CN211902304U - Modular staple bolt structure of high stability - Google Patents

Modular staple bolt structure of high stability Download PDF

Info

Publication number
CN211902304U
CN211902304U CN202020588708.4U CN202020588708U CN211902304U CN 211902304 U CN211902304 U CN 211902304U CN 202020588708 U CN202020588708 U CN 202020588708U CN 211902304 U CN211902304 U CN 211902304U
Authority
CN
China
Prior art keywords
fixing
chain link
connecting piece
modular
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020588708.4U
Other languages
Chinese (zh)
Inventor
周建锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Tongchuang Lihua Technology Co.,Ltd.
Original Assignee
Hangzhou Hongkang Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Hongkang Information Technology Co ltd filed Critical Hangzhou Hongkang Information Technology Co ltd
Priority to CN202020588708.4U priority Critical patent/CN211902304U/en
Application granted granted Critical
Publication of CN211902304U publication Critical patent/CN211902304U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a high-stability modular hoop structure, which comprises a hoop body and a support frame arranged on the hoop body; the hoop body comprises chain link modules, a first connecting piece, a first screw and a fastener, wherein the first connecting piece is used for connecting two adjacent chain link modules; the supporting frame comprises a connecting piece, a stable piece arranged on the connecting piece, a limiting piece and a limiting screw rod; the method is characterized in that: the inner surface and the outer surface of the chain link module are concentric inner arc surfaces and outer arc surfaces; a rubber pad is fixedly adhered to the inner arc surface; the outer cambered surface is also provided with a plurality of parallel connecting columns. The utility model is simple to disassemble and install and easy to operate, and can adapt to various installation environments; the rubber mat is beneficial to increasing the friction force between the anchor ear and the implementation object, and has good stability and strong wind resistance; the gasket of fastener is circular-arc, still can guarantee that tapered end and gasket area of contact are enough big when the hoop body encircles the unable alignment of back fastener on implementing the object, reinforcing overall structure intensity.

Description

Modular staple bolt structure of high stability
[ technical field ] A method for producing a semiconductor device
The utility model relates to a communication staple bolt technical field, in particular to modular staple bolt structure of high stability.
[ background of the invention ]
Present current network is often 2G, 3G, the base station is built in 4G sharing, most day feeder scene has taken original single-pipe tower platform to full, if need increase antenna or dilatation, on-the-spot transformation is very difficult, municipal construction's light pole, platforms such as control pole, can't use modes such as welding to install additional the platform, embrace the pole etc. can only install miniaturized base station, some websites do not satisfy the construction demand, consequently when increasing equipment, need use the staple bolt to fix the equipment that increases on single-pipe tower, light pole etc.. The existing anchor ear has a single structure, can only meet the requirements of the diameters of a few fixed towers or rods, and cannot adjust the inner diameter; the equipment installation direction is single, and the equipment installation direction is fixed after the hoop is fixed, so that the device can not adapt to various installation environments; the anchor ear is fixed with the tower or the pole through the pressure between the two, has not enough, the phenomenon that the anchor ear droops behind the permanent.
[ summary of the invention ]
The utility model aims at solving the above problems and providing a modular staple bolt structure of high stability.
In order to achieve the above purpose, the utility model provides a following technical scheme: a high-stability modular hoop structure comprises a hoop body and a support frame arranged on the hoop body; the hoop body comprises chain link modules, a first connecting piece, a first screw and a fastener, wherein the first connecting piece is used for connecting two adjacent chain link modules; the number of the chain link modules is multiple; the chain link modules are connected with each other in a matched mode through a plurality of connecting pieces I and a screw rod I; the supporting frame comprises a connecting piece, a stable piece arranged on the connecting piece, a limiting piece and a limiting screw rod; the connecting piece is fixedly connected with the stable piece through a bolt; the method is characterized in that: the inner surface and the outer surface of the chain link module are concentric inner arc surfaces and outer arc surfaces; a rubber pad is fixedly adhered to the inner arc surface; the outer cambered surface is also provided with a plurality of parallel connecting columns.
Preferably, the middles of the inner arc surface and the outer arc surface are hollow, and reinforcing ribs are arranged in hollow areas.
Preferably, the upper side and the lower side of the rubber gasket are respectively provided with a clamping block, and the clamping blocks are clamped in the reinforcing ribs; and the outer arc surface of the chain link module is provided with a fixing screw for radially fixing the clamping block.
Preferably, the fastener comprises a lock head, a gasket, a second connecting sheet for connecting the lock head and the chain link module, a fixing screw and a fixing nut; the outer side of the lock head is a concave cambered surface; the lock head, the gasket, the fixing nut and the connecting piece II are provided with two groups.
Preferably, one side of the gasket, which is connected with the lock head, is an outward convex cambered surface matched with the lock head, and the other side of the gasket is provided with a groove matched with the diameter of the fixing nut; the fixing screw penetrates through the two groups of lock heads and the gasket and is fixed through the fixing nut.
Preferably, a square limiting hole is formed in the fixing position of the connecting piece and the fixing piece.
Preferably, the limit screw is connected with the stable part and the limit part; and locking nuts are arranged at two ends of the limiting screw rod.
Preferably, the inner side of the limiting member is provided with a fixing groove for conveniently locking the equipment carrier.
Preferably, the connecting piece is provided with a screw hole matched with the connecting column; the connecting piece is fixedly connected with the connecting column through a second screw rod.
The utility model has the advantages that: the disassembly and the assembly are simple and easy to operate, the number of the chain links can be changed according to the diameter of an implementation object, and the support frame can be arranged in each direction of the hoop body, so that the high-stability modular hoop structure can adapt to various assembly environments; the rubber pad is arranged on the inner side of each chain link, so that the friction force between the hoop and an implementation object is increased, the stability is good, and the wind resistance is strong; the gasket of fastener cooperatees with the tapered end and is circular-arc, still can guarantee that tapered end and gasket area of contact are enough big when the hoop body encircles the unable alignment of back fastener on implementing the object, reinforcing overall structure intensity.
[ description of the drawings ]
Fig. 1 is a top view of the present invention;
FIG. 2 is a schematic diagram of the chain link structure of the present invention;
FIG. 3 is a schematic view of the fastener structure of the present invention;
fig. 4 is a schematic view of the structure of the connecting member of the present invention.
Illustration of the drawings: 1. a hoop body; 11. a chain link module; 111. an intrados surface; 112. an outer arc surface; 113. reinforcing ribs; 114. a rubber pad; 1141. a clamping block; 115. connecting columns; 116. fixing screws; 12. connecting a first sheet; 13. a first screw rod; 14. a fastener; 141. a lock head; 1411. an inner concave cambered surface; 142. a gasket; 1421. a convex cambered surface; 1422. a groove; 143. a second connecting sheet; 144. fixing the screw rod; 145. fixing a nut; 2. a support frame; 21. a connecting member; 211. a square limiting hole; 212. a screw hole; 213. a second screw; 22. a stabilizing member; 23. a limiting member; 231. fixing grooves; 24. a limit screw; 25. and locking the nut.
[ detailed description ] embodiments
The following describes a high-stability modular hoop structure according to the present invention with reference to the accompanying drawings.
As shown in fig. 1-4, the modular hoop structure with high stability of the present embodiment includes a hoop body 1, a support frame 2 mounted on the hoop body 1; the hoop body 1 comprises chain link modules 11, a connecting piece I12 for connecting two adjacent chain link modules 11, a screw rod I13 and a fastener 14; a plurality of chain link modules 11 are arranged; the chain link modules are connected with each other in a matched manner through a plurality of connecting pieces I12 and a screw rod I13; the support frame 2 comprises a connecting piece 21, a fixing piece 22 arranged on the connecting piece 21, a limiting piece 23 and a limiting screw rod 24; the connecting piece 21 is fixedly connected with the fixing piece 22 through bolts; the method is characterized in that: the inner and outer surfaces of the chain link module 11 are concentric inner arc surface 111 and outer arc surface 112; a rubber pad 114 is fixedly adhered to the inner arc surface 111; the outer arc surface 112 is further provided with a plurality of parallel connecting columns 115; the middle of the inner arc surface 111 and the middle of the outer arc surface 112 are hollow, and a reinforcing rib 113 is arranged in the hollow area; a clamping block 1141 is arranged on the upper side and the lower side of the rubber pad 114, and the clamping block 1141 is clamped in the reinforcing rib 113; the outer arc surface 112 of the link module 11 is provided with a fixing screw 116 for radially fixing the clamping block 1141; the fastener 14 comprises a lock head 141, a gasket 142, a second connecting sheet 143 for connecting the lock head 141 and the link module 11, a fixing screw 144 and a fixing nut 145; the outer side of the lock head 141 is an inward concave cambered surface 1411; two groups of locking heads 141, gaskets 142, fixing nuts 145 and connecting pieces 143 are arranged; one side of the gasket 142 connected with the lock head 141 is an outward convex cambered surface 1421 matched with the lock head 141, and the other side is provided with a groove 1422 matched with the diameter of the fixing nut 145; the fixing screw 144 passes through the two groups of locking heads 141 and the gasket 142 and is fixed by a fixing nut 145; a square limiting hole 211 is formed in the fixing position of the connecting piece 21 and the fixing piece 22; the limit screw 24 is connected with the stable part 22 and the limit part 23; locking nuts 25 are arranged at two ends of the limiting screw 24; a fixing groove 231 convenient for locking the equipment carrier is arranged on the inner side of the limiting piece 23; the connecting piece 21 is provided with a screw hole 212 matched with the connecting column 115; the connecting piece 21 is fixedly connected with the connecting column 115 through a second screw 213.
When the chain link module is used, the hoop body 1 and the support frame 2 are pre-installed, the rubber pad 114 is adhered to the inner arc surface 111 of the chain link module 11, the clamping block 1141 is clamped in the reinforcing rib 113, and the fixing screw 116 penetrates through the outer arc surface 112 to radially fix the clamping block 1141; determining the number of the required chain link modules 11 according to implementation objects, hinging a plurality of chain link modules 11 together by using a connecting piece I12 and a screw rod I13, and connecting a lock head 141 with the chain link modules 11 at two ends of the hoop body 1 by using a connecting piece II 143; the connecting piece 21 and the fixing piece 22 are fixed together through bolts, the bolts can be clamped through the square limiting holes 211 on the connecting piece 21, the connecting piece 21 and the fixing piece 22 do not rotate relatively, then the limiting screw 24 penetrates through the fixing piece 22 and the limiting piece 23, and two ends of the limiting screw are fixed through the locking nuts 25, so that the fixing piece 22 and the limiting piece 23 are connected together. When the hoop body 1 is installed on an implementation object, the hoop body 1 is firstly encircled on the implementation object, then the fixing screw 144 penetrates through two groups of lock heads 141 and gaskets 142, two ends of the hoop body are fixed by fixing nuts 145, the fixing nuts 145 are clamped in the grooves 1422 of the gaskets 142, so that the hoop body 1 can be tightly clamped on the implementation object, the support frame 2 is fixed on the connecting column 115 of the link module 11 by using the second screw 213, the holding pole is clamped between the two limiting screws 24 of the support frame 2, the locking nut 25 is rotated until the holding pole can be tightly fixed in the fixing groove 231 of the limiting part 23, and finally equipment needing to be added is installed on the holding pole. In the utility model, the hoop body 1 is composed of a plurality of chain link modules 11, the disassembly and the installation are simple and easy to operate, the number of the chain link modules 11 can be changed according to the diameter of an implementation object, each chain link module 11 of the hoop body 1 is provided with a connecting column 115, and the support frame 2 can be installed in each direction of the hoop body 1, so that the high-stability modular hoop structure can adapt to various installation environments; the inner side of each chain link module 11 is provided with a rubber cushion 114, so that the friction force between the hoop and an implementation object can be increased, the stability is good, and the wind resistance is strong; because the gasket 142 of the fastener 14 is matched with the lock head 141 in an arc shape, when the fastener 14 cannot be aligned after the hoop body 1 is surrounded on an implementation object, the contact area between the lock head 141 and the gasket 142 can be ensured to be large enough, and the overall structural strength is enhanced.
The above-mentioned embodiment is right the utility model discloses an explanation, it is not right the utility model discloses a limited, any right the scheme after the simple transform of the utility model all belongs to the protection scope of the utility model.

Claims (9)

1. A high-stability modular hoop structure comprises a hoop body (1) and a support frame (2) arranged on the hoop body (1); the hoop body (1) comprises chain link modules (11), a connecting piece I (12) for connecting two adjacent chain link modules (11), a screw rod I (13) and a fastener (14); the chain link modules (11) are provided with a plurality of chain link modules; the chain link modules are connected with each other in a matching way through a plurality of connecting pieces I (12) and a screw rod I (13); the support frame (2) comprises a connecting piece (21), a fixing piece (22) arranged on the connecting piece (21), a limiting piece (23) and a limiting screw rod (24); the connecting piece (21) is fixedly connected with the stable piece (22) through a bolt; the method is characterized in that: the inner surface and the outer surface of the chain link module (11) are concentric inner arc surfaces (111) and outer arc surfaces (112); a rubber pad (114) is fixedly adhered to the inner arc surface (111); the extrados surface (112) is also provided with a plurality of parallel connecting columns (115).
2. The modular hoop structure of claim 1, wherein: the middle of the inner arc surface (111) and the middle of the outer arc surface (112) are hollow, and reinforcing ribs (113) are arranged in the hollow areas.
3. The modular hoop structure of claim 1, wherein: clamping blocks (1141) are arranged on the upper side and the lower side of the rubber pad (114), and the clamping blocks (1141) are clamped in the reinforcing ribs (113); and a fixing screw (116) for radially fixing the clamping block (1141) is arranged on the outer arc surface (112) of the chain link module (11).
4. The modular hoop structure of claim 1, wherein: the fastener (14) comprises a lock head (141), a gasket (142), a second connecting piece (143) for connecting the lock head (141) and the link module (11), a fixing screw rod (144) and a fixing nut (145); the outer side of the lock head (141) is an inwards concave cambered surface (1411); two groups of locking heads (141), gaskets (142), fixing nuts (145) and connecting pieces II (143) are arranged.
5. The modular hoop structure of claim 4, wherein: one side of the gasket (142) connected with the lock head (141) is an outward convex cambered surface (1421) matched with the lock head (141), and the other side of the gasket is provided with a groove (1422) matched with the diameter of the fixing nut (145); the fixing screw rod (144) penetrates through the two groups of lock heads (141) and the gasket (142) and is fixed through the fixing nut (145).
6. The modular hoop structure of claim 1, wherein: and a square limiting hole (211) is formed in the fixing position of the connecting piece (21) and the fixing piece (22).
7. The modular hoop structure of claim 1, wherein: the limiting screw rod (24) is connected with the stable part (22) and the limiting part (23); and locking nuts (25) are arranged at two ends of the limiting screw rod (24).
8. The modular hoop structure of claim 1, wherein: the inner side of the limiting part (23) is provided with a fixing groove (231) convenient for locking the equipment carrier.
9. The modular hoop structure of claim 1, wherein: the connecting piece (21) is provided with a screw hole (212) matched with the connecting column (115); the connecting piece (21) is fixedly connected with the connecting column (115) through a second screw rod (213).
CN202020588708.4U 2020-04-20 2020-04-20 Modular staple bolt structure of high stability Active CN211902304U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020588708.4U CN211902304U (en) 2020-04-20 2020-04-20 Modular staple bolt structure of high stability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020588708.4U CN211902304U (en) 2020-04-20 2020-04-20 Modular staple bolt structure of high stability

Publications (1)

Publication Number Publication Date
CN211902304U true CN211902304U (en) 2020-11-10

Family

ID=73277057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020588708.4U Active CN211902304U (en) 2020-04-20 2020-04-20 Modular staple bolt structure of high stability

Country Status (1)

Country Link
CN (1) CN211902304U (en)

Similar Documents

Publication Publication Date Title
CN211902304U (en) Modular staple bolt structure of high stability
CN109378570B (en) Safe and reliable's network basic station antenna erection support
CN112937785A (en) Floating type water surface photovoltaic array multidimensional flexible connection system in alpine region
CN212643244U (en) Staple bolt structure that fastening strength is high
CN216390860U (en) Multidirectional supporting steel cable photovoltaic support
CN212653364U (en) Ground screw height adjusting device
CN211351566U (en) Cable fixation clamp convenient to installation
CN209823693U (en) Roof photovoltaic support that can install fast
CN219013922U (en) Three-pipe tower pole mounting device
CN220935050U (en) Photovoltaic module fixed knot constructs and photovoltaic system
CN220769042U (en) Electric power iron tower that resistance to wind is good
CN222884324U (en) A safety connection device for high voltage line erection
CN216840902U (en) Connecting structure of existing angle steel tower and base station equipment
CN218952631U (en) Photovoltaic module anchor suitable for air film structure
CN212960191U (en) A support for electromechanical pipeline installation for spatial grid structure
CN206460756U (en) pole mounting bracket
CN211557207U (en) Solar panel support frame
CN214364085U (en) Steel construction pipe truss constructional device
CN211289954U (en) Lamp mounting device
CN216648581U (en) Pole support is embraced to communication tower antenna
CN220319197U (en) Film structure trompil department correction fixing device
CN221372511U (en) Steel column structure connecting assembly
CN215717800U (en) Rail guard is used in public road bridge roof beam construction
CN115839182B (en) Single-tube tower prestressed steel strand reinforced structure
CN222721397U (en) Photovoltaic equipment and self-balancing photovoltaic bracket thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210510

Address after: 311411 3rd floor, No.2 Taiyangshan Road, Changkou Town, Fuyang District, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou Tongchuang Lihua Technology Co.,Ltd.

Address before: Room 381, 16-18 Chezhan South Road, Yunfeng community, Pengbu Town, Jianggan District, Hangzhou, Zhejiang 310000

Patentee before: HANGZHOU HONGKANG INFORMATION TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right