CN211846848U - Hoisting hanger device of steel reinforcement cage - Google Patents
Hoisting hanger device of steel reinforcement cage Download PDFInfo
- Publication number
- CN211846848U CN211846848U CN202020102672.4U CN202020102672U CN211846848U CN 211846848 U CN211846848 U CN 211846848U CN 202020102672 U CN202020102672 U CN 202020102672U CN 211846848 U CN211846848 U CN 211846848U
- Authority
- CN
- China
- Prior art keywords
- lifting
- hanger
- reinforcement cage
- support arm
- steel reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a hoisting hanger device of a steel reinforcement cage, which comprises a cross-shaped hanger main body and four hanger support arms, wherein the outer end part of each hanger support arm and the center position of the intersection of the four hanger support arms are provided with a hoisting point, the hoisting point is connected with a pull rod, and a hoisting ring is fixed after the five pull rods are intersected; and each hanger support arm is provided with a plurality of mounting holes, and one mounting hole of each hanger support arm is fixedly provided with a lifting hook. The utility model discloses utilize cross gallows to lift by crane the steel reinforcement cage, when lifting by crane, whole gallows atress is balanced, can guarantee stable removal steel reinforcement cage, it is downthehole to put into it.
Description
Technical Field
The utility model belongs to the technical field of the construction, in particular to lifting hanger device of steel reinforcement cage.
Background
The cast-in-situ bored pile technology is a construction technology with high mechanization degree, high construction speed, mature process, strong structural integrity, good earthquake resistance, guaranteed safe operation and remarkable economic comprehensive benefit in the construction of foundation structure engineering in China. When the cast-in-situ bored pile is constructed, a reinforcement cage must be accurately and stably hoisted into a pile hole, and the instability of the reinforcement cage in the hoisting process can influence the quality of the cast-in-situ bored pile and the safety of personnel in the construction process.
Disclosure of Invention
The utility model aims at providing a simple structure can guarantee steel reinforcement cage hoisting hanger device that steel reinforcement cage remains stable at hoist and mount in-process.
Therefore, the technical scheme of the utility model is that: the utility model provides a lifting hanger device of steel reinforcement cage which characterized in that: the lifting device comprises a cross-shaped lifting frame main body, wherein the cross-shaped lifting frame main body consists of four lifting frame support arms, a lifting point is arranged at the center position where the outer end part of each lifting frame support arm and the four lifting frame support arms are intersected, a pull rod is connected to the lifting point, and a lifting ring is fixed after the five pull rods are intersected; and each hanger support arm is provided with a plurality of mounting holes, and one mounting hole of each hanger support arm is fixedly provided with a lifting hook.
Furthermore, rings are located the top of gallows main part central point, and the lifting hook is located gallows support arm below.
Furthermore, the upper end of the lifting hook is of a bolt structure and is fixed through a nut after penetrating through the mounting hole of the hanger support arm.
When the lifting hook is used, a proper mounting hole is selected on each hanger support arm according to the radius of the steel reinforcement cage, and the lifting hook is mounted; hanging the hoisting ring on the hoisting equipment so that the hanger main body is hoisted to a height suitable for operation; the lifting hook on the hanger support arm is connected with the steel reinforcement cage through a steel wire rope, and the steel reinforcement cage is stably hung in the pile hole through the hanger; and after the hoisting construction is finished, the lifting hook on the hanger support arm is removed, and the hanger is moved to the next construction area.
The utility model discloses utilize the gallows of cross to lift by crane the steel reinforcement cage, the central point of gallows puts and four extreme point positions set up the hoisting point, and the rings that put the top through the pull rod with the central point are connected, and during the lift by crane, whole gallows atress is balanced, can guarantee stable removal steel reinforcement cage, puts into the stake downthehole with it. Be equipped with a plurality of mounting holes on the gallows support arm for the gallows can steadily hoist and mount the steel reinforcement cage of different diameter specifications, but reuse, and enlarge application range.
Drawings
The following detailed description is made with reference to the accompanying drawings and embodiments of the present invention
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a side view of the structure of the present invention;
fig. 3 is a top view of the structure of the present invention;
fig. 4 is a bottom view of the structure of the present invention.
Labeled as: the hanging bracket comprises a hanging bracket main body 1, a hanging bracket support arm 11, a hanging point 12, a mounting hole 13, a pull rod 2, a hanging ring 3 and a hanging hook 4.
Detailed Description
See the drawings. The hanger device of the embodiment comprises a cross-shaped hanger main body 1, wherein the hanger main body is formed by a cross-shaped steel frame and comprises four hanger support arms 11 which are perpendicular to each other, and the cross-sectional dimension of each hanger support arm is 200mmx100 mm. Lifting points 12 are arranged at the four end points and the center of the hanger main body, round steel pull rods 2 with the diameter of 20mm are connected to the lifting points, and the five pull rods 2 are finally connected to a lifting ring 3 above the center of the hanger main body 1. Each hanger support arm 11 is provided with a first mounting hole 300mm from the center, next mounting holes are formed every other 100mm, and each hanger support arm is provided with 8 mounting holes 13 with the diameter of 20 mm; only install lifting hook 4 on one mounting hole on every gallows support arm 11, the lifting hook is made for 20mm diameter round steel, and the upper end is bolt structure, passes behind the mounting hole of gallows support arm and fixes through the nut.
When the lifting hook is used, a proper mounting hole is selected on each hanger support arm 11 according to the radius of the steel reinforcement cage, and the lifting hook 4 is mounted; hanging the hanging ring 3 on the hoisting equipment, so that the hanger main body 1 is hoisted to a height suitable for operation; the lifting hook 4 on the hanger support arm 11 is connected with the reinforcement cage through a steel wire rope, and the reinforcement cage is stably hung in the pile hole through the hanger device; and after the hoisting construction is finished, removing the lifting hook on the hanger support arm, moving to the next construction area, and continuing hoisting the next reinforcement cage.
Claims (3)
1. The utility model provides a lifting hanger device of steel reinforcement cage which characterized in that: the lifting device comprises a cross-shaped lifting frame main body, wherein the cross-shaped lifting frame main body consists of four lifting frame support arms, a lifting point is arranged at the center position where the outer end part of each lifting frame support arm and the four lifting frame support arms are intersected, a pull rod is connected to the lifting point, and a lifting ring is fixed after the five pull rods are intersected; and each hanger support arm is provided with a plurality of mounting holes, and one mounting hole of each hanger support arm is fixedly provided with a lifting hook.
2. The steel reinforcement cage lifting frame device of claim 1, wherein: the lifting ring is located above the center of the hanger main body, and the lifting hook is located below the hanger supporting arm.
3. The steel reinforcement cage lifting frame device of claim 1, wherein: the upper end of the lifting hook is of a bolt structure and is fixed through a nut after penetrating through the mounting hole of the hanger support arm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020102672.4U CN211846848U (en) | 2020-01-17 | 2020-01-17 | Hoisting hanger device of steel reinforcement cage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020102672.4U CN211846848U (en) | 2020-01-17 | 2020-01-17 | Hoisting hanger device of steel reinforcement cage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211846848U true CN211846848U (en) | 2020-11-03 |
Family
ID=73232213
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020102672.4U Active CN211846848U (en) | 2020-01-17 | 2020-01-17 | Hoisting hanger device of steel reinforcement cage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211846848U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111099494A (en) * | 2020-01-17 | 2020-05-05 | 浙江省三建建设集团有限公司 | Hoisting and hanging bracket device and method for steel reinforcement cage |
-
2020
- 2020-01-17 CN CN202020102672.4U patent/CN211846848U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111099494A (en) * | 2020-01-17 | 2020-05-05 | 浙江省三建建设集团有限公司 | Hoisting and hanging bracket device and method for steel reinforcement cage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113387267B (en) | Safe hoisting and lowering method for underground diaphragm wall reinforcement cage | |
CN211846848U (en) | Hoisting hanger device of steel reinforcement cage | |
CN205224050U (en) | Steel reinforcement cage is hung and is put device | |
CN111099494A (en) | Hoisting and hanging bracket device and method for steel reinforcement cage | |
CN110924723A (en) | Construction method and hoisting device for earth-covered oil tank and using method | |
CN112193984B (en) | Steel reinforcement cage lifting and fixing device and steel reinforcement cage lifting method | |
CN214574174U (en) | Loading device for single-pile high-strain detection | |
CN211444740U (en) | Shaft pipeline hoist device | |
CN210560547U (en) | Blast furnace surrounding pipe hoisting structure | |
CN101723240B (en) | Special fixture for hoisting rectangular section steel column and hoisting method by using same | |
CN207108239U (en) | A kind of Novel steel profile hoisting device | |
CN112694016A (en) | Bridge crane steel wire rope installation auxiliary device and using method thereof | |
CN215558335U (en) | Cross shoulder pole beam for hoisting pile foundation reinforcing steel bars | |
CN220564121U (en) | Bridge crane lifting hook | |
CN220813849U (en) | Positioning device for installation and lowering of deep hole large-diameter pile foundation reinforcement cage | |
CN215160262U (en) | Pile foundation steel reinforcement cage hoisting device | |
CN219839349U (en) | Device for replacing drilling and grouting reinforcement cage hanging bars | |
CN210768082U (en) | Chimney is dead man device for putting on beams in place | |
CN220926076U (en) | Temporary supporting tool convenient for turnover | |
CN220223275U (en) | Pile foundation drill core sampling verticality location promotes support | |
CN218027231U (en) | Simple device for lowering bottom basket of hanging basket | |
CN220868215U (en) | Assembled steel frame type heavy steel casing temporary hanging bracket and positioning adjusting device | |
CN215593688U (en) | Bridge pipeline mounting platform | |
CN218712914U (en) | Dig a steel reinforcement cage soon and hang and put hole guider | |
CN212954013U (en) | Material lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |