CN211859423U - A kind of tensioning device for power overhead line - Google Patents

A kind of tensioning device for power overhead line Download PDF

Info

Publication number
CN211859423U
CN211859423U CN202020870480.8U CN202020870480U CN211859423U CN 211859423 U CN211859423 U CN 211859423U CN 202020870480 U CN202020870480 U CN 202020870480U CN 211859423 U CN211859423 U CN 211859423U
Authority
CN
China
Prior art keywords
wire
overhead
clamping
pulley
clamping block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020870480.8U
Other languages
Chinese (zh)
Inventor
徐皓
刘江
贺家顺
范氏玉艳
杜氏丽
阮玉泰
武明芳
罗瑞
胡怀元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Vocational Institute of Engineering
Original Assignee
Chongqing Vocational Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Vocational Institute of Engineering filed Critical Chongqing Vocational Institute of Engineering
Priority to CN202020870480.8U priority Critical patent/CN211859423U/en
Application granted granted Critical
Publication of CN211859423U publication Critical patent/CN211859423U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses an electric power is overspeed device tensioner for overhead line, including the overhead line, the strain insulator end erection joint of overhead line is equipped with card line mechanism, and it is firm to be pressed from both sides the locking mutually by card line mechanism, it is equipped with the fixture block to assemble the installation in the card line mechanism, the fixture block is connected between through tension bar and the pulley holder, it has installed the movable pulley to rotate the ann on the pulley holder, fixed connection wire rope's one end on the movable pulley, the direction connection has fixed pulley assembly in proper order on the wire rope, change to pulley assembly, fixed pulley assembly, change to pulley assembly and equally divide other fixed mounting and set up on the strain insulator tower, wire rope's the other end is connected to the hank emery wheel, hank emery wheel fixed cover is established and is installed the. By adopting the technical scheme, the wire clamping mechanism clamps and fixes the overhead wire, so that the overhead wire is conveniently tensioned and adjusted up and down by driving the steel wire rope to pull through the winching motor, the danger of overhead wire high-altitude tensioning operation can be avoided, and meanwhile, the labor intensity of workers can be reduced.

Description

一种电力架空线用张紧装置A kind of tensioning device for power overhead line

技术领域technical field

实用新型涉及电力架空线安装的技术领域,尤其涉及一种电力架空线用张紧装置。The utility model relates to the technical field of electric overhead wire installation, in particular to a tensioning device for electric overhead wires.

背景技术Background technique

现有技术中对于电力架空线的耐张紧端架设过程中,通常是安装人员进行高空张紧调节架设,因处在耐张线塔上进行高空的作业,且由于电力架空线的远程布设重量较大,需要对电力架空线的拉紧所需作用力较大,使得工作人员在进行电力架空线的拉紧作业时处于一种不安全状态,因此,我们设计一种电力架空线用张紧装置。In the prior art, in the process of erecting the tension-resistant end of the power overhead line, the installer usually performs high-altitude tension adjustment and erection, because the high-altitude operation is performed on the tension line tower, and due to the weight of the remote installation of the power overhead line. It is large, and the force required to tighten the overhead power line is large, which makes the staff in an unsafe state when the overhead power line is tightened. Therefore, we design a tensioning power overhead line device.

实用新型内容Utility model content

为解决现有技术方案的缺陷,实用新型公开了一种电力架空线用张紧装置。In order to solve the defects of the existing technical solutions, the utility model discloses a tensioning device for electric overhead wires.

实用新型公开了一种电力架空线用张紧装置,包括架空线、卡线机构,所述架空线的耐张线端装配安装设有卡线机构,所述卡线机构是由卡线主体架、侧耳卡线座、中部卡线座、顶端卡接座一体结构组成,所述卡线主体架的两侧倾斜底端设置有侧耳卡线座,两侧所述的侧耳卡线座上分别设置有线避让缺槽,所述线避让缺槽内避让穿过架空线,所述侧耳卡线座的前后两侧壁上分别螺纹配合安装有横向T形螺栓,所述横向T形螺栓的尾端固定连接有横向夹紧块,所述横向夹紧块抵触夹紧固定架空线,所述卡线主体架的底壁上设置有中部卡线座,所述中部卡线座的中间位置处开设有线插孔,所开设的线插孔内避让穿过架空线,所述中部卡线座的上下两端分别开设有缺口槽,所开设的缺口槽内设置有与中部卡线座之间相螺纹配合安装的竖向T形螺栓,所述竖向T形螺栓的尾端固定连接有竖向夹紧块,所述竖向夹紧块滑移装配安装设置在滑移槽内,且所述的竖向夹紧块抵触夹紧固定架空线,所述卡线主体架的顶壁上设置有顶端卡接座,所述顶端卡接座上所设置的卡槽内装配安装设有卡块,所述顶端卡接座与卡块之间通过防脱销轴相一体装配固定,所述卡块通过拉力杆与滑轮支架之间相连接,所述滑轮支架上转动安装设有动滑轮,所述动滑轮上固定连接钢丝绳的一端,所述钢丝绳上依次导向连接有定滑轮组件、改向滑轮组件,所述定滑轮组件、改向滑轮组件均分别固定安装设置在耐张线塔上,所述钢丝绳的另一端连接至绞磨轮,所述绞磨轮固定套设安装在绞磨电机的输出端,所述绞磨电机固定安装设置在耐张线塔上。The utility model discloses a tensioning device for an electric overhead wire, comprising an overhead wire and a wire clamping mechanism, the tension-resistant wire end of the overhead wire is assembled and installed with a wire clamping mechanism, and the wire clamping mechanism is composed of a main wire clamping mechanism. , The side ear clip wire seat, the middle clip wire seat, and the top clip joint seat are integrated into one structure. The two inclined bottom ends of the main body frame of the clip wire are provided with side ear clip wire seats, and the side ear clip wire seats on both sides are respectively provided. The wire avoids the groove, and the wire avoids the groove to avoid passing through the overhead wire. The front and rear side walls of the side ear clip wire seat are respectively threaded and installed with transverse T-shaped bolts, and the tail ends of the transverse T-shaped bolts are fixed. A transverse clamping block is connected, and the transverse clamping block abuts against and clamps the overhead wire, the bottom wall of the main frame of the wire clamping is provided with a middle wire clamping seat, and the middle position of the middle wire clamping seat is provided with a wire socket. The opened wire jacks avoid passing overhead wires, the upper and lower ends of the middle wire clamp are respectively provided with notch grooves, and the opened notch grooves are provided with threads for installation with the middle wire clamp The vertical T-shaped bolt, the vertical clamping block is fixedly connected to the tail end of the vertical T-shaped bolt, the vertical clamping block is slidingly assembled and installed in the sliding groove, and the vertical clamping block is installed in the sliding groove. The clamping block abuts and clamps the overhead wire, the top wall of the main frame of the clamping wire is provided with a top clamping seat, and a clamping block is assembled and installed in the clamping groove set on the top clamping seat, and the top The clamping seat and the clamping block are integrally assembled and fixed by the anti-falling pin shaft. The clamping block is connected with the pulley bracket through the tension rod. The movable pulley is rotatably installed on the pulley bracket, and the steel wire rope is fixedly connected to the movable pulley. At one end of the wire rope, a fixed pulley assembly and a diverting pulley assembly are sequentially connected to the wire rope. The fixed pulley assembly and the diverting pulley assembly are fixedly installed on the tension tower respectively. The grinding wheel is fixedly sleeved and installed on the output end of the grinding motor, and the grinding motor is fixedly installed on the tension-resistant wire tower.

优选的,所述定滑轮组件设置在动滑轮的正上方,所述改向滑轮组件与动滑轮之间呈倾斜牵引角度设置。Preferably, the fixed pulley assembly is disposed just above the movable pulley, and the redirecting pulley assembly and the movable pulley are disposed at an inclined traction angle.

优选的,所述线避让缺槽的规格大小要远大于架空线的规格大小。Preferably, the size of the wire avoidance groove is much larger than the size of the overhead line.

优选的,所述线插孔的孔径大小要大于架空线的直径大小。Preferably, the aperture size of the wire jack is larger than the diameter of the overhead wire.

优选的,所述横向夹紧块的底端过渡设有一体结构的弧形拖钩。Preferably, the bottom end of the transverse clamping block is transitionally provided with an arc-shaped tow hook of an integrated structure.

优选的,所述防脱销轴的两侧设置有防脱帽,所述防脱帽限位抵触设置在顶端卡接座的侧壁上。Preferably, both sides of the anti-falling pin shaft are provided with anti-falling caps, and the anti-falling caps are provided on the side wall of the top clamping seat in a position-resisting manner.

优选的,所述拉力杆的两端分别紧固连接有凸环套,两端所述的凸环套分别一体结构设置在卡块、滑轮支架上。Preferably, two ends of the tension rod are respectively fastened with convex ring sleeves, and the convex ring sleeves at both ends are respectively integrally arranged on the clamping block and the pulley bracket.

有益效果是:卡线机构通过两侧设置的侧耳卡线座以及中部设置的中部卡线座分别对架空线进行夹紧固定,使得架空线通过卡线机构进行固定张紧调节方便,卡线机构通过拉力杆与滑轮支架相一体连接,便于通过绞磨电机带动钢丝绳牵引的作用,改向滑轮组件、动滑轮、定滑轮组件三者之间形成稳定的提升机构,从而实现卡线机构带动架空线进行上下张紧调节,可以避免架空线高空张紧作业的危险性,同时可以减少了人工劳动强度。The beneficial effect is that the wire clamping mechanism clamps and fixes the overhead wire respectively through the side ear wire clamping bases arranged on both sides and the middle wire clamping base arranged in the middle, so that the overhead wire can be fixed and tensioned easily by the wire clamping mechanism, and the wire clamping mechanism Through the integral connection of the tension rod and the pulley bracket, it is convenient to drive the wire rope traction through the grinding motor, and a stable lifting mechanism is formed between the redirecting pulley assembly, the movable pulley and the fixed pulley assembly, so as to realize that the wire clamping mechanism drives the overhead wire to carry out The upper and lower tensioning adjustment can avoid the danger of overhead line tensioning operation, and at the same time can reduce the labor intensity.

附图说明Description of drawings

图1是实用新型一种电力架空线用张紧装置的结构示意图;Fig. 1 is the structural representation of a kind of tensioning device for electric overhead line of the utility model;

图2是实用新型一种电力架空线用张紧装置的中部卡线座截面示意图;Figure 2 is a schematic cross-sectional view of the middle part of the tensioning device for an overhead power line of the utility model;

图3是实用新型一种电力架空线用张紧装置的侧耳卡线座示意图;3 is a schematic diagram of a side ear clip wire seat of a tensioning device for an overhead power line of the utility model;

图4是实用新型一种电力架空线用张紧装置的防脱销轴示意图。FIG. 4 is a schematic diagram of the anti-falling pin shaft of a tensioning device for an overhead wire of the utility model.

其中:1-架空线;2-卡线机构,20-卡线主体架,21-侧耳卡线座,210-线避让缺槽,22-中部卡线座,220-线插孔,221-滑移槽,222-缺口槽,23-顶端卡接座,230-卡槽;3-横向夹紧块,30-弧形拖钩;4-横向T形螺栓;5-竖向T形螺栓;6-竖向夹紧块;7-卡块;8-防脱销轴,80-防脱帽;9-拉力杆;10-滑轮支架;11-动滑轮;12-耐张线塔;13-定滑轮组件;14-钢丝绳;15-改向滑轮组件;16-绞磨轮;17-绞磨电机;18-凸环套。Among them: 1- overhead cable; 2- cable clamping mechanism, 20- cable main frame, 21- side ear cable holder, 210- cable avoidance slot, 22- middle cable holder, 220- cable jack, 221- slide Shift slot, 222-notch slot, 23-top snap seat, 230-card slot; 3-horizontal clamping block, 30-arc tow hook; 4-horizontal T-bolt; 5-vertical T-bolt; 6 -Vertical clamping block; 7-Clamping block; 8-Anti-falling pin, 80-Anti-falling cap; 9-Tension rod; 10-Pulley bracket; 11-Moving pulley; 12-Tension tower; 13-Fixed pulley assembly; 14- Steel wire rope; 15- Reversing pulley assembly; 16- Spinning grinding wheel; 17- Spinning grinding motor; 18- Convex ring sleeve.

具体实施方式Detailed ways

下面将结合实用新型实施例中的附图,对实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是实用新型一部分实施例,而不是全部的实施例;基于实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于实用新型保护的范围。The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the utility model. Obviously, the described embodiments are only a part of the embodiments of the utility model, rather than all the embodiments; Based on the embodiments in the utility model, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the utility model.

如图1-4所示,实用新型公开了一种电力架空线用张紧装置,包括架空线1、卡线机构2,所述架空线1的耐张线端装配安装设有卡线机构2,所述卡线机构2是由卡线主体架20、侧耳卡线座21、中部卡线座22、顶端卡接座23一体结构组成,所述卡线主体架20的两侧倾斜底端设置有侧耳卡线座21,两侧所述的侧耳卡线座21上分别设置有线避让缺槽210,所述线避让缺槽210内避让穿过架空线1,所述侧耳卡线座21的前后两侧壁上分别螺纹配合安装有横向T形螺栓4,所述横向T形螺栓4的尾端固定连接有横向夹紧块3,所述横向夹紧块3抵触夹紧固定架空线1。As shown in Figures 1-4, the utility model discloses a tensioning device for electric overhead wires, which includes an overhead wire 1 and a wire clamping mechanism 2. The tension wire end of the overhead wire 1 is assembled and installed with a wire clamping mechanism 2 The wire clamping mechanism 2 is composed of a main body frame 20 for wire clamping, a side ear clamping wire seat 21, a middle wire clamping seat 22, and a top clamping seat 23. The two sides of the main body frame 20 are provided with inclined bottom ends. There is a side ear clip wire seat 21, the side ear clip wire seat 21 on both sides is respectively provided with a wire avoidance slot 210, the wire avoidance slot 210 avoids passing through the overhead wire 1, the front and rear of the side ear clip wire seat 21 The lateral T-shaped bolts 4 are respectively threadedly installed on the two side walls, and the rear ends of the lateral T-shaped bolts 4 are fixedly connected with a lateral clamping block 3 , and the lateral clamping block 3 abuts against and clamps the overhead wire 1 .

所述卡线主体架20的底壁上设置有中部卡线座22,所述中部卡线座22的中间位置处开设有线插孔220,所开设的线插孔220内避让穿过架空线1,所述中部卡线座22的上下两端分别开设有缺口槽222,所开设的缺口槽222内设置有与中部卡线座22之间相螺纹配合安装的竖向T形螺栓5,所述竖向T形螺栓5的尾端固定连接有竖向夹紧块6,所述竖向夹紧块6滑移装配安装设置在滑移槽221内,且所述的竖向夹紧块6抵触夹紧固定架空线1。The bottom wall of the main body frame 20 is provided with a middle wire holder 22, a wire jack 220 is opened at the middle position of the middle wire holder 22, and the wire jack 220 is opened to avoid passing through the overhead wire 1. , the upper and lower ends of the middle wire clamping seat 22 are respectively provided with notched grooves 222, and the opened notched grooves 222 are provided with vertical T-shaped bolts 5 that are threadedly installed with the middle wire clamping seat 22. The tail end of the vertical T-shaped bolt 5 is fixedly connected with a vertical clamping block 6, and the vertical clamping block 6 is slidingly assembled and installed in the sliding groove 221, and the vertical clamping block 6 is in contact with each other. Clamp and fix the overhead wire 1.

所述卡线主体架20的顶壁上设置有顶端卡接座23,所述顶端卡接座23上所设置的卡槽230内装配安装设有卡块7,所述顶端卡接座23与卡块7之间通过防脱销轴8相一体装配固定,所述卡块7通过拉力杆9与滑轮支架10之间相连接,所述滑轮支架10上转动安装设有动滑轮11,所述动滑轮11上固定连接钢丝绳14的一端,所述钢丝绳14上依次导向连接有定滑轮组件13、改向滑轮组件15,所述定滑轮组件13、改向滑轮组件15均分别固定安装设置在耐张线塔12上,所述钢丝绳14的另一端连接至绞磨轮16,所述绞磨轮16固定套设安装在绞磨电机17的输出端,所述绞磨电机17固定安装设置在耐张线塔12上。A top clamping seat 23 is provided on the top wall of the main body frame 20 for the wire clamping. A clamping block 7 is assembled and installed in the clamping slot 230 provided on the top clamping seat 23. The top clamping seat 23 and The clamping blocks 7 are integrally assembled and fixed by the anti-falling pin shaft 8, and the clamping blocks 7 are connected with the pulley bracket 10 through the tension rod 9. The movable pulley 11 is rotatably installed on the pulley bracket 10. The movable pulley 11 One end of the wire rope 14 is fixedly connected to the top, and the wire rope 14 is guided and connected with a fixed pulley assembly 13 and a redirecting pulley assembly 15 in turn. 12, the other end of the wire rope 14 is connected to the grinding wheel 16, the grinding wheel 16 is fixedly sleeved and installed on the output end of the grinding motor 17, and the grinding motor 17 is fixedly installed on the tension tower 12 .

所述定滑轮组件13设置在动滑轮11的正上方,所述改向滑轮组件15与动滑轮11之间呈倾斜牵引角度设置。The fixed pulley assembly 13 is disposed just above the movable pulley 11 , and the diverting pulley assembly 15 and the movable pulley 11 are disposed at an inclined traction angle.

所述线避让缺槽210的规格大小要远大于架空线1的规格大小,所述线插孔220的孔径大小要大于架空线1的直径大小,从而适应大小规格不同的架空线1进行卡线固定张紧。The size of the wire avoidance groove 210 is much larger than the size of the overhead wire 1, and the aperture size of the wire jack 220 is larger than the diameter of the overhead wire 1, so as to adapt to different sizes and specifications of the overhead wire 1 for wire clamping. Fixed tension.

所述横向夹紧块3的底端过渡设有一体结构的弧形拖钩30,设置的弧形拖钩30用于起到紧贴架空线1而防滑脱落的作用。The bottom end of the transverse clamping block 3 is transitionally provided with an arc-shaped tow hook 30 with an integrated structure, and the provided arc-shaped tow hook 30 is used to play a role in closely adhering to the overhead wire 1 to prevent slipping off.

所述防脱销轴8的两侧设置有防脱帽80,所述防脱帽80限位抵触设置在顶端卡接座23的侧壁上,使得卡块7在顶端卡接座23上销接固定牢靠。Both sides of the anti-falling pin shaft 8 are provided with anti-falling caps 80, and the anti-falling caps 80 are provided on the side wall of the top clamping seat 23 in limited contact, so that the clamping block 7 is pinned and fixed on the top clamping seat 23 firmly. .

所述拉力杆9的两端分别紧固连接有凸环套18,两端所述的凸环套18分别一体结构设置在卡块7、滑轮支架10上,一体装配连接方便。Two ends of the tension rod 9 are respectively fastened with convex ring sleeves 18, and the two ends of the convex ring sleeves 18 are respectively integrally arranged on the clamping block 7 and the pulley bracket 10, and the integral assembly and connection are convenient.

实用新型是这样实施的:通过在架空线1的耐张线端装配安装设有卡线机构2,卡线机构2的侧耳卡线座21上避让穿过架空线1,并由前后两侧螺纹配合的横向T形螺栓4转动而带动横向夹紧块3推移,从而使得横向夹紧块3对架空线1进行横向夹紧稳定;卡线机构2的中部卡线座22上避让插设穿出架空线1,通过上下两侧螺纹配合的竖向夹紧块6带动竖向夹紧块6进行推移,从而使得竖向夹紧块6对架空线1进行竖向夹紧固定,使得架空线1通过卡线机构2进行固定张紧调节方便,张紧调节过程中,通过绞磨电机17带动钢丝绳14的牵引,钢丝绳经改向滑轮组件15、动滑轮11、定滑轮组件13进行传动连接,使得钢丝绳在牵引时,从而便于带动动滑轮11进行提升或下放,动滑轮11通过拉力杆9与卡线机构2相一体装配连接,从而使得卡线机构2带动架空线1进行上下张紧调节。采用本技术方案,卡线机构通过两侧设置的侧耳卡线座以及中部设置的中部卡线座分别对架空线进行夹紧固定,使得架空线通过卡线机构进行固定张紧调节方便,卡线机构通过拉力杆与滑轮支架相一体连接,便于通过绞磨电机带动钢丝绳牵引的作用,改向滑轮组件、动滑轮、定滑轮组件三者之间形成稳定的提升机构,从而实现卡线机构带动架空线进行上下张紧调节,可以避免架空线高空张紧作业的危险性,同时可以减少了人工劳动强度。The utility model is implemented in this way: by assembling and installing a wire clamping mechanism 2 on the tensile wire end of the overhead wire 1, the side ear clamping wire seat 21 of the wire clamping mechanism 2 avoids passing through the overhead wire 1, and is threaded from the front and rear sides. The matching transverse T-bolt 4 rotates to drive the transverse clamping block 3 to move, so that the transverse clamping block 3 can clamp and stabilize the overhead wire 1 laterally; The overhead wire 1 is driven by the vertical clamping blocks 6 that are threaded on the upper and lower sides to move the vertical clamping block 6, so that the vertical clamping block 6 vertically clamps and fixes the overhead wire 1, so that the overhead wire 1 It is convenient to carry out the fixed tension adjustment through the wire clamping mechanism 2. During the tension adjustment process, the wire rope 14 is pulled by the grinding motor 17, and the wire rope is driven and connected through the redirecting pulley assembly 15, the movable pulley 11, and the fixed pulley assembly 13, so that the wire rope When pulling, it is convenient to drive the movable pulley 11 to lift or lower. The movable pulley 11 is assembled and connected with the wire clamping mechanism 2 through the tension rod 9, so that the wire clamping mechanism 2 drives the overhead wire 1 to adjust the tension up and down. By adopting the technical solution, the wire clamping mechanism clamps and fixes the overhead wires respectively through the side ear wire clamping bases provided on both sides and the middle wire clamping base provided in the middle, so that the overhead wires can be fixed and tensioned easily by the wire clamping mechanism, and the wire is clamped. The mechanism is integrally connected with the pulley bracket through the tension rod, which is convenient to drive the wire rope traction through the grinding motor, and form a stable lifting mechanism between the redirecting pulley assembly, the movable pulley and the fixed pulley assembly, so as to realize the wire clamping mechanism to drive the overhead wire. The upper and lower tensioning adjustment can avoid the danger of the overhead line tensioning operation at high altitude, and at the same time can reduce the labor intensity.

最后应说明的是:以上实施例仅用以说明实用新型而并非限制实用新型所描述的技术方案;因此,尽管本说明书参照上述的各个实施例对实用新型已进行了详细的说明,但是,本领域的普通技术人员应当理解,仍然可以对实用新型进行修改或等同替换;而一切不脱离实用新型的精神和范围的技术方案及其改进,其均应涵盖在实用新型的权利要求范围中。Finally, it should be noted that the above embodiments are only used to illustrate the utility model rather than limit the technical solutions described by the utility model; therefore, although the present specification has described the utility model in detail with reference to the above-mentioned various embodiments, this Those skilled in the art should understand that the utility model can still be modified or equivalently replaced; and all technical solutions and improvements that do not depart from the spirit and scope of the utility model should be covered by the scope of the claims of the utility model.

Claims (7)

1.一种电力架空线用张紧装置,包括架空线(1)、卡线机构(2),其特征在于,所述架空线(1)的耐张线端装配安装设有卡线机构(2),所述卡线机构(2)是由卡线主体架(20)、侧耳卡线座(21)、中部卡线座(22)、顶端卡接座(23)一体结构组成,所述卡线主体架(20)的两侧倾斜底端设置有侧耳卡线座(21),两侧所述的侧耳卡线座(21)上分别设置有线避让缺槽(210),所述线避让缺槽(210)内避让穿过架空线(1),所述侧耳卡线座(21)的前后两侧壁上分别螺纹配合安装有横向T形螺栓(4),所述横向T形螺栓(4)的尾端固定连接有横向夹紧块(3),所述横向夹紧块(3)抵触夹紧固定架空线(1),所述卡线主体架(20)的底壁上设置有中部卡线座(22),所述中部卡线座(22)的中间位置处开设有线插孔(220),所开设的线插孔(220)内避让穿过架空线(1),所述中部卡线座(22)的上下两端分别开设有缺口槽(222),所开设的缺口槽(222)内设置有与中部卡线座(22)之间相螺纹配合安装的竖向T形螺栓(5),所述竖向T形螺栓(5)的尾端固定连接有竖向夹紧块(6),所述竖向夹紧块(6)滑移装配安装设置在滑移槽(221)内,且所述的竖向夹紧块(6)抵触夹紧固定架空线(1),所述卡线主体架(20)的顶壁上设置有顶端卡接座(23),所述顶端卡接座(23)上所设置的卡槽(230)内装配安装设有卡块(7),所述顶端卡接座(23)与卡块(7)之间通过防脱销轴(8)相一体装配固定,所述卡块(7)通过拉力杆(9)与滑轮支架(10)之间相连接,所述滑轮支架(10)上转动安装设有动滑轮(11),所述动滑轮(11)上固定连接钢丝绳(14)的一端,所述钢丝绳(14)上依次导向连接有定滑轮组件(13)、改向滑轮组件(15),所述定滑轮组件(13)、改向滑轮组件(15)均分别固定安装设置在耐张线塔(12)上,所述钢丝绳(14)的另一端连接至绞磨轮(16),所述绞磨轮(16)固定套设安装在绞磨电机(17)的输出端,所述绞磨电机(17)固定安装设置在耐张线塔(12)上。1. A tensioning device for an electric overhead wire, comprising an overhead wire (1) and a wire clamping mechanism (2), characterized in that the tension wire end of the overhead wire (1) is assembled and installed with a wire clamping mechanism ( 2), the wire clamping mechanism (2) is composed of a main body frame (20), a side ear clamping wire seat (21), a middle wire clamping seat (22), and a top clamping seat (23). Side ear clip wire seats (21) are arranged at the inclined bottom ends of the two sides of the main body frame of the wire clip (20), and the wire avoidance grooves (210) are respectively provided on the side ear clip wire seats (21) on both sides. The overhead wire (1) is avoided in the missing groove (210), and transverse T-shaped bolts (4) are respectively threadedly fitted on the front and rear side walls of the side ear clip wire seat (21). The transverse T-shaped bolts ( The rear end of 4) is fixedly connected with a transverse clamping block (3), the transverse clamping block (3) abuts against and clamps the overhead wire (1), and the bottom wall of the wire clamping main frame (20) is provided with a The middle cable holder (22), a wire jack (220) is provided at the middle position of the middle cable holder (22), and the wire jack (220) that is opened avoids passing through the overhead line (1), and the The upper and lower ends of the middle wire clamping seat (22) are respectively provided with notched grooves (222); Bolts (5), the tail end of the vertical T-shaped bolts (5) is fixedly connected with a vertical clamping block (6), and the vertical clamping block (6) is slidably assembled and installed in the sliding groove ( 221), and the vertical clamping block (6) abuts against and clamps the overhead wire (1), the top wall of the wire clamping main frame (20) is provided with a top clamping seat (23), so A clamping block (7) is assembled and installed in the clamping groove (230) provided on the top clamping seat (23), and an anti-falling pin shaft ( 8) The phases are assembled and fixed in one piece, the clamping block (7) is connected with the pulley bracket (10) through the tension rod (9), and a movable pulley (11) is rotatably installed on the pulley bracket (10). One end of the wire rope (14) is fixedly connected to the movable pulley (11), and the wire rope (14) is guided and connected with a fixed pulley assembly (13) and a reversing pulley assembly (15) in sequence. The pulley assemblies (15) are respectively fixedly installed on the tension tower (12), and the other end of the steel wire rope (14) is connected to the grinding wheel (16), and the grinding wheel (16) is fixedly sleeved and installed on the The output end of the grinding motor (17), the grinding motor (17) is fixedly installed on the tension tower (12). 2.根据权利要求1所述的一种电力架空线用张紧装置,其特征在于:所述定滑轮组件(13)设置在动滑轮(11)的正上方,所述改向滑轮组件(15)与动滑轮(11)之间呈倾斜牵引角度设置。2 . The tensioning device for electric overhead lines according to claim 1 , wherein the fixed pulley assembly ( 13 ) is arranged just above the movable pulley ( 11 ), and the redirecting pulley assembly ( 15 ) It is set at an inclined traction angle with the movable pulley (11). 3.根据权利要求1所述的一种电力架空线用张紧装置,其特征在于:所述线避让缺槽(210)的规格大小要远大于架空线(1)的规格大小。3 . The tensioning device for an electric power overhead line according to claim 1 , characterized in that: the specification size of the line avoidance groove ( 210 ) is much larger than that of the overhead line ( 1 ). 4 . 4.根据权利要求1所述的一种电力架空线用张紧装置,其特征在于:所述线插孔(220)的孔径大小要大于架空线(1)的直径大小。4 . The tensioning device for an overhead power line according to claim 1 , wherein the aperture size of the line insertion hole ( 220 ) is larger than the diameter of the overhead line ( 1 ). 5 . 5.根据权利要求1所述的一种电力架空线用张紧装置,其特征在于:所述横向夹紧块(3)的底端过渡设有一体结构的弧形拖钩(30)。5 . The tensioning device for overhead power lines according to claim 1 , wherein the bottom end of the transverse clamping block ( 3 ) is transitionally provided with an arc-shaped tow hook ( 30 ) of an integrated structure. 6 . 6.根据权利要求1所述的一种电力架空线用张紧装置,其特征在于:所述防脱销轴(8)的两侧设置有防脱帽(80),所述防脱帽(80)限位抵触设置在顶端卡接座(23)的侧壁上。6. A tensioning device for overhead power lines according to claim 1, characterized in that: both sides of the anti-falling pin shaft (8) are provided with anti-falling caps (80), and the anti-falling caps (80) limit the The bit abutting is arranged on the side wall of the top clamping seat (23). 7.根据权利要求1所述的一种电力架空线用张紧装置,其特征在于:所述拉力杆(9)的两端分别紧固连接有凸环套(18),两端所述的凸环套(18)分别一体结构设置在卡块(7)、滑轮支架(10)上。7 . The tensioning device for overhead power lines according to claim 1 , wherein two ends of the tension rod ( 9 ) are respectively fastened with convex ring sleeves ( 18 ). The convex ring sleeve (18) is integrally arranged on the clamping block (7) and the pulley bracket (10), respectively.
CN202020870480.8U 2020-05-22 2020-05-22 A kind of tensioning device for power overhead line Expired - Fee Related CN211859423U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020870480.8U CN211859423U (en) 2020-05-22 2020-05-22 A kind of tensioning device for power overhead line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020870480.8U CN211859423U (en) 2020-05-22 2020-05-22 A kind of tensioning device for power overhead line

Publications (1)

Publication Number Publication Date
CN211859423U true CN211859423U (en) 2020-11-03

Family

ID=73236180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020870480.8U Expired - Fee Related CN211859423U (en) 2020-05-22 2020-05-22 A kind of tensioning device for power overhead line

Country Status (1)

Country Link
CN (1) CN211859423U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111431096A (en) * 2020-05-22 2020-07-17 重庆工程职业技术学院 A kind of tensioning device for power overhead line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111431096A (en) * 2020-05-22 2020-07-17 重庆工程职业技术学院 A kind of tensioning device for power overhead line
CN111431096B (en) * 2020-05-22 2024-09-10 重庆工程职业技术学院 Tensioning device for electric power overhead line

Similar Documents

Publication Publication Date Title
CN113937665A (en) Cable tensioning device for overhead laying of cables based on electric power engineering
CN114552485A (en) A tensioner bullwheel for air wire erects
CN211859423U (en) A kind of tensioning device for power overhead line
CN104538887B (en) A kind of lightning conducter lifts converter
CN217135029U (en) Live work wire lifting device
CN208782377U (en) A dual-purpose tensioner
CN112072554A (en) Transmission line cable straining device
CN112993862B (en) Wire tightening device for power construction
CN111431096B (en) Tensioning device for electric power overhead line
CN107732789B (en) Overhead line tensioning device
CN118343590B (en) Auxiliary lifting device for electric angle steel tower
CN212559202U (en) Hoisting mechanism for pole-mounted switch
CN112271632B (en) Standing type high-voltage cable operation device
CN103487910B (en) Optical cable tightener
CN2287345Y (en) Transmission line tensioner
CN219513749U (en) Power transmission line frame cable installation equipment
CN107465146B (en) Combined wire tightening tool for tightening wire of line conductor
CN117543431A (en) Auxiliary clamp for overhead line tightener and overhead line tightening device
CN205543984U (en) Multi -functional turn -buckle of power transmission and transformation circuit
CN219636837U (en) Tension stabilizer for suspended inspection platform and suspended inspection platform
CN203455531U (en) Optical cable tightener
JPH1094125A (en) Support device for sheave device
CN110289575B (en) Electric power wire drawing device
CN210680463U (en) Clamping line type contact net elastic sling installation device
CN213212913U (en) Overhead line tightening structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201103

Termination date: 20210522