CN211665715U - High-low dam and water taking structure - Google Patents
High-low dam and water taking structure Download PDFInfo
- Publication number
- CN211665715U CN211665715U CN201922020741.7U CN201922020741U CN211665715U CN 211665715 U CN211665715 U CN 211665715U CN 201922020741 U CN201922020741 U CN 201922020741U CN 211665715 U CN211665715 U CN 211665715U
- Authority
- CN
- China
- Prior art keywords
- water
- dam
- dam body
- low
- river
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Barrages (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及水坝技术领域,具体涉及一种高低坝及取水结构。The utility model relates to the technical field of dams, in particular to a high-low dam and a water intake structure.
背景技术Background technique
在山区河道处,常常因为河床较浅或是淡水季河流中河水变少,导致取水深度太低,河水中杂质较多,造成取水困难。在现有取水技术中,主要使用拦河坝和取水装置,通过在河流上设置拦河坝,将拦河坝上游的水位提高,再利用取水装置取水,但这样的取水结构容易导致水中杂质沉积,甚至大量的泥沙进入取水装置中,造成淤堵。In mountain rivers, often because the riverbed is shallow or the river water in the freshwater season is less, the water intake depth is too low, and the river water contains more impurities, making it difficult to obtain water. In the existing water intake technology, barrages and water intake devices are mainly used. By setting a barrage on the river, the water level upstream of the barrage is raised, and then the water intake device is used to obtain water. However, such a water intake structure easily leads to the deposition of impurities in the water, and even a large amount of sediment Into the water intake device, causing blockage.
实用新型内容Utility model content
有鉴于此,本实用新型的目的之一在于提供一种高低坝,优化了大坝蓄水与排泄功能,利于排泄漂浮杂物,提高取水的水质。In view of this, one of the purposes of the present utility model is to provide a high-low dam, which optimizes the water storage and excretion functions of the dam, facilitates excretion of floating debris, and improves the water quality.
为实现上述目的,本实用新型的技术方案为:For achieving the above object, the technical scheme of the present utility model is:
一种高低坝,主要包括横向设置在河道中间的主坝体,设置在主坝体底部嵌入河底岩层的多个嵌入桩,设置在主坝体一侧面向河道上游的迎水面,设置在主坝体另一侧且与迎水面对应的落水面。A high-low dam mainly includes a main dam body horizontally arranged in the middle of a river channel, a plurality of embedded piles which are arranged at the bottom of the main dam body and embedded in the bottom rock formation, arranged on the upstream side of the main dam body facing the upstream of the river channel, and arranged on the main dam body. The falling water surface on the other side of the dam body and corresponding to the upstream surface.
其中,主坝体包括用于雨季过洪溢流的高坝体,低于高坝体用于淡水季溢流的低坝体以及连接高坝体与低坝体的连接坝。Among them, the main dam body includes a high dam body for flood overflow in the rainy season, a low dam body lower than the high dam body for freshwater season overflow, and a connecting dam connecting the high dam body and the low dam body.
优选地,高坝体底部设有贯穿迎水面和落水面的泄砂管,泄砂管中间部分垂直向上设置一个阀门井,阀门井对应的主坝体坝顶设有控制泄砂管开闭的手自一体阀门。Preferably, the bottom of the high dam body is provided with a sand discharge pipe that runs through the upstream surface and the falling water surface, a valve well is arranged vertically upward in the middle part of the sand discharge pipe, and a valve well is provided on the crest of the main dam body corresponding to the valve well to control the opening and closing of the sand discharge pipe. Manual valve.
优选地,低坝体坝顶距河底2m±0.5m,连接坝坝顶为倾斜面,且与低坝体坝顶之间呈135°±5°夹角,高坝体坝顶比低坝体坝顶高0.3m±0.05m。Preferably, the crest of the low dam body is 2m±0.5m away from the bottom of the river, the connecting dam crest is an inclined plane, and the angle between the crest of the low dam body and the dam body of the low dam is 135°±5°, and the crest of the high dam body is higher than the crest of the low dam body. The body dam crest height is 0.3m±0.05m.
优选地,多个嵌入桩之间中心相距2m±0.5m,并嵌入河底岩层下0.5m±0.05m。Preferably, the centers of the plurality of embedded piles are 2m±0.5m apart, and are embedded 0.5m±0.05m under the rock formation at the bottom of the river.
优选地,高低坝采用钢筋混凝土重力溢流坝设计,并选址在地质稳定河床平缓的河道。Preferably, the high and low dams are designed with reinforced concrete gravity overflow dams, and are located in a river channel with a stable geologically stable river bed.
优选地,迎水面的坡度为1:1.5,落水面的坡度为1:0.5。Preferably, the slope of the upstream surface is 1:1.5, and the slope of the falling surface is 1:0.5.
具体地,在非洪水期或是淡水季,高低坝将河水拦截在高低坝的上游,过多的河水通过低坝体溢流,溢流的河水将河道中的枯枝落叶、树根杂草等杂物经过高低坝的低坝体部分的迎水面疏散至高低坝的下游;Specifically, in the non-flood period or the fresh water season, the high and low dams intercept the river water upstream of the high and low dams, and the excess river water overflows through the low dam body, and the overflowing river water removes litter, tree roots and weeds in the river channel. The sundries are evacuated to the downstream of the high and low dam through the upstream surface of the low dam body part of the high and low dam;
在山洪爆发,雨水充足时期,河水通过高低坝的主坝体的全段过洪溢流,低坝体的上游河床硬化,与迎水面形成的水力曲线,在丰水期,水力将河床底部的浮动泥砂通过迎水面从低坝体处冲走;During flash floods and sufficient rain, the river flows through the entire section of the main dam body of the high and low dams, and the upstream river bed of the low dam body hardens, forming a hydraulic curve with the upstream surface. Floating mud and sand are washed away from the low dam body through the upstream surface;
优选地,在山洪爆发,雨水充足时期,将泄砂管上方的阀门井上面的手自一体匣门打开,淤积在高低坝上游河底的泥砂淤泥从泄砂管处流向高低坝下游。Preferably, when a flash flood occurs and the rain is sufficient, the manual integrated box door above the valve well above the sand discharge pipe is opened, and the silt silt deposited on the river bottom upstream of the high and low dams flows from the sand discharge pipe to the downstream of the high and low dams.
有鉴于此,本实用新型的目的之二在于提供一种取水结构,使取水与泄砂同步进行,避免了泥砂堵塞取水渠,提高取水的水质。In view of this, the second purpose of the present utility model is to provide a water intake structure, so that the water intake and the sand release are carried out synchronously, so as to avoid the clogging of the water intake channel by the mud and sand, and improve the water quality of the water intake.
为实现上述目的,本实用新型的技术方案为:For achieving the above object, the technical scheme of the present utility model is:
一种取水结构,主要包括:A water intake structure mainly includes:
上述目的之一的高低坝;High and low dams for one of the above purposes;
取水装置,取水装置包括弧形结构的取水渠与沉砂池;Water intake device, the water intake device includes an arc-shaped water intake channel and a grit chamber;
其中,取水渠的两端分别连接高低坝的上游河道和下游河道,取水渠的前端垂直设置在高低坝上游河道的一侧,并设有取水口,取水口设有拦截水中杂物的不锈钢格栅,取水渠的末端与高低坝的下游河道相连,并设有泄砂口,泄砂口的前端取水渠处设有第一启闭机;Among them, the two ends of the water intake channel are respectively connected to the upstream channel and the downstream channel of the high and low dams, and the front end of the intake channel is vertically arranged on one side of the upstream channel of the high and low dam, and is provided with a water intake, which is provided with a stainless steel grid to intercept debris in the water. The end of the water intake channel is connected with the downstream channel of the high and low dams, and is provided with a sand discharge port, and the front end of the sand discharge port is provided with a first hoist at the water intake channel;
沉砂池的一端设有一进水渠,且通过进水渠与第一启闭机的上方取水渠相连,进水渠设有第二启闭机,沉砂池的另一端开设出水口。One end of the grit chamber is provided with an inlet channel, which is connected with the water intake channel above the first hoist through the inlet channel. The inlet channel is provided with a second hoist, and the other end of the grit chamber is provided with a water outlet.
进一步地,沉砂池包括排砂口,导流墙以及高度低于导流墙的溢流墙;其中,排砂口设置在进水渠正对面一侧;导流墙与溢流墙相连将沉砂池分割成积砂区与积水区,排砂口位于积砂区内,出水口位于积水区内。Further, the grit chamber includes a sand outlet, a diversion wall and an overflow wall whose height is lower than the diversion wall; wherein, the sand outlet is arranged on the side opposite to the water inlet; The sand pool is divided into a sand accumulation area and a water accumulation area, the sand discharge port is located in the sand accumulation area, and the water outlet is located in the water accumulation area.
在取水时期,第一启闭机关闭,第二启闭机开启,河水从取水口通过第二启闭机进入沉砂池,停留30min,河水从出水口流出;During the water intake period, the first hoist is turned off, the second hoist is turned on, and the river water enters the grit chamber from the water intake through the second hoist, stays for 30 minutes, and the river water flows out from the water outlet;
优选地,在取水时期,根据取水口的进水量,提升第一启闭机的高度,形成第一启闭机与取水渠的间隙,开启第二启闭机,河水从取水口通过第二启闭机进入沉砂池,泥砂经过第一启闭机与取水渠渠底的间隙从泄砂口流出。Preferably, during the water intake period, according to the water intake of the water intake, the height of the first hoist is raised to form a gap between the first hoist and the water intake channel, the second hoist is opened, and the river water passes through the second hoist from the water intake. The closed machine enters the grit chamber, and the mud sand flows out from the sand discharge port through the gap between the first hoist and the bottom of the water intake channel.
在检修阶段,打开第一启闭机,关闭第二启闭机,河水从取水口进入,通过第一启闭机从泄砂口流出,对取水渠进行冲洗。In the maintenance stage, open the first hoist, close the second hoist, the river water enters from the water intake, and flows out from the sand discharge port through the first hoist to flush the water intake.
优选地,取水渠呈弧形结构,弧形结构的半径为10m。Preferably, the water intake channel has an arc structure, and the radius of the arc structure is 10m.
优选地,取水渠的取水口到泄砂口之间的河道两侧建有河堤。Preferably, embankments are built on both sides of the river between the water intake of the water intake and the sand discharge port.
有益效果beneficial effect
本实用新型公开的一种高低坝及取水结构,有益效果之一在于通过高低坝的高坝体与低坝体等结构,使高低坝能在枯水期提高水位满足取水要求的同时,一边通过低坝体溢流,疏散水中的漂浮杂物;一边通过高坝体中的泄砂管,防止高低坝上游河道中的泥砂淤积,提升取水的水源水质。The utility model discloses a high-low dam and a water intake structure, one of the beneficial effects is that the high-low dam can increase the water level in dry season to meet the water intake requirements through the high-low dam body and the low dam body and other structures, while passing the low dam The body overflows to evacuate the floating debris in the water; while passing the sand discharge pipe in the high dam body, it prevents the sedimentation of sediment in the upstream channel of the high and low dam, and improves the water quality of the water source.
本实用新型公开的一种高低坝及取水结构,有益效果之二在于,在使用取水结构取水之时,使取水与泄砂同步进行,避免了泥砂堵塞取水渠,提高取水的水质。The utility model discloses a high-low dam and a water intake structure, and the second beneficial effect is that when the water intake structure is used for water intake, the water intake and the sand discharge are carried out synchronously, so as to avoid the mud and sand blocking the water intake channel and improve the water quality of the water intake.
附图说明Description of drawings
为了更清楚地说明本实用新型具体实施方式或现有技术中的技术方案,下面将对实施方式或现有技术描述中所需要使用的附图作一简单地介绍。在所有附图中,类似的元件或部分一般由类似的附图标记标识。附图中,各元件或部分可按照实际的比例绘制。In order to illustrate the specific embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that are required in the description of the embodiments or the prior art. Similar elements or parts are generally identified by similar reference numerals throughout the drawings. In the drawings, each element or part may be drawn to an actual scale.
图1为本实用新型的一种取水结构的一实施例中结构示意图;1 is a schematic structural diagram of an embodiment of a water intake structure of the present invention;
图2为本实用新型的一种高低坝的一实施例中剖面结构示意图;2 is a schematic cross-sectional structure diagram of an embodiment of a high-low dam of the present invention;
图3为本实用新型的一种高低坝的一实施例中横断面结构示意图;3 is a schematic cross-sectional structure diagram of an embodiment of a high-low dam of the present invention;
图4为本实用新型的一种高低坝的一实施例中平面结构示意图;FIG. 4 is a schematic plan view of an embodiment of a high-low dam of the present invention;
图5为本实用新型的一种取水结构的一实施例中取水渠的取水口截面结构示意图;5 is a schematic diagram of a cross-sectional structure of a water intake of a water intake channel in an embodiment of a water intake structure of the present invention;
图6为本实用新型的一种取水结构的一实施例中沉砂池的平面结构示意图;6 is a schematic plan view of a grit chamber in an embodiment of a water intake structure of the present invention;
图7本实用新型的一种取水结构的一实施例中沉砂池的剖面结构示意图。7 is a schematic cross-sectional structure diagram of a grit chamber in an embodiment of a water intake structure of the present invention.
具体实施方式Detailed ways
下面结合附图,对本实用新型作详细的说明。The present utility model will be described in detail below in conjunction with the accompanying drawings.
为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solutions and advantages of the present utility model more clearly understood, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not intended to limit the present invention.
参考图1,为本实用新型的一种取水结构的结构示意图,具体地,本实施例中的取水结构包括高低坝S100和取水装置,其中,高低坝S100横向设置在河道的中间,取水装置包括取水渠S202与沉砂池S204。Referring to FIG. 1, it is a structural schematic diagram of a water intake structure of the present invention. Specifically, the water intake structure in this embodiment includes a high and low dam S100 and a water intake device, wherein the high and low dam S100 is horizontally arranged in the middle of the river, and the water intake device includes Water intake channel S202 and grit chamber S204.
在本实施例中,高低坝S100选择在坝基及两岸山坡地质稳定,岩盘露头、河谷狭窄、河床平缓的地方;结构形式采用钢筋混凝土重力溢流坝设计。In this embodiment, the high and low dams S100 are selected in places where the dam foundation and the hillsides on both sides are geologically stable, rock outcrops, narrow river valleys, and gentle river beds; the structural form adopts the design of reinforced concrete gravity overflow dam.
具体地,高低坝S100包括主坝体S102,主坝体S102的两侧分别设有迎水面S104与落水面S106,主坝体S102下部设有垂直贯穿迎水面S104和落水面S106防泥砂淤积的泄砂管S108,泄砂管S108的管径为钢管820X10mm,管材采用焊接防腐钢管;泄砂管S108中间部分向上垂直对应的主坝体S102的坝顶设有手自一体阀门S110,手自一体阀门S110通过阀门井S111控制泄砂管S108的开闭;主坝体S102底部设有多个嵌入桩S112,该嵌入桩之间中心相距2m,嵌入河底的岩层下不少于0.5m处;Specifically, the high and low dams S100 include a main dam body S102, two sides of the main dam body S102 are respectively provided with a water facing surface S104 and a falling water surface S106, and the lower part of the main dam body S102 is provided with a vertical penetration surface S104 and a falling water surface S106 to prevent mud and sand deposition. Sand discharge pipe S108, the diameter of sand discharge pipe S108 is steel pipe 820X10mm, and the pipe is welded anti-corrosion steel pipe; the middle part of sand discharge pipe S108 is vertically upward and corresponding to the top of the main dam body S102, there is a manual valve S110, and the manual is integrated The valve S110 controls the opening and closing of the sand discharge pipe S108 through the valve well S111; the bottom of the main dam body S102 is provided with a plurality of embedded piles S112, the centers of the embedded piles are 2m apart, and the embedded piles are not less than 0.5m below the rock formation at the bottom of the river;
优选地,主坝体S102的迎水面S104坡度为1:1.5,落水面S106坡度为1:0.5,Preferably, the slope of the upstream surface S104 of the main dam body S102 is 1:1.5, and the slope of the falling surface S106 is 1:0.5,
本实施例中,主坝体S102包括用于雨季过洪溢流的高坝体S114,用于淡水季溢流的低坝体S116以及连接高坝体S114与低坝体S116的连接坝S118。In this embodiment, the main dam body S102 includes a high dam body S114 for flood overflow in the rainy season, a low dam body S116 for the fresh water season overflow, and a connecting dam S118 connecting the high dam body S114 and the low dam body S116.
在一具体实施例中,主坝体S102的总长度为L,低坝体S116占主坝体的一半,长度为0.5L,低坝体S116坝高2m,连接坝S118坝顶为倾斜面,且与低坝体S116坝顶之间呈135°夹角,高坝体S114坝顶比低坝体S116坝顶高0.3m,主坝体S102的坝顶宽2m。In a specific embodiment, the total length of the main dam body S102 is L, the low dam body S116 accounts for half of the main dam body, the length is 0.5L, the dam height of the low dam body S116 is 2m, and the dam crest of the connecting dam S118 is an inclined surface, And there is an angle of 135° with the crest of the low dam body S116. The crest of the high dam body S114 is 0.3m higher than the crest of the low dam body S116, and the crest of the main dam body S102 is 2m wide.
优选地,泄砂管S108设置在高坝体S114的底部且距河堤(0.3±0.05)L长。Preferably, the sand release pipe S108 is arranged at the bottom of the high dam body S114 and is (0.3±0.05)L long from the river bank.
进一步地,将低坝体S116上游的河床底部硬化。Further, the bottom of the river bed upstream of the low dam body S116 is hardened.
在一实施例中,在非洪水期或是淡水季,高低坝S100将河水拦截在高低坝S100的上游,过多的河水通过低坝体溢流,溢流的河水将河道中的漂浮杂物,如枯枝落叶、树根杂草等杂物经过高低坝S100的低坝体部分的迎水面S104疏散至高低坝S100的下游;In one embodiment, in the non-flood period or the fresh water season, the high and low dams S100 intercept the river water upstream of the high and low dams S100, and the excess river water overflows through the low dam body, and the overflowing river water removes the floating debris in the river channel. , such as litter, tree root weeds and other sundries are evacuated to the downstream of the high and low dam S100 through the upstream surface S104 of the low dam body part of the high and low dam S100;
在另一实施例中,山洪爆发,雨水充足,导致高低坝S100上游河水流速湍急,此时取水区有较多的浮动泥砂,河水通过高低坝S100的主坝体S102的全段过洪溢流,低坝体的上游河床硬化,与迎水面S104形成的水力曲线,在丰水期,水力将河床底部的浮动泥砂通过迎水面S104从低坝体处冲走;在一具体实施例中,山洪爆发,雨水充足时期,将泄砂管S108上方的阀门井S111上面的手自一体匣门S110打开,淤积在高低坝S100上游河底的泥砂淤泥从泄砂管S108处流向高低坝S100下游。In another embodiment, the mountain torrent broke out and the rain was sufficient, resulting in the rapid flow of the river upstream of the high and low dams S100. At this time, there was a lot of floating mud and sand in the water intake area, and the river water overflowed through the entire section of the main dam body S102 of the high and low dams S100. , the upstream river bed of the low dam body is hardened, and the hydraulic curve formed with the upstream surface S104, in the flood season, the water force will wash away the floating mud and sand at the bottom of the river bed through the upstream surface S104 from the low dam body; When the outbreak occurs and the rain is sufficient, the manual box door S110 above the valve well S111 above the sand discharge pipe S108 is opened, and the silt and silt deposited on the river bottom upstream of the high and low dams S100 flow from the sand discharge pipe S108 to the downstream of the high and low dams S100.
优选地,可以根据高低坝S100的上游水位,通过调控手自一体匣门S110控制泄砂管S108开闭的大小,比如在非山洪时期,河底的淤积泥砂较少,可以将泄砂管S108半开,使取水区的水位满足取水要求的同时也可根据水流速更好的清理河底的泥砂。Preferably, according to the upstream water level of the high and low dam S100, the size of the opening and closing of the sand discharge pipe S108 can be controlled by adjusting the manual integrated box door S110. Half-open, so that the water level in the water intake area meets the water intake requirements, and at the same time, it can better clean the mud and sand at the bottom of the river according to the water flow rate.
本实施例中,取水装置包括取水渠S202与沉砂池S204,取水渠S202两端分别与高低坝S100上游和高低坝S100下游的河道相连,且在取水渠S202的前端设置取水口S206在取水渠S202的末端设置泄砂口S208,其中,取水口S206设置在距离高低坝S100上游8m左右处,取水口S206垂直于河道一侧,并在取水口S206处设置拦截水中杂物的不锈钢格栅S210,取水口S206的宽度和被河水覆盖的深度(有效取水深度)可以根据取水规模设定;泄砂口S208与高低坝S100的下游河道相连,且在泄砂口S208的前端取水渠S202处设有第一启闭机S212,如LQD型手自一体启闭机、LQD型手电两用启闭机等。In this embodiment, the water intake device includes a water intake channel S202 and a grit chamber S204. The two ends of the water intake channel S202 are respectively connected to the river channels upstream of the high and low dams S100 and downstream of the high and low dams S100, and a water intake port S206 is set at the front end of the water intake channel S202. The sand discharge port S208 is set at the end of the water channel S202, wherein the water intake S206 is set at about 8m upstream from the high and low dam S100. S210, the width of the water intake S206 and the depth covered by river water (effective water intake depth) can be set according to the water intake scale; the sand discharge port S208 is connected to the downstream channel of the high and low dams S100, and is located at the water intake channel S202 at the front end of the sand discharge port S208 There is a first hoist S212, such as LQD type manual hoist, LQD type flashlight dual-purpose hoist, etc.
本实施例中,在取水渠S202位于高低坝S100的下游附近处设有一个沉砂池S204,沉砂池S204的一端设有一进水渠S213,沉砂池S204通过进水渠S213与取水渠S202的相连,进水渠S213设有第二启闭机S214,如LQD型手自一体启闭机、LQD型手电两用启闭机等,沉砂池S204的另一端开设出水口S216。In this embodiment, a grit chamber S204 is provided near the downstream of the high and low dam S100 in the water intake channel S202, and an inlet channel S213 is provided at one end of the sand chamber S204. The sand chamber S204 passes through the connection between the intake channel S213 and the intake channel S202. Connected, the water inlet channel S213 is provided with a second hoist S214, such as LQD type manual hoist, LQD type flashlight dual-purpose hoist, etc. The other end of the grit chamber S204 is provided with a water outlet S216.
优选地,取水渠S202的取水口顶部高于河流常水位0.5m,取水渠S202净宽w与有效取水深度Δh之比按w:Δh=2:1设置,取水渠S202的坡度i≥0.01;Preferably, the top of the water intake of the water intake channel S202 is 0.5m higher than the normal water level of the river, the ratio of the net width w of the water intake channel S202 to the effective water intake depth Δh is set as w:Δh=2:1, and the slope of the water intake channel S202 i≥0.01;
优选地,取水口S206的净宽度为1~1.5m,有效取水深度(常水位与取水渠渠底的长度)为0.5~1m;Preferably, the net width of the water intake S206 is 1 to 1.5 m, and the effective water intake depth (the length of the constant water level and the bottom of the water intake channel) is 0.5 to 1 m;
优选地,取水口S206处的不锈钢格栅S210方格净空50X50mm;Preferably, the square clearance of the stainless steel grid S210 at the water intake S206 is 50X50mm;
优选地,取水渠S202呈弧形结构,且弧形半径为10m,渠顶高于常水位h=0.5m。Preferably, the water intake channel S202 has an arc-shaped structure, and the arc-shaped radius is 10m, and the top of the canal is higher than the normal water level by h=0.5m.
在一实施例中,本实用新型的采用高低坝S100的取水结构在运作时,河流处于枯水期,高低坝S100拦截河水将河流上游的水位提高以满足取水水位要求,河流处于丰水期,高低坝S100的河道上游水位也满足取水要求,河水通过取水渠S202的取水口S206流入取水渠S202,取水口S206的不锈钢格栅S210能拦截河水中的一部分杂物,在河水流入取水渠S202后,关闭第一启闭机S212,打开第二启闭机S214,河水流入沉砂池S204,设置河水在沉砂池S204的停留时间,例如30分钟,河水在沉砂池S204停留30分钟,在此期间,河水中的部分杂物如沉砂沉积在沉砂池S204池底,河水再从沉砂池S204另一侧的出水口S216流出。In one embodiment, when the water intake structure using the high and low dams S100 of the present invention is in operation, the river is in a dry season, the high and low dams S100 intercept the river water and raise the water level upstream of the river to meet the water intake water level requirements, the river is in a high water period, and the high and low dams The upstream water level of the river channel S100 also meets the water intake requirements. The river water flows into the intake channel S202 through the intake channel S206 of the intake channel S202. The stainless steel grille S210 of the intake channel S206 can intercept a part of the sundries in the river water. After the river water flows into the intake channel S202, it is closed. The first hoist S212, the second hoist S214 is turned on, the river water flows into the grit chamber S204, and the residence time of the river water in the grit chamber S204 is set, for example, 30 minutes, and the river water stays in the grit chamber S204 for 30 minutes, during this period , some sundries in the river water, such as grit, are deposited at the bottom of the grit chamber S204, and the river water flows out from the water outlet S216 on the other side of the grit chamber S204.
优选地,本实施例中的沉砂池S204与传统沉砂池不同的,如图6和图7,在沉砂池S204中设置了导流墙S218与溢流墙S220,在一具体实施例中,导流墙S218与溢流墙S220将沉砂池S204分割成两个区域,分别为积砂区S222与积水区S224,导流墙S218的高度低于池顶0.3m左右,溢流墙S220高度低于导流墙S218,可设为0.5~1.0m。在积砂区S222正对于进水渠S213的一侧设有一排砂口,排砂口处也设有一启闭机,具体地,当河水从进水渠S213进入沉砂池S204后,河水先进入积砂区S222,此时因为导流墙S218与溢流墙S220的阻挡,河水不能立即流入积水区S224,经过一段时间的停留,河水中部分杂物沉积在积砂区S222底部,然后,河水从溢流墙S220进入积水区S224,溢流墙S220和导流墙S218能有效的防止沉积的泥砂进入积水区S224,污染取水水质;当积砂区S222底部堆积一定的沉砂以后,关闭出水口S216处的手电两用闸阀,打开排砂口处的启闭机,让流进沉砂池S204中的河水对积砂区S222底部堆积的沉砂进行冲洗,使沉砂从排砂口流出,减少因沉砂池S204堆积沉砂导致的水中杂质过多和取水量减少等问题。进一步地,本实施例中的沉砂池S204是封闭的,能有效预防在雨季、风季等时期,大量杂质会进入沉砂池S204中,导致取水水质变差。Preferably, the grit chamber S204 in this embodiment is different from the traditional grit chamber. As shown in Figures 6 and 7 , a guide wall S218 and an overflow wall S220 are set in the grit chamber S204. In a specific embodiment Among them, the diversion wall S218 and the overflow wall S220 divide the grit chamber S204 into two areas, namely the sand accumulation area S222 and the water accumulation area S224. The height of the diversion wall S218 is about 0.3m lower than the top of the pool, and the overflow The height of the wall S220 is lower than the guide wall S218, and can be set to 0.5-1.0m. A sand outlet is provided on the side of the sand accumulation area S222 facing the water inlet channel S213, and a hoist is also provided at the sand outlet. In the sand area S222, at this time, due to the blocking of the diversion wall S218 and the overflow wall S220, the river water cannot flow into the water accumulation area S224 immediately. Entering the water accumulation area S224 from the overflow wall S220, the overflow wall S220 and the diversion wall S218 can effectively prevent the deposited mud and sand from entering the water accumulation area S224 and pollute the water intake quality; when the bottom of the sand accumulation area S222 accumulates a certain amount of sediment, Close the flashlight dual-purpose gate valve at the water outlet S216, open the hoist at the sand discharge port, and let the river water flowing into the grit chamber S204 wash the sand accumulated at the bottom of the sand accumulation area S222, so that the sand is discharged from the sand discharge. Outflow from the outlet to reduce problems such as excessive impurities in the water and reduced water intake caused by the accumulation of sand in the grit chamber S204. Further, the grit chamber S204 in this embodiment is closed, which can effectively prevent a large amount of impurities from entering the grit chamber S204 during rainy seasons and windy seasons, resulting in poor water quality.
在另一实施例中,当取水装置出现故障或是周期维护时,例如取水渠S202内沉砂堆积,取水量变小等,需要对取水装置进行检修,打开第一启闭机S212,关闭第二启闭机S214,让河流中的河水从取水渠S202的取水口S206流向泄砂口S208,对渠道内的沉砂进行清扫冲洗。In another embodiment, when the water intake device is faulty or periodically maintained, for example, sand deposits accumulate in the water intake channel S202, and the amount of water intake becomes small, etc., the water intake device needs to be overhauled, the first hoist S212 is opened, and the second hoist is closed. The hoist S214 allows the river water in the river to flow from the water intake S206 of the water intake channel S202 to the sand discharge port S208, and cleans and flushes the sediment in the channel.
进一步地,也可以在取水装置运作时,开启第二启闭机S214,抬高第一启闭机S212,让第一启闭机S212高于取水渠S202的渠底,这样不仅可以保证取水需求,也可以让取水渠S202中的沉砂从泄砂口S208流入高低坝S100的下游,保证取水为河流上层水,减少杂物。特别地,第一启闭机S212提升的高度可以根据取水渠S202取水口S206的水量调整,优选地,第一启闭机S212可以高于渠底10~20cm。以上各实施例仅用以说明本实用新型的技术方案,而非对其限制;尽管参照前述各实施例对本实用新型进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本实用新型各实施例技术方案的范围,其均应涵盖在本实用新型的权利要求和说明书的范围当中。Further, it is also possible to open the second hoist S214 and raise the first hoist S212 when the water intake device is in operation, so that the first hoist S212 is higher than the bottom of the water intake channel S202, which can not only ensure the water intake demand. , the sand in the water intake channel S202 can also flow into the downstream of the high and low dams S100 from the sand discharge port S208 to ensure that the water intake is the upper layer water of the river and reduce debris. In particular, the height of the first hoist S212 can be adjusted according to the water volume of the water intake S206 of the water intake channel S202. Preferably, the first hoist S212 can be 10-20 cm higher than the bottom of the canal. The above embodiments are only used to illustrate the technical solutions of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand: The technical solutions recorded in the various embodiments are modified, or some or all of the technical features thereof are equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the various embodiments of the present invention. All should be included in the scope of the claims and description of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922020741.7U CN211665715U (en) | 2019-11-21 | 2019-11-21 | High-low dam and water taking structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922020741.7U CN211665715U (en) | 2019-11-21 | 2019-11-21 | High-low dam and water taking structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211665715U true CN211665715U (en) | 2020-10-13 |
Family
ID=72732488
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922020741.7U Expired - Fee Related CN211665715U (en) | 2019-11-21 | 2019-11-21 | High-low dam and water taking structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211665715U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110761249A (en) * | 2019-11-21 | 2020-02-07 | 四川轻化工大学 | Water purification method and water taking structure based on high-low dam water taking principle |
| CN113914416A (en) * | 2021-03-04 | 2022-01-11 | 甘肃省水利水电勘测设计研究院有限责任公司 | Anti-freezing and anti-blocking water taking system for sediment-laden river |
| CN118309136A (en) * | 2024-06-06 | 2024-07-09 | 南昌大学 | A return type suspended river water intake method |
-
2019
- 2019-11-21 CN CN201922020741.7U patent/CN211665715U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110761249A (en) * | 2019-11-21 | 2020-02-07 | 四川轻化工大学 | Water purification method and water taking structure based on high-low dam water taking principle |
| CN110761249B (en) * | 2019-11-21 | 2025-05-27 | 四川轻化工大学 | A water purification method and water intake structure based on high and low dam water intake principle |
| CN113914416A (en) * | 2021-03-04 | 2022-01-11 | 甘肃省水利水电勘测设计研究院有限责任公司 | Anti-freezing and anti-blocking water taking system for sediment-laden river |
| CN118309136A (en) * | 2024-06-06 | 2024-07-09 | 南昌大学 | A return type suspended river water intake method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108978585B (en) | A kind of anti-scour flood control dam | |
| CN115262436B (en) | Domatic mud-rock flow prevention and control device and method | |
| CN104895021B (en) | Reservoir layering flood discharge and sand discharge device | |
| CN104695390A (en) | Integrated super-discharge energy-dissipation flood-overflowing unit and method | |
| CN202214710U (en) | Overflow and water discharge integrated sluice weir | |
| CN106702968B (en) | An arc-shaped rolling dam capable of automatically washing sand and reducing silt and its operation method | |
| CN209323605U (en) | A simple sediment discharge system for river water intake | |
| CN209025056U (en) | A kind of Floater removing gate and scouring sluice integrated structure | |
| CN204753696U (en) | Water intaking structure for mountain channel | |
| JP7593226B2 (en) | Water intake and sand discharge device | |
| CN110714436A (en) | Retaining system of check dam | |
| CN119956728B (en) | A slope protection structure for hydropower dams used in soil and water conservation | |
| CN206706712U (en) | A kind of split type net cage for intercepting floating object | |
| RU157640U1 (en) | WATER INTAKE STRUCTURE FOR MOUNTAIN RIVERS | |
| CN222101029U (en) | A side-inlet water intake structure | |
| CN110990932B (en) | Check dam and design method thereof | |
| CN110761249A (en) | Water purification method and water taking structure based on high-low dam water taking principle | |
| CN116856361B (en) | A sand retaining and discharging structure for the lower reservoir of a pumped storage power station and its operation method | |
| WO2019101158A1 (en) | Intensive flood irrigation channel | |
| CN104963379A (en) | Water taking structure for mountainous area river course | |
| CN214460826U (en) | Bottom grid barrier and upstream surface seepage flow perforated pipe water collecting gallery water taking system | |
| CN211113432U (en) | Check dam water storage system | |
| CN116289817A (en) | A water inlet structure of a high head hydropower station without a sedimentation tank and a sedimentation and discharge method | |
| CN115992539A (en) | Water Intake Structure in Alpine and High Altitude Areas | |
| CN111236139B (en) | Comprehensive treatment method for debris flow in catchment power area by water interception and drainage method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201013 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |