CN211776388U - Installation mechanism of fence for building - Google Patents

Installation mechanism of fence for building Download PDF

Info

Publication number
CN211776388U
CN211776388U CN201922243695.7U CN201922243695U CN211776388U CN 211776388 U CN211776388 U CN 211776388U CN 201922243695 U CN201922243695 U CN 201922243695U CN 211776388 U CN211776388 U CN 211776388U
Authority
CN
China
Prior art keywords
fence
sleeve
rotating shaft
connection
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922243695.7U
Other languages
Chinese (zh)
Inventor
张秀娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuancheng Guanyuan Construction Engineering Co ltd
Original Assignee
Yunhe Longsheng Machinery Design Studio
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunhe Longsheng Machinery Design Studio filed Critical Yunhe Longsheng Machinery Design Studio
Priority to CN201922243695.7U priority Critical patent/CN211776388U/en
Application granted granted Critical
Publication of CN211776388U publication Critical patent/CN211776388U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

本实用新型公开了一种建筑用围栏的安装机构,包括连接主体、第一围栏和第二围栏,所述连接主体,所述第一围栏与第二围栏通过连接主体转动安装在一起,所述连接主体包括控制主体、第一连接套和第二连接套,所述控制主体滑动嵌接安装在第一连接套的内壁,所述控制主体通过第二连接套转动安装,所述控制主体包括连接杆和转轴,所述转轴均匀设置在连接杆的侧壁,所述转轴通过连接杆固定连接,所述第一连接套包括第一套筒,所述转轴的上端滑动插接在第一套筒的内壁,所述第一套筒通过第一围栏与第二围栏的一侧端固定连接,所述第二连接套包括第二连接块和第二套筒。本实用新型方便了围栏组装,更好的满足使用需要。

Figure 201922243695

The utility model discloses an installation mechanism of a fence for construction, which comprises a connection main body, a first fence and a second fence, the connection main body, the first fence and the second fence are rotated and installed together through the connection main body. The connection body includes a control body, a first connection sleeve and a second connection sleeve, the control body is slidably fitted on the inner wall of the first connection sleeve, the control body is rotatably installed through the second connection sleeve, and the control body includes a connection A rod and a rotating shaft, the rotating shaft is evenly arranged on the side wall of the connecting rod, the rotating shaft is fixedly connected by the connecting rod, the first connecting sleeve includes a first sleeve, and the upper end of the rotating shaft is slidably inserted into the first sleeve The first sleeve is fixedly connected to one side end of the second fence through the first fence, and the second connecting sleeve includes a second connecting block and a second sleeve. The utility model facilitates the assembly of the fence and better meets the needs of use.

Figure 201922243695

Description

一种建筑用围栏的安装机构An installation mechanism for a building fence

技术领域technical field

本实用新型涉及建筑用围栏设备技术领域,具体为一种建筑用围栏的安装机构。The utility model relates to the technical field of fence equipment for construction, in particular to an installation mechanism for fences used in construction.

背景技术Background technique

常见的建筑用围栏在组装时通常采用将轴插入到轴套内的方式进行组装,由于第一个围栏在安装时不方便站立,使得其安装过程中需要多人进行组装,且围栏的自重过大,不方便将其整体抬起插入组装,从而导致现有常见的围栏组装困难的问题,所以急需要一种能够缓解上述问题的装置。Common construction fences are usually assembled by inserting the shaft into the shaft sleeve. Since the first fence is inconvenient to stand during installation, it requires multiple people to assemble during the installation process, and the weight of the fence is too high. It is inconvenient to lift and insert the whole fence, which leads to the problem of difficulty in assembling the existing common fence. Therefore, there is an urgent need for a device that can alleviate the above problem.

实用新型内容Utility model content

本实用新型的目的在于提供一种建筑用围栏的安装机构,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide an installation mechanism of a fence for construction, so as to solve the problems raised in the above background technology.

为实现上述目的,本实用新型提供如下技术方案:一种建筑用围栏的安装机构,包括连接主体、第一围栏和第二围栏;所述连接主体,所述第一围栏与第二围栏通过连接主体转动安装在一起;所述连接主体包括控制主体、第一连接套和第二连接套,所述控制主体滑动嵌接安装在第一连接套的内壁,所述控制主体通过第二连接套转动安装;所述控制主体包括连接杆和转轴,所述转轴均匀设置在连接杆的侧壁,所述转轴通过连接杆固定连接,所述第一连接套包括第一套筒,所述转轴的上端滑动插接在第一套筒的内壁,所述第一套筒通过第一围栏与第二围栏的一侧端固定连接;所述第二连接套包括第二连接块和第二套筒,所述第二套筒的下端固定连接在第二连接块的上端,所述第二连接块通过第一围栏和第二围栏的另一侧端固定连接,所述转轴的下端转动插接在第二套筒的内壁。In order to achieve the above purpose, the present invention provides the following technical solutions: an installation mechanism for a fence for construction, comprising a connection body, a first fence and a second fence; the connection main body, the first fence and the second fence are connected by connecting The main bodies are rotatably installed together; the connection main body includes a control main body, a first connection sleeve and a second connection sleeve, the control main body is slidably fitted on the inner wall of the first connection sleeve, and the control main body rotates through the second connection sleeve installation; the control body includes a connecting rod and a rotating shaft, the rotating shaft is evenly arranged on the side wall of the connecting rod, the rotating shaft is fixedly connected by the connecting rod, the first connecting sleeve includes a first sleeve, and the upper end of the rotating shaft The first sleeve is slidably inserted into the inner wall of the first sleeve, and the first sleeve is fixedly connected to one side of the second fence through the first fence; the second connection sleeve includes a second connection block and a second sleeve, so The lower end of the second sleeve is fixedly connected to the upper end of the second connecting block, the second connecting block is fixedly connected through the other side end of the first fence and the second fence, and the lower end of the rotating shaft is rotatably inserted in the second inner wall of the sleeve.

优选的,所述一种建筑用围栏的安装机构还包括第一辅助支撑脚,所述第一辅助支撑脚通过第一围栏和第二围栏的一侧下端转动安装。Preferably, the installation mechanism of the construction fence further includes a first auxiliary support foot, and the first auxiliary support foot is rotated and installed by the lower ends of one side of the first fence and the second fence.

优选的,所述一种建筑用围栏的安装机构还包括第二辅助支撑脚,所述第二辅助支撑脚通过第一围栏和第二围栏的另一侧下端转动安装。Preferably, the installation mechanism of the construction fence further includes a second auxiliary support foot, and the second auxiliary support foot is rotated and installed by the lower ends of the other side of the first fence and the second fence.

优选的,所述控制主体还包括第一连接块,所述第一连接块固定连接在转轴的上端,所述转轴通过第一连接块与连接杆固定连接在一起。Preferably, the control body further includes a first connecting block, the first connecting block is fixedly connected to the upper end of the rotating shaft, and the rotating shaft is fixedly connected to the connecting rod through the first connecting block.

优选的,所述第一连接套还包括滑口,所述滑口镂空开设在第一套筒的前壁,所述第一连接块滑动安装在滑口的内壁。Preferably, the first connecting sleeve further includes a sliding port, the sliding port is hollowed out on the front wall of the first sleeve, and the first connecting block is slidably installed on the inner wall of the sliding port.

与现有技术相比,本实用新型的有益效果如下:Compared with the prior art, the beneficial effects of the present utility model are as follows:

当第一围栏与第二围栏需要组装时,先将第一围栏下端的第一辅助支撑脚和第二辅助支撑脚向不同方向展开,第一辅助支撑脚和第二辅助支撑脚的内端顶部通过第一围栏和第二围栏的下壁卡接安装,利用第一辅助支撑脚和第二辅助支撑脚展开后支撑第一围栏防止第一围栏倾倒,接着手动向上移动连接杆,通过连接杆带动第一连接块和转轴沿第一套筒内壁向上滑动,直到转轴收到入到第一套筒内侧后,将与第二围栏固定安装的第二套筒对准第一套筒的下端,然后松开连接杆,利用连接杆与转轴的重力带动转轴插入到第二套筒内壁,接着同理将第二围栏下端安装的第一辅助支撑脚和第二辅助支撑脚向不同方向展开,同理安装另一个第一围栏形成围栏组,当第一围栏与第二围栏组装完成后,再依次将第一辅助支撑脚与第二辅助支撑脚重新卡回第一围栏与第二围栏的下壁。When the first fence and the second fence need to be assembled, first unfold the first auxiliary support foot and the second auxiliary support foot at the lower end of the first fence in different directions, and the inner top of the first auxiliary support foot and the second auxiliary support foot The first fence and the lower wall of the second fence are clamped and installed, and the first auxiliary support foot and the second auxiliary support foot are deployed to support the first fence to prevent the first fence from falling, and then manually move the connecting rod upward to drive the driving through the connecting rod. The first connecting block and the rotating shaft slide up along the inner wall of the first sleeve until the rotating shaft is received into the inside of the first sleeve, align the second sleeve fixed with the second fence to the lower end of the first sleeve, and then Loosen the connecting rod, use the gravity of the connecting rod and the rotating shaft to drive the rotating shaft to be inserted into the inner wall of the second sleeve, and then similarly expand the first and second auxiliary supporting feet installed at the lower end of the second fence in different directions. Another first fence is installed to form a fence group, and after the first fence and the second fence are assembled, the first auxiliary support leg and the second auxiliary support leg are then snapped back to the lower walls of the first fence and the second fence in sequence.

附图说明Description of drawings

图1为本实用新型的主体结构示意图;Fig. 1 is the main structure schematic diagram of the present utility model;

图2为本实用新型的连接主体结构示意图;Fig. 2 is the connection main structure schematic diagram of the utility model;

图3为本实用新型的控制主体结构示意图;Fig. 3 is the control main body structure schematic diagram of the present invention;

图4为本实用新型的第一连接套结构示意图;4 is a schematic structural diagram of the first connecting sleeve of the present invention;

图5为本实用新型的第二连接套结构示意图。FIG. 5 is a schematic structural diagram of the second connection sleeve of the present invention.

图中:1、第一辅助支撑脚;2、连接主体;3、第一围栏;4、第二围栏;5、第二辅助支撑脚;6、控制主体;7、第一连接套;8、第二连接套;9、连接杆;10、第一连接块;11、转轴;12、第一套筒;13、滑口;14、第二连接块;15、第二套筒。In the figure: 1, the first auxiliary support foot; 2, the connection body; 3, the first fence; 4, the second fence; 5, the second auxiliary support foot; 6, the control body; 7, the first connection sleeve; 8, 9, connecting rod; 10, first connecting block; 11, rotating shaft; 12, first sleeve; 13, sliding port; 14, second connecting block; 15, second sleeve.

具体实施方式Detailed ways

下面将结合本实用新型实施例,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments.

在本实用新型的描述中,需要理解的是,术语“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为的方位或位置的相对关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inside", The orientation or positional relationship indicated by "outside" is a relative relationship of orientation or position, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, a specific orientation, and a specific orientation. Therefore, it should not be construed as a limitation on the present invention.

请参阅图1-5,本实用新型提供的一种实施例:一种建筑用围栏的安装机构,包括连接主体2、第一围栏3和第二围栏4;连接主体2,第一围栏3与第二围栏4通过连接主体2转动安装在一起;连接主体2包括控制主体6、第一连接套7和第二连接套8,控制主体6滑动嵌接安装在第一连接套7的内壁,控制主体6通过第二连接套8转动安装;控制主体6包括连接杆9和转轴11,转轴11均匀设置在连接杆9的侧壁,转轴11通过连接杆9固定连接,第一连接套7包括第一套筒12,转轴11的上端滑动插接在第一套筒12的内壁,第一套筒12通过第一围栏3与第二围栏4的一侧端固定连接;第二连接套8包括第二连接块14和第二套筒15,第二套筒15的下端固定连接在第二连接块14的上端,第二连接块14通过第一围栏3和第二围栏4的另一侧端固定连接,转轴11的下端转动插接在第二套筒15的内壁,当第一围栏3与第二围栏4需要组装时,先将第一围栏3下端的第一辅助支撑脚1和第二辅助支撑脚5向不同方向展开,第一辅助支撑脚1和第二辅助支撑脚5的内端顶部通过第一围栏3和第二围栏4的下壁卡接安装,利用第一辅助支撑脚1和第二辅助支撑脚5展开后支撑第一围栏3防止第一围栏3倾倒,接着手动向上移动连接杆9,通过连接杆9带动第一连接块10和转轴11沿第一套筒12内壁向上滑动,直到转轴11收到入到第一套筒12内侧后,将与第二围栏4固定安装的第二套筒15对准第一套筒12的下端,然后松开连接杆9,利用连接杆9与转轴11的重力带动转轴11插入到第二套筒15内壁,接着同理将第二围栏4下端安装的第一辅助支撑脚1和第二辅助支撑脚5向不同方向展开,同理安装另一个第一围栏3形成围栏组,当第一围栏3与第二围栏4组装完成后,再依次将第一辅助支撑脚1与第二辅助支撑脚5重新卡回第一围栏3与第二围栏4的下壁。Please refer to FIGS. 1-5 , an embodiment provided by the present invention: an installation mechanism for a fence for construction, including a connecting body 2, a first fence 3 and a second fence 4; the connecting main body 2, the first fence 3 and the The second fence 4 is rotatably installed together through the connection body 2; the connection body 2 includes a control body 6, a first connection sleeve 7 and a second connection sleeve 8, and the control body 6 is slidably installed on the inner wall of the first connection sleeve 7, and controls The main body 6 is rotatably installed through the second connecting sleeve 8; the control main body 6 includes a connecting rod 9 and a rotating shaft 11, the rotating shaft 11 is evenly arranged on the side wall of the connecting rod 9, the rotating shaft 11 is fixedly connected through the connecting rod 9, and the first connecting sleeve 7 includes the first connecting rod 9. A sleeve 12, the upper end of the rotating shaft 11 is slidably inserted into the inner wall of the first sleeve 12, the first sleeve 12 is fixedly connected with one side end of the second fence 4 through the first fence 3; the second connecting sleeve 8 includes a first sleeve 12. Two connecting blocks 14 and a second sleeve 15 , the lower end of the second sleeve 15 is fixedly connected to the upper end of the second connecting block 14 , and the second connecting block 14 is fixed by the other side ends of the first fence 3 and the second fence 4 Connected, the lower end of the rotating shaft 11 is rotated and inserted into the inner wall of the second sleeve 15. When the first fence 3 and the second fence 4 need to be assembled, the first auxiliary support feet 1 and the second auxiliary support feet 1 and the second auxiliary support at the lower end of the first fence 3 The support feet 5 are spread out in different directions, and the inner tops of the first auxiliary support feet 1 and the second auxiliary support feet 5 are snap-fitted through the lower walls of the first fence 3 and the second fence 4, and the first auxiliary support feet 1 and After the second auxiliary supporting foot 5 is deployed, it supports the first fence 3 to prevent the first fence 3 from falling, and then manually moves the connecting rod 9 upward, and the connecting rod 9 drives the first connecting block 10 and the rotating shaft 11 to slide upward along the inner wall of the first sleeve 12 , until the rotating shaft 11 is received into the inner side of the first sleeve 12, align the second sleeve 15 fixedly installed with the second fence 4 at the lower end of the first sleeve 12, then release the connecting rod 9, use the connecting rod 9 and the gravity of the rotating shaft 11 drive the rotating shaft 11 to be inserted into the inner wall of the second sleeve 15, and then similarly expand the first auxiliary support foot 1 and the second auxiliary support foot 5 installed at the lower end of the second fence 4 in different directions, and install them in the same way. The other first fence 3 forms a fence group. After the first fence 3 and the second fence 4 are assembled, the first auxiliary support foot 1 and the second auxiliary support foot 5 are then snapped back to the first fence 3 and the second fence in turn. Lower wall of fence 4.

一种建筑用围栏的安装机构还包括第一辅助支撑脚1,第一辅助支撑脚1通过第一围栏3和第二围栏4的一侧下端转动安装,一种建筑用围栏的安装机构还包括第二辅助支撑脚5,第二辅助支撑脚5通过第一围栏3和第二围栏4的另一侧下端转动安装,控制主体6还包括第一连接块10,第一连接块10固定连接在转轴11的上端,转轴11通过第一连接块10与连接杆9固定连接在一起,第一连接套7还包括滑口13,滑口13镂空开设在第一套筒12的前壁,第一连接块10滑动安装在滑口13的内壁。An installation mechanism of a construction fence also includes a first auxiliary support foot 1, and the first auxiliary support foot 1 is rotated and installed by the lower ends of one side of the first fence 3 and the second fence 4, and an installation mechanism of a construction fence also includes The second auxiliary support foot 5 is rotated and installed through the lower ends of the other side of the first fence 3 and the second fence 4 , and the control body 6 further includes a first connection block 10 , and the first connection block 10 is fixedly connected to the On the upper end of the rotating shaft 11, the rotating shaft 11 is fixedly connected with the connecting rod 9 through the first connecting block 10. The first connecting sleeve 7 also includes a sliding port 13. The sliding port 13 is hollowed out on the front wall of the first sleeve 12. The connecting block 10 is slidably mounted on the inner wall of the sliding port 13 .

工作原理:当第一围栏3与第二围栏4需要组装时,先将第一围栏3下端的第一辅助支撑脚1和第二辅助支撑脚5向不同方向展开,第一辅助支撑脚1和第二辅助支撑脚5的内端顶部通过第一围栏3和第二围栏4的下壁卡接安装,利用第一辅助支撑脚1和第二辅助支撑脚5展开后支撑第一围栏3防止第一围栏3倾倒,接着手动向上移动连接杆9,通过连接杆9带动第一连接块10和转轴11沿第一套筒12内壁向上滑动,直到转轴11收到入到第一套筒12内侧后,将与第二围栏4固定安装的第二套筒15对准第一套筒12的下端,然后松开连接杆9,利用连接杆9与转轴11的重力带动转轴11插入到第二套筒15内壁,接着同理将第二围栏4下端安装的第一辅助支撑脚1和第二辅助支撑脚5向不同方向展开,同理安装另一个第一围栏3形成围栏组,当第一围栏3与第二围栏4组装完成后,再依次将第一辅助支撑脚1与第二辅助支撑脚5重新卡回第一围栏3与第二围栏4的下壁。Working principle: When the first fence 3 and the second fence 4 need to be assembled, the first auxiliary support foot 1 and the second auxiliary support foot 5 at the lower end of the first fence 3 are unfolded in different directions. The top of the inner end of the second auxiliary support foot 5 is clamped and installed by the lower wall of the first fence 3 and the second fence 4, and the first auxiliary support foot 1 and the second auxiliary support foot 5 are deployed to support the first fence 3 to prevent the A fence 3 is overturned, and then the connecting rod 9 is manually moved upward, and the first connecting block 10 and the rotating shaft 11 are driven by the connecting rod 9 to slide upward along the inner wall of the first sleeve 12 until the rotating shaft 11 is received into the inner side of the first sleeve 12. , align the second sleeve 15 fixedly installed with the second fence 4 to the lower end of the first sleeve 12, then loosen the connecting rod 9, and use the gravity of the connecting rod 9 and the rotating shaft 11 to drive the rotating shaft 11 to be inserted into the second sleeve 15 inner wall, then similarly expand the first auxiliary support foot 1 and the second auxiliary support foot 5 installed at the lower end of the second fence 4 to different directions, and similarly install another first fence 3 to form a fence group, when the first fence 3 After the assembly with the second fence 4 is completed, the first auxiliary support feet 1 and the second auxiliary support feet 5 are then snapped back to the lower walls of the first fence 3 and the second fence 4 in sequence.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (5)

1. A mounting mechanism of a fence for construction, comprising a connecting body (2), a first fence (3) and a second fence (4), characterized in that: the connecting body (2), the first rail (3) and the second rail (4) are rotatably mounted together through the connecting body (2); the connecting main body (2) comprises a control main body (6), a first connecting sleeve (7) and a second connecting sleeve (8), the control main body (6) is installed on the inner wall of the first connecting sleeve (7) in a sliding embedding mode, and the control main body (6) is installed in a rotating mode through the second connecting sleeve (8); the control main body (6) comprises a connecting rod (9) and a rotating shaft (11), the rotating shaft (11) is uniformly arranged on the side wall of the connecting rod (9), the rotating shaft (11) is fixedly connected through the connecting rod (9), the first connecting sleeve (7) comprises a first sleeve (12), the upper end of the rotating shaft (11) is inserted into the inner wall of the first sleeve (12) in a sliding mode, and the first sleeve (12) is fixedly connected with one side end of the second fence (4) through the first fence (3); the second connecting sleeve (8) comprises a second connecting block (14) and a second sleeve (15), the lower end of the second sleeve (15) is fixedly connected to the upper end of the second connecting block (14), the second connecting block (14) is fixedly connected to the other side of the second fence (4) through a first fence (3), and the lower end of the rotating shaft (11) is rotatably inserted into the inner wall of the second sleeve (15).
2. A mounting mechanism for a construction fence according to claim 1 wherein: the mounting mechanism of the building fence further comprises a first auxiliary supporting leg (1), and the first auxiliary supporting leg (1) is rotatably mounted through the lower ends of one sides of the first fence (3) and the second fence (4).
3. A mounting mechanism for a construction fence according to claim 1 wherein: the mounting mechanism of the building fence further comprises a second auxiliary supporting leg (5), and the second auxiliary supporting leg (5) is rotatably mounted at the lower end of the other side of the first fence (3) and the second fence (4).
4. A mounting mechanism for a construction fence according to claim 1 wherein: the control main body (6) further comprises a first connecting block (10), the first connecting block (10) is fixedly connected to the upper end of the rotating shaft (11), and the rotating shaft (11) is fixedly connected with the connecting rod (9) through the first connecting block (10).
5. A mounting mechanism for a construction fence according to claim 4 wherein: first connecting sleeve (7) still include smooth mouthful (13), smooth mouthful (13) fretwork is seted up in the antetheca of first sleeve (12), first connecting block (10) slidable mounting is at the inner wall of smooth mouthful (13).
CN201922243695.7U 2019-12-16 2019-12-16 Installation mechanism of fence for building Expired - Fee Related CN211776388U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922243695.7U CN211776388U (en) 2019-12-16 2019-12-16 Installation mechanism of fence for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922243695.7U CN211776388U (en) 2019-12-16 2019-12-16 Installation mechanism of fence for building

Publications (1)

Publication Number Publication Date
CN211776388U true CN211776388U (en) 2020-10-27

Family

ID=72982449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922243695.7U Expired - Fee Related CN211776388U (en) 2019-12-16 2019-12-16 Installation mechanism of fence for building

Country Status (1)

Country Link
CN (1) CN211776388U (en)

Similar Documents

Publication Publication Date Title
CN107558758A (en) A kind of rain-proof effect is good and the intellectual city of cleaning afforests bus platform
CN112343355B (en) A promote pusher jack for fitment stone material curtain stone material board installation
CN208380489U (en) A kind of interior decoration staircase convenient for storage
CN206616931U (en) A kind of tent cornices device automatically
CN204717291U (en) Projector's lifting frame
CN211776388U (en) Installation mechanism of fence for building
CN110847564B (en) Installation equipment and operating mechanism for glass interior of a building
CN209686813U (en) A kind of architectural decorative glass attachment device
US2828869A (en) Hoist for building sections
CN205338361U (en) Foldable recreation bed bedstead
CN117108080A (en) Glass curtain wall construction devices and construction methods based on green buildings
CN207330227U (en) A kind of air duct installation lifter
CN208895573U (en) A large CNC machine tool support device
CN221664298U (en) A curtain wall installation auxiliary equipment
CN221988915U (en) Vertical lifting clothes drying device
CN221988922U (en) Wall type clothes airing device
CN222878359U (en) Can accomodate clothes hanger that dries in air that occupation space is little
CN222138578U (en) A composite air duct installation support device for subway
CN113775903A (en) An auxiliary device for fixing office projectors that is close to the desktop
CN2455144Y (en) Mosquito net as well painting
CN209053402U (en) A kind of quick plastering machine of construction and decoration
CN223102678U (en) A lifting bracket for building decoration
CN218004274U (en) A detachable class tent model teaching aid
CN222847912U (en) Tent folding framework convenient to accomodate
CN204311671U (en) A kind of horizontal pedal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220805

Address after: 242000 No. 12 Chuangye Road, Feicai office, Xuancheng City, Anhui Province

Patentee after: Xuancheng Guanyuan Construction Engineering Co.,Ltd.

Address before: 323600 No.80 Jinyang Road, Yuanhe street, Yunhe County, Lishui City, Zhejiang Province

Patentee before: Yunhe Longsheng machinery design studio

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201027