CN211714520U - An easy-to-remove scaffold for civil engineering - Google Patents
An easy-to-remove scaffold for civil engineering Download PDFInfo
- Publication number
- CN211714520U CN211714520U CN202020073752.1U CN202020073752U CN211714520U CN 211714520 U CN211714520 U CN 211714520U CN 202020073752 U CN202020073752 U CN 202020073752U CN 211714520 U CN211714520 U CN 211714520U
- Authority
- CN
- China
- Prior art keywords
- pipe
- shaped connecting
- fixedly connected
- scaffold
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
本实用新型涉及土木工程技术领域,尤其为一种土木工程用便于拆卸的脚手架,包括脚手架本体,所述脚手架本体的拐角处安装有纵向支撑管,所述纵向支撑管的下侧固定连接有插接管,所述纵向支撑管与插接管的连接处固定连接有第一L形连接片,所述第一L形连接片的下侧中间处开设有限位孔,所述纵向支撑管的外壁并且位于第一L形连接片的上侧固定连接有第一连接卡盘,所述第一连接卡盘的上侧呈圆周开设有连接插孔,所述纵向支撑管通过第一连接卡盘安装有第一承载层,所述第一承载层包括第一连接管、第二连接管,所述第一承载层的左右两侧安装有第一连接管,整体设备结构简单,操作方便,功能丰富,且稳定性和实用性较高,具有一定的推广价值。
The utility model relates to the technical field of civil engineering, in particular to an easily disassembled scaffold for civil engineering, comprising a scaffold body, a longitudinal support pipe is installed at the corner of the scaffold body, and the lower side of the longitudinal support pipe is fixedly connected with a socket A first L-shaped connecting piece is fixedly connected to the connection between the longitudinal support tube and the plug-in tube, a limiting hole is set in the middle of the lower side of the first L-shaped connecting piece, and the outer wall of the longitudinal support tube is located at the The upper side of the first L-shaped connecting piece is fixedly connected with a first connecting chuck, the upper side of the first connecting chuck is provided with a connecting hole in the circumference, and the longitudinal support pipe is installed with a first connecting chuck through the first connecting chuck. A bearing layer, the first bearing layer includes a first connecting pipe and a second connecting pipe, the left and right sides of the first bearing layer are installed with the first connecting pipe, the overall equipment structure is simple, the operation is convenient, and the functions are rich, and It has high stability and practicability, and has certain promotion value.
Description
技术领域technical field
本实用新型涉及土木工程技术领域,具体为一种土木工程用便于拆卸的脚手架。The utility model relates to the technical field of civil engineering, in particular to a scaffold which is easy to disassemble for civil engineering.
背景技术Background technique
脚手架是施工现场为工人操作并解决垂直和水平运输而搭设的一种临时性的建筑工具,其主要用在外墙、内部装修或层高较高无法直接施工的地方,主要为了施工人员上下干活或外围安全网维护及高空安装构件等,它的制作材料通常有竹、木、钢管或合成材料等,现有的脚手架通常为钢管或合金材料制作而成。Scaffolding is a temporary construction tool set up on the construction site for workers to operate and solve vertical and horizontal transportation. It is mainly used in exterior walls, interior decoration or places with high storey height that cannot be directly constructed. It is mainly for construction personnel to work up and down. Or peripheral safety net maintenance and high-altitude installation components, etc., its materials are usually made of bamboo, wood, steel pipes or synthetic materials, etc. The existing scaffolding is usually made of steel pipes or alloy materials.
现有的脚手架通常采用螺栓进行固定,且脚手架的连接件较多,导致脚手架拆卸的步骤较为繁琐,且零配件不易管理,因此需要一种土木工程用便于拆卸的脚手架对上述问题做出改善。Existing scaffolds are usually fixed with bolts, and the scaffolding has many connecting parts, which leads to complicated steps for disassembling the scaffolding, and the spare parts are not easy to manage. Therefore, there is a need for a scaffolding that is easy to disassemble for civil engineering to improve the above problems.
实用新型内容Utility model content
本实用新型的目的在于提供一种土木工程用便于拆卸的脚手架,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide a scaffolding for civil engineering that is easy to disassemble, so as to solve the problems raised in the above background technology.
为实现上述目的,本实用新型提供如下技术方案:To achieve the above object, the utility model provides the following technical solutions:
一种土木工程用便于拆卸的脚手架,包括脚手架本体,所述脚手架本体的拐角处安装有纵向支撑管,所述纵向支撑管的下侧固定连接有插接管,所述纵向支撑管与插接管的连接处固定连接有第一L形连接片,所述第一L形连接片的下侧中间处开设有限位孔,所述纵向支撑管的外壁并且位于第一L 形连接片的上侧固定连接有第一连接卡盘,所述第一连接卡盘的上侧呈圆周开设有连接插孔,所述纵向支撑管通过第一连接卡盘安装有第一承载层,所述第一承载层包括第一连接管、第二连接管,所述第一承载层的左右两侧安装有第一连接管,所述第一承载层的前后两侧安装有第二连接管,所述第一连接管、第二连接管的端部并且与连接插孔对应的位置固定连接有第二L形连接片,所述第一连接管、第二连接管的端部并且位于第二L形连接片的上侧固定连接有弧形连接板,所述纵向支撑管的外壁并且位于第一连接卡盘的上侧安装有缩颈套筒,所述第二连接管的中间处安装有横向支撑管,所述横向支撑管的两端套接有连接套管,所述连接套管的上侧中间处螺纹连接有锁紧栓,所述连接套管的端部并且与第二连接管的连接处固定连接有C形卡箍,所述纵向支撑管的外壁并且位于第二L形连接片的上侧固定连接有第二连接卡盘,所述纵向支撑管通过第二连接卡盘安装有第二承载层,所述纵向支撑管的上侧端部固定连接有上侧呈接盘,所述上侧呈接盘的上侧并且与第一L 形连接片对应的位置开设有限位连接缺口。A scaffolding for civil engineering that is easy to disassemble, comprising a scaffolding body, a longitudinal support pipe is installed at the corner of the scaffolding body, a plug-in pipe is fixedly connected to the lower side of the longitudinal support pipe, and the longitudinal support pipe and the plug-in pipe are connected to each other. The connection is fixedly connected with a first L-shaped connecting piece, a limiting hole is opened in the middle of the lower side of the first L-shaped connecting piece, and the outer wall of the longitudinal support tube is fixedly connected on the upper side of the first L-shaped connecting piece There is a first connecting chuck, the upper side of the first connecting chuck is provided with a connecting hole in a circumference, the longitudinal support pipe is installed with a first bearing layer through the first connecting chuck, and the first bearing layer includes The first connecting pipe and the second connecting pipe, the first connecting pipe is installed on the left and right sides of the first bearing layer, the second connecting pipe is installed on the front and rear sides of the first bearing layer, and the first connecting pipe , The end of the second connecting pipe and the position corresponding to the connecting jack are fixedly connected with a second L-shaped connecting piece, and the first connecting pipe and the end of the second connecting pipe are located on the second L-shaped connecting piece. The side is fixedly connected with an arc-shaped connecting plate, the outer wall of the longitudinal support pipe and the upper side of the first connecting chuck is installed with a necking sleeve, the middle of the second connecting pipe is installed with a transverse support pipe, the The two ends of the lateral support pipe are sleeved with connecting sleeves, the middle of the upper side of the connecting sleeves is threadedly connected with a locking bolt, and the ends of the connecting sleeves are fixedly connected to the connection with the second connecting pipe. A C-shaped clamp, the outer wall of the longitudinal support tube and the upper side of the second L-shaped connecting piece are fixedly connected with a second connection chuck, and the longitudinal support tube is installed with a second bearing layer through the second connection chuck, The upper end of the longitudinal support tube is fixedly connected with a receiving plate on the upper side.
优选的,所述插接管的外径与纵向支撑管的内径相适配。Preferably, the outer diameter of the plug-in tube is adapted to the inner diameter of the longitudinal support tube.
优选的,所述第一L形连接片、第二L形连接片均设有四个,并且所述第一L形连接片在纵向支撑管的外壁呈圆周分布。Preferably, there are four first L-shaped connecting pieces and four second L-shaped connecting pieces, and the first L-shaped connecting pieces are distributed circumferentially on the outer wall of the longitudinal support tube.
优选的,所述第一承载层、第一连接卡盘分别与第二承载层、第二连接卡盘的结构完全相同。Preferably, the structures of the first carrier layer and the first connection chuck are identical to those of the second carrier layer and the second connection chuck, respectively.
优选的,所述弧形连接板的尺寸与纵向支撑管的外壁相适配,所述弧形连接板外壁的截面为上小下大的直角梯形,并且弧形连接板的外壁开设有外螺纹。Preferably, the size of the arc-shaped connecting plate is adapted to the outer wall of the longitudinal support pipe, the cross-section of the outer wall of the arc-shaped connecting plate is a right-angled trapezoid with a small top and a large bottom, and the outer wall of the arc-shaped connecting plate is provided with external threads .
优选的,所述缩颈套筒的内壁开设有内螺纹,并且所述缩颈套筒的内部尺寸与弧形连接板相适配。Preferably, the inner wall of the necking sleeve is provided with an internal thread, and the internal size of the necking sleeve is adapted to the arc-shaped connecting plate.
优选的,所述锁紧栓贯穿于连接套管并且与第二连接管螺纹连接。Preferably, the locking bolt penetrates through the connecting sleeve and is threadedly connected with the second connecting pipe.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:
1、本实用新型中,通过设置的纵向支撑管的结构使得整体的零配件较少,保证在拆卸搬运的过程中零配件的管理更加方便,另外,插接管与第一L形连接片、上侧呈接盘的设置使得相邻的纵向支撑管的连接方式更加简单的同时还能够保证其连接处的牢固性,相较于传统的脚手架来说本方案的稳定性更强且安装方便。1. In this utility model, the structure of the longitudinal support pipe provided makes the whole spare parts less, which ensures that the management of spare parts is more convenient in the process of dismantling and handling. The arrangement of the side plate makes the connection of the adjacent longitudinal support pipes simpler and at the same time ensures the firmness of the connection. Compared with the traditional scaffolding, the solution is more stable and easy to install.
2、本实用新型中,通过设置的C形卡箍与连接套管配合使用使得横向支撑管的安装更加简单方便,另外,第二L形连接片的加入使得第一连接管与第二连接管的安装更加方便,与此同时,锁精套筒与弧形连接板的加入使得第一连接管与第二连接管的安装更加稳固,整体来说智能体结构设计使得脚手架本体的安装与拆卸更加方便快捷,同时还具有较高的稳固性。2. In the present utility model, the installation of the lateral support pipe is simpler and more convenient through the use of the provided C-shaped clamp and the connecting sleeve. In addition, the addition of the second L-shaped connecting piece makes the first connecting pipe and the second connecting pipe more convenient. At the same time, the addition of the locking sleeve and the arc-shaped connecting plate makes the installation of the first connecting pipe and the second connecting pipe more stable. On the whole, the intelligent body structure design makes the installation and disassembly of the scaffold body more stable. Convenient and fast, but also has a high stability.
附图说明Description of drawings
图1为本实用新型整体轴测图;Fig. 1 is the overall axonometric view of the utility model;
图2为本实用新型第一连接管放大图;2 is an enlarged view of the first connecting pipe of the present invention;
图3为本实用新型纵向支撑管放大图。FIG. 3 is an enlarged view of the longitudinal support tube of the utility model.
图中:1-脚手架本体、2-纵向支撑管、3-插接管、4-第一L形连接片、 5-限位孔、6-第一连接卡盘、7-连接插孔、8-第一承载层、9-第一连接管、 10-第二连接管、11-第二L形连接片、12-弧形连接板、13-缩颈套筒、14-横向支撑管、15-连接套管、16-锁紧栓、17-C形卡箍、18-第二连接卡盘、19- 第二承载层、20-上侧呈接盘、21-限位连接缺口。In the figure: 1- Scaffolding body, 2- Longitudinal support pipe, 3- Plug-in pipe, 4- First L-shaped connecting piece, 5- Limit hole, 6- First connecting chuck, 7- Connecting jack, 8- First bearing layer, 9-first connecting pipe, 10-second connecting pipe, 11-second L-shaped connecting piece, 12-arc connecting plate, 13- necking sleeve, 14-transverse support pipe, 15- Connecting sleeve, 16 - locking bolt, 17 - C-shaped clamp, 18 - second connecting chuck, 19 - second bearing layer, 20 - connecting plate on the upper side, 21 - limit connection gap.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例,基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. For example, based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.
请参阅图1-3,本实用新型提供一种技术方案:Please refer to Figures 1-3, the utility model provides a technical solution:
一种土木工程用便于拆卸的脚手架,包括脚手架本体1,脚手架本体1的拐角处安装有纵向支撑管2,纵向支撑管2的下侧固定连接有插接管3,纵向支撑管2与插接管3的连接处固定连接有第一L形连接片4,第一L形连接片 4的下侧中间处开设有限位孔5,纵向支撑管2的外壁并且位于第一L形连接片4的上侧固定连接有第一连接卡盘6,第一连接卡盘6的上侧呈圆周开设有连接插孔7,纵向支撑管2通过第一连接卡盘6安装有第一承载层8,第一承载层8包括第一连接管9、第二连接管10,第一承载层8的左右两侧安装有第一连接管9,第一承载层8的前后两侧安装有第二连接管10,第一连接管9、第二连接管10的端部并且与连接插孔7对应的位置固定连接有第二L形连接片11,第一连接管9、第二连接管10的端部并且位于第二L形连接片11的上侧固定连接有弧形连接板12,纵向支撑管2的外壁并且位于第一连接卡盘 6的上侧安装有缩颈套筒13,第二连接管10的中间处安装有横向支撑管14,横向支撑管14的两端套接有连接套管15,连接套管15的上侧中间处螺纹连接有锁紧栓16,连接套管15的端部并且与第二连接管10的连接处固定连接有C形卡箍17,纵向支撑管2的外壁并且位于第二L形连接片11的上侧固定连接有第二连接卡盘18,纵向支撑管2通过第二连接卡盘18安装有第二承载层19,纵向支撑管2的上侧端部固定连接有上侧呈接盘20,上侧呈接盘20 的上侧并且与第一L形连接片4对应的位置开设有限位连接缺口21。A scaffold that is easy to disassemble for civil engineering, comprising a scaffold body 1, a
本实用新型工作流程:使用时,将纵向支撑管2分别放置在脚手架基座上合适的位置,之后将第一承载层8的第一连接管9与第二连接管10端部的第二L形连接片11挂入相应的连接插孔7内,之后将锁精套筒13向下滑动套住弧形连接板12并拧紧,之后将横向支撑管14通过C形卡箍17对称安装在第二连接管10上,将第二承载层19按上述操作安装在纵向支撑管2上,根据需要将另外的纵向支撑管2的差接管3插入安装好的纵向支撑管2的上端,将第一L形连接片4对准纤维连接缺口21,之后使用螺栓穿过限位孔5 将其固定,之后重复上述步骤即可,拆卸过程与安装过程相反,在此不做赘述。The working process of the utility model: when in use, the
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020073752.1U CN211714520U (en) | 2020-01-14 | 2020-01-14 | An easy-to-remove scaffold for civil engineering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020073752.1U CN211714520U (en) | 2020-01-14 | 2020-01-14 | An easy-to-remove scaffold for civil engineering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211714520U true CN211714520U (en) | 2020-10-20 |
Family
ID=72823471
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020073752.1U Expired - Fee Related CN211714520U (en) | 2020-01-14 | 2020-01-14 | An easy-to-remove scaffold for civil engineering |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211714520U (en) |
-
2020
- 2020-01-14 CN CN202020073752.1U patent/CN211714520U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209837294U (en) | Assembled building steel skeleton is connected | |
| CN211714520U (en) | An easy-to-remove scaffold for civil engineering | |
| CN204060148U (en) | A kind of fence that can improve application life | |
| CN217840861U (en) | Multi-angle template jacking bracket | |
| CN214090860U (en) | Assembled combined scaffold | |
| CN211974295U (en) | Firm in connection's round knot formula scaffold frame | |
| CN218562982U (en) | Climbing frame protection device | |
| CN206309116U (en) | A kind of interim builder's temporary shed of Construction of Civil Engineering | |
| CN216764114U (en) | A tower crane attached truss | |
| CN211422025U (en) | Assembling structure of power grid line iron tower | |
| CN205617772U (en) | Gallows structure under lifting foot hand rack special use | |
| CN209353662U (en) | Climbing frame protective net frame and pole connection structure | |
| CN218714886U (en) | Nut type lifting support leg for moving operation platform | |
| CN205857663U (en) | A kind of folding hoistway operation platform | |
| CN222413985U (en) | Auxiliary support for overhanging end of tray buckle support | |
| CN218779925U (en) | Aluminum alloy protection net fixed connection spare | |
| CN211923623U (en) | A kind of building edge protection tool type railing | |
| CN218815098U (en) | A cantilevered building platform | |
| CN220469346U (en) | A kind of building scaffolding component | |
| CN219826027U (en) | Bottom reinforcing anti-toppling structure | |
| CN222413968U (en) | Safety protection device for steel structure construction | |
| CN214090922U (en) | Scaffold steel pipe vertical butt joint auxiliary device | |
| CN206887963U (en) | A kind of active spiral steel pipe is to support | |
| CN207211675U (en) | Socket joint type disk button jacking screw structure | |
| CN112538960A (en) | Make things convenient for dismouting and firm scaffold frame |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201020 Termination date: 20220114 |
