CN211741981U - Integrated communication scheduling mainboard loading equipment - Google Patents

Integrated communication scheduling mainboard loading equipment Download PDF

Info

Publication number
CN211741981U
CN211741981U CN202020358780.8U CN202020358780U CN211741981U CN 211741981 U CN211741981 U CN 211741981U CN 202020358780 U CN202020358780 U CN 202020358780U CN 211741981 U CN211741981 U CN 211741981U
Authority
CN
China
Prior art keywords
integrated communication
mainboard
rotating
make
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020358780.8U
Other languages
Chinese (zh)
Inventor
常克捷
陈凯
董建东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Zhixing Lianheng Information Technology Co ltd
Original Assignee
Ningxia Zhixing Lianheng Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Zhixing Lianheng Information Technology Co ltd filed Critical Ningxia Zhixing Lianheng Information Technology Co ltd
Priority to CN202020358780.8U priority Critical patent/CN211741981U/en
Application granted granted Critical
Publication of CN211741981U publication Critical patent/CN211741981U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)
  • Structure Of Telephone Exchanges (AREA)

Abstract

The utility model discloses an integrated communication dispatch mainboard loading attachment, including the support column, the support column top is connected with the support, and the support outer wall installs slewing mechanism, slewing mechanism is inside including the annular piece, and has seted up first spout on one side of the annular piece, the inside slidable mounting of first spout has first slider. The utility model discloses in, under slewing mechanism's effect, the installing frame is through first spout, first slider slides at the annular block outer wall, make the installing frame drive the picture peg and slide, thereby make the picture peg in the outside activity of support, make the use that integrated communication dispatch mainboard loading equipment can satisfy different positions, integrated communication dispatch mainboard loading equipment's application range has been enlarged, and through the picture peg at the inside swing joint of installing frame, make the user can adjust the picture peg content according to the demand, make the practicality of picture peg stronger, the convenience and the plasticity of integrated communication dispatch mainboard loading equipment use have been improved.

Description

Integrated communication scheduling mainboard loading equipment
Technical Field
The utility model relates to an integrated communication technology field especially relates to an integrated communication dispatch mainboard loader.
Background
The main board is a rectangular circuit board, on which the main circuit system forming the computer is installed, and generally there are elements such as BIOS chip, I/O control chip and panel control switch interface, expansion slot, main board and DC power supply of plug-in card for electric connector, etc. the main function of the integrated communication scheduling main board loading device is to fix the main board and make the main board exert excellent performance.
The existing communication scheduling mainboard loading equipment does not have a mechanism for circularly rotating and moving a communication scheduling mainboard plugboard, does not have a mechanism for collecting and arranging cables of the communication scheduling mainboard loading equipment, and does not have a mechanism for placing heat dissipation on the communication scheduling mainboard loading equipment, so that the integration effect of the communication scheduling mainboard loading equipment is poor, and the working efficiency is low.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving current communication dispatch mainboard loading equipment and not possessing the mechanism that carries out annular rotatory removal to communication dispatch mainboard picture peg to do not possessing the mechanism that collects the arrangement to the cable of communication dispatch mainboard loading equipment, do not possessing and placing radiating mechanism to communication dispatch mainboard loading equipment in addition, it is poor to lead to the integrated effect of communication dispatch mainboard loading equipment, and the shortcoming that work efficiency is low, and the integrated communication dispatch mainboard loading equipment who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an integrated communication dispatch mainboard loading equipment, includes the support column, the support column top is connected with the support, and the support outer wall installs slewing mechanism, slewing mechanism is inside including annular block, and has seted up first spout on one side of the annular block, the inside slidable mounting of first spout has first slider, and first slider one side fixedly connected with installing frame, the inside movable mounting of installing frame has the picture peg, the support top is connected with admission machine, and the admission machine bottom installs heat dissipation mechanism.
As a further description of the above technical solution:
the picture peg passes through the installing frame and constitutes transmission structure with the annular piece, and the installing frame passes through first slider, first spout and annular piece constitution sliding construction.
As a further description of the above technical solution:
the take-up mechanism is internally provided with a connecting rod, the connecting rod is internally connected with a rotating shaft, the rotating disc is installed at the top end of the rotating shaft, the rotating disc is internally connected with a torsional spring, and the rotating rod is installed at the bottom end of the rotating shaft.
As a further description of the above technical solution:
the rotating rod and the rotating disc form a rotating structure through the rotating shaft, and the rotating disc and the rotating shaft form an elastic structure through the torsional spring.
As a further description of the above technical solution:
the heat dissipation mechanism is internally provided with a fixing plate, a heat dissipation fan is embedded in the fixing plate, a press switch is installed at the top of the heat dissipation fan, a spring is connected to the outer side of the press switch, a bearing plate is fixedly installed at the top end of the spring, a second sliding block is connected to one side of the bearing plate, and a second sliding groove is installed on the other side of the second sliding block in a sliding mode.
As a further description of the above technical solution:
the bearing board passes through the spring and constitutes elastic construction with the fixed plate, and the bearing board passes through second slider, second spout and support column constitution sliding construction.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model discloses in, under slewing mechanism's effect, the installing frame is through first spout, first slider slides at the annular block outer wall, make the installing frame drive the picture peg and slide, thereby make the picture peg in the outside activity of support, make the use that integrated communication dispatch mainboard loading equipment can satisfy different positions, integrated communication dispatch mainboard loading equipment's application range has been enlarged, and through the picture peg at the inside swing joint of installing frame, make the user can adjust the picture peg content according to the demand, make the practicality of picture peg stronger, the convenience and the plasticity of integrated communication dispatch mainboard loading equipment use have been improved.
2. The utility model discloses in, under admission machine's effect, through rotating the bull stick, make the bull stick drive the pivot activity, thereby make the carousel rotate, make the cable in the integrated communication dispatch mainboard loading equipment collected by the carousel winding, thereby make the carousel collect the arrangement to the cable, under the elastic action of torsional spring, can make the cable carry out automatically regulated to the cable when the activity, avoid cable winding or rupture, improve the life of cable, the user audio-visual observation cable distribution of being convenient for simultaneously, the later stage of being convenient for is to the maintenance and the maintenance of cable, indirect reduction use cost.
3. The utility model discloses in, under heat dissipation mechanism's effect, place on the loading board top through communication dispatch mainboard loading equipment, under the action of gravity of mainboard, make the loading board pass through the second spout, the second slider slides in support column one side lapse, thereby make loading board extrusion push down switch downwards, electric connection through push down switch and radiator fan, make radiator fan open, thereby make radiator fan dispel the heat to the loading board, through such setting, can dispel the heat to the mainboard under the action of gravity of mainboard, avoid the high influence mainboard performance of high temperature.
Drawings
Fig. 1 is a schematic structural diagram of an integrated communication scheduling motherboard loading device according to the present invention;
FIG. 2 is a schematic view of the structure of the rotating mechanism of the present invention;
FIG. 3 is a schematic view of the structure of the take-up mechanism of the present invention;
FIG. 4 is a schematic structural view of the heat dissipation mechanism of the present invention;
illustration of the drawings:
1. a support pillar; 2. a support; 3. a rotating mechanism; 301. a ring block; 302. a first chute; 303. a first slider; 304. installing a frame; 305. inserting plates; 4. a take-up mechanism; 401. a connecting rod; 402. a rotating shaft; 403. a turntable; 404. a torsion spring; 405. a rotating rod; 5. a heat dissipation mechanism; 501. a fixing plate; 502. a heat radiation fan; 503. a push switch; 504. a spring; 505. a carrier plate; 506. a second slider; 507. a second runner.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-4, an integrated communication scheduling mainboard loading device includes a support pillar 1, a bracket 2, a rotating mechanism 3, a ring-shaped block 301, a first sliding groove 302, a first sliding block 303, a mounting frame 304, an inserting plate 305, a wire-rewinding mechanism 4, a connecting rod 401, a rotating shaft 402, a rotating disc 403, a torsion spring 404, a rotating rod 405, a heat-dissipating mechanism 5, a fixing plate 501, a heat-dissipating fan 502, a press switch 503, a spring 504, a bearing plate 505, a second sliding block 506 and a second sliding groove 507, wherein the top end of the support pillar 1 is connected with the bracket 2, the outer wall of the bracket 2 is provided with the rotating mechanism 3, the rotating mechanism 3 includes the ring-shaped block 301, one side of the ring-shaped block 301 is provided with the first sliding groove 302, the first sliding block 303 is slidably mounted in the first sliding groove 302, one side of the first sliding block 303 is fixedly connected with the, and the bottom of the take-up mechanism 4 is provided with the heat dissipation mechanism 5, and the annular block 301 is fixedly connected with the outer wall of the bracket 2, so that the mounting frame 304 slides outside the bracket 2, thereby enabling the plugboard 305 to meet the use requirements in different directions and expanding the application range of the plugboard 305.
Furthermore, the plug board 305 forms a transmission structure with the annular block 301 through the mounting frame 304, the mounting frame 304 forms a sliding structure with the annular block 301 through the first sliding block 303, the first sliding groove 302, and the plug board 305 is movably connected inside the mounting frame 304, so that a user can adjust the content of the plug board 305 according to requirements, the practicability of the plug board 305 is stronger, and the convenience and the plasticity of the integrated communication scheduling mainboard loading device are improved.
Further, take-up mechanism 4 is inside including connecting rod 401, and connecting rod 401 internal connection has pivot 402, and carousel 403 is installed on pivot 402 top, and carousel 403 internal connection has torsional spring 404, and bull stick 405 is installed to pivot 402 bottom, and carousel 403 can make the audio-visual understanding cable of user connect the condition through collecting and regular winding arrangement to the cable, and the user of being convenient for overhauls or maintains.
Furthermore, the rotating rod 405 and the rotating disc 403 form a rotating structure through the rotating shaft 402, the rotating disc 403 and the rotating shaft 402 form an elastic structure through the torsion spring 404, and the cables can be automatically adjusted when moving under the elastic action of the torsion spring 404, so that the cables are prevented from being wound or broken, and the service life of the cables is prolonged.
Further, the inside fixed plate 501 that is included of heat dissipation mechanism 5, and the inside gomphosis of fixed plate 501 has radiator fan 502, push switch 503 is installed at radiator fan 502 top, and the push switch 503 outside is connected with spring 504, spring 504 top fixed mounting has loading board 505, and loading board 505 one side is connected with second slider 506, second slider 506 opposite side slidable mounting has second spout 507, radiator fan 502 is through dispelling the heat to the mainboard, can make the mainboard keep excellent performance all the time, improve the life of mainboard.
Further, the loading board 505 forms an elastic structure with the fixing board 501 through the spring 504, and the loading board 505 forms a sliding structure with the supporting pillar 1 through the second slider 506, the second sliding slot 507, and under the elastic action of the spring 504, when the loading board 505 is not stressed, the spring 504 drives the loading board 505 to reset, so that the heat dissipation fan 502 is closed.
The working principle is as follows: when the integrated communication dispatching mainboard loading equipment is used, when a user needs to circularly rotate and move the plug board 305, the mounting frame 304 slides on the outer wall of the annular block 301 through the first sliding groove 302 and the first sliding block 303, so that the mounting frame 304 drives the plug board 305 to slide, the plug board 305 moves outside the bracket 2, the integrated communication dispatching mainboard loading equipment can meet the use in different directions, the use range of the integrated communication dispatching mainboard loading equipment is expanded, and the plug board 305 is movably connected inside the mounting frame 304, so that the user can adjust the content of the plug board 305 according to the requirement, the practicability of the plug board 305 is stronger, the convenience and the plasticity of the use of the integrated communication dispatching mainboard loading equipment are improved, when the user needs to collect and arrange cables of the communication dispatching mainboard loading equipment, the rotating rod 405 is rotated to drive the rotating shaft 402 to move, and the rotating disc 403 is rotated, the cables in the integrated communication dispatching mainboard loading device are wound and collected by the rotary disc 403, so that the rotary disc 403 collects and arranges the cables, the cables can be automatically regulated when moving under the elastic action of the torsion spring 404, the cables are prevented from being wound or broken, the service life of the cables is prolonged, meanwhile, the cable distribution condition can be visually observed by a user conveniently, the cables can be maintained and maintained at the later stage conveniently, the use cost is indirectly reduced, when the communication dispatching mainboard loading device needs to be placed by the user, the communication dispatching mainboard loading device is placed at the top end of the bearing plate 505, under the action of gravity of the mainboard, the bearing plate 505 slides downwards on one side of the supporting column 1 through the second sliding groove 507 and the second sliding block 506, so that the bearing plate 505 extrudes the press switch 503 downwards and is electrically connected with the heat dissipation fan 502 through the press switch 503, then radiator fan 502 is opened to make radiator fan 502 dispel the heat to loading board 505, thereby can dispel the heat to the mainboard through the action of gravity of mainboard, avoid the high temperature to influence mainboard performance, just so accomplish the theory of operation of the device.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides an integrated communication dispatch mainboard loading equipment, includes support column (1), its characterized in that, support column (1) top is connected with support (2), and support (2) outer wall installs slewing mechanism (3), slewing mechanism (3) inside is including annular block (301), and annular block (301) one side has seted up first spout (302), first spout (302) inside slidable mounting has first slider (303), and first slider (303) one side fixedly connected with installing frame (304), the inside movable mounting of installing frame (304) has picture peg (305), support (2) top is connected with admission machine (4), and admission machine (4) bottom installs heat dissipation mechanism (5).
2. The integrated communication scheduling motherboard loading device as recited in claim 1, wherein said plug board (305) forms a transmission structure with the ring block (301) through the mounting frame (304), and the mounting frame (304) forms a sliding structure with the ring block (301) through the first sliding block (303), the first sliding groove (302).
3. The integrated communication scheduling mainboard loading device according to claim 1, wherein a connecting rod (401) is included inside the wire rewinding mechanism (4), a rotating shaft (402) is connected inside the connecting rod (401), a rotating disc (403) is installed at the top end of the rotating shaft (402), a torsion spring (404) is connected inside the rotating disc (403), and a rotating rod (405) is installed at the bottom end of the rotating shaft (402).
4. The mainboard loading device for integrated communication dispatch of claim 3, wherein the rotating rod (405) and the rotating disc (403) form a rotating structure through the rotating shaft (402), and the rotating disc (403) and the rotating shaft (402) form an elastic structure through the torsion spring (404).
5. The integrated communication scheduling motherboard loading device as recited in claim 1, wherein the heat dissipation mechanism (5) comprises a fixing plate (501) inside, a heat dissipation fan (502) is embedded inside the fixing plate (501), a push switch (503) is installed on the top of the heat dissipation fan (502), a spring (504) is connected to the outer side of the push switch (503), a bearing plate (505) is fixedly installed on the top end of the spring (504), a second slider (506) is connected to one side of the bearing plate (505), and a second sliding slot (507) is slidably installed on the other side of the second slider (506).
6. The motherboard loading device with integrated communication scheduling of claim 5, wherein the loading board (505) and the fixing board (501) form a resilient structure through a spring (504), and the loading board (505) and the supporting column (1) form a sliding structure through a second sliding block (506), a second sliding slot (507).
CN202020358780.8U 2020-03-20 2020-03-20 Integrated communication scheduling mainboard loading equipment Expired - Fee Related CN211741981U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020358780.8U CN211741981U (en) 2020-03-20 2020-03-20 Integrated communication scheduling mainboard loading equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020358780.8U CN211741981U (en) 2020-03-20 2020-03-20 Integrated communication scheduling mainboard loading equipment

Publications (1)

Publication Number Publication Date
CN211741981U true CN211741981U (en) 2020-10-23

Family

ID=72854819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020358780.8U Expired - Fee Related CN211741981U (en) 2020-03-20 2020-03-20 Integrated communication scheduling mainboard loading equipment

Country Status (1)

Country Link
CN (1) CN211741981U (en)

Similar Documents

Publication Publication Date Title
CN211741981U (en) Integrated communication scheduling mainboard loading equipment
CN109960391B (en) Heat dissipation dustproof connecting device for fixing power supply on back of host
CN102465899A (en) Cooling fan convenient for installation
CN216700198U (en) Plug-in ARM cluster server
CN217060383U (en) Monitoring and fault positioning device for power grid distribution circuit
CN216564139U (en) Power box for power engineering
CN213185175U (en) Movable outdoor distribution box
CN216057074U (en) Online cloud monitoring and observing aircraft working state equipment
CN210109599U (en) Building equipment automatic control device capable of being remotely operated
CN211722244U (en) A computer network equipment storage cabinet
CN216486296U (en) Portable heat dissipation VPX machine case
CN217928049U (en) Electric energy remote metering management equipment
CN215896990U (en) Distribution automation station terminal of easily working a telephone switchboard
CN210691176U (en) Mobile management terminal for power grid business expansion and installation work
CN222582712U (en) A handheld power inspection device
CN216052837U (en) Portable notebook computer radiator
CN216486403U (en) Wireless screen projection equipment
CN221058598U (en) Multifunctional thermal automation field debugging equipment
CN221961632U (en) A visual remote monitoring device
CN213403871U (en) Computer network control box
CN220119096U (en) Comprehensive information release terminal
CN216896424U (en) Information display is with realizing new media screen convenient to installation
CN217689931U (en) Computer plastic shell convenient to heat dissipation
CN214337649U (en) Distributed intelligent monitoring system for direct-current power supply
CN217463856U (en) Portable management device for grid expansion

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201023