CN211712419U - Lifting frame for building prefabricated slab - Google Patents

Lifting frame for building prefabricated slab Download PDF

Info

Publication number
CN211712419U
CN211712419U CN201922175667.6U CN201922175667U CN211712419U CN 211712419 U CN211712419 U CN 211712419U CN 201922175667 U CN201922175667 U CN 201922175667U CN 211712419 U CN211712419 U CN 211712419U
Authority
CN
China
Prior art keywords
column
welded
lifting
groove
lifting frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922175667.6U
Other languages
Chinese (zh)
Inventor
游涛
陈平
徐波
边辰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201922175667.6U priority Critical patent/CN211712419U/en
Application granted granted Critical
Publication of CN211712419U publication Critical patent/CN211712419U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

一种用于建筑预制板的吊运架A hoisting frame for building prefabricated panels

技术领域technical field

本实用新型涉及建筑施工技术领域,特别涉及一种用于建筑预制板的吊运架。The utility model relates to the technical field of building construction, in particular to a hoisting frame used for building prefabricated panels.

背景技术Background technique

在建筑工地上,常常需要从地面往高处吊运建筑材料或预制板材,而吊运用的吊运架和挂钩往往无法与建筑预制板材和板材材料进行固定,无法实现通过电机带动来吊运建筑预制板材和板材材料。现有的建筑施工吊运架设计比较传统,其抗震能力较差,导致吊运较重的建筑材料时容易受力开裂,且由于板材重量较大,惯性较强,常出现惯性引起的绳索断裂。而高级减震设备不仅结构过于复杂,成本过高,而且容易损坏,适用性不强,且通过绳索捆绑,用勾手进行吊运时,因板材重心不平的问题,也会有脱落现象。On construction sites, it is often necessary to lift building materials or prefabricated panels from the ground to a high place, and the hoisting frame and hooks used for hoisting often cannot be fixed with the prefabricated panels and panel materials of the building, and it is impossible to hoist the building by the motor. Prefabricated panels and panel materials. The design of the existing building construction hoisting frame is relatively traditional, and its anti-seismic capacity is poor, which makes it easy to crack under force when hoisting heavier building materials, and due to the large weight of the plate and strong inertia, the rope breakage caused by the inertia often occurs. . The advanced shock absorption equipment is not only too complicated in structure and high in cost, but also easy to damage and not suitable for strong applicability. When it is bundled with ropes and hoisted with hooks, the plate will also fall off due to the problem of uneven center of gravity.

实用新型内容Utility model content

为解决上述背景技术中提出的问题,本实用新型提供一种用于建筑预制板的吊运架,该吊运架通过设置的“T”字形凹槽,使得吊运架可以根据板材重心进行调节吊运柱位置,对重心进行调节,通过设置的第二轴承,使得板材安装更为灵活,通过设置的强力弹簧、安装板和安装孔,使得板材更易与吊运架安装,且可以使得强力弹簧缓冲板材因惯性导致的断裂等问题。In order to solve the problems raised in the above background technology, the utility model provides a hoisting frame for building prefabricated panels, the hoisting frame can be adjusted according to the center of gravity of the plate through the set "T"-shaped groove. The position of the hoisting column is adjusted to adjust the center of gravity, and the second bearing is set to make the plate installation more flexible. Problems such as fracture of the buffer plate due to inertia.

本实用新型是这样实现的,一种用于建筑预制板的吊运架,包括固定柱和吊运柱,所述固定柱的中央处开设有第一凹槽,所述第一凹槽内部固定设置有第一轴承,所述第一轴承的内壁与吊运柱的下端焊接,所述吊运柱的顶端面焊接有吊运环,所述固定柱的两端位于第一凹槽两侧均焊接有第二轴承,两个所述第二轴承的内壁与固定柱焊接,两个所述第二轴承的外壁均焊接有固定块,两个所述固定块贯穿上端内部与第二轴承的外壁焊接,两个所述固定块的下端均固定设置有安装板。The utility model is realized in this way, a hoisting frame for building prefabricated panels includes a fixed column and a hoisting column, the center of the fixed column is provided with a first groove, and the first groove is fixed inside. A first bearing is provided, the inner wall of the first bearing is welded with the lower end of the lifting column, the top surface of the lifting column is welded with a lifting ring, and the two ends of the fixed column are located on both sides of the first groove. A second bearing is welded, the inner walls of the two second bearings are welded with the fixing column, the outer walls of the two second bearings are welded with fixing blocks, and the two fixing blocks penetrate through the interior of the upper end and the outer wall of the second bearing Welding, the lower ends of the two fixing blocks are fixedly provided with mounting plates.

为了使得吊运柱与固定柱更好的卡接,且使得通过限位孔固定吊运柱的位置,作为本实用新型一种用于建筑预制板的吊运架优选的,所述第一凹槽为倒“T”字形结构,所述第一轴承与第一凹槽卡接,所述固定柱对应第一凹槽的底部贯穿开设有多个限位孔。In order to better clamp the hoisting column and the fixed column, and to fix the position of the hoisting column through the limit hole, as a hoisting frame for building prefabricated panels of the present invention, the first concave The groove is an inverted "T"-shaped structure, the first bearing is clamped with the first groove, and a plurality of limiting holes are formed through the bottom of the fixing column corresponding to the first groove.

为了防止固定柱意外断裂,发生事故,作为本实用新型一种用于建筑预制板的吊运架优选的,两个所述固定块的顶端均固定连接有防坠绳,两根所述防坠绳的另一端均与吊运柱的上端固定连接。In order to prevent the accidental breakage of the fixed column and the occurrence of an accident, it is preferable as a lifting frame for building prefabricated panels of the present invention, the tops of the two fixing blocks are fixedly connected with anti-fall ropes, and the two anti-falling ropes are fixedly connected with each other. The other end of the rope is fixedly connected with the upper end of the hoisting column.

为了缓冲板材的惯性,作为本实用新型一种用于建筑预制板的吊运架优选的,两个所述固定块的下端均贯穿开设有第二凹槽,两个所述第二凹槽的内部顶端均焊接有两个强力弹簧,所述强力弹簧的下端与安装板焊接。In order to buffer the inertia of the board, as a hoisting frame for building prefabricated boards of the present invention, preferably, the lower ends of the two fixing blocks are both provided with second grooves, and the two second grooves are provided with a second groove. Two strong springs are welded on the top ends of the interiors, and the lower ends of the strong springs are welded with the mounting plate.

为了使得板材可以更好的与吊运架安装固定,作为本实用新型一种用于建筑预制板的吊运架优选的,所述安装板的两端位于强力弹簧的两侧均贯穿开设有多个安装孔。In order to make the plate can be better installed and fixed with the hoisting frame, as a hoisting frame used for building prefabricated panels of the present invention, it is preferable that the two ends of the mounting plate are located on both sides of the strong spring, and there are multiple openings running through them. mounting holes.

为了使得安装板与强力弹簧互不影响工作,作为本实用新型一种用于建筑预制板的吊运架优选的,所述强力弹簧自然状态的长度略大于第二凹槽的内部深度。In order to prevent the installation plate and the strong spring from interfering with each other's work, as a sling for building prefabricated panels of the present invention, preferably, the length of the strong spring in its natural state is slightly greater than the inner depth of the second groove.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:

1、该种用于建筑预制板的吊运架,通过设置的“T”字形槽、第一轴承和吊运柱,使得整个吊运架可以调节吊运柱位置,便可以调节整个吊运架的重心,可以使得整个吊运过程更加平稳,效率更高。1. This kind of hoisting frame used for building prefabricated panels can adjust the position of the hoisting column by setting the "T"-shaped groove, the first bearing and the hoisting column, so that the whole hoisting frame can be adjusted. The center of gravity can make the whole lifting process more stable and more efficient.

2、该种用于建筑预制板的吊运架,通过设置的第二轴承、固定块、强力弹簧、安装板和安装孔,使得建筑预制板材和板材材料与吊运架更灵活的固定,且固定更为稳定,通过强力弹簧还可以缓冲板材惯性引起的不稳定,通过安装孔使得板材更为固定,通过设置的防坠绳保证了吊运的安全性,防止固定柱断裂引起吊运板材坠落引发事故。2. This kind of hoisting frame used for building prefabricated panels makes the prefabricated building panels and plate materials and the hoisting frame more flexibly fixed by setting the second bearing, the fixing block, the strong spring, the mounting plate and the installation hole, and The fixing is more stable, and the instability caused by the inertia of the plate can also be buffered by the strong spring, the plate is more fixed through the installation hole, and the safety of the lifting and transportation is ensured by the anti-fall rope set to prevent the fixed column from breaking and causing the lifting plate to fall. cause an accident.

附图说明Description of drawings

图1为本实用新型一种用于建筑预制板的吊运架的整体结构图;Fig. 1 is the overall structure diagram of a kind of hoisting frame used for building prefabricated panels of the present invention;

图2为本实用新型一种用于建筑预制板的吊运架的固定柱剖面图;2 is a cross-sectional view of a fixed column of a hoisting frame used for building prefabricated panels of the present utility model;

图3为本实用新型一种用于建筑预制板的吊运架的固定块剖面图;3 is a sectional view of a fixed block of a hoisting frame used for building prefabricated panels of the present utility model;

图4为本实用新型一种用于建筑预制板的吊运架的安装板底部平面图;4 is a bottom plan view of a mounting plate of a hoisting frame used for building prefabricated panels of the present invention;

图5为本实用新型一种用于建筑预制板的吊运架的固定柱底部平面图;5 is a bottom plan view of a fixed column of a hoisting frame used for building prefabricated panels of the present invention;

图中,1、固定柱;2、吊运柱;201、吊运环;202、第一轴承;3、第一凹槽;301、限位孔;4、固定块;401、第二凹槽;402、强力弹簧;5、第二轴承;6、防坠绳;7、安装板;701、安装孔。In the figure, 1, fixed column; 2, lifting column; 201, lifting ring; 202, first bearing; 3, first groove; 301, limit hole; 4, fixing block; 401, second groove ; 402, strong spring; 5, second bearing; 6, anti-fall rope; 7, mounting plate; 701, mounting hole.

具体实施方式Detailed ways

为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solutions and advantages of the present utility model more clearly understood, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not intended to limit the present invention.

在本实用新型的描述中,需要理解的是,术语“长度”、“宽度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,在本实用新型的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In the description of the present invention, it should be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical" , "horizontal", "top", "bottom", "inside", "outside" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, only for the convenience of describing the present utility model and simplifying the description, Rather than indicating or implying that the indicated device or element must have a particular orientation, be constructed and operate in a particular orientation, it should not be construed as a limitation of the present invention. In addition, in the description of the present invention, "plurality" means two or more, unless otherwise expressly and specifically defined.

请参阅图1-5,一种用于建筑预制板的吊运架,包括固定柱1和吊运柱2,固定柱1的中央处开设有第一凹槽3,第一凹槽3内部固定设置有第一轴承202,第一轴承202的内壁与吊运柱2的下端焊接,吊运柱2的顶端面焊接有吊运环201,固定柱1的两端位于第一凹槽3两侧均焊接有第二轴承5,两个第二轴承5的内壁与固定柱1焊接,两个第二轴承5的外壁均焊接有固定块4,两个固定块4贯穿上端内部与第二轴承5的外壁焊接,两个固定块4的下端均固定设置有安装板7。Please refer to Figures 1-5, a lifting frame for building prefabricated panels, including a fixed column 1 and a lifting column 2, a first groove 3 is opened in the center of the fixed column 1, and the first groove 3 is fixed inside A first bearing 202 is provided, the inner wall of the first bearing 202 is welded with the lower end of the lifting column 2, the top surface of the lifting column 2 is welded with a lifting ring 201, and the two ends of the fixed column 1 are located on both sides of the first groove 3 Both are welded with second bearings 5, the inner walls of the two second bearings 5 are welded with the fixed column 1, the outer walls of the two second bearings 5 are welded with fixed blocks 4, and the two fixed blocks 4 penetrate through the interior of the upper end and the second bearing 5. The outer walls of the two fixing blocks 4 are welded, and the lower ends of the two fixing blocks 4 are fixedly provided with a mounting plate 7 .

在本实施例中,通过设置的固定柱1、吊运柱2、第一凹槽3、第一轴承202和吊运环201组成整个吊运架,整个吊运架结构简单,且可以根据吊运板材的重心,调节吊运架的整体重心,适用性较强,设计简单,性能稳定,配合电机便可用吊绳吊运起建筑材料或预制板材。In this embodiment, the fixed column 1 , the lifting column 2 , the first groove 3 , the first bearing 202 and the lifting ring 201 constitute the entire lifting frame. The center of gravity of the conveying plate can be adjusted to adjust the overall center of gravity of the hoisting frame. It has strong applicability, simple design and stable performance. With the help of the motor, the building materials or prefabricated plates can be hoisted with a sling.

作为本实用新型的一种技术优化方案,第一凹槽3为倒“T”字形结构,第一轴承202与第一凹槽3卡接,固定柱1对应第一凹槽3的底部贯穿开设有多个限位孔301。As a technical optimization solution of the present invention, the first groove 3 is an inverted "T"-shaped structure, the first bearing 202 is clamped with the first groove 3, and the bottom of the fixing column 1 corresponding to the first groove 3 runs through. There are a plurality of limiting holes 301 .

在本实施例中,第一凹槽3为倒“T”字形结构,第一轴承202与第一凹槽3卡接,固定柱1对应第一凹槽3的底部贯穿开设有多个限位孔301,使得吊运柱2可以移动,调节重心,且通过设置的限位孔301,使得吊运柱2移动后,通过限位孔301固定吊运柱2的位置。In this embodiment, the first groove 3 is an inverted "T"-shaped structure, the first bearing 202 is clamped with the first groove 3 , and the bottom of the fixing column 1 corresponding to the first groove 3 is provided with a plurality of limit stops penetrating through it. The hole 301 enables the hoisting column 2 to move and adjust the center of gravity, and through the limit hole 301 provided, after the hoisting column 2 moves, the position of the hoisting column 2 is fixed through the limit hole 301 .

作为本实用新型的一种技术优化方案,两个固定块4的顶端均固定连接有防坠绳6,两根防坠绳6的另一端均与吊运柱2的上端固定连接。As a technical optimization scheme of the present invention, the top ends of the two fixing blocks 4 are fixedly connected with anti-falling ropes 6 , and the other ends of the two anti-falling ropes 6 are fixedly connected with the upper ends of the lifting columns 2 .

在本实施例中,两个固定块4的顶端均固定连接有防坠绳6,两根防坠绳6的另一端均与吊运柱2的上端固定连接,通过设置的防坠绳6,防止意外事故导致固定柱1断裂,引发事故,防坠绳6增加整体吊运架的安全性能。In this embodiment, the top ends of the two fixing blocks 4 are fixedly connected with anti-falling ropes 6, and the other ends of the two anti-falling ropes 6 are fixedly connected with the upper ends of the lifting columns 2. Through the provided anti-falling ropes 6, To prevent accidental accidents from causing the fixed column 1 to break and cause accidents, the anti-falling rope 6 increases the safety performance of the overall hoisting frame.

作为本实用新型的一种技术优化方案,两个固定块4的下端均贯穿开设有第二凹槽401,两个第二凹槽401的内部顶端均焊接有两个强力弹簧402,强力弹簧402的下端与安装板7焊接。As a technical optimization scheme of the present invention, second grooves 401 are formed through the lower ends of the two fixing blocks 4, and two strong springs 402 are welded to the inner top ends of the two second grooves 401. The strong springs 402 The lower end is welded with the mounting plate 7.

在本实施例中,两个固定块4的下端均贯穿开设有第二凹槽401,两个第二凹槽401的内部顶端均焊接有两个强力弹簧402,通过设置的强力弹簧402,使得整个吊运架可以缓冲吊运板材自身重力引发的惯性,防止了由于惯性引起的板材断裂、吊运架变形或断裂的事故。In this embodiment, second grooves 401 are formed through the lower ends of the two fixing blocks 4, and two strong springs 402 are welded to the inner top ends of the two second grooves 401. The whole hoisting frame can buffer the inertia caused by the own gravity of the hoisting plate, and prevent the accident of plate breakage, deformation or breakage of the hoisting frame caused by inertia.

作为本实用新型的一种技术优化方案,安装板7的两端位于强力弹簧402的两侧均贯穿开设有多个安装孔701。As a technical optimization solution of the present invention, the two ends of the mounting plate 7 located on both sides of the strong spring 402 are provided with a plurality of mounting holes 701 therethrough.

在本实施例中,安装板7的两端位于强力弹簧402的两侧均贯穿开设有多个安装孔701,通过设置的安装孔701,使得建筑预制板材更好的与安装板7更好的进行固定。In this embodiment, the two ends of the mounting plate 7 are located on both sides of the strong spring 402 and there are a plurality of mounting holes 701 penetrating through them. to be fixed.

作为本实用新型的一种技术优化方案,强力弹簧402自然状态的长度略大于第二凹槽401的内部深度。As a technical optimization solution of the present invention, the length of the strong spring 402 in the natural state is slightly larger than the inner depth of the second groove 401 .

在本实施例中,强力弹簧402自然状态的长度略大于第二凹槽401的内部深度,防止弹簧在自然状态收缩时,外部焊接的安装板7使得强力弹簧402不能自动收缩,降低弹簧的使用效果和使用寿命。In this embodiment, the length of the strong spring 402 in the natural state is slightly larger than the inner depth of the second groove 401 to prevent the spring from shrinking in the natural state. The externally welded mounting plate 7 prevents the strong spring 402 from automatically shrinking, reducing the use of the spring. effect and longevity.

工作原理:首先,工作人员将吊运环201与钢缆等吊运绳固定连接,然后将需要吊运的建筑板材或建筑预制板与两块安装板7通过安装孔701固定,然后通过设置的第一凹槽3、吊运柱2和限位孔301,调节整个吊运架和建筑板材的重心至水平位置,通过限位孔301固定吊运柱2的位置,然后将板材吊运至高处使用,通过设置的强力弹簧402,用来缓冲建筑板材自身重力的惯性,引起的建筑板材断裂、吊运架塑性变形和开裂,可以有效的进行减震作用,适用性较强,设计简单,性能稳定,配合电机便可用吊绳吊运起建筑材料或预制板材。Working principle: First, the staff fixedly connect the hoisting ring 201 to the hoisting rope such as steel cable, and then fix the building board or building prefabricated board to be hoisted and the two mounting boards 7 through the mounting holes 701, and then pass the set The first groove 3, the lifting column 2 and the limit hole 301, adjust the center of gravity of the entire lifting frame and the building board to a horizontal position, fix the position of the lifting column 2 through the limit hole 301, and then lift the board to a high place Use, by setting the strong spring 402, it is used to buffer the inertia of the building board's own gravity, causing the breaking of the building board, plastic deformation and cracking of the hoisting frame, which can effectively perform shock absorption, with strong applicability, simple design and high performance. Stable, with the motor, the building materials or prefabricated panels can be hoisted with a sling.

以上仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present utility model shall be included in the present utility model. within the scope of protection.

Claims (6)

1. The utility model provides a lifting frame for building prefabricated plate, includes fixed column (1) and handling post (2), its characterized in that: the middle of the fixing column (1) is provided with a first groove (3), a first bearing (202) is fixedly arranged in the first groove (3), the inner wall of the first bearing (202) is welded with the lower end of the lifting column (2), a lifting ring (201) is welded to the top end face of the lifting column (2), second bearings (5) are welded to two ends of the fixing column (1) on two sides of the first groove (3), the inner walls of the two second bearings (5) are welded with the fixing column (1), fixing blocks (4) are welded to the outer wall of the two second bearings (5), the two fixing blocks (4) penetrate through the inner portion of the upper end and are welded with the outer wall of the second bearing (5), and a mounting plate (7) is fixedly arranged at the lower end of the two fixing blocks (4).
2. A lifting frame for building panels as claimed in claim 1, wherein: first recess (3) are "T" font structure of falling, first bearing (202) and first recess (3) joint, a plurality of spacing holes (301) have been seted up in the bottom that fixed column (1) correspond first recess (3) through.
3. A lifting frame for building panels as claimed in claim 1, wherein: the top of the two fixed blocks (4) is fixedly connected with two anti-falling ropes (6), and the other ends of the two anti-falling ropes (6) are fixedly connected with the upper end of the lifting column (2).
4. A lifting frame for building panels as claimed in claim 1, wherein: two the lower extreme of fixed block (4) all runs through and has seted up second recess (401), two strong spring (402) have all been welded on the inside top of second recess (401), the lower extreme and mounting panel (7) welding of strong spring (402).
5. A lifting frame for building panels as claimed in claim 1, wherein: the both ends of mounting panel (7) are located both sides of powerful spring (402) and all run through and have seted up a plurality of mounting holes (701).
6. A lifting frame for building panels as claimed in claim 4, wherein: the length of the strong spring (402) in a natural state is slightly larger than the inner depth of the second groove (401).
CN201922175667.6U 2019-12-08 2019-12-08 Lifting frame for building prefabricated slab Expired - Fee Related CN211712419U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922175667.6U CN211712419U (en) 2019-12-08 2019-12-08 Lifting frame for building prefabricated slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922175667.6U CN211712419U (en) 2019-12-08 2019-12-08 Lifting frame for building prefabricated slab

Publications (1)

Publication Number Publication Date
CN211712419U true CN211712419U (en) 2020-10-20

Family

ID=72817042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922175667.6U Expired - Fee Related CN211712419U (en) 2019-12-08 2019-12-08 Lifting frame for building prefabricated slab

Country Status (1)

Country Link
CN (1) CN211712419U (en)

Similar Documents

Publication Publication Date Title
CN204606561U (en) A kind of prefabricated panel pallet
CN214740171U (en) Ancient building wall body hoist and mount migration device
CN211712419U (en) Lifting frame for building prefabricated slab
CN205069139U (en) Screen work roll -over stand is stored to nuclear power plant's spentnuclear fuel
CN203201149U (en) Electric lifting discharging platform
CN218541445U (en) Hanging type construction protection platform device
CN211169551U (en) Reinforcing frame for electric hoist
CN110388042A (en) A kind of construction of lift well operating platform
CN104355232B (en) Truck turning device
CN210084724U (en) A general hoisting accessory is hung to plane four points for precast concrete component
CN220928187U (en) Support girder steel structure
CN210366654U (en) Automatic closed nonmetal sound barrier cell board embraces card hoisting accessory
CN218841482U (en) Pipeline lifting device for construction
CN220926024U (en) High-rise building floor hoisting assembly
CN220312209U (en) Frame type high pile construction operation platform
CN219840354U (en) Aerial work platform for installing suspended ceiling in ultra-high steel structure
CN115719938B (en) Integral tubular busbar hoisting scheme special for wind power stepped concrete tower
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN205531284U (en) Attaches wall device
CN221009639U (en) Ring main unit shell easy to lift
CN220686857U (en) Top returning supporting device convenient to fix
CN219751697U (en) A kind of anti-side swing limiting tool for vertical lifting of objects
CN212246037U (en) C-shaped lifting hook device
CN217516514U (en) Lifting appliance for modular lifting
CN219156363U (en) Cantilever hanging frame of welding machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201020

Termination date: 20211208