CN211790412U - Electric power construction cable suspension device - Google Patents
Electric power construction cable suspension device Download PDFInfo
- Publication number
- CN211790412U CN211790412U CN201921979310.7U CN201921979310U CN211790412U CN 211790412 U CN211790412 U CN 211790412U CN 201921979310 U CN201921979310 U CN 201921979310U CN 211790412 U CN211790412 U CN 211790412U
- Authority
- CN
- China
- Prior art keywords
- fixed plate
- electric power
- worm
- power construction
- bobbin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 15
- 239000000725 suspension Substances 0.000 title claims description 12
- 238000004804 winding Methods 0.000 claims abstract description 7
- 230000003014 reinforcing Effects 0.000 claims description 9
- 240000004282 Grewia occidentalis Species 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 3
- 206010044565 Tremor Diseases 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000006011 modification reaction Methods 0.000 description 2
- 101700022029 GBLP Proteins 0.000 description 1
- 238000004026 adhesive bonding Methods 0.000 description 1
- 230000001808 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002708 enhancing Effects 0.000 description 1
Images
Abstract
The utility model discloses an electric power construction cable hanging device, including mounting bracket and assembly pulley, the mounting bracket is whole to be the style of calligraphy frame, install the bobbin in the mounting bracket, install on the winding roller in the bobbin and carry and act as go-between, driving motor is installed to one side of bobbin, the dead lever is installed on the top of mounting bracket, carry and act as go-between and pass assembly pulley and tip and install the couple, the top fixed mounting of assembly pulley has the fixed plate, the centre gripping breach has been seted up to one side of fixed plate, the top and the bottom of centre gripping breach are convex setting, the shifting chute has been seted up on the upper portion of fixed plate, install the removal grip block in the shifting chute, install the regulation pole in the fixed plate, the top fixed mounting who adjusts the pole has the worm wheel, the worm is. The utility model discloses, can strengthen the installation stability of assembly pulley, facilitate the use more.
Description
Technical Field
The utility model relates to an electric power construction technical field specifically is an electric power construction cable suspension device.
Background
In the process of electric power construction, since the cable is generally installed at a high altitude, it is necessary to lift and suspend the cable using a suspension device, and then to fix and install the cable manually.
The utility model discloses an applicant discovers, and current cable hanging device uses the couple to hang fixedly when using, and the cable promotes the in-process and can drop because hang the shakiness, influences the use of device.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power construction cable hanging device to solve among the prior art cable hanging device when using, the assembly pulley uses the couple to hang fixedly, can hang the problem that the shakiness drops because of hanging in the cable promotion in-process.
In order to achieve the above object, the utility model provides a following technical scheme:
a cable suspension device for electric power construction comprises a mounting frame and a pulley block, wherein the mounting frame is integrally a rectangular frame, a bobbin is mounted in the mounting frame and is mounted in the mounting frame through bolts, a lifting wire is mounted on a winding roller in the bobbin, a driving motor is mounted on one side of the bobbin, the output end of the driving motor is connected with the winding roller in the bobbin through a coupler, a fixing rod is mounted at the top end of the mounting frame, two ends of the fixing rod are fixedly connected with the mounting frame, the lifting wire penetrates through the pulley block, a hook is mounted at the end of the lifting wire, a fixing plate is fixedly mounted at the top end of the pulley block, a clamping notch is formed in one side of the fixing plate, one side of the clamping notch penetrates through the fixing plate, the top end and the bottom end of the clamping notch are both arc-, install the removal grip block in the removal inslot, install the regulation pole in the fixed plate, the bottom of adjusting the pole extends to in the removal inslot and inserts and remove the grip block, adjust pole upper portion and pass through the bearing and install in the fixed plate, the top fixed mounting who adjusts the pole has the worm wheel, the worm is installed to fixed plate upper portion one side.
Preferably, a reinforcing column is installed at the bottom of the fixing rod and is arranged obliquely, and two ends of the fixing rod are fixedly connected with the reinforcing column and the mounting rack respectively.
Preferably, the four corners in bottom of mounting bracket are installed and are had the lock universal wheel, the area is locked the universal wheel and is installed in the mounting bracket through the bolt.
Preferably, the bottom of centre gripping breach is installed fixed grip block, the bottom at the centre gripping breach is installed through the mode of veneer to fixed grip block.
Preferably, the adjusting rod is provided with an external thread at the part located in the moving groove, the upper part of the moving clamping plate is provided with a threaded through hole matched with the adjusting rod, and the adjusting rod is in threaded fit with the moving clamping plate.
Preferably, the worm passes through the bearing and installs in the fixed plate, the one end that the worm is located the fixed plate meshes with the worm wheel, the one end fixed mounting that the worm is located the fixed plate outside has the handle.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the movable clamping plate is driven to move through the worm, the worm wheel and the adjusting rod and is matched with the fixed clamping plate to clamp and fix the fixed plate, so that the pulley block is fixed, and the installation stability of the pulley block is enhanced.
2. When the device is not used, the fixing plate can be installed on the fixing rod at the top of the mounting frame, the device can be stored, and the device can be stored and used more conveniently.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the fixing plate and the pulley block of the present invention;
fig. 3 is a schematic view of the internal structure of the fixing plate of the present invention.
In the figure: 1. a mounting frame; 2. a bobbin; 3. pulling the wire; 4. universal wheels with locks; 5. a drive motor; 6. fixing the rod; 7. a fixing plate; 8. a pulley block; 9. reinforcing columns; 10. a worm; 11. clamping the notch; 12. moving the clamping plate; 13. fixing the clamping plate; 14. a moving groove; 15. a worm gear; 16. and adjusting the rod.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-3, in an embodiment of the present invention, an electric power construction cable suspension device, includes a mounting bracket 1 and a pulley block 8, the whole mounting bracket 1 is a frame, the universal wheels 4 with locks are installed at four corners of the bottom end of the mounting bracket 1, the universal wheels 4 with locks are installed in the mounting bracket 1 through bolts, a bobbin 2 is installed in the mounting bracket 1, the bobbin 2 is installed in the mounting bracket 1 through bolts, the pull wire 3 is installed on the winding roller in the bobbin 2, a driving motor 5 is installed at one side of the bobbin 2, the output end of the driving motor 5 is connected with the winding roller in the bobbin 2 through a shaft coupling, a fixing rod 6 is installed at the top end of the mounting bracket 1, two ends of the fixing rod 6 are fixedly connected with the mounting bracket 1, a reinforcing column 9 is installed at the bottom of the fixing rod 6, the reinforcing column 9 is arranged in, The mounting frame 1 is fixedly connected, the reinforcing column 9 enhances the stability of the fixing rod 6, the pulling wire 3 passes through the pulley block 8, the end part of the pulling wire is provided with a hook, the driving motor 5 drives the pulling wire 3 to move, the pulling and hanging of the cable are realized, the top end of the pulley block 8 is fixedly provided with a fixing plate 7, one side of the fixing plate 7 is provided with a clamping gap 11, one side of the clamping gap 11 penetrates through the fixing plate 7, the top end and the bottom end of the clamping gap 11 are both in arc shape, the bottom end of the clamping gap 11 is provided with a fixing clamping plate 13, the fixing clamping plate 13 is arranged at the bottom end of the clamping gap 11 in a gluing mode, the upper part of the fixing plate 7 is provided with a moving groove 14, a moving clamping plate 12 is arranged in the moving groove 14, an adjusting rod 16 is arranged in the fixing plate 7, the bottom of, the upper part of the movable clamping plate 12 is provided with a threaded through hole matched with an adjusting rod 16, the adjusting rod 16 is in threaded fit with the movable clamping plate 12, the upper part of the adjusting rod 16 is installed in the fixed plate 7 through a bearing, a worm wheel 15 is fixedly installed at the top end of the adjusting rod 16, a worm 10 is installed on one side of the upper part of the fixed plate 7, the worm 10 is installed in the fixed plate 7 through a bearing, one end, located in the fixed plate 7, of the worm 10 is meshed with the worm wheel 15, one end, located outside the fixed plate 7, of the worm 10 is fixedly provided with a handle, the worm wheel 15 is driven to rotate through the worm 10, the adjusting rod 16 drives the movable clamping plate 12 to move in the moving groove 14 along with the worm, the movable clamping plate is moved through the universal wheel 4 with a lock at the bottom end of the mounting frame 1, the fixed plate 7 is, realize the centre gripping of fixed plate 7 fixed to realize the installation of assembly pulley 8, driving motor 5 drives and carries 3 movements of acting as go-between, carries out the drawing of cable through the couple on carrying the acting as go-between 3 and suspends in midair, when not using the device, detains fixed plate 7 on dead lever 6.
The utility model discloses a theory of operation and use flow: when the device is used, the universal wheel 4 with the lock at the bottom end of the mounting rack 1 is moved, the fixing plate 7 is installed at a required position, the worm 10 drives the worm wheel 15 to rotate, the adjusting rod 16 drives the movable clamping plate 12 to move in the movable groove 14 along with the movable clamping plate, the fixed clamping plate 13 is matched with the fixed clamping plate, the fixing of the fixing plate 7 is achieved, the pulley block 8 is installed, the driving motor 5 drives the lifting wire 3 to move, the lifting wire 3 is hung by lifting the cable through the hook on the lifting wire 3, and when the device is not used, the fixing plate 7 is buckled on the fixing rod 6.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. The utility model provides an electric power construction cable suspension device, includes mounting bracket (1) and assembly pulley (8), its characterized in that: the integral rectangular rack of the mounting rack (1), the bobbin (2) is installed in the mounting rack (1) through bolts, the pull wire (3) is installed on the winding roller in the bobbin (2), the driving motor (5) is installed on one side of the bobbin (2), the output end of the driving motor (5) is connected with the winding roller in the bobbin (2) through a coupler, the top end of the mounting rack (1) is provided with the fixing rod (6), two ends of the fixing rod (6) are fixedly connected with the mounting rack (1), the pull wire (3) penetrates through the pulley block (8) and the end part of the pulley block (8) is provided with the hook, the top end of the pulley block (8) is fixedly provided with the fixing plate (7), one side of the fixing plate (7) is provided with the clamping notch (11), one side of the clamping notch (11) penetrates through the fixing plate (7, the top and the bottom of centre gripping breach (11) are convex setting, shifting chute (14) have been seted up on the upper portion of fixed plate (7), install in shifting chute (14) and remove grip block (12), install in fixed plate (7) and adjust pole (16), the bottom of adjusting pole (16) extends to in shifting chute (14) and inserts in removing grip block (12), it installs in fixed plate (7) through the bearing to adjust pole (16) upper portion, the top fixed mounting who adjusts pole (16) has worm wheel (15), worm (10) are installed to fixed plate (7) upper portion one side.
2. The electric power construction cable suspension device of claim 1, wherein: reinforcing column (9) is installed to dead lever (6) bottom, reinforcing column (9) are the slope setting, the both ends of dead lever (6) are fixed continuous with reinforcing column (9), mounting bracket (1) respectively.
3. The electric power construction cable suspension device of claim 1, wherein: four corners in the bottom of mounting bracket (1) are installed and are had lock universal wheel (4), area lock universal wheel (4) pass through the bolt and install in mounting bracket (1).
4. The electric power construction cable suspension device of claim 3, wherein: fixed grip block (13) are installed to the bottom of centre gripping breach (11), the bottom at centre gripping breach (11) is installed through the mode of veneer in fixed grip block (13).
5. The electric power construction cable suspension device of claim 4, wherein: the adjusting rod (16) is provided with an external thread at the part positioned in the moving groove (14), the upper part of the moving clamping plate (12) is provided with a thread through hole matched with the adjusting rod (16), and the adjusting rod (16) is in thread fit with the moving clamping plate (12).
6. The electric power construction cable suspension device of claim 4, wherein: the worm (10) is installed in the fixed plate (7) through the bearing, one end that worm (10) is located fixed plate (7) meshes with worm wheel (15), the one end fixed mounting that worm (10) is located fixed plate (7) outside has the handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921979310.7U CN211790412U (en) | 2019-11-15 | 2019-11-15 | Electric power construction cable suspension device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921979310.7U CN211790412U (en) | 2019-11-15 | 2019-11-15 | Electric power construction cable suspension device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211790412U true CN211790412U (en) | 2020-10-27 |
Family
ID=72964206
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921979310.7U Active CN211790412U (en) | 2019-11-15 | 2019-11-15 | Electric power construction cable suspension device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211790412U (en) |
-
2019
- 2019-11-15 CN CN201921979310.7U patent/CN211790412U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108673078B (en) | Electric power fastener erection equipment | |
CN210177926U (en) | Sliding telescopic hanging basket for building external wall construction | |
CN211790412U (en) | Electric power construction cable suspension device | |
CN209536668U (en) | A kind of take-up that weak current engineering is arranged with loosening | |
CN216034591U (en) | Simple hoisting trolley for constructional engineering | |
CN215208085U (en) | A construction tool for assembled PC component | |
CN212053828U (en) | Steel construction engineering component rotating device | |
CN107971992A (en) | It is a kind of for mould hold can the mould of intelligent control hold rack device | |
CN209078659U (en) | A kind of vehicle-mounted pulley extractor of large-tonnage | |
CN217302272U (en) | Safety automatic stop device of blue and white lapper | |
CN217859962U (en) | Clamping and fixing device for machining axle housing of heavy truck | |
CN217388052U (en) | Plateau electric power erects and uses cable hoist device | |
CN217024994U (en) | Electrolytic cell cathode carbon block hoisting device | |
CN204873185U (en) | Cable dish admission machine | |
CN216638682U (en) | Assembled building materials hoisting apparatus | |
CN217984273U (en) | Cable dismouting auxiliary device | |
CN214167146U (en) | Steel construction section bar lifting device | |
CN218557124U (en) | But quick replacement's robot anchor clamps | |
CN217808425U (en) | Auxiliary lifting device for engineering construction | |
CN217264177U (en) | Portable pole chuck hoist device | |
CN219666578U (en) | Fixer for bridge processing | |
CN218198366U (en) | Construction raw material shifts car is built in room | |
CN210173878U (en) | Electric pole steel reinforcement framework prestress tension moving tool | |
CN218642306U (en) | Hook bridge crane | |
CN210735801U (en) | Modified is convenient for cable paying out machine for power engineering that removes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |