CN211666334U - Strutting arrangement is used in civil engineering construction - Google Patents
Strutting arrangement is used in civil engineering construction Download PDFInfo
- Publication number
- CN211666334U CN211666334U CN202020158553.0U CN202020158553U CN211666334U CN 211666334 U CN211666334 U CN 211666334U CN 202020158553 U CN202020158553 U CN 202020158553U CN 211666334 U CN211666334 U CN 211666334U
- Authority
- CN
- China
- Prior art keywords
- plate
- base
- pin shaft
- hinged support
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 230000008093 supporting effect Effects 0.000 claims abstract description 44
- 230000008901 benefit Effects 0.000 claims abstract description 4
- 238000003466 welding Methods 0.000 claims description 9
- 230000000149 penetrating effect Effects 0.000 claims description 8
- 238000000034 method Methods 0.000 claims description 4
- 238000003860 storage Methods 0.000 claims description 2
- 230000006872 improvement Effects 0.000 abstract description 3
- 230000002633 protecting effect Effects 0.000 abstract description 3
- 238000005457 optimization Methods 0.000 description 4
- 238000000151 deposition Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The utility model provides a strutting arrangement is used in civil engineering construction, include: a supporting plate, a base and a connecting seat; the supporting plate is of a rectangular plate-shaped structure, and the rear part of the supporting plate is provided with a base; the connecting seat is arranged at the front part of the supporting plate and is connected with the base through a bolt; the fixed seat is arranged on one side of the supporting plate and is connected with the connecting seat through a connecting rod; through the improvement to current device, have simple structure, easy dismounting, easily deposit, support the advantage that the protecting effect is good to effectual solution the utility model provides a problem and not enough.
Description
Technical Field
The utility model relates to a support technical field, more specifically the utility model particularly relates to a simple structure, easy dismounting, easily deposit, support effectual strutting arrangement for civil engineering construction.
Background
In the process of engineering construction, due to the reasons of terrain and construction process, various supporting and protecting devices are usually used for preventing falling and sliding objects, but the existing supporting devices for soil slopes and wall bodies have partial defects.
The existing supporting device is mainly supported at a point when supporting the wall body, the supporting effect is poor, the dismounting is not convenient enough, and the storage is not easy.
In view of this, research and improvement are carried out to the existing problem, and a supporting device for civil engineering construction, which has a simple structure, is convenient to disassemble and assemble, is easy to store and has a good supporting effect, is provided, and aims to achieve the purposes of solving the problem and improving the practical value through the technology.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a strutting arrangement is used in civil engineering construction to solve the current strutting arrangement who proposes in the above-mentioned background art, mostly be some supports when supporting the wall body, its supporting effect is relatively poor, and the dismouting is convenient inadequately, the difficult problem of depositing and not enough.
In order to achieve the above object, the utility model provides a strutting arrangement is used in civil engineering construction is reached by following specific technological means:
a strutting arrangement is used in civil engineering construction, includes: the device comprises a supporting plate, a base, a connecting seat, a fixed seat, a connecting rod, a base plate, a threaded rod, a connecting plate, a first hinged support, a first pin shaft, a fixed plate, a second hinged support, a second pin shaft and an expansion bolt; the supporting plate is of a rectangular plate-shaped structure, and the rear part of the supporting plate is provided with a base; the connecting seat is arranged at the front part of the supporting plate and is connected with the base through a bolt; the fixed seat is arranged on one side of the supporting plate and is connected with the connecting seat through a connecting rod; the base includes: a base plate and a threaded rod; a threaded rod is arranged on the side part of the base plate, and the base plate is connected with the threaded rod in a welding mode; the connecting seat includes: the hinge comprises a connecting plate, a first hinge support and a first pin shaft; a first hinged support is arranged on the side of the connecting plate, and the connecting plate is connected with the first hinged support in a welding mode; the first hinge support is arranged at the middle part of the first hinge support, and the first hinge support is connected with the first hinge support in a penetrating way; the fixing base includes: the fixing plate, the second hinged support, the second pin shaft and the expansion bolt are arranged on the fixing plate; a second hinged support is arranged at the upper part of the fixed plate, and the fixed plate is connected with the second hinged support in a welding mode; the second hinge support is arranged at the middle part of the second hinge support, and the second hinge support is connected with the second hinge support in a penetrating way; the expansion bolt is arranged on the side part of the second hinged support and is connected with the fixing plate in a penetrating mode.
As this technical scheme's further optimization, the utility model relates to a strutting arrangement is used in civil engineering construction the middle part of backup pad is provided with four through-holes, and the threaded rod of base runs through the anterior through-hole of backup pad.
As the further optimization of this technical scheme, the utility model relates to a strutting arrangement is used in civil engineering construction the connecting rod is rectangle platelike structure, and the both ends of connecting rod all are provided with circular through-hole.
As this technical scheme's further optimization, the utility model relates to a strutting arrangement is used in civil engineering construction the middle part of connecting plate is provided with the four through-holes, and the threaded rod runs through it is fixed to screw up through the nut behind the four through-holes.
As this technical scheme's further optimization, the utility model relates to a strutting arrangement is used in civil engineering construction the both ends of connecting rod are connected to first hinged-support and second hinged-support respectively, and establish ties through first round pin axle and second round pin axle.
Because of above-mentioned technical scheme's application, compared with the prior art, the utility model have the following advantage:
1. the utility model relates to a strutting arrangement is used in civil engineering construction, through setting up the strutting arrangement who comprises backup pad, base, connecting seat, fixing base, connecting rod quintuple, it all connects through round pin axle and bolt, and each part is simple structure not only, the split is ann convenient, and easily deposits the transportation.
2. The utility model relates to a strutting arrangement is used in civil engineering construction is used for the protection of wall body or slight slope to support through the backup pad that sets up a rectangle to pass through the backup pad base and connecting seat and be connected with the connecting rod, the connecting rod is connected with the fixing base, and its protection support area is big, effectual.
3. The utility model discloses a to the improvement of current device, have simple structure, easy dismounting, easily deposit, support the advantage that the protecting effect is good to effectual solution the utility model provides a problem and not enough.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification. In the drawings:
fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic diagram of the explosion structure of the present invention;
FIG. 3 is a schematic view of the fixing base of the present invention;
fig. 4 is a schematic view of the base and the connecting seat of the present invention.
In the figure: the support plate 1, the base 2, the connecting seat 3, the fixing seat 4, the connecting rod 5, the base plate 201, the threaded rod 202, the connecting plate 301, the first hinged support 302, the first pin shaft 303, the fixing plate 401, the second hinged support 402, the second pin shaft 403 and the expansion bolt 404.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
It is to be noted that, in the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Meanwhile, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or electrical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to 4, the present invention provides a specific technical implementation of a supporting device for civil engineering construction:
a strutting arrangement is used in civil engineering construction, includes: the device comprises a supporting plate 1, a base 2, a connecting seat 3, a fixed seat 4, a connecting rod 5, a base plate 201, a threaded rod 202, a connecting plate 301, a first hinged support 302, a first pin shaft 303, a fixed plate 401, a second hinged support 402, a second pin shaft 403 and an expansion bolt 404; the supporting plate 1 is of a rectangular plate-shaped structure, and the rear part of the supporting plate 1 is provided with a base 2; the connecting seat 3 is arranged at the front part of the supporting plate 1, and the connecting seat 3 is connected with the base 2 through a bolt; the fixed seat 4 is arranged on one side of the supporting plate 1, and the fixed seat 4 is connected with the connecting seat 3 through a connecting rod 5; the base 2 includes: a base plate 201 and a threaded rod 202; a threaded rod 202 is arranged on the side of the base plate 201, and the base plate 201 is connected with the threaded rod 202 in a welding mode; the connecting socket 3 includes: a connecting plate 301, a first hinge support 302 and a first pin shaft 303; a first hinge support 302 is arranged on the side of the connecting plate 301, and the connecting plate 301 is connected with the first hinge support 302 in a welding mode; the first pin shaft 303 is arranged in the middle of the first hinged support 302, and the first pin shaft 303 is connected with the first hinged support 302 in a penetrating manner; the fixing base 4 includes: a fixing plate 401, a second hinge support 402, a second pin 403 and an expansion bolt 404; a second hinge support 402 is arranged at the upper part of the fixing plate 401, and the fixing plate 401 is connected with the second hinge support 402 in a welding mode; the second pin shaft 403 is arranged in the middle of the second hinge support 402, and the second pin shaft 403 is connected with the second hinge support 402 in a penetrating manner; an expansion bolt 404 is provided at a side portion of the second hinge bracket 402, and the expansion bolt 404 is connected with the fixing plate 401 by a penetration manner.
Specifically, the middle of the supporting plate 1 is provided with four through holes, and the threaded rod 202 of the base 2 penetrates through the through hole at the front part of the supporting plate 1 and is used for being connected with the connecting seat 3.
Specifically, the connecting rod 5 is a rectangular plate-shaped structure, and both ends of the connecting rod 5 are provided with circular through holes for connecting the first hinge support 302 and the second hinge support 402.
Specifically, the middle of the connecting plate 301 is provided with four through holes, and the threaded rod 202 penetrates through the four through holes and is screwed and fixed through nuts.
Specifically, two ends of the connecting rod 5 are respectively connected to the first hinge support 302 and the second hinge support 402, and are connected in series through a first pin 303 and a second pin 403.
The method comprises the following specific implementation steps:
when the device is used, the base 2 is arranged at the rear part of the support plate 1, the threaded rod 202 penetrates through round holes at four positions of the support plate 1, the connecting seat 3 is installed at the front part of the support plate 1, the threaded rod 202 penetrates through the connecting plate 301 and is screwed up and connected through a nut, the top end of the connecting rod 5 is connected with the first hinged support 302 through the first pin shaft 303, the bottom end of the connecting rod 5 is connected with the second hinged support 402 through the second pin shaft 403, then the support plate 1 is erected, a soil slope or a wall body is tightly attached, and finally the fixing seat 4 is connected with the ground through the expansion bolt 404.
In summary, the following steps: according to the supporting device for the civil engineering construction, the supporting device consisting of the supporting plate, the base, the connecting seat, the fixing seat and the connecting rod is arranged and connected through the pin shaft and the bolt, and each part is simple in structure, convenient to disassemble and assemble and easy to store and transport; the backup pad through setting up a rectangle is used for the protection of wall body or slight slope to pass through the base with the backup pad and the connecting seat is connected with the connecting rod, and the connecting rod is connected with the fixing base, and its protection is supported the area big, effectual, has solved current strutting arrangement, is mostly a little when supporting the wall body and supports, and its supporting effect is relatively poor, and the dismouting is convenient inadequately, the difficult problem of depositing.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a strutting arrangement is used in civil engineering construction which characterized in that: the device has the advantages of simple structure, convenient assembly and disassembly, easy storage and good supporting effect; the method comprises the following steps: the device comprises a supporting plate (1), a base (2), a connecting seat (3), a fixed seat (4), a connecting rod (5), a base plate (201), a threaded rod (202), a connecting plate (301), a first hinged support (302), a first pin shaft (303), a fixed plate (401), a second hinged support (402), a second pin shaft (403) and an expansion bolt (404); the supporting plate (1) is of a rectangular plate-shaped structure, and the rear part of the supporting plate (1) is provided with a base (2); the connecting seat (3) is arranged at the front part of the supporting plate (1), and the connecting seat (3) is connected with the base (2) through a bolt; the fixing seat (4) is arranged on one side of the supporting plate (1), and the fixing seat (4) is connected with the connecting seat (3) through a connecting rod (5); the base (2) comprises: a base plate (201) and a threaded rod (202); a threaded rod (202) is arranged on the side of the base plate (201), and the base plate (201) is connected with the threaded rod (202) in a welding mode; the connecting seat (3) includes: the hinge comprises a connecting plate (301), a first hinge support (302) and a first pin shaft (303); a first hinged support (302) is arranged on the side of the connecting plate (301), and the connecting plate (301) is connected with the first hinged support (302) in a welding mode; the first pin shaft (303) is arranged in the middle of the first hinged support (302), and the first pin shaft (303) is connected with the first hinged support (302) in a penetrating mode; the fixing base (4) comprises: the fixing plate (401), the second hinge support (402), the second pin shaft (403) and the expansion bolt (404); a second hinged support (402) is arranged at the upper part of the fixing plate (401), and the fixing plate (401) is connected with the second hinged support (402) in a welding mode; the second pin shaft (403) is arranged in the middle of the second hinged support (402), and the second pin shaft (403) is connected with the second hinged support (402) in a penetrating manner; the expansion bolt (404) is arranged on the side part of the second hinge support (402), and the expansion bolt (404) is connected with the fixing plate (401) in a penetrating mode.
2. The supporting device for civil engineering construction according to claim 1, wherein: the middle part of the supporting plate (1) is provided with four through holes, and the threaded rod (202) of the base (2) penetrates through the through hole in the front part of the supporting plate (1).
3. The supporting device for civil engineering construction according to claim 1, wherein: the connecting rod (5) is of a rectangular plate-shaped structure, and circular through holes are formed in two ends of the connecting rod (5).
4. The supporting device for civil engineering construction according to claim 1, wherein: the middle part of the connecting plate (301) is provided with four through holes, and the threaded rod (202) penetrates through the four through holes and then is screwed up and fixed through nuts.
5. The supporting device for civil engineering construction according to claim 1, wherein: two ends of the connecting rod (5) are respectively connected to the first hinged support (302) and the second hinged support (402) and are connected in series with the second pin shaft (403) through the first pin shaft (303).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020158553.0U CN211666334U (en) | 2020-02-10 | 2020-02-10 | Strutting arrangement is used in civil engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020158553.0U CN211666334U (en) | 2020-02-10 | 2020-02-10 | Strutting arrangement is used in civil engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211666334U true CN211666334U (en) | 2020-10-13 |
Family
ID=72740587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020158553.0U Expired - Fee Related CN211666334U (en) | 2020-02-10 | 2020-02-10 | Strutting arrangement is used in civil engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211666334U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112431329A (en) * | 2020-11-23 | 2021-03-02 | 浙江安防职业技术学院 | Wall body safety protection device for resisting typhoon |
-
2020
- 2020-02-10 CN CN202020158553.0U patent/CN211666334U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112431329A (en) * | 2020-11-23 | 2021-03-02 | 浙江安防职业技术学院 | Wall body safety protection device for resisting typhoon |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211666334U (en) | Strutting arrangement is used in civil engineering construction | |
CN101985861B (en) | A Temporary Telephone Pole for Rapid Loading and Dismounting | |
CN201966835U (en) | Stent structure for photovoltaic module | |
CN217954764U (en) | Thunder and lightning early warning instrument | |
CN216650740U (en) | Large-scale trees are strutted anti-tilt device | |
CN214674264U (en) | Bracket arm connecting piece and bracket arm structure of electric power tunnel | |
CN220209303U (en) | Lightning protection pole earthing device | |
CN211017927U (en) | Outdoor waterproof switch board base | |
CN211736625U (en) | Righting device for power transmission line pole tower in mining area | |
CN218408782U (en) | Mud pipe support | |
CN218092316U (en) | Small-size signal tower prevents empting securing device | |
CN220954907U (en) | Steel pipe pole with locking function | |
CN217897459U (en) | Communication engineering communication tower is with pre-buried base | |
CN220288973U (en) | Fixing device for testing wind power blade sub-components | |
CN218226525U (en) | Can convertible assembly fixture structure | |
CN215105981U (en) | Safe type building I-steel straining beam structure of encorbelmenting | |
CN220754719U (en) | Photovoltaic vertical pole installation distribution structure | |
JP3053769U (en) | Fence support | |
CN214492522U (en) | Cooling module fixing structure | |
CN218441244U (en) | Split type antidetonation pipe clamp structure | |
CN219980710U (en) | Angle adjusting frame for photovoltaic module installation | |
CN212073764U (en) | Portable suspension base mounting structure | |
CN213330097U (en) | Positioning pile for I-steel cantilever beam | |
CN215859365U (en) | Typhoon-resistant light steel iron tower structure | |
CN215804957U (en) | High-stability wind driven generator base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201013 Termination date: 20210210 |