- CN211737150U CN211737150U CN201922364598.3U CN201922364598U CN211737150U CN 211737150 U CN211737150 U CN 211737150U CN 201922364598 U CN201922364598 U CN 201922364598U CN 211737150 U CN211737150 U CN 211737150U
- Authority
- CN
- China
- Prior art keywords
- ditch
- sliding sleeve
- cable trench
- suspension
- trench
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型公开了一种隧道线缆沟和水沟施工台车,包括具有行走机构的主桁架,所述行走机构包括主动部分和具有转向功能的从动部分,所述主桁架两侧的立柱外侧安装有能够带动模具组上下升降、水平移动的悬挂装置,该悬挂装置通过悬吊机构连接成套的且定位即用的模具组;每部台车可配置数套长度12米的模具组,每个模具组由数块模板组和数个定位架组成,台车将模具组吊到指定位置后即可脱离该模具组,进行其他模具组的吊运工作。模具组依靠自身的调整机构将模板调整到准确位置,无需台车辅助。本实用新型使用方便,能够实现多个模具组循环作业,用于隧道线缆沟和水沟的施工,缩短水沟和线缆沟的施工周期,提高了作业效率。
The utility model discloses a tunnel cable ditch and a water ditch construction trolley, comprising a main truss with a traveling mechanism, the traveling mechanism including an active part and a driven part with a steering function, and uprights on both sides of the main truss A suspension device is installed on the outside that can drive the mold group to move up and down and move horizontally. The suspension device is connected to a complete set of mold groups that can be positioned and used through the suspension mechanism; each trolley can be equipped with several sets of mold groups with a length of 12 meters. Each die set is composed of several template sets and several positioning frames. After the trolley lifts the die set to the designated position, it can be separated from the die set to carry out the lifting of other die sets. The die set relies on its own adjustment mechanism to adjust the template to the exact position without the aid of a trolley. The utility model is convenient to use, can realize the cyclic operation of a plurality of mould groups, is used for the construction of the tunnel cable trench and the water trench, shortens the construction period of the water trench and the cable trench, and improves the operation efficiency.
Description
技术领域technical field
本实用新型涉及一种隧道施工设备,具体讲是一种隧道线缆沟和水沟施工台车。The utility model relates to a tunnel construction equipment, in particular to a tunnel cable trench and a water trench construction trolley.
背景技术Background technique
隧道是埋置于地层内的工程建筑物,是人类利用地下空间的一种形式;隧道可分为交通隧道、水工隧道、市政隧道、矿山隧道。在隧道中线缆沟和水沟施工,一般是在隧道衬砌完成后再单独浇筑线缆沟和水沟;Tunnels are engineering buildings buried in the stratum, and it is a form of human utilization of underground space; tunnels can be divided into traffic tunnels, hydraulic tunnels, municipal tunnels, and mine tunnels. In the construction of cable trenches and water trenches in tunnels, the cable trenches and water trenches are generally poured separately after the tunnel lining is completed;
而传统的线缆沟和水沟浇筑虽然也是采用台车辅助浇筑,但传统的浇筑方式一部台车仅配置一套模板,且从混凝土开始浇筑到凝固的整个过程中,台车与模板不能分离,不能够实现多组模板同时循环作业,施工效率低。Although the traditional pouring of cable trenches and water ditches also uses trolley-assisted pouring, in the traditional pouring method, a trolley is only equipped with one set of formwork, and the trolley and the formwork cannot be installed during the whole process from the start of concrete pouring to the solidification. Separation, it is impossible to realize the simultaneous circulation operation of multiple groups of templates, and the construction efficiency is low.
实用新型内容Utility model content
因此,为了克服上述不足,本实用新型在此提供一种设计合理,结构简单,使用方便用于隧道线缆沟和水沟施工的台车,通过合理的设计台车,在施工时能够缩短水沟和线缆沟的施工周期,降低成本,克服传统效率低,质量不稳定的问题,合理的设计台车,能够实现施工循环作业,提高效率。Therefore, in order to overcome the above deficiencies, the present invention provides a trolley with reasonable design, simple structure and convenient use for the construction of tunnel cable trenches and water trenches. The construction period of trenches and cable trenches can reduce costs, overcome the traditional problems of low efficiency and unstable quality, and reasonably design the trolley, which can realize construction cycle operations and improve efficiency.
本实用新型是这样实现的,构造一种隧道线缆沟和水沟施工台车, 包括具有行走机构的主桁架,所述行走机构包括主动部分和具有转向功能的从动部分,所述主桁架两侧的立柱外侧安装有能够上下升降的悬挂装置,该悬挂装置通过悬吊机构连接有成套的且定位即用的模具组。The utility model is realized by constructing a tunnel cable trench and a water trench construction trolley, including a main truss with a traveling mechanism, the traveling mechanism including an active part and a driven part with a steering function, the main truss Suspension devices that can be lifted up and down are installed on the outer sides of the uprights on both sides, and the suspension devices are connected with a complete set of mold sets that can be positioned and ready to use through the suspension mechanism.
优选的,所述悬挂装置包括悬梁、滑柱、滑套和拉杆,所述悬梁内端以铰接方式与滑套连接,所述拉杆的上端以铰接方式连接于滑套上端,而拉杆的下端以铰接方式与悬梁外端连接,所述滑套套于滑柱外围,而滑柱竖直固定安装于立柱外侧;Preferably, the suspension device includes a suspension beam, a sliding column, a sliding sleeve and a pull rod, the inner end of the suspension beam is hingedly connected to the sliding sleeve, the upper end of the pull rod is hingedly connected to the upper end of the sliding sleeve, and the lower end of the pull rod is connected to the sliding sleeve in a hinged manner. The hinge is connected with the outer end of the cantilever beam, the sliding sleeve is sleeved on the periphery of the sliding column, and the sliding column is vertically fixed and installed on the outer side of the column;
在所述立柱外侧固定安装有升降油缸,该升降油缸的活塞杆连接于滑套,而缸体固定连接于立柱。A lifting oil cylinder is fixedly installed on the outer side of the vertical column, the piston rod of the lifting oil cylinder is connected to the sliding sleeve, and the cylinder body is fixedly connected to the vertical column.
优选的,所述悬吊机构包括平移滑套,平移油缸和吊梁,所述平移滑套套于悬梁,所述平移油缸一端连接于悬梁,而另一端连接于平移滑套,通过平移油缸伸缩运动带动平移滑套横向移动,所述吊梁上端连接于横向滑套,下端连接于模具组。Preferably, the suspension mechanism includes a translation sliding sleeve, a translation oil cylinder and a hanging beam, the translation sliding sleeve is sleeved on the suspension beam, one end of the translation oil cylinder is connected to the suspension beam, and the other end is connected to the translation sliding sleeve, and the translation cylinder is used for telescopic movement. The translation sliding sleeve is driven to move laterally, the upper end of the hanging beam is connected to the transverse sliding sleeve, and the lower end is connected to the die set.
优选的,所述模具组包括模板组和定位架,所述模板组通过位置调整机构安装于定位架下方;Preferably, the die set includes a template set and a positioning frame, and the template set is installed under the positioning frame through a position adjustment mechanism;
所述定位架上端通过吊梁连接于平移滑套;The upper end of the positioning frame is connected to the translation sliding sleeve through the hanging beam;
所述定位架两端为与地面接触端,且在该地面接触端安装有高度可调的调节支腿。Both ends of the positioning frame are ground contact ends, and height-adjustable adjusting legs are installed on the ground contact ends.
优选的,所述模板组包括水沟模板组和线缆沟模板组,Preferably, the template group includes a water ditch template group and a cable trench template group,
所述水沟模板组包括两侧的水沟侧模板,两个所述水沟侧模板底部两端以铰接方式连接,同时在两端还设置有保持两个水沟侧模板相对位置的限位板;The gutter formwork group includes gutter side formwork on both sides, the bottom ends of the two gutter side formwork are connected in a hinged manner, and the two ends are also provided with limiters for maintaining the relative positions of the two gutter side formwork. plate;
所述线缆沟模板组包括两侧的线缆沟侧模板,在两个所述线缆沟侧模板的两端安装有保持两模板相对位置的限位板。The cable trench formwork group includes cable trench side templates on both sides, and limit plates for keeping the relative positions of the two templates are installed at both ends of the two cable trench side templates.
优选的,所述位置调整机构包括数个竖直花篮螺栓,该竖直花篮螺栓上部连接于定位架,下端与模板组连接,在相邻竖直花篮螺栓的顶端之间连接有横向花篮螺栓,Preferably, the position adjustment mechanism includes several vertical turnbuckles, the upper part of the vertical turnbuckle is connected to the positioning frame, the lower end is connected to the template group, and the horizontal turnbuckle is connected between the top ends of the adjacent vertical turnbuckles,
所述模板组的高度通过竖直花篮螺栓调节,而横向位置通过横向花篮螺栓调节。The height of the template group is adjusted by vertical turnbuckles, and the lateral position is adjusted by transverse turnbuckles.
优选的,所述模板包括两侧的水沟侧模板,两个所述水沟侧模板底部两端以铰接方式连接,同时在两端还设置有保持两个水沟侧模板相对位置的限位板;Preferably, the formwork includes two ditch side formworks on both sides, and two bottom ends of the two ditch side formworks are connected in a hinged manner, and at the same time, there are also limits at both ends to keep the relative positions of the two ditch side formwork. plate;
所述线缆沟模板组件包括两侧的线缆沟侧模板,在两个所述线缆沟侧模板的两端安装有保持两模板相对位置的限位板。The cable trench template assembly includes cable trench side templates on both sides, and limit plates for maintaining the relative positions of the two templates are installed at both ends of the two cable trench side templates.
优选的,所述吊梁与模具组的采用花篮螺栓或电动葫芦或手动葫芦连接。Preferably, the hanging beam and the die set are connected with a turnbuckle bolt or an electric hoist or a manual hoist.
本实用新型具有如下有益效果:The utility model has the following beneficial effects:
本实用新型设计合理,结构简单,使用方便,通过合理的设计台车,在施工时能够缩短水沟和线缆沟的施工周期,降低成本,克服传统效率低,质量不稳定的问题,合理的设计台车,能够实现施工循环作业,提高效率。The utility model has the advantages of reasonable design, simple structure and convenient use. Through the reasonable design of the trolley, the construction period of the water ditch and the cable ditch can be shortened, the cost can be reduced, and the traditional problems of low efficiency and unstable quality can be overcome. The design of the trolley can realize the construction cycle operation and improve the efficiency.
合理的设计台车,该台车包括悬挂装置和悬吊装置,其中悬挂装置能够上下移动,所述悬吊装置能够实现模具组的吊装,并且带动其左右移动;从而方便模具组的位置调节;Reasonable design of the trolley, the trolley includes a suspension device and a suspension device, wherein the suspension device can move up and down, and the suspension device can realize the hoisting of the die set and drive it to move left and right; thus facilitating the position adjustment of the die set;
所述悬挂装置包括悬梁、滑柱、滑套和拉杆,所述悬梁内端以铰接方式与滑套连接,所述拉杆的上端以铰接方式连接于滑套上端,而拉杆的下端以铰接方式与悬梁外端连接,所述滑套套于滑柱外围,而滑柱竖直固定安装于立柱外侧;在所述立柱外侧固定安装有升降油缸,该升降油缸的活塞杆连接于滑套,而缸体固定连接于立柱。在使用时,升降油缸带动滑套在导杆上移动,同时移动件带动悬梁上下移动,从而便于模具组的吊装。The suspension device includes a suspension beam, a sliding column, a sliding sleeve and a pull rod, the inner end of the suspension beam is hingedly connected to the sliding sleeve, the upper end of the pull rod is hingedly connected to the upper end of the sliding sleeve, and the lower end of the pull rod is hingedly connected to the upper end of the sliding sleeve. The outer end of the cantilever beam is connected, the sliding sleeve is sleeved on the periphery of the sliding column, and the sliding column is vertically and fixedly installed on the outer side of the column; a lifting oil cylinder is fixedly installed on the outer side of the column, and the piston rod of the lifting oil cylinder is connected to the sliding sleeve, and the cylinder body is fixedly installed. Fixed connection to the column. When in use, the lifting cylinder drives the sliding sleeve to move on the guide rod, and at the same time, the moving part drives the suspension beam to move up and down, so as to facilitate the hoisting of the die set.
所述悬吊装置包括平移滑套,平移油缸和吊梁,所述平移滑套套于悬梁,所述平移油缸一端连接于悬梁,而另一端连接于平移滑套,通过平移油缸伸缩运动带动平移滑套横向移动,所述吊梁上端连接于横向滑套,下端连接于模具组;在使用时平移油缸的伸缩运动带动平移滑套在悬梁移动,平移滑套再通过吊梁带动模具组在横向方向移动,从而实现模具组的左右方向位置调整。The suspension device includes a translation sliding sleeve, a translation oil cylinder and a hanging beam, the translation sliding sleeve is sleeved on the suspension beam, one end of the translation oil cylinder is connected to the suspension beam, and the other end is connected to the translation sliding sleeve. The sleeve moves laterally, the upper end of the hanging beam is connected to the lateral sliding sleeve, and the lower end is connected to the die set; when in use, the telescopic motion of the translation cylinder drives the translation sliding sleeve to move on the suspension beam, and the translation sliding sleeve drives the die set in the lateral direction through the hanging beam. Move, so as to realize the left and right position adjustment of the die set.
其中和的设计模具组,该模具组能够成组吊装和安装,在安装时,仅需定位即可,而且定位方便,组装后的模板不会变形,相邻模板之间设置有限位板,该限位板能够保持模板之间的间距不变,并且还设置有定位架,该定位架能够实现各个模板间的相对位置调整,同时在该定位架的底部还设置有可调节的支腿,能够实现模板高度的微调。Among them, the design of the die set, which can be hoisted and installed in groups, only needs to be positioned during installation, and the positioning is convenient, the assembled formwork will not be deformed, and there is a limit plate between adjacent formwork, the The limit plate can keep the distance between the templates unchanged, and is also provided with a positioning frame, which can realize the relative position adjustment between the templates. Realize fine-tuning of template height.
附图说明Description of drawings
图1是本实用新型在隧道施工状态示意图;Fig. 1 is the present utility model in the tunnel construction state schematic diagram;
图2是本实用新型在隧道吊装模具组时的状态示意图;Fig. 2 is the state schematic diagram of the present utility model when the die set is hoisted in the tunnel;
图3是图2中M的局部放大示意图;Fig. 3 is the partial enlarged schematic diagram of M in Fig. 2;
图4是本实用新型模具组安装状态示意图;4 is a schematic diagram of the installation state of the mold set of the present invention;
图5是本实用新型台车示意图;Fig. 5 is the schematic diagram of the utility model trolley;
图6是本实用新型定位架主视图;Fig. 6 is the front view of the utility model positioning frame;
图7是本实用新型定位架的俯视图。FIG. 7 is a top view of the positioning frame of the present invention.
具体实施方式Detailed ways
下面将结合附图1-图7对本实用新型进行详细说明,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The present utility model will be described in detail below with reference to accompanying
如图1-图7所示,本实用新型在此提供一种隧道线缆沟和水沟施工台车, 包括具有行走机构的主桁架17,所述行走机构包括主动部分19和具有转向功能的从动部分18,所述主桁架两侧的立柱6外侧安装有能够上下升降的悬挂装置,该悬挂装置通过悬吊机构连接有成套的且定位即用的模具组。As shown in FIGS. 1 to 7 , the present invention provides a tunnel cable trench and water trench construction trolley, including a
在该实施例中,所述悬挂装置包括悬梁9、滑柱13、滑套14和拉杆12,所述悬梁内端以铰接方式与滑套14连接,所述拉杆的上端以铰接方式连接于滑套上端,而拉杆的下端以铰接方式与悬梁外端连接,所述滑套14套于滑柱外围,而滑柱竖直固定安装于立柱外侧;该拉杆为可调节的丝杆千斤。In this embodiment, the suspension device includes a
在所述立柱外侧固定安装有升降油缸,该升降油缸的活塞杆连接于滑套,而缸体固定连接于立柱。A lifting oil cylinder is fixedly installed on the outer side of the vertical column, the piston rod of the lifting oil cylinder is connected to the sliding sleeve, and the cylinder body is fixedly connected to the vertical column.
在该实施例中,所述悬吊机构包括平移滑套10,平移油缸11和吊梁8,所述平移滑套10套于悬梁9,所述平移油缸一端连接于悬梁,而另一端连接于平移滑套10,通过平移油缸伸缩运动带动平移滑套横向移动,所述吊梁8上端连接于横向滑套,下端连接于模具组。In this embodiment, the suspension mechanism includes a
在该实施例中,所述模具组包括模板组和定位架5,所述模板组通过位置调整机构安装于定位架下方;In this embodiment, the die set includes a template set and a
所述定位架5上端通过吊梁8连接于平移滑套10;The upper end of the
所述定位架5两端为与地面接触端,且在该地面接触端安装有高度可调的调节支腿1。该调节支腿包括螺母和螺栓,通过螺栓插入定位架的高度可调,实现支腿高度可调,适应多种地面。Both ends of the
在该实施例中,所述模板组包括水沟模板组和线缆沟模板组,In this embodiment, the template group includes a water ditch template group and a cable trench template group,
所述水沟模板组包括两侧的水沟侧模板7,两个所述水沟侧模板底部两端以铰接方式连接,同时在两端还设置有保持两个水沟侧模板相对位置的限位板4;The water ditch formwork group includes water
所述线缆沟模板组包括两侧的线缆沟侧模板3,在两个所述线缆沟侧模板的两端安装有保持两模板相对位置的限位板。The cable trench formwork group includes cable
在该实施例中,所述位置调整机构包括数个竖直花篮螺栓2,该竖直花篮螺栓上部连接于定位架,下端与模板组连接,在相邻竖直花篮螺栓的顶端之间连接有横向花篮螺栓,In this embodiment, the position adjustment mechanism includes several
所述模板组的高度通过竖直花篮螺栓调节,而横向位置通过横向花篮螺栓调节。The height of the template group is adjusted by vertical turnbuckles, and the lateral position is adjusted by transverse turnbuckles.
在该实施例中,所述模板包括两侧的水沟侧模板7,两个所述水沟侧模板底部两端以铰接方式连接,同时在两端还设置有保持两个水沟侧模板相对位置的限位板4;In this embodiment, the formwork includes
所述线缆沟模板组件包括两侧的线缆沟侧模板3,在两个所述线缆沟侧模板的两端安装有保持两模板相对位置的限位板。The cable trench formwork assembly includes cable
在该实施例中,所述吊梁与模具组的采用花篮螺栓或电动葫芦或手动葫芦连接。In this embodiment, the hanging beam and the die set are connected with a turnbuckle bolt or an electric hoist or a manual hoist.
在实施时,每部台车可配置数套长度12米的模具组,每个模具组由数块模板组和数个定位架组成,台车将模具组吊到指定位置后即可脱离该模具组,进行其他模具组的吊运工作。模具组依靠自身的调整机构将模板调整到准确位置,无需台车辅助。During implementation, each trolley can be equipped with several sets of mold sets with a length of 12 meters. Each mold set is composed of several template sets and several positioning frames. After the trolley lifts the mold set to the designated position, it can be separated from the mold. group, to carry out the lifting work of other mold groups. The die set relies on its own adjustment mechanism to adjust the template to the exact position without the aid of a trolley.
本实用新型设计合理,结构简单,使用方便,能够实现多个模具组循环作业,用于隧道线缆沟和水沟的施工,克服了传统施工方法效率低,质量不稳定的问题,缩短水沟和线缆沟的施工周期,提高了作业效率。The utility model has the advantages of reasonable design, simple structure and convenient use, can realize the cyclic operation of a plurality of mould groups, is used for the construction of tunnel cable trenches and water trenches, overcomes the problems of low efficiency and unstable quality of traditional construction methods, and shortens the water trenches. and the construction period of the cable trench, which improves the work efficiency.
一种采用隧道线缆沟和水沟的施工方法,其特征在于:包括如下步骤:A construction method using a tunnel cable trench and a water trench is characterized in that: comprising the following steps:
①准备多组模具组,将台车移动到隧道15内,使得台车在隧道基面16行走,通过带有行走机构的主桁架将一组模具组吊装到施工位置,并通过定位架安装好该模具组,在此过程中主桁架两侧是同时施工;①Prepare multiple sets of mold sets, move the trolley into the
②一组工作人员向安装好的模具组中浇筑混凝土,在浇筑时,该组模具组是与主桁架脱离的,在浇筑的同时主桁架再吊装另一组模具组,并将新吊的模具组吊装到指定位置,并对其进行定位和拼接;② A group of workers poured concrete into the installed mold set. During the pouring, the mold group was separated from the main truss. At the same time of pouring, the main truss hoisted another group of mold groups, and the newly hoisted mold group was hoisted. The group is hoisted to the designated position, and it is positioned and spliced;
③向新安装的模具组进行混泥土浇筑,在浇筑时,可继续重复步骤②,实现循环浇筑,同时两侧同时施工;③Pour concrete to the newly installed mold set. During the pouring, you can continue to repeat
④拆卸前端混凝土凝固后的模具组,通过主桁架整体吊装,将其吊装到后端继续安装,并重复步骤②;④Remove the die set after the solidified concrete at the front end, hoist it as a whole through the main truss, hoist it to the rear end to continue the installation, and repeat
⑤重复步骤③和步骤④,直到整个隧道段浇筑完成。⑤
在该方法中,所述步骤②和步骤④吊装过程如下:平移油缸11的伸缩运动带动平移滑套10在悬梁9移动,平移滑套再通过吊梁8带动模具组在横向方向移动;所述悬梁9在竖直方向移动时,通过升降油缸带动滑套14在滑柱上移动,从而通过悬梁带动模具组竖直方向移动。In this method, the hoisting process of the
在该方法中,吊装模具组时,线缆沟侧模板3和水沟侧模板7通过限位板保持形状,保持形状的模板再通过模板位置调整机构安装于定位架5,模具组通过吊梁与平移滑套连接;In this method, when the die set is hoisted, the cable
在安装组装好的模板时,通过位置调整机构调节其高度。所述模板组的高度通过竖直花篮螺栓调节,而横向位置通过横向花篮螺栓调节。When installing the assembled formwork, its height is adjusted by the position adjustment mechanism. The height of the template group is adjusted by vertical turnbuckles, and the lateral position is adjusted by transverse turnbuckles.
本实用新型在施工时能够缩短水沟和线缆沟的施工周期,降低成本,克服传统效率低,质量不稳定的问题,合理的设计台车,能够实现施工循环作业,提高效率。The utility model can shorten the construction period of the water ditch and the cable ditch, reduce the cost, overcome the traditional problems of low efficiency and unstable quality, reasonably design the trolley, can realize the construction cycle operation and improve the efficiency.
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本实用新型。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本实用新型的精神或范围的情况下,在其它实施例中实现。因此,本实用新型将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Thus, the present invention is not intended to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922364598.3U CN211737150U (en) | 2019-12-25 | 2019-12-25 | A tunnel cable trench and water trench construction trolley |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922364598.3U CN211737150U (en) | 2019-12-25 | 2019-12-25 | A tunnel cable trench and water trench construction trolley |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211737150U true CN211737150U (en) | 2020-10-23 |
Family
ID=72872217
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922364598.3U Active CN211737150U (en) | 2019-12-25 | 2019-12-25 | A tunnel cable trench and water trench construction trolley |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211737150U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111042835A (en) * | 2019-12-25 | 2020-04-21 | 都江堰现代机械制造有限责任公司 | Tunnel cable trench and ditch construction trolley and construction method thereof |
-
2019
- 2019-12-25 CN CN201922364598.3U patent/CN211737150U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111042835A (en) * | 2019-12-25 | 2020-04-21 | 都江堰现代机械制造有限责任公司 | Tunnel cable trench and ditch construction trolley and construction method thereof |
| CN111042835B (en) * | 2019-12-25 | 2024-06-18 | 都江堰现代机械制造有限责任公司 | A tunnel cable trench and water trench construction trolley and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105736016B (en) | Tunnel double-lining framework of steel reinforcement construction equipment and its application | |
| CN113235472B (en) | Concrete placement platform truck is contained to apron | |
| CN203022024U (en) | Integrally-movable formwork for pipe gallery cast-in-situ construction | |
| CN104533460B (en) | Support replacement formula formwork jumbo and the construction method of underpass concreting | |
| CN107165191A (en) | City comprehensive pipe gallery die and using method thereof | |
| CN104120877B (en) | A kind of hydraulic climbing die block system and climbing form method | |
| CN112160770B (en) | Tunnel reinforced concrete center ditch construction equipment and construction method thereof | |
| CN112144546A (en) | Horizontal scalable foundation ditch support frame based on U type shield constructs machine | |
| CN214993219U (en) | Concrete placement platform truck is contained to apron | |
| CN206874289U (en) | Just lining construction hydraulic template trolley | |
| CN111042835B (en) | A tunnel cable trench and water trench construction trolley and construction method thereof | |
| CN205936645U (en) | A full liquid die plate system for culvert is pour | |
| CN211737150U (en) | A tunnel cable trench and water trench construction trolley | |
| CN205975365U (en) | Cast -in -situ box girder combined type moving die carrier | |
| CN213682135U (en) | Horizontal scalable foundation ditch support frame based on U type shield constructs machine | |
| CN204002842U (en) | In full section, slide rail moves steel form carrier | |
| CN204419203U (en) | All-hydraulic gantry type ditch, cable trench mould bases chassis | |
| CN210422637U (en) | A concreting system for full section concrete of circular tunnel | |
| CN118498247A (en) | Hydraulic culvert wall pouring integral template device and construction method thereof | |
| CN219509168U (en) | Heat preservation template installation die carrier | |
| CN208473293U (en) | Narrow deformation joint easy-dismount template system | |
| CN206053965U (en) | A kind of tunnel ditch cable trough construction trolley | |
| CN206035501U (en) | Tunnel water ditch die carrier device | |
| CN106939793B (en) | Tunnel Center Ditch Trolley for Efficient Construction | |
| CN216405121U (en) | Cantilever hydraulic climbing frame system for variable cross-section hollow pier construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250317 Address after: No. 96, Xinjian Street, Dujiangyan Irrigation Project Economic Development Zone, Dujiangyan Irrigation Project, Chengdu, Sichuan 611830 Patentee after: Dujiangyan Irrigation Project Tunnel Construction Intelligent Decoration Technology Co.,Ltd. Country or region after: China Address before: 611830 No.7, Jintang Road, Dujiangyan Economic Development Zone, Chengdu, Sichuan Patentee before: DUJIANGYAN MODERN MACHINERY MANUFACTURING CO.,LTD. Country or region before: China |