by flexible switching of the first pipeline electric conversion valve and the second pipeline electric conversion valve, so as to realize emergency movement or increase the drainage of the water pump. At the same time, the gate valve conversion structure of the underground mine water pump pipeline can also ensure that the underground drainage facilities can be used normally under any circumstances, and the drainage capacity will not be reduced. The utility model is especially suitable for the underground mine drainage system.

附图说明Description of drawings

图1是本实用新型的结构示意图。Figure 1 is a schematic structural diagram of the present invention.

图中标记为:第一水泵1、第一管道11、第一管道电转换阀12、第二水泵2、第二管道21、第二管道电转换阀22、连接管3。The figures are marked as: the first water pump 1 , the first pipeline 11 , the first pipeline electric conversion valve 12 , the second water pump 2 , the second pipeline 21 , the second pipeline electric conversion valve 22 , and the connecting pipe 3 .

具体实施方式Detailed ways

下面结合附图对本实用新型进一步说明。The present utility model will be further described below in conjunction with the accompanying drawings.

如图1所示的井下矿山水泵管道闸阀转换结构,包括第一管道11,所述第一管道11的一端设置有第一水泵1,包括第二管道21,所述第二管道21一端设置有第二水泵2,所述第一管道11与第二管道21之间通过连接管3连通,其中,连接管3一端通过第一管道电转换阀12与第一管道11连通,连接管3另一端通过第二管道电转换阀22与第二管道21连通。As shown in FIG. 1 , the gate valve conversion structure of the underground mine water pump pipeline includes a first pipeline 11, one end of the first pipeline 11 is provided with the first water pump 1, and includes a second pipeline 21, and one end of the second pipeline 21 is provided with a In the second water pump 2 , the first pipeline 11 and the second pipeline 21 are connected through a connecting pipe 3 , wherein one end of the connecting pipe 3 is connected with the first pipeline 11 through the first pipeline electrical conversion valve 12 , and the other end of the connecting pipe 3 is connected with the first pipeline 11 . The electrical switching valve 22 communicates with the second pipeline 21 through the second pipeline.

在实际使用时,一般通过第一管道11即可保证正常的排水需要。此时,通过第一管道电转换阀12让排水通过第一管道11进行输送。当出现第一管道11输送故障或矿井水仓出现大量涌水,存在淹没水泵危险和最低位置水泵被淹的情况时,则可以通过第二管道电转换阀22以及第一管道电转换阀12的调节,实现水流在第一管道11和第二管道21之间的切换,从而保证水流输送的灵活性,也能更好的适应多样的生产需求。一般的,为了实现上述的灵活调节的功能,优选所述第一管道电转换阀12为三通转换闸阀。同时,也可以优选第二管道电转换阀22为三通转换闸阀。In actual use, normal drainage requirements can generally be ensured through the first pipeline 11 . At this time, the drain water is conveyed through the first pipeline 11 through the first pipeline electrical switching valve 12 . When the transmission failure of the first pipeline 11 occurs or a large amount of water gushing occurs in the mine silo, there is a danger of submerging the water pump and the water pump at the lowest position is flooded, then the second pipeline electric conversion valve 22 and the first pipeline electric conversion valve 12 can be adjusted by adjusting , to realize the switching of the water flow between the first pipeline 11 and the second pipeline 21 , thereby ensuring the flexibility of the water flow transportation and better adapting to various production needs. Generally, in order to realize the above-mentioned function of flexible adjustment, it is preferable that the first pipeline electrical switching valve 12 is a three-way switching gate valve. At the same time, it may also be preferred that the second pipeline electrical switching valve 22 is a three-way switching gate valve.

为了保证泵水的稳定性,优选所述第一水泵1的进水口和第二水泵2的进水口设置于同一水平面上。In order to ensure the stability of pumped water, preferably, the water inlet of the first water pump 1 and the water inlet of the second water pump 2 are arranged on the same horizontal plane.

本实用新型通过对现有构造较小的改造,很好的解决了原有的排水灵活性差的问题,即便出现了排水管路任意管路出现偶然停运故障及管道意外损坏时,也可以第一时间进行灵活的调节,从而保证生产顺利进行。本实用新型技术优势明显,市场推广前景十分广阔。The utility model solves the problem of poor flexibility of the original drainage by making minor modifications to the existing structure. Flexible adjustments can be made at one time to ensure smooth production. The technical advantage of the utility model is obvious, and the market promotion prospect is very broad.

Claims (4)

1.井下矿山水泵管道闸阀转换结构,包括第一管道(11),所述第一管道(11)的一端设置有第一水泵(1),其特征在于:包括第二管道(21),所述第二管道(21)一端设置有第二水泵(2),所述第一管道(11)与第二管道(21)之间通过连接管(3)连通,其中,连接管(3)一端通过第一管道电转换阀(12)与第一管道(11)连通,连接管(3)另一端通过第二管道电转换阀(22)与第二管道(21)连通。1. An underground mine water pump pipeline gate valve conversion structure, comprising a first pipeline (11), and one end of the first pipeline (11) is provided with a first water pump (1), characterized in that: it comprises a second pipeline (21), so One end of the second pipeline (21) is provided with a second water pump (2), and the first pipeline (11) and the second pipeline (21) are communicated through a connecting pipe (3), wherein one end of the connecting pipe (3) The first pipeline electrical switching valve (12) is communicated with the first pipeline (11), and the other end of the connecting pipe (3) is communicated with the second pipeline (21) through the second pipeline electrical switching valve (22). 2.如权利要求1所述的井下矿山水泵管道闸阀转换结构,其特征在于:所述第一管道电转换阀(12)为三通转换闸阀。2 . The gate valve switching structure of an underground mine water pump pipeline according to claim 1 , wherein the first pipeline electrical switching valve ( 12 ) is a three-way switching gate valve. 3 . 3.如权利要求1或2所述的井下矿山水泵管道闸阀转换结构,其特征在于:所述第二管道电转换阀(22)为三通转换闸阀。3. The gate valve switching structure of an underground mine water pump pipeline according to claim 1 or 2, characterized in that: the second pipeline electrical switching valve (22) is a three-way switching gate valve. 4.如权利要求1或2所述的井下矿山水泵管道闸阀转换结构,其特征在于:所述第一水泵(1)的进水口和第二水泵(2)的进水口设置于同一水平面上。4. The underground mine water pump pipeline gate valve switching structure according to claim 1 or 2, characterized in that: the water inlet of the first water pump (1) and the water inlet of the second water pump (2) are arranged on the same horizontal plane.
CN202020438053.2U 2020-03-30 2020-03-30 Conversion structure of gate valve of underground mine water pump pipeline Active CN211902387U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020438053.2U CN211902387U (en) 2020-03-30 2020-03-30 Conversion structure of gate valve of underground mine water pump pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020438053.2U CN211902387U (en) 2020-03-30 2020-03-30 Conversion structure of gate valve of underground mine water pump pipeline

Publications (1)

Publication Number Publication Date
CN211902387U true CN211902387U (en) 2020-11-10

Family

ID=73274657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020438053.2U Active CN211902387U (en) 2020-03-30 2020-03-30 Conversion structure of gate valve of underground mine water pump pipeline

Country Status (1)

Country Link
CN (1) CN211902387U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111306447A (en) * 2020-03-30 2020-06-19 攀钢集团矿业有限公司 Conversion structure of gate valve of underground mine water pump pipeline

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111306447A (en) * 2020-03-30 2020-06-19 攀钢集团矿业有限公司 Conversion structure of gate valve of underground mine water pump pipeline

Similar Documents

Publication Publication Date Title
CN211902387U (en) Conversion structure of gate valve of underground mine water pump pipeline
CN108786339A (en) A kind of dust-proof water injector of interior construction auto-partition of subway station
CN105780869A (en) Electronic frequency-conversion constant-pressure water supply equipment and water supply method
CN203049675U (en) Automatic exhaust and water taking device for vacuum water sucking of photovoltaic pumping system
CN105297829A (en) Multi-path water supply system
CN201354770Y (en) Cooling water circulation device for pumps
CN204676632U (en) A kind of remote monitoring type stabilizing compensation non-negative pressure method of water supply device
CN216280686U (en) Multifunctional valve combined box
CN204152745U (en) Tandem emulsion power pack
CN111306447A (en) Conversion structure of gate valve of underground mine water pump pipeline
CN108050082B (en) Combined sewage pump with novel standby pump structure
CN202152475U (en) A stabilized water supply equipment
CN116006379A (en) A method for draining water from the roof of a hydropower plant
CN207277418U (en) A kind of new subregion intelligent water supply system and water supply installation
CN203961007U (en) Building operations environmental protection cyclic water tank device
CN207362923U (en) A kind of rural area lift pumping station Simple Control System
CN204715468U (en) A kind of Intelligent silent constant pressure water supply equipment
CN203320606U (en) Mine downhole water supply system
CN219753370U (en) Variable-frequency interconnected constant-pressure water supply system with multiple water pumps
CN210315942U (en) Backflow-preventing drainage device of water collecting well
CN203238713U (en) Water supplementing device for high level cistern
CN219366254U (en) Double-water pump water supply structure
CN2560775Y (en) Pond water-pumping and water-supplying apparatus
CN207714432U (en) Emergent water tank inlet control device
CN206174045U (en) Frequency conversion deep -well pump

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant