CN211811639U - Flanged part handling equipment - Google Patents

Flanged part handling equipment Download PDF

Info

Publication number
CN211811639U
CN211811639U CN202020385241.3U CN202020385241U CN211811639U CN 211811639 U CN211811639 U CN 211811639U CN 202020385241 U CN202020385241 U CN 202020385241U CN 211811639 U CN211811639 U CN 211811639U
Authority
CN
China
Prior art keywords
pull rod
vertical support
horizontal
inner core
outer sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020385241.3U
Other languages
Chinese (zh)
Inventor
王有发
刘俊杰
闫冬冬
刘宴伟
孙征
费立敏
王少云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Bureau Group Installation Engineering Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Bureau Group Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Bureau Group Installation Engineering Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202020385241.3U priority Critical patent/CN211811639U/en
Application granted granted Critical
Publication of CN211811639U publication Critical patent/CN211811639U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a flanged part haulage equipment, it includes: the lifting device comprises a pull rod, a movable lifting hook, a vertical bracket, a horizontal support rod, a roller, a supporting arm and a flange clamp; the pull rod comprises a pull rod inner core and a pull rod outer sleeve; the movable lifting hook is sleeved on the pull rod; the upper end of the vertical bracket is hinged with one end of the pull rod; the horizontal stay bar is fixedly connected with the lower end of the vertical support; the rollers are arranged at two ends of the horizontal support rod; the bracket arm is fixed on the vertical bracket and/or the horizontal stay bar; the flange fixture is connected to the lower end of the movable lifting hook; the flange clamp comprises a base, an ear plate and a flange clamp arm, the ear plate is fixedly connected with the base, and the flange clamp arm is hinged with the ear plate. The utility model discloses haulage equipment has solved the flanged part transportation difficulty, needs a plurality of personnel problem of cooperating in coordination, can effectively reduce the transportation degree of difficulty and personnel cost, and whole device maintenance is accomodate conveniently simultaneously, the used repeatedly of being convenient for. The construction cost is saved, and the construction efficiency is improved.

Description

Flanged part handling equipment
Technical Field
The utility model belongs to the technical field of pipeline type construction transport means, especially, relate to a flanged part haulage equipment.
Background
In construction and pipeline construction process, to the short distance removal of heavier material, use the flat carrier car to go on usually, put things in good order the material such as strip stone, fragment of brick in the flat carrier car, once can transport more material.
However, for parts with flanges, such as pipeline parts like valves, the existence of the flanges causes the material of the parts to be unstable after being placed on the flat-bed transport vehicle, and the parts are difficult to fix. When the flat-bed transport vehicle is used for moving, the transportation is difficult, and the unloading needs to be carried out for two times after the flat-bed transport vehicle is transported in place, so that the workload and the labor intensity are increased.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a flanged part haulage equipment.
The utility model provides an above-mentioned technical problem's technical scheme as follows: a flanged part handling apparatus, comprising: the lifting device comprises a pull rod, a movable lifting hook, a vertical bracket, a horizontal support rod, a roller, a supporting arm and a flange clamp; the pull rod comprises a pull rod inner core and a pull rod outer sleeve, the pull rod inner core is inserted into the pull rod outer sleeve, adjusting holes are formed in the pull rod inner core and the pull rod outer sleeve, and a pull rod pin bolt is inserted into the adjusting holes to fix the length of the pull rod; the movable lifting hook is sleeved on the pull rod; the upper end of the vertical support is hinged with one end of the pull rod; the horizontal support rod is fixedly connected with the lower end of the vertical support; the rollers are arranged at two ends of the horizontal support rod; the supporting arm is fixed on the vertical bracket and/or the horizontal supporting rod; the flange fixture is connected to the lower end of the movable lifting hook; the flange fixture comprises a base, an ear plate and a flange clamping arm, the ear plate is fixedly connected with the base, and the flange clamping arm is hinged with the ear plate.
The utility model discloses as above flanged part haulage equipment, further, flange fixture still includes the clamp plate, the clamp plate articulates the inboard at flange card arm.
The utility model discloses as above flanged part haulage equipment, further, flange fixture still includes outer convex part, outer convex part sets up the outside at flange card arm.
The utility model discloses a flanged part handling equipment as above, further, portable lifting hook includes splint, pulley and coupling hook, and the pulley is connected between the splint, and the coupling mechanism is fixed in the lower part of splint; the pull rod is arranged in the clamping plate and is positioned below the pulley.
The utility model discloses as above flanged part haulage equipment, it is further, vertical support includes vertical support inner core and vertical support outer tube, vertical support inner core inserts in the vertical support outer tube, sets up the regulation hole on vertical support inner core and vertical support outer tube, and the support cotter pin inserts the length of the fixed vertical support in regulation hole.
The utility model discloses as above flanged part haulage equipment, it is further, horizontal brace includes horizontal brace inner core and horizontal brace outer tube, horizontal brace inner core inserts horizontal brace outer tube intraductally, sets up the regulation hole on horizontal brace inner core and horizontal brace outer tube, the length that the bracing bolt inserted the fixed horizontal brace in regulation hole.
The utility model discloses as above flanged part haulage equipment, further, still include three corner brace, the pull rod is connected to three corner brace's one end, and vertical support is connected to the other end, constitutes triangular supports structure.
The utility model discloses as above flanged part haulage equipment, further, still include the floor, the position at vertical support and horizontal vaulting pole handing-over is fixed to the floor.
The utility model discloses haulage equipment has solved the flanged part transportation difficulty, needs a plurality of personnel problem of cooperating in coordination, can effectively reduce the transportation degree of difficulty and personnel cost, and whole device maintenance is accomodate conveniently simultaneously, the used repeatedly of being convenient for. The construction cost is saved, and the construction efficiency is improved.
Drawings
The above and/or other aspects and advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are given by way of illustration only and not by way of limitation, wherein:
fig. 1 is a schematic view of a flanged component handling apparatus according to an embodiment of the present invention;
fig. 2 is a schematic view of a flange fixture and a flanged component according to an embodiment of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. the device comprises a pull rod, 11, a pull rod inner core, 12, a pull rod outer sleeve, 13, a pull rod pin bolt, 2, a movable lifting hook, 21, a clamping plate, 22, a pulley, 23, a connecting hook, 3, a triangular support, 4, a vertical support, 41, a vertical support inner core, 42, a vertical support outer sleeve, 43, a support pin bolt, 5, a bracket arm, 6, a rib plate, 7, a horizontal support rod, 71, a horizontal support rod inner core, 72, a horizontal support rod outer sleeve, 8, a roller, 9, a flange clamp, 91, a base, 92, an ear plate, 93, a bolt, 94, a flange clamp arm, 95, a pressing plate, 96, an outer convex part, 10, a part with a flange, 20 and a flange.
Detailed Description
Hereinafter, embodiments of the flanged part transfer apparatus of the present invention will be described with reference to the accompanying drawings.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of the respective portions and the mutual relationships thereof. It should be noted that for the sake of clarity in showing the structures of the various components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
Fig. 1 and 2 show flanged part handling equipment of an embodiment of the present invention, which includes:
the pull rod 1 comprises a pull rod inner core 11 and a pull rod outer sleeve 12, the pull rod inner core 11 is inserted into the pull rod outer sleeve 12, adjusting holes are formed in the pull rod inner core 11 and the pull rod outer sleeve 12, and a pull rod pin 13 is inserted into the adjusting holes to fix the length of the pull rod 1; the pull rod is of a structure with adjustable length, so that when one end of the pull rod is lifted, a heavy flanged part can be lifted in a labor-saving manner.
The movable lifting hook 2 is sleeved on the pull rod 1; due to the arrangement of the movable lifting hook, when the flanged part is lifted and moved, the position of the part can be conveniently moved, after the flanged part is lifted, the movable lifting hook and the flanged part are moved to the lower end of the position (close to one end of the vertical support) by lifting one end of the pull rod, and therefore the flanged part can be positioned and cannot swing in the moving process. In the embodiment shown in fig. 2, the movable hook 2 includes clamping plates 21, a pulley 22 and a connecting hook 23, the pulley 22 is connected between the clamping plates 21, and a connecting mechanism is fixed to the lower portion of the clamping plates 21; the pull rod 1 is mounted in the clamping plate 21 below the pulley 22. The arrangement of the pulley can enable the movable lifting hook to move on the pull rod more smoothly.
The upper end of the vertical support 4 is hinged with one end of the pull rod 1; in a preferred embodiment, the vertical bracket comprises a vertical bracket inner core 41 and a vertical bracket outer sleeve 42, the vertical bracket inner core 41 is inserted into the vertical bracket outer sleeve 42, adjusting holes are arranged on the vertical bracket inner core 41 and the vertical bracket outer sleeve 42, and a bracket pin 43 is inserted into the adjusting holes to fix the length of the vertical bracket 4. The vertical support is designed into a type with adjustable height, so that the carrying equipment is suitable for carrying flanged parts with different sizes and specifications; meanwhile, when the parts are conveyed to a higher position, the purpose of facilitating discharging is achieved by adjusting the height of the vertical support.
The horizontal support rod 7 is fixedly connected with the lower end of the vertical support 4; in a preferred embodiment, the horizontal stay 7 comprises an inner horizontal stay core 71 and an outer horizontal stay tube 72, the inner horizontal stay core 71 is inserted into the outer horizontal stay tube 72, adjusting holes are arranged on the inner horizontal stay core 71 and the outer horizontal stay tube 72, and a stay bolt is inserted into the adjusting holes to fix the length of the horizontal stay 7. The length of the horizontal stay bar influences the stability of the carrying equipment during moving, so that the length of the horizontal stay bar cannot be too short, but the longer horizontal stay bar can cause occupation of larger space when the equipment is stored in an idle state, and the length-adjustable horizontal stay bar can solve the contradiction. And the rollers 8 are arranged at two ends of the horizontal support rod 7, and the number of the rollers shown in figure 1 is two.
The supporting arm 5 is fixed on the vertical support 4 and/or the horizontal supporting rod 7; as shown in fig. 1, the bracket is formed by two flat plates bent into an L shape. Preferably, the two abutting plates are angled (e.g., 160 to 170 degrees) to facilitate gripping of the lower portion of the flanged component. After the flanged part is lifted, one end of the lifting rod is lifted to enable the movable lifting hook and the flanged part to move to the lower end of the position (close to one end of the vertical support), and the flanged part is in contact with the supporting arm, so that the flanged part is positioned and cannot swing in the moving process. In addition, the trailing arm can avoid the flanged part to lead to its damage with vertical support collision.
The flange clamp 9, the flange clamp 9 is connected to the lower end of the movable hook 2; the flange fixture 9 comprises a base 91, an ear plate 92 and a flange clamp arm 94, wherein the ear plate 92 is fixedly connected with the base 91, and the flange clamp arm 94 is hinged with the ear plate 92 by a bolt 93 or a rivet.
When the flanged part 10 shown in fig. 1 is conveyed, the external profile of the part is not regular cuboid or linear column due to the flange 20, and the conventional tool is difficult to transport smoothly and laborsavingly. The utility model discloses haulage equipment has solved the flanged part transportation difficulty, needs a plurality of personnel problem of cooperating in coordination, can effectively reduce the transportation degree of difficulty and personnel cost, and whole device maintenance is accomodate conveniently simultaneously, the used repeatedly of being convenient for. The construction cost is saved, and the construction efficiency is improved.
In a preferred flanged parts handler embodiment, the flange clamp 9 further comprises a pressure plate 95, the pressure plate 95 being hinged inside the flange clamp arm 94. The pressing plate is moved upwards before the flange-provided part is lifted by equipment, after the flange-provided part is hooked by the hook part at the lower end of the flange clamping arm 94, the pressing plate is pressed downwards to be clamped with the hook part together, the part is prevented from falling in the transportation process, and the use safety of the equipment is improved.
In a preferred flanged parts handler embodiment, the flange clamp 9 further comprises an outer protrusion 96, the outer protrusion 96 being disposed outside the flange clamp arm 94. The outer convex part can be used as a holding point for adjusting the positions and angles of the flange clamp and the part with the flange by workers, and facilitates the force application of the workers.
In a preferred flanged part handling equipment embodiment, still include triangular supports 3, the pull rod 1 is connected to the one end of triangular supports 3, and the vertical support 4 is connected to the other end, constitutes triangular supports structure. The triangular supports can be used for reducing the force of workers for lifting the pull rod after lifting the parts with the flanges, and the aim of saving labor is fulfilled.
In a preferred embodiment of the flanged part handling device, the flanged part handling device further comprises a cross brace 6, and the cross brace 6 is fixed at the position where the vertical support 4 and the horizontal support rod 7 are jointed. The setting of floor can avoid the welding point or the connecting bolt of the position of vertical support 4 and 7 handing-over of horizontal vaulting pole to damage, improve equipment's bulk strength.
The technical features disclosed above are not limited to the combinations with other features disclosed, and other combinations between the technical features can be performed by those skilled in the art according to the purpose of the invention to achieve the aim of the invention.

Claims (8)

1. A flanged part handling equipment, characterized by includes: the lifting device comprises a pull rod (1), a movable lifting hook (2), a vertical support (4), a horizontal support rod (7), a roller (8), a support arm (5) and a flange clamp (9); the pull rod (1) comprises a pull rod inner core (11) and a pull rod outer sleeve (12), the pull rod inner core (11) is inserted into the pull rod outer sleeve (12), adjusting holes are formed in the pull rod inner core (11) and the pull rod outer sleeve (12), and a pull rod pin (13) is inserted into the adjusting holes to fix the length of the pull rod (1); the movable lifting hook (2) is sleeved on the pull rod (1); the upper end of the vertical support (4) is hinged with one end of the pull rod (1); the horizontal support rod (7) is fixedly connected with the lower end of the vertical support (4); the rollers (8) are arranged at two ends of the horizontal support rod (7); the supporting arm (5) is fixed on the vertical bracket (4) and/or the horizontal supporting rod (7); the flange fixture (9) is connected to the lower end of the movable lifting hook (2); the flange clamp (9) comprises a base (91), an ear plate (92) and a flange clamp arm (94), wherein the ear plate (92) is fixedly connected with the base (91), and the flange clamp arm (94) is hinged with the ear plate (92).
2. Flanged part handling equipment according to claim 1, characterized in that the flange clamp (9) further comprises a pressure plate (95), the pressure plate (95) being hinged inside the flange clamp arm (94).
3. Flanged parts handler arrangement according to claim 2, characterized in that the flange clamp (9) further comprises an outer protrusion (96), which outer protrusion (96) is arranged outside the flange clamp arm (94).
4. Flanged parts handling equipment according to claim 3, characterized in that the movable hook (2) comprises clamping plates (21), pulleys (22) and attachment hooks (23), the pulleys (22) being attached between the clamping plates (21), the attachment means being fixed to the lower part of the clamping plates (21); the pull rod (1) is arranged in the clamping plate (21) and is positioned below the pulley (22).
5. The flanged part handling apparatus of claim 4, characterized in that the vertical support comprises a vertical support inner core (41) and a vertical support outer sleeve (42), the vertical support inner core (41) is inserted into the vertical support outer sleeve (42), adjusting holes are arranged on the vertical support inner core (41) and the vertical support outer sleeve (42), and a support pin (43) is inserted into the adjusting holes to fix the length of the vertical support (4).
6. The flanged part handling apparatus of claim 4, characterized in that the horizontal stay (7) comprises a horizontal stay inner core (71) and a horizontal stay outer sleeve (72), the horizontal stay inner core (71) is inserted into the horizontal stay outer sleeve (72), adjusting holes are arranged on the horizontal stay inner core (71) and the horizontal stay outer sleeve (72), and stay pin bolts are inserted into the adjusting holes to fix the length of the horizontal stay (7).
7. The flanged part handling apparatus of any of claims 1-6, further comprising a triangular brace (3), wherein one end of the triangular brace (3) is connected with the tie rod (1) and the other end is connected with the vertical support (4) to form a triangular support structure.
8. Flanged part handling equipment according to any of claims 1-6, characterized by further comprising a cross brace (6), the cross brace (6) being fixed in a position where the vertical support (4) meets the horizontal brace (7).
CN202020385241.3U 2020-03-24 2020-03-24 Flanged part handling equipment Expired - Fee Related CN211811639U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020385241.3U CN211811639U (en) 2020-03-24 2020-03-24 Flanged part handling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020385241.3U CN211811639U (en) 2020-03-24 2020-03-24 Flanged part handling equipment

Publications (1)

Publication Number Publication Date
CN211811639U true CN211811639U (en) 2020-10-30

Family

ID=73009377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020385241.3U Expired - Fee Related CN211811639U (en) 2020-03-24 2020-03-24 Flanged part handling equipment

Country Status (1)

Country Link
CN (1) CN211811639U (en)

Similar Documents

Publication Publication Date Title
CN209778055U (en) A general lifting device for lifting cylinder head
CN201485169U (en) Fixture for mounting multistage cylinder of dump truck
CN211811639U (en) Flanged part handling equipment
CN203006706U (en) Lifting device for cabin longitudinal beam welding assembly of vehicle body
CN219603128U (en) Beam unloading equipment
CN211388779U (en) Tire carrying manipulator
CN210736005U (en) A device for automatic loading of the double side walls of a container to a final assembly table
CN209853547U (en) Railway freight container lifting appliance
CN219257359U (en) Rail conveyer
CN214326916U (en) Lifting appliance for hub
CN210558996U (en) Assembled building model platform double-limb column lifting appliance
CN214454102U (en) Simple large-size square brick carrying device
CN223590744U (en) Electric power engineering member travelling bogie
CN210284972U (en) Semi-permanent car coupler transporting device
CN208716308U (en) For the conveying device of aluminum alloy pattern plate material transfer
CN207876783U (en) Flexible transport carriage for eight-corner tube gripping apparatus
CN221894680U (en) Workpiece handling tool
CN214611099U (en) Steel pipe hoisting accessory
CN220432045U (en) Lifting appliance for carrying metal coiled materials
CN219489356U (en) Lifting mechanism for strip-shaped mold
CN222202588U (en) Article carrying frame
CN216659981U (en) Smelting furnace is conveyer for scrap iron ladle
CN119389280A (en) A kind of electric power engineering pole transport trolley
CN216304431U (en) Bridge hogging moment tensioning jack moving die frame
CN211945908U (en) Large and light hoisting frame for bearing body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030

CF01 Termination of patent right due to non-payment of annual fee