CN211898116U - An on-site dust suppression device for earthwork excavation - Google Patents

An on-site dust suppression device for earthwork excavation Download PDF

Info

Publication number
CN211898116U
CN211898116U CN202020187139.2U CN202020187139U CN211898116U CN 211898116 U CN211898116 U CN 211898116U CN 202020187139 U CN202020187139 U CN 202020187139U CN 211898116 U CN211898116 U CN 211898116U
Authority
CN
China
Prior art keywords
water
plate
dust suppression
suppression device
water conduit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020187139.2U
Other languages
Chinese (zh)
Inventor
梁玉坤
贺晟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 3 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 3 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 3 Engineering Co Ltd filed Critical China Gezhouba Group No 3 Engineering Co Ltd
Priority to CN202020187139.2U priority Critical patent/CN211898116U/en
Application granted granted Critical
Publication of CN211898116U publication Critical patent/CN211898116U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本实用新型公开了一种土方开挖的现场降尘装置,包括竖向导水管以及与安装在所述竖向导水管上的横向导水管,所述竖向导水管的一端为进水端连接进水,另一端为出水端与所述横向导水管进水口连通,所述横向导水管的两端均设置有喷头,且所述横向导水管的内壁设置有第一导流板和第二导流板,所述第一导流板与所述第二导流板对高压水进行导流,使喷头内部产生水流压带动横向导水管旋转,喷头进行喷洒。本实用新型的第一导流板和第二导流板使喷头内部产生水流压带动横向导水管自身产生旋转,从而将水源进行全方位喷洒,达到更好的降尘效果。

Figure 202020187139

The utility model discloses an on-site dust suppression device for earthwork excavation, which comprises a vertical water guide pipe and a horizontal water guide pipe installed on the vertical water guide pipe. One end is the water outlet end and communicates with the water inlet of the horizontal water guide pipe, both ends of the horizontal water guide pipe are provided with spray heads, and the inner wall of the horizontal water guide pipe is provided with a first guide plate and a second guide plate, so The first guide plate and the second guide plate guide the high-pressure water, so that the water flow pressure inside the nozzle drives the horizontal water guide pipe to rotate, and the nozzle sprays. The first guide plate and the second guide plate of the utility model make the water flow pressure inside the nozzle drive the horizontal water guide pipe itself to rotate, so as to spray the water source in all directions and achieve better dust reduction effect.

Figure 202020187139

Description

一种土方开挖的现场降尘装置An on-site dust suppression device for earthwork excavation

技术领域technical field

本实用新型涉及降尘设备技术领域,具体为一种土方开挖的现场降尘装置。The utility model relates to the technical field of dust suppression equipment, in particular to an on-site dust suppression device for earthwork excavation.

背景技术Background technique

土方开挖是工程初期以至施工过程中的关键工序。将土和岩石进行松动、破碎、挖掘并运出的工程,按岩土性质,土石方开挖分土方开挖和石方开挖,而土方开挖常常伴随大量扬尘,因此现场降尘装置是不可或缺的设备。Earth excavation is a key process in the initial stage of the project and even in the construction process. In the project of loosening, crushing, excavating and transporting soil and rocks, according to the nature of rock and soil, earthwork excavation is divided into earthwork excavation and stone excavation, and earthwork excavation is often accompanied by a large amount of dust, so on-site dust suppression devices are not available missing equipment.

但是现有的现场降尘装置存在以下问题:However, the existing on-site dust suppression devices have the following problems:

现有的现场降尘装置,在除尘的时候很难达到全方位除尘,从而出现除尘效果不佳,导致扬尘依旧有少部分存在,以此影响到周边环境。The existing on-site dust suppression device is difficult to achieve all-round dust removal during dust removal, resulting in poor dust removal effect, resulting in the existence of a small part of the dust, which affects the surrounding environment.

实用新型内容Utility model content

针对现有技术的不足,本实用新型提供了一种土方开挖的现场降尘装置,解决目前降尘装置不能全方位除尘的技术问题。Aiming at the deficiencies of the prior art, the utility model provides an on-site dust reduction device for earthwork excavation, which solves the technical problem that the current dust reduction device cannot remove dust in all directions.

为实现上述目的,本实用新型提供如下技术方案:一种土方开挖的现场降尘装置,包括竖向导水管以及安装在所述竖向导水管上的横向导水管,所述竖向导水管的一端为进水端连接进水,另一端为出水端与所述横向导水管进水口连通,所述横向导水管的两端均设置有喷头,且所述横向导水管的内壁固定设置有第一导流板和第二导流板,所述第一导流板与所述第二导流板对高压水进行导流,使喷头内部产生水流压带动横向导水管旋转,喷头进行喷洒。In order to achieve the above purpose, the present utility model provides the following technical solutions: an on-site dust suppression device for earthwork excavation, comprising a vertical water guide pipe and a horizontal water guide pipe installed on the vertical water guide pipe, and one end of the vertical water guide pipe is an inlet pipe. The water end is connected to the water inlet, and the other end is the water outlet end that communicates with the water inlet of the horizontal water conduit. Both ends of the horizontal water conduit are provided with nozzles, and the inner wall of the horizontal water conduit is fixedly provided with a first deflector. and a second guide plate, the first guide plate and the second guide plate guide the high-pressure water, so that the water flow pressure inside the nozzle drives the horizontal water guide pipe to rotate, and the nozzle sprays.

进一步的,所述第一导流板和所述第二导流板均为竖直设置,所述第一导流板与所述第二导流板相互平行设置,且所述第一导流板的未固定端与第二导流板的未固定端均远离横向导水管的进水口设置,Further, the first air guide plate and the second air guide plate are both arranged vertically, the first air guide plate and the second air guide plate are arranged parallel to each other, and the first air guide plate The unfixed end of the plate and the unfixed end of the second deflector are both arranged away from the water inlet of the transverse water conduit,

进一步的,所述第一导流板和横向导水管的轴线夹角以及所述第二导流板和横向导水管的轴线夹角相同,Further, the included angle between the axis of the first deflector and the lateral water conduit and the included angle between the axis of the second deflector and the lateral water conduit are the same,

进一步的,还包括底座,所述底座上固定安装有水箱,所述水箱内安装有水泵,所述水箱上设置有注水口和出水口,所述水泵的出水端与出水口连接,所述出水口还连接有软管,所述软管还与竖向导水管的进水端连接,所述软管将水泵输出的高压水传输至竖向导水管。Further, it also includes a base, a water tank is fixedly installed on the base, a water pump is installed in the water tank, a water injection port and a water outlet are arranged on the water tank, the water outlet of the water pump is connected with the water outlet, and the outlet The water port is also connected with a hose, the hose is also connected with the water inlet end of the vertical water conduit, and the hose transmits the high-pressure water output by the water pump to the vertical water conduit.

进一步的,所述底座上还转动连接有两个螺纹杆,所述螺纹杆的外表面螺纹连接有螺纹块,两个所述螺纹块之间连接有搭接板,所述竖向导水管固定在搭接板上,所述螺纹块在螺纹杆上的螺纹运动,实现搭接板的升降。Further, two threaded rods are also rotatably connected to the base, threaded blocks are threadedly connected to the outer surfaces of the threaded rods, and a lap plate is connected between the two threaded blocks, and the vertical water conduit is fixed on the On the overlapping plate, the thread movement of the threaded block on the threaded rod realizes the lifting and lowering of the overlapping plate.

进一步的,所述底座上还固定安装有伺服电机,所述伺服电机的输出端固定连接有第一卡齿盘,所述螺纹杆上安装有第二卡齿盘,所述第一卡齿盘与第二卡齿盘啮合连接,所述伺服电机工作带动搭接板进行升降,所述底座的底部安装有移动轮。Further, a servo motor is also fixedly installed on the base, the output end of the servo motor is fixedly connected with a first chucking plate, the threaded rod is installed with a second chucking plate, and the first chucking plate is It is meshed and connected with the second toothed plate, the servo motor works to drive the lap plate to move up and down, and a moving wheel is installed at the bottom of the base.

进一步的,所述搭接板与竖向导水管之间固定连接有斜架杆。Further, an inclined frame rod is fixedly connected between the overlapping plate and the vertical water conduit.

进一步的,所述竖向导水管与横向导水管之间通过防水轴承连接。Further, the vertical water conduit and the lateral water conduit are connected by a waterproof bearing.

进一步的,所述软管的长度大于搭接板的可移动高度。Further, the length of the hose is greater than the movable height of the overlapping plate.

进一步的,所述底座的两侧固定连接有螺母,所述螺母螺纹连接有螺杆,所述螺杆的底端设有定位板,所述定位板的底面设置有定位钉或橡胶层。Further, the two sides of the base are fixedly connected with nuts, the nuts are screwed with screws, the bottom ends of the screws are provided with positioning plates, and the bottom surfaces of the positioning plates are provided with positioning pins or rubber layers.

与现有技术相比,本实用新型至少具备以下有益效果:Compared with the prior art, the present invention has at least the following beneficial effects:

本实用新型提供了一种土方开挖的现场降尘装置,通过连接在水箱上的竖向导水管,竖向导水管与横向导水管之间活动连接,横向导水管内壁设置有两个导流板,第一导流板和第二导流板均为竖直设置,第一导流板与所述第二导流板相互平行设置,且第一导流板的未固定端与第二导流板的未固定端均远离横向导水管的进水口设置,使得横向导水管的两边受到相反方向的水压力,使横向水管自身产生旋转,让降尘装置具备全方位降尘的范围,将水源进行全方位喷洒,达到更好的降尘效果,避免周围出现扬尘,而影响周边的环境。The utility model provides an on-site dust suppression device for earthwork excavation. A vertical water guide pipe is connected to a water tank. The vertical water guide pipe and the horizontal water guide pipe are movably connected. The inner wall of the horizontal water guide pipe is provided with two guide plates. Both a deflector and a second deflector are vertically arranged, the first deflector and the second deflector are arranged in parallel to each other, and the unfixed end of the first deflector and the second deflector are The unfixed ends are set away from the water inlet of the horizontal water conduit, so that the two sides of the horizontal water conduit are subjected to water pressure in opposite directions, so that the horizontal water pipe itself rotates, so that the dust suppression device has a range of all-round dust reduction, and the water source is sprayed in all directions. To achieve a better dust reduction effect, avoid the occurrence of dust around and affect the surrounding environment.

进一步的,现有的现场降尘装置,很难根据现场情况进行相应的高度调整,使得设备的使用受到局限性,本实用新型的现场降尘装置,还设置有螺纹杆和螺纹块,伺服电机工作带动第一卡齿盘旋转,第一卡齿盘带动第二卡齿盘旋转,第二卡齿盘带动螺纹杆旋转,从而使搭接板实现升降,达到对搭接板的高度进行调节的操作,以此使横向导水管的高度产生改变,达到不同高度的喷洒需求,满足不同场合的降尘装置的需求。Further, it is difficult to adjust the height of the existing on-site dust suppression device according to the on-site situation, so that the use of the equipment is limited. The on-site dust suppression device of the present utility model is also provided with a threaded rod and a threaded block. The first chucking plate rotates, the first chucking plate drives the second chucking plate to rotate, and the second chucking plate drives the threaded rod to rotate, so that the lap plate can be lifted and lowered, and the height of the lap plate can be adjusted. In this way, the height of the horizontal water conduit can be changed to meet the spraying requirements of different heights and meet the requirements of dust suppression devices in different occasions.

进一步的,本实用新型在底座上固定连接有螺母和螺杆,通过螺杆在螺母上的螺纹运动,使螺杆上的定位板达到固定整个装置的作用,而且本实用新型还在定位板的底面设置有定位钉或橡胶层,使整个装置的稳定性得到进一步的提升。Further, the utility model is fixedly connected with a nut and a screw rod on the base, and the positioning plate on the screw rod can achieve the function of fixing the whole device through the thread movement of the screw rod on the nut, and the utility model is also provided with a bottom surface of the positioning plate. Positioning pins or rubber layers further enhance the stability of the entire device.

进一步的,本实用新型中的竖向导水管与横向导水管之间通过防水轴承连接,保证了竖向导水管与横向导水管之间的密封性,确保了竖向导水管向横向导水管传输水源时的密封性,也确保了输入横向导水管内的水源的压力,使横向导水管能对周围环境进行稳定的旋转喷洒。Further, the vertical water guide pipe and the horizontal water guide pipe in the present invention are connected by a waterproof bearing, which ensures the sealing between the vertical water guide pipe and the horizontal water guide pipe, and ensures that the vertical water guide pipe transmits the water source to the horizontal water guide pipe. The tightness also ensures the pressure of the water source input into the lateral aqueduct, so that the lateral aqueduct can stably rotate and spray the surrounding environment.

附图说明Description of drawings

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型横向导水管的结构俯剖图;Fig. 2 is the structural top sectional view of the horizontal water conduit of the present utility model;

图3为本实用新型水箱的结构示意图。FIG. 3 is a schematic structural diagram of the water tank of the present invention.

图中:1、底座;2、螺纹杆;3、螺纹块;4、搭接板;5、竖向导水管;6、横向导水管;7、喷头;8、螺母;9、水箱;10、水泵;11、连接管;12、出水口;13、注水口;14、软管;15、安装槽;16、伺服电机;17、第一卡齿盘;18、第二卡齿盘;19、移动轮;20、斜架杆;21、螺杆;22、定位板;23、第一导流板;24、第二导流板。In the figure: 1. Base; 2. Threaded rod; 3. Threaded block; 4. Overlap plate; 5. Vertical conduit; 6. Horizontal conduit; 7. Sprinkler; 8. Nut; 9. Water tank; 10. Water pump ; 11, connecting pipe; 12, water outlet; 13, water injection port; 14, hose; 15, installation slot; 16, servo motor; 17, the first chuck; 18, the second chuck; wheel; 20, inclined frame rod; 21, screw; 22, positioning plate; 23, first deflector; 24, second deflector.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

请参阅图1-3,本实用新型提供以下技术方案:一种土方开挖的现场降尘装置,包括底座1,底座1的上端通过轴承转动连接有螺纹杆2,螺纹杆2的外表面螺纹连接有螺纹块3,螺纹块3之间固定连接有搭接板4,搭接板4上安装有竖向导水管5,优选的,搭接板4与竖向导水管5之间设置有斜架杆20,斜架杆20的设计则是为了让竖向导水管5可以更稳定的与搭接板4连接,竖向导水管5的上端通过轴承转动连接有横向导水管6,横向导水管6的两端固定连接有喷头7,横向导水管6的内壁固定设置有第一导流板23和第二导流板24,所述第一导流板23和所述第二导流板24均为竖直设置,所述第一导流板23与所述第二导流板24相互平行,且所述第一导流板23的未固定端与第二导流板24的未固定端均远离横向导水管6的进水口设置,优选的,所述第一导流板23和横向导水管6轴线的夹角α以及所述第二导流板24和横向导水管6轴线的夹角β相同,其中,α和β均小于90°;底座1的上端安装有水箱9,水箱9的内部固定安装有水泵10,水泵10的出水端连接有连接管11,水箱9的上端开设有出水口12和注水口13,出水口12的上端连接有软管14,所述软管14还与竖向导水管5连接。1-3, the present utility model provides the following technical solutions: an on-site dust suppression device for earthwork excavation, comprising a base 1, the upper end of the base 1 is rotatably connected with a threaded rod 2 through a bearing, and the outer surface of the threaded rod 2 is threadedly connected There are threaded blocks 3, and a lap plate 4 is fixedly connected between the threaded blocks 3, and a vertical water conduit 5 is installed on the lap plate 4. Preferably, an inclined frame rod 20 is provided between the lap plate 4 and the vertical water conduit 5. The design of the inclined frame rod 20 is to allow the vertical aqueduct 5 to be more stably connected to the lap plate 4. The upper end of the vertical aqueduct 5 is connected to a horizontal aqueduct 6 through a bearing rotation, and the two ends of the horizontal aqueduct 6 are fixed. The sprinkler head 7 is connected, and the inner wall of the lateral water conduit 6 is fixedly provided with a first deflector 23 and a second deflector 24, and the first deflector 23 and the second deflector 24 are both vertically arranged , the first deflector 23 and the second deflector 24 are parallel to each other, and the unfixed end of the first deflector 23 and the unfixed end of the second deflector 24 are both away from the lateral water conduit 6 water inlet settings, preferably, the angle α between the first baffle 23 and the axis of the lateral water conduit 6 and the angle β between the second baffle 24 and the axis of the lateral water conduit 6 are the same, wherein, α and β are both less than 90°; a water tank 9 is installed on the upper end of the base 1, a water pump 10 is fixedly installed inside the water tank 9, the water outlet end of the water pump 10 is connected with a connecting pipe 11, and the upper end of the water tank 9 is provided with a water outlet 12 and a water injection port 13. A hose 14 is connected to the upper end of the water outlet 12, and the hose 14 is also connected to the vertical water conduit 5.

在本实施例的优选实施例中,竖向导水管5与横向导水管6之间通过防水轴承连接,所述横向导水管6与防水轴承的内圈连接,所述防水轴承的外圈与竖向导水管5连接。In the preferred embodiment of this embodiment, the vertical water conduit 5 and the horizontal water conduit 6 are connected by a waterproof bearing, the lateral water conduit 6 is connected with the inner ring of the waterproof bearing, and the outer ring of the waterproof bearing is connected with the vertical guide Water pipe 5 is connected.

本实施方案中,启动水泵10,水泵10将水箱9内部的水源通过连接管11送到软管14的内部,软管14再次将水源传递到竖向导水管5的内部,最后由竖向导水管5输送给横向导水管6,其中软管14的长度足够搭接板4产生上下移动,水源进入横向导水管6后,会在第一导流板23和第二导流板24的作用下进行导流,以此使喷头7的内部产生水流压,由于横向导水管6与竖向导水管5是通过防水轴承转动连接,此时的横向导水管6会在喷头7的配合下进行旋转喷洒。In this embodiment, the water pump 10 is activated, the water pump 10 sends the water source inside the water tank 9 to the inside of the hose 14 through the connecting pipe 11 , and the hose 14 transfers the water source to the interior of the vertical water conduit 5 again, and finally the vertical water conduit 5 It is conveyed to the lateral water conduit 6, wherein the length of the hose 14 is sufficient for the lap plate 4 to move up and down. After the water source enters the lateral water conduit 6, it will be guided under the action of the first deflector 23 and the second deflector 24. Therefore, the water flow pressure is generated inside the sprinkler head 7. Since the horizontal water conduit 6 and the vertical water conduit 5 are rotatably connected through a waterproof bearing, the horizontal water conduit 6 will rotate and spray under the cooperation of the sprinkler head 7.

具体的,底座1的上端开设有两个安装槽15,安装槽15的内部固定安装有伺服电机16,伺服电机16的输出端固定连接有第一卡齿盘17,螺纹杆2上固定连接有第二卡齿盘18。Specifically, the upper end of the base 1 is provided with two installation grooves 15 , the inner part of the installation groove 15 is fixedly installed with the servo motor 16 , the output end of the servo motor 16 is fixedly connected with a first clamping tooth plate 17 , and the threaded rod 2 is fixedly connected with a The second chuck 18 .

本实施例中,启动伺服电机16,使伺服电机16带动第一卡齿盘17产生旋转,而第一卡齿盘17啮合着第二卡齿盘18,以此使螺纹杆2产生旋转,从而使螺纹块3在螺纹杆2的外表面带动搭接板4产生上下移动,此时便可使横向导水管6的高度产生变化,达到最适的喷洒高度。In this embodiment, the servo motor 16 is activated, so that the servo motor 16 drives the first chucking plate 17 to rotate, and the first chucking plate 17 engages with the second chucking plate 18, so that the threaded rod 2 is rotated, thereby The threaded block 3 drives the lap plate 4 to move up and down on the outer surface of the threaded rod 2, and at this time, the height of the lateral water conduit 6 can be changed to achieve the optimum spraying height.

本实施例中,底座1的下端安装有移动轮19,具体的,移动轮19的设计,方便了整个设备的移动。In this embodiment, a moving wheel 19 is installed on the lower end of the base 1 . Specifically, the design of the moving wheel 19 facilitates the movement of the entire device.

本实施例中,第一卡齿盘17与第二卡齿盘18啮合连接,第一卡齿盘17与第二卡齿盘18啮合连接,使得伺服电机16可以更好的将动力传输给螺纹杆2,使得螺纹杆2更好的带动螺纹块3上下运动。In this embodiment, the first chucking plate 17 is meshed with the second chucking plate 18, and the first chucking plate 17 is meshed and connected with the second chucking plate 18, so that the servo motor 16 can better transmit power to the thread rod 2, so that the threaded rod 2 can better drive the threaded block 3 to move up and down.

本实施例中,连接管的一端与水泵10的出水端连接,连接管的另一端和出水口12的下端连接,软管的一端与出水口12的上端,软管的另一端和竖向导水管5的下端连接。In this embodiment, one end of the connecting pipe is connected to the water outlet end of the water pump 10, the other end of the connecting pipe is connected to the lower end of the water outlet 12, one end of the hose is connected to the upper end of the water outlet 12, and the other end of the hose is connected to the vertical water conduit 5 is connected to the lower end.

具体的,软管14的长度大于搭接板4的移动高度,移动轮19的设置数量为四个,且相互对称设置;其中,软管14的长度大于搭接板4的移动高度,以此不影响高度的调节,而移动轮19的设置数量为四个,使得移动更为稳定。Specifically, the length of the hose 14 is greater than the moving height of the overlapping plate 4, and the number of the moving wheels 19 is four, and they are arranged symmetrically with each other; wherein, the length of the hose 14 is greater than the moving height of the overlapping plate 4, so that The height adjustment is not affected, and the number of moving wheels 19 is four, which makes the movement more stable.

在本实施例的优选实施例中,所述底座1的两侧固定连接有螺母8,所述螺母8螺纹连接有螺杆21,所述螺杆21的底端设有定位板22,螺杆21与螺母8的螺纹运动,实现螺杆21的升降,螺杆21下降,定位板22接地,使本实用新型整体固定位置更加稳定,优选的,所述定位板22的底面设置有定位钉或橡胶层,增加定位板22与地面之间的摩擦力。In a preferred embodiment of this embodiment, nuts 8 are fixedly connected to both sides of the base 1 , the nuts 8 are threadedly connected with a screw rod 21 , the bottom end of the screw rod 21 is provided with a positioning plate 22 , the screw rod 21 and the nut The screw 21 moves up and down, the screw 21 descends, and the positioning plate 22 is grounded, so that the overall fixed position of the present utility model is more stable. Preferably, the bottom surface of the positioning plate 22 is provided with positioning nails or rubber layers to increase positioning Friction between the plate 22 and the ground.

本实用新型的工作原理及使用流程:通过本装置的移动轮,将本装置移动到需要进行降尘的现场,然后旋转螺杆21,螺杆21在螺母8内做螺纹运动,使定位板22与地面或其他支撑面接触固定,在设备进行降尘之前,首先根据现场情况对设备的喷洒高度进行调节,具体步骤如下:启动伺服电机16,使伺服电机16带动第一卡齿盘17产生旋转,而第一卡齿盘17啮合着第二卡齿盘18,以此使螺纹杆2产生旋转,从而使螺纹块3在螺纹杆2的外表面带动搭接板4产生上下移动,此时便可使横向导水管6的高度产生变化,达到最适的喷洒高度,随后启动水泵10,水泵10将水箱9内部的水源通过连接管11送到软管14的内部,软管14再次将水源传递到竖向导水管5的内部,最后由竖向导水管5输送给横向导水管6,其中软管14的长度足够搭接板4产生上下移动,水源进入横向导水管6后,会在第一导流板23和第二导流板24的作用下进行导流,以此使喷头7的内部产生水流压,由于横向导水管6与竖向导水管5是通过防水轴承转动连接,此时的横向导水管6会在喷头7的配合下进行旋转喷洒。The working principle and use process of the present utility model: move the device to the site where dust reduction needs to be carried out through the moving wheel of the device, then rotate the screw 21, and the screw 21 makes a threaded movement in the nut 8, so that the positioning plate 22 is connected to the ground or the ground. The other supporting surfaces are in contact and fixed. Before the equipment performs dust reduction, first adjust the spraying height of the equipment according to the site conditions. The specific steps are as follows: start the servo motor 16, so that the servo motor 16 drives the first chucking plate 17 to rotate, and the first The chucking plate 17 is engaged with the second chucking plate 18, so that the threaded rod 2 is rotated, so that the threaded block 3 drives the lap plate 4 to move up and down on the outer surface of the threaded rod 2, and at this time, the lateral guide can be made to move up and down. The height of the water pipe 6 changes to reach the optimum spraying height, and then the water pump 10 is started. The water pump 10 sends the water source inside the water tank 9 to the inside of the hose 14 through the connecting pipe 11, and the hose 14 again transmits the water source to the vertical water conduit. The inside of 5 is finally transported to the horizontal aqueduct 6 by the vertical aqueduct 5, wherein the length of the hose 14 is enough to lap the plate 4 to move up and down. Under the action of the two deflectors 24, the flow is diverted, so that the water flow pressure is generated inside the nozzle 7. Since the horizontal water guide 6 and the vertical water guide 5 are rotatably connected through the waterproof bearing, the horizontal water guide 6 at this time will be in the nozzle. Rotary spraying is carried out with the cooperation of 7.

最后应说明的是:以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Finally, it should be noted that the above are only the preferred embodiments of the present invention, and are not intended to limit the present invention. , it is still possible to modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements to some of the technical features. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims (10)

1.一种土方开挖的现场降尘装置,其特征在于:包括竖向导水管(5)以及安装在所述竖向导水管(5)上的横向导水管(6),所述竖向导水管(5)的一端为进水端连接进水,另一端为出水端与所述横向导水管(6)进水口连通,所述横向导水管(6)的两端均设置有喷头(7),且所述横向导水管(6)的内壁设置有第一导流板(23)和第二导流板(24),所述第一导流板(23)与所述第二导流板(24)对高压水进行导流,使喷头(7)内部产生水流压带动横向导水管(6)旋转,喷头(7)进行喷洒。1. An on-site dust suppression device for earthwork excavation, characterized in that: comprising a vertical water conduit (5) and a lateral water conduit (6) installed on the vertical water conduit (5), the vertical water conduit (5) ) is connected to the water inlet at one end of the water inlet, and the other end is the water outlet communicated with the water inlet of the horizontal water conduit (6), and both ends of the horizontal water conduit (6) are provided with nozzles (7), and all the The inner wall of the transverse water conduit (6) is provided with a first deflector (23) and a second deflector (24), the first deflector (23) and the second deflector (24) The high-pressure water is diverted, so that the water flow pressure generated inside the nozzle (7) drives the horizontal water guide pipe (6) to rotate, and the nozzle (7) sprays. 2.根据权利要求1所述的一种土方开挖的现场降尘装置,其特征在于:所述第一导流板(23)和所述第二导流板(24)均为竖直设置,所述第一导流板(23)与所述第二导流板(24)相互平行设置,且所述第一导流板(23)的未固定端与第二导流板(24)的未固定端均远离横向导水管(6)的进水口设置。2. An on-site dust suppression device for earthwork excavation according to claim 1, characterized in that: the first deflector (23) and the second deflector (24) are both vertically arranged, The first air guide plate (23) and the second air guide plate (24) are arranged parallel to each other, and the unfixed end of the first air guide plate (23) and the second air guide plate (24) The unfixed ends are all arranged away from the water inlet of the lateral water conduit (6). 3.根据权利要求1所述的一种土方开挖的现场降尘装置,其特征在于:所述第一导流板(23)和横向导水管(6)的轴线夹角以及所述第二导流板(24)和横向导水管(6)的轴线夹角相同。3. An on-site dust suppression device for earthwork excavation according to claim 1, characterized in that: the included angle between the axis of the first deflector (23) and the lateral water conduit (6) and the second guide The angle between the axes of the flow plate (24) and the transverse water conduit (6) is the same. 4.根据权利要求1所述的一种土方开挖的现场降尘装置,其特征在于:还包括底座(1),所述底座(1)上固定安装有水箱(9),所述水箱(9)内安装有水泵(10),所述水箱(9)上设置有注水口(13)和出水口(12),所述水泵(10)的出水端与出水口(12)连接,所述出水口(12)还连接有软管(14),所述软管(14)还与竖向导水管(5)的进水端连接,所述软管(14)将水泵输出的高压水传输至竖向导水管(5)。4. An on-site dust suppression device for earthwork excavation according to claim 1, characterized in that it further comprises a base (1), a water tank (9) is fixedly installed on the base (1), and the water tank (9) ) is installed with a water pump (10), the water tank (9) is provided with a water injection port (13) and a water outlet (12), the water outlet of the water pump (10) is connected with the water outlet (12), and the water outlet (12) is connected to the water outlet (12). The water port (12) is also connected with a hose (14), the hose (14) is also connected with the water inlet end of the vertical water conduit (5), and the hose (14) transmits the high-pressure water output by the water pump to the vertical pipe (5). Guide the water pipe (5). 5.根据权利要求4所述的一种土方开挖的现场降尘装置,其特征在于:所述底座(1) 上还转动连接有两个螺纹杆(2),所述螺纹杆(2)的外表面螺纹连接有螺纹块(3),两个所述螺纹块(3)之间连接有搭接板(4),所述竖向导水管(5)固定在搭接板(4)上,所述螺纹块(3)在螺纹杆(2)上的螺纹运动,实现搭接板(4)的升降。5. An on-site dust suppression device for earth excavation according to claim 4, characterized in that: the base (1) is also rotatably connected with two threaded rods (2). A threaded block (3) is threadedly connected on the outer surface, an overlapping plate (4) is connected between the two threaded blocks (3), and the vertical water conduit (5) is fixed on the overlapping plate (4), so the The threaded movement of the threaded block (3) on the threaded rod (2) realizes the lifting and lowering of the overlapping plate (4). 6.根据权利要求5所述的一种土方开挖的现场降尘装置,其特征在于:所述底座(1)上还固定安装有伺服电机(16),所述伺服电机(16)的输出端固定连接有第一卡齿盘(17),所述螺纹杆(2)上安装有第二卡齿盘(18),所述第一卡齿盘(17)与第二卡齿盘(18)啮合连接,所述伺服电机(16)工作带动搭接板(4)进行升降,所述底座的底部安装有移动轮。The on-site dust suppression device for earthwork excavation according to claim 5, characterized in that: a servo motor (16) is also fixedly installed on the base (1), and the output end of the servo motor (16) A first toothed plate (17) is fixedly connected, a second toothed plate (18) is installed on the threaded rod (2), the first toothed plate (17) and the second toothed plate (18) In meshing connection, the servo motor (16) works to drive the lap plate (4) to move up and down, and a moving wheel is installed on the bottom of the base. 7.根据权利要求5所述的一种土方开挖的现场降尘装置,其特征在于:所述搭接板(4)与竖向导水管(5)之间设置有斜架杆(20)。7 . The on-site dust suppression device for earthwork excavation according to claim 5 , wherein an inclined frame rod ( 20 ) is arranged between the overlapping plate ( 4 ) and the vertical water conduit ( 5 ). 8 . 8.根据权利要求1所述的一种土方开挖的现场降尘装置,其特征在于:所述竖向导水管(5)与横向导水管(6)之间通过防水轴承连接。8 . The on-site dust suppression device for earth excavation according to claim 1 , wherein the vertical water conduit ( 5 ) and the lateral water conduit ( 6 ) are connected by a waterproof bearing. 9 . 9.根据权利要求4所述的一种土方开挖的现场降尘装置,其特征在于:所述软管(14)的长度大于搭接板(4)的可移动高度。9 . The on-site dust suppression device for earth excavation according to claim 4 , wherein the length of the hose ( 14 ) is greater than the movable height of the overlapping plate ( 4 ). 10 . 10.根据权利要求4所述一种土方开挖的现场降尘装置,其特征在于:所述底座(1)的两侧固定连接有螺母(8),所述螺母(8)螺纹连接有螺杆(21),所述螺杆(21)的底端设有定位板(22),所述定位板(22)的底面设置有定位钉或橡胶层。10. The on-site dust suppression device for earthwork excavation according to claim 4, characterized in that: nuts (8) are fixedly connected to both sides of the base (1), and the nuts (8) are threadedly connected with screws ( 21), the bottom end of the screw (21) is provided with a positioning plate (22), and the bottom surface of the positioning plate (22) is provided with positioning pins or a rubber layer.
CN202020187139.2U 2020-02-19 2020-02-19 An on-site dust suppression device for earthwork excavation Expired - Fee Related CN211898116U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020187139.2U CN211898116U (en) 2020-02-19 2020-02-19 An on-site dust suppression device for earthwork excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020187139.2U CN211898116U (en) 2020-02-19 2020-02-19 An on-site dust suppression device for earthwork excavation

Publications (1)

Publication Number Publication Date
CN211898116U true CN211898116U (en) 2020-11-10

Family

ID=73290650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020187139.2U Expired - Fee Related CN211898116U (en) 2020-02-19 2020-02-19 An on-site dust suppression device for earthwork excavation

Country Status (1)

Country Link
CN (1) CN211898116U (en)

Similar Documents

Publication Publication Date Title
CN204973410U (en) Building site dust collector
CN105065056B (en) A kind of underground coal mine multi-stage, energy-saving tunnel cleaning device
CN211818057U (en) Spray cooling and dust settling equipment for building construction
CN211898116U (en) An on-site dust suppression device for earthwork excavation
CN207228029U (en) A kind of efficient device for reducing dust of building engineering construction
CN213790631U (en) Civil engineering is with on-spot dust collector
CN218794840U (en) Water-saving dust removal device
CN214883350U (en) Civil engineering is with on-spot dust collector
CN204921020U (en) Colliery is multistage energy -conserving tunnel belt cleaning device in pit
CN215610221U (en) Portable double-fluid dust removal atomizer
CN214863841U (en) Movable cantilever breaking hammer
CN211462594U (en) Dust treatment device for hydraulic blasting
CN213159965U (en) On-spot dust collector for construction
CN209985122U (en) Leading water conservation dust device of loader
CN219630924U (en) Spraying dust suppression equipment for constructional engineering
CN220531058U (en) Construction dust suppression device
CN217041844U (en) Dust device is used in hydraulic engineering construction
CN221957623U (en) A dust-proof spray device for fully mechanized mining working face in coal mine
CN221942502U (en) A mobile fire extinguishing device for coal mines
CN220927423U (en) Leveling device for treating soft soil roadbed
CN221896631U (en) A dust prevention device for mining
CN217501735U (en) A kind of non-coal underground mine excavation working face dust suppression device
CN219722321U (en) Building engineering dust device
CN221879312U (en) Drilling device for building construction
CN215761525U (en) Engineering drilling machine for anchoring slope protection operation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201110