CN211646468U - Municipal administration utility tunnel drain line cross node structure - Google Patents

Municipal administration utility tunnel drain line cross node structure Download PDF

Info

Publication number
CN211646468U
CN211646468U CN201922312540.4U CN201922312540U CN211646468U CN 211646468 U CN211646468 U CN 211646468U CN 201922312540 U CN201922312540 U CN 201922312540U CN 211646468 U CN211646468 U CN 211646468U
Authority
CN
China
Prior art keywords
positioning
hole
fastening
cross
drain pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922312540.4U
Other languages
Chinese (zh)
Inventor
刘茜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922312540.4U priority Critical patent/CN211646468U/en
Application granted granted Critical
Publication of CN211646468U publication Critical patent/CN211646468U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型公开了一种市政综合管廊排水管线交叉节点结构,包括交叉井,交叉井表面设有若干通孔,通孔内连接有排水管,交叉井顶面设有定位孔,定位孔贯穿通孔延伸至其下侧,定位孔内连接有相匹配的定位杆,排水管在靠近口部位置设有与定位杆相配的固定孔,交叉井固定连接有定位块,定位块设有台阶孔,台阶孔的大小与定位挡板相匹配,台阶孔的底面设有垫块槽,垫块槽底部连接有支撑槽,支撑槽内安装有弹簧,弹簧连接有垫块,垫块与排水管相贴合,定位块外侧上下两端连接有紧固套环,上紧固套环为焊接式上紧固套环,上紧固套环由12块上翼缘板焊接形成的紧固箍,下紧固套环为焊接式下紧固套环,下紧固套环由12块下翼缘板焊接形成的紧固箍。

Figure 201922312540

The utility model discloses a cross node structure of a municipal comprehensive pipe gallery drainage pipeline, which comprises a cross well, a plurality of through holes are arranged on the surface of the cross well, a drainage pipe is connected in the through holes, a positioning hole is arranged on the top surface of the cross well, and the positioning hole penetrates The through hole extends to its lower side, the positioning hole is connected with a matching positioning rod, the drain pipe is provided with a fixing hole matching the positioning rod at the position near the mouth, the cross well is fixedly connected with a positioning block, and the positioning block is provided with a stepped hole , The size of the step hole matches the positioning baffle, the bottom surface of the step hole is provided with a pad slot, the bottom of the pad slot is connected with a support slot, a spring is installed in the support slot, the spring is connected with a pad, and the pad is connected to the drain pipe. Fitting, the upper and lower ends of the outer side of the positioning block are connected with fastening collars, the upper fastening collar is a welded upper fastening collar, the upper fastening collar is a fastening hoop formed by welding 12 upper flange plates, and the lower The fastening collar is a welded lower fastening collar, and the lower fastening collar is a fastening hoop formed by welding 12 lower flange plates.

Figure 201922312540

Description

一种市政综合管廊排水管线交叉节点结构A cross-node structure of drainage pipelines in municipal comprehensive pipe gallery

技术领域technical field

本实用新型属于节点结构技术领域,具体涉及一种市政综合管廊排水管线交叉节点结构。The utility model belongs to the technical field of node structures, in particular to a cross-node structure of a municipal comprehensive pipe gallery drainage pipeline.

背景技术Background technique

综合管廊(日本称“共同沟”、中国台湾称“共同管道”),就是地下城市管道综合走廊,即在城市地下建造一个隧道空间,将电力、通信,燃气、供热、给排水等各种工程管线集于一体,设有专门的检修口、吊装口和监测系统,实施统一规划、统一设计、统一建设和管理,是保障城市运行的重要基础设施和“生命线”。现有的排水管与交叉井在交叉组合连接时,操作过程比较繁琐,需要花费工人更多的时间和精力,安装效率较低,并且安装后,由于每个连接的节点没有固定结构,使连接不稳定。Comprehensive pipeline corridor (called "common ditch" in Japan and "common pipeline" in Taiwan) is an underground urban pipeline comprehensive corridor, that is, a tunnel space is built underground in the city to connect electricity, communication, gas, heating, water supply and drainage, etc. It is an important infrastructure and "lifeline" to ensure the operation of the city. When the existing drainage pipe and the cross well are cross-connected, the operation process is cumbersome, it takes more time and energy of the workers, and the installation efficiency is low. After installation, since each connected node has no fixed structure, the connection is unstable.

实用新型内容Utility model content

针对上述背景技术所提出的问题,本实用新型的目的是:旨在提供一种市政综合管廊排水管线交叉节点结构。为实现上述技术目的,本实用新型采用的技术方案如下:Aiming at the problems raised by the above-mentioned background technology, the purpose of the present utility model is to provide a cross-node structure of drainage pipelines of municipal comprehensive pipe gallery. In order to realize the above-mentioned technical purpose, the technical scheme that the utility model adopts is as follows:

一种市政综合管廊排水管线交叉节点结构,包括交叉井,所述交叉井表面设有若干通孔,所述通孔内连接有排水管,所述交叉井顶面设有定位孔,所述定位孔贯穿通孔延伸至其下侧,所述定位孔内连接有相匹配的定位杆,所述排水管连接有定位挡板,所述排水管在靠近口部位置设有与定位杆相配的固定孔,所述交叉井固定连接有定位块,所述定位块与交叉井连接的一端设有排水管孔,所述定位块设有台阶孔,所述台阶孔的大小与定位挡板相匹配,所述台阶孔的底面设有垫块槽,所述垫块槽底部连接有支撑槽,所述支撑槽内安装有弹簧,所述弹簧连接有垫块,所述垫块与排水管相贴合,所述定位块外侧上下两端连接有紧固套环,所述上紧固套环为焊接式上紧固套环,所述上紧固套环由12块上翼缘板焊接形成的紧固箍,所述下紧固套环为焊接式下紧固套环,所述下紧固套环由12块下翼缘板焊接形成的紧固箍。A municipal comprehensive pipe gallery drainage pipeline intersection node structure, comprising a cross well, a plurality of through holes are arranged on the surface of the intersection well, a drainage pipe is connected in the through holes, a positioning hole is arranged on the top surface of the intersection well, and the The positioning hole extends through the through hole to its lower side, the positioning hole is connected with a matching positioning rod, the drainage pipe is connected with a positioning baffle, and the drainage pipe is provided with a matching positioning rod at a position close to the mouth. a fixing hole, a positioning block is fixedly connected to the cross well, the end of the positioning block connected to the cross well is provided with a drainage pipe hole, the positioning block is provided with a step hole, and the size of the step hole matches the positioning baffle , the bottom surface of the step hole is provided with a spacer groove, the bottom of the spacer groove is connected with a support groove, a spring is installed in the support groove, the spring is connected with a spacer block, and the spacer block is attached to the drain pipe In combination, the upper and lower ends of the outer side of the positioning block are connected with fastening collars, the upper fastening collars are welded upper fastening collars, and the upper fastening collars are formed by welding 12 upper flange plates. A fastening hoop, the lower fastening sleeve is a welded lower fastening sleeve, and the lower fastening sleeve is a fastening hoop formed by welding 12 lower flange plates.

进一步限定,所述通孔内设有密封槽,所述密封槽内安装有密封圈。这样的结构设计使密封效果更好,防止污水流出。Further limited, the through hole is provided with a sealing groove, and a sealing ring is installed in the sealing groove. This structural design makes the sealing effect better and prevents sewage from flowing out.

进一步限定,所述定位杆顶面固定连接有拉板,所述拉板安装在交叉井的表面。这样的结构设计方便拉取定位杆。Further limited, a pull plate is fixedly connected to the top surface of the positioning rod, and the pull plate is installed on the surface of the cross well. Such a structural design is convenient for pulling the positioning rod.

进一步限定,所述定位块上下两端的紧固套环大小形状相同。这样的结构设计方便对定位块进行紧固。It is further limited that the size and shape of the fastening collars at the upper and lower ends of the positioning block are the same. Such a structural design facilitates the fastening of the positioning block.

进一步限定,所述排水管的最大载荷量小于弹簧的最大压缩载荷量。这样的结构设计防止排水管将弹簧压断。Further defined, the maximum load of the drain pipe is less than the maximum compressive load of the spring. This structural design prevents the drain pipe from breaking the spring.

本实用新型具有以下优点:The utility model has the following advantages:

1、本实用新型通过设置紧固套环,通过紧固套环将定位块紧固固定,使排水管与交叉井交叉连接的节点更加稳定;1. The utility model is provided with a fastening collar, and the positioning block is fastened and fixed by the fastening collar, so that the node where the drain pipe and the cross well are cross-connected is more stable;

2、本实用新型通过设置定位杆,当排水管与交叉井交叉连接时,通过插入定位杆,使排水管与交叉井连接在一起,使安装简便。2. In the present invention, by setting the positioning rod, when the drain pipe is cross-connected with the cross well, the drain pipe and the cross well are connected together by inserting the positioning rod, which makes the installation easy.

附图说明Description of drawings

本实用新型可以通过附图给出的非限定性实施例进一步说明;The present invention may be further illustrated by the non-limiting examples given in the accompanying drawings;

图1为本实用新型实施例一种市政综合管廊排水管线交叉节点结构的结构示意图;Fig. 1 is the structural schematic diagram of the cross-node structure of a municipal comprehensive pipe gallery drainage pipeline according to an embodiment of the present utility model;

图2为本实用新型实施例一种市政综合管廊排水管线交叉节点结构的剖面结构示意图;2 is a schematic cross-sectional structural diagram of a cross-node structure of a municipal comprehensive pipe gallery drainage pipeline according to an embodiment of the present utility model;

图3为本实用新型实施例一种市政综合管廊排水管线交叉节点结构的排水管结构示意图;3 is a schematic diagram of a drainage pipe structure of a cross-node structure of a municipal comprehensive pipe gallery drainage pipeline according to an embodiment of the present utility model;

主要元件符号说明如下:The main component symbols are explained as follows:

交叉井1、排水管2、定位孔3、定位杆4、定位挡板5、固定孔6、定位块7、排水管孔8、台阶孔9、支撑槽10、弹簧11、垫块12、紧固套环13、上紧固套环131、上翼缘板132、下紧固套环133、下翼缘板134、密封圈14、拉板15。Cross well 1, drain pipe 2, positioning hole 3, positioning rod 4, positioning baffle 5, fixing hole 6, positioning block 7, drain pipe hole 8, step hole 9, support groove 10, spring 11, spacer block 12, tightening The fixing collar 13 , the upper fastening collar 131 , the upper flange plate 132 , the lower fastening collar 133 , the lower flange plate 134 , the sealing ring 14 , and the pulling plate 15 .

具体实施方式Detailed ways

为了使本领域的技术人员可以更好地理解本实用新型,下面结合附图和实施例对本实用新型技术方案进一步说明。In order to enable those skilled in the art to better understand the present invention, the technical solutions of the present invention are further described below with reference to the accompanying drawings and embodiments.

如图1-3所示,本实用新型的一种市政综合管廊排水管线交叉节点结构,交叉井1表面设有若干通孔,通孔内连接有排水管2,交叉井1顶面设有定位孔3,定位孔3贯穿通孔延伸至其下侧,定位孔3内连接有相匹配的定位杆4,排水管2连接有定位挡板5,排水管2在靠近口部位置设有与定位杆4相配的固定孔6,交叉井1固定连接有定位块7,定位块7与交叉井1连接的一端设有排水管孔8,定位块7设有台阶孔9,台阶孔9的大小与定位挡板5相匹配,台阶孔9的底面设有垫块槽,垫块槽底部连接有支撑槽10,支撑槽10内安装有弹簧11,弹簧11连接有垫块12,垫块12与排水管2相贴合,定位块7外侧上下两端连接有紧固套环13,上紧固套环13为焊接式上紧固套环131,上紧固套环131由12块上翼缘板132焊接形成的紧固箍,下紧固套环13为焊接式下紧固套环133,下紧固套环13由12块下翼缘板134焊接形成的紧固箍。As shown in Figures 1-3, a municipal comprehensive pipe gallery drainage pipeline intersection node structure of the present utility model, the surface of the intersection well 1 is provided with a number of through holes, the through holes are connected with drainage pipes 2, and the top surface of the intersection well 1 is provided with Positioning hole 3, the positioning hole 3 extends through the through hole to its lower side, the positioning hole 3 is connected with a matching positioning rod 4, the drainage pipe 2 is connected with a positioning baffle 5, and the drainage pipe 2 is provided with a position close to the mouth. The fixed hole 6 matched with the positioning rod 4, the cross well 1 is fixedly connected with a positioning block 7, the end of the positioning block 7 connected with the cross well 1 is provided with a drain pipe hole 8, the positioning block 7 is provided with a step hole 9, the size of the step hole 9 is Matching with the positioning baffle 5, the bottom surface of the step hole 9 is provided with a spacer groove, the bottom of the spacer groove is connected with a support groove 10, a spring 11 is installed in the support groove 10, the spring 11 is connected with a spacer block 12, and the spacer block 12 and The drain pipe 2 is attached to each other, and the upper and lower ends of the outer side of the positioning block 7 are connected with a fastening collar 13. The upper fastening collar 13 is a welded upper fastening collar 131, and the upper fastening collar 131 consists of 12 upper flanges. The plate 132 is a fastening hoop formed by welding, the lower fastening collar 13 is a welded lower fastening collar 133 , and the lower fastening collar 13 is a fastening hoop formed by welding 12 lower flange plates 134 .

安装时,将排水管2带有定位挡板5的一端对准定位块7内的台阶孔9插入进去,当定位挡板5抵住台阶孔9的台阶面时,排水管2上的固定孔6与交叉井1的定位孔3相贴合,在插入定位杆4,使排水管2与交叉井1连接固定,当定位挡板5在台阶孔9内滑动时,弹簧11带动垫块12呈压缩状态,当定位挡板5与台阶孔9的台阶面接触时,弹簧11带动垫块12弹起,并将排水管2支撑起来,当排水管2与交叉井1连接安装好后,通过焊接翼缘板形成的紧固套环13将定位块7连接固定起来,使排水管2与交叉井1连接的交叉节点更稳定。When installing, insert the end of the drain pipe 2 with the positioning baffle 5 into the stepped hole 9 in the positioning block 7. When the positioning baffle 5 is against the stepped surface of the stepped hole 9, the fixing hole on the drain pipe 2 6 Fits with the positioning hole 3 of the cross well 1, inserts the positioning rod 4 to connect and fix the drain pipe 2 to the cross well 1, when the positioning baffle 5 slides in the step hole 9, the spring 11 drives the cushion block 12 to move. In the compressed state, when the positioning baffle 5 is in contact with the stepped surface of the stepped hole 9, the spring 11 drives the cushion block 12 to bounce up and supports the drain pipe 2. After the drain pipe 2 is connected to the cross well 1 and installed, it is welded The fastening collar 13 formed by the flange plate connects and fixes the positioning block 7, so that the cross node connecting the drain pipe 2 and the cross well 1 is more stable.

优选通孔内设有密封槽,密封槽内安装有密封圈14。这样的结构设计使密封效果更好,防止污水流出。实际上,也可以根据具体情况考虑其他的密封圈14结构形状。Preferably, a sealing groove is provided in the through hole, and a sealing ring 14 is installed in the sealing groove. This structural design makes the sealing effect better and prevents sewage from flowing out. In fact, other structural shapes of the sealing ring 14 can also be considered according to specific conditions.

优选定位杆4顶面固定连接有拉板15,拉板15安装在交叉井1的表面。这样的结构设计方便拉取定位杆4。实际上,也可以根据具体情况考虑其他的拉板15结构形状。Preferably, a pull plate 15 is fixedly connected to the top surface of the positioning rod 4 , and the pull plate 15 is installed on the surface of the cross well 1 . Such a structural design is convenient for pulling the positioning rod 4 . In fact, other structural shapes of the pull plate 15 may also be considered according to specific conditions.

优选定位块7上下两端的紧固套环13大小形状相同。这样的结构设计方便对定位块7进行紧固。实际上,也可以根据具体情况考虑其他的紧固套环13结构形状。Preferably, the size and shape of the fastening collars 13 at the upper and lower ends of the positioning block 7 are the same. Such a structural design facilitates the fastening of the positioning block 7 . In fact, other structural shapes of the fastening collar 13 may also be considered according to specific conditions.

优选排水管2的最大载荷量小于弹簧11的最大压缩载荷量。这样的结构设计防止排水管2将弹簧11压断。实际上,也可以根据具体情况考虑其他的支撑结构形状。Preferably, the maximum load of the drain pipe 2 is smaller than the maximum compressive load of the spring 11 . Such a structural design prevents the spring 11 from being crushed by the drain pipe 2 . In fact, other support structure shapes may also be considered on a case-by-case basis.

上述实施例仅示例性说明本实用新型的原理及其功效,而非用于限制本实用新型。任何熟悉此技术的人士皆可在不违背本实用新型的精神及范畴下,对上述实施例进行修饰或改变。因此,凡所属技术领域中具有通常知识者在未脱离本实用新型所揭示的精神与技术思想下所完成的一切等效修饰或改变,仍应由本实用新型的权利要求所涵盖。The above-mentioned embodiments merely illustrate the principles and effects of the present invention, but are not intended to limit the present invention. Anyone skilled in the art can modify or change the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or changes completed by those with ordinary knowledge in the technical field without departing from the spirit and technical idea disclosed by the present invention should still be covered by the claims of the present invention.

Claims (5)

1. The utility model provides a municipal administration utility tunnel water drainage pipeline intersection node structure, includes cross well (1), its characterized in that: the surface of the cross well (1) is provided with a plurality of through holes, a drain pipe (2) is connected in the through holes, the top surface of the cross well (1) is provided with a positioning hole (3), the positioning hole (3) penetrates through the through holes and extends to the lower side of the through holes, a matched positioning rod (4) is connected in the positioning hole (3), the drain pipe (2) is connected with a positioning baffle (5), the drain pipe (2) is provided with a fixing hole (6) matched with the positioning rod (4) at the position close to the opening part, the cross well (1) is fixedly connected with a positioning block (7), one end of the positioning block (7) connected with the cross well (1) is provided with a drain pipe hole (8), the positioning block (7) is provided with a step hole (9), the size of the step hole (9) is matched with the positioning baffle (5), the bottom surface of the step hole (9) is, install spring (11) in support groove (10), spring (11) are connected with cushion (12), cushion (12) and drain pipe (2) are laminated mutually, both ends are connected with fastening ring (13) about locating piece (7) outside, go up fastening ring (13) and be fastening ring (131) on the welded formula, go up fastening ring (131) and by the fastening hoop of 12 last flange boards (132) welding formations, fastening ring (13) are fastening ring (133) under the welded formula down, fastening ring (13) is by the fastening hoop of 12 lower flange boards (134) welding formations down.
2. The municipal utility tunnel drain line cross-node structure of claim 1, wherein: a sealing groove is arranged in the through hole, and a sealing ring (14) is arranged in the sealing groove.
3. The municipal utility tunnel drain line cross-node structure of claim 2, wherein: the top surface of the positioning rod (4) is fixedly connected with a pulling plate (15), and the pulling plate (15) is installed on the surface of the cross well (1).
4. The municipal utility tunnel drain line cross-node structure of claim 3, wherein: the fastening lantern rings (13) at the upper end and the lower end have the same size and shape.
5. The municipal utility tunnel drain line cross-node structure of claim 4, wherein: the maximum load capacity of the drain pipe (2) is smaller than the maximum compression load capacity of the spring (11).
CN201922312540.4U 2019-12-20 2019-12-20 Municipal administration utility tunnel drain line cross node structure Expired - Fee Related CN211646468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922312540.4U CN211646468U (en) 2019-12-20 2019-12-20 Municipal administration utility tunnel drain line cross node structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922312540.4U CN211646468U (en) 2019-12-20 2019-12-20 Municipal administration utility tunnel drain line cross node structure

Publications (1)

Publication Number Publication Date
CN211646468U true CN211646468U (en) 2020-10-09

Family

ID=72697655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922312540.4U Expired - Fee Related CN211646468U (en) 2019-12-20 2019-12-20 Municipal administration utility tunnel drain line cross node structure

Country Status (1)

Country Link
CN (1) CN211646468U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119711612A (en) * 2025-02-28 2025-03-28 台州市森磊环境建设有限公司 Municipal road drainage construction structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119711612A (en) * 2025-02-28 2025-03-28 台州市森磊环境建设有限公司 Municipal road drainage construction structure and construction method thereof
CN119711612B (en) * 2025-02-28 2025-12-05 台州市森磊环境建设有限公司 Municipal road drainage construction structure and construction methods

Similar Documents

Publication Publication Date Title
CN207098570U (en) A kind of the shockproof of cable protection pipe, quick-mounting pipe pillow
CN110259158A (en) A kind of fixation device of piping lane service sleeve
CN206770801U (en) A kind of multi-functional suspension and support based on pipe gallery arrangement
CN205296229U (en) Sewer manhole in utility tunnel
CN209876514U (en) Coupling system of horizontal buried pipe in underground heat exchange system
CN209891245U (en) Prefabricated integral reinforced concrete gas valve well
CN102507309A (en) Heavy-caliber elbow pipe fitting water pressure test seal device
CN205205863U (en) Prefabricated inspection shaft
CN206112897U (en) Coal economizer
CN107606344A (en) A kind of bindiny mechanism of municipal pipeline
CN210117732U (en) An assembled underground pipe gallery
CN210855406U (en) Vertical rare earth permanent magnet processor
CN201837146U (en) Underground heat exchanger with multiple U pipes
CN209975565U (en) Prefabricated round section utility tunnel of assembling
CN221919523U (en) Novel large-scale circular rainwater assembled inspection shaft
CN207661270U (en) Voltage stabilizing plumbing sealed pipe fittings
CN210128133U (en) Temporary Fixing Device for Pipe Passing Through Firewall of Integrated Pipe Gallery
CN207176764U (en) End head formwork fixes rubber water-proof band structure
CN221722863U (en) Tunnel structure penetrating through karst channel
CN220869374U (en) A gas extraction drilling hole high pressure circulation grouting sealing device
CN216924837U (en) Buried well flow balance adjustment horizontal connecting pipe of shallow soil source heat pump system
CN221958369U (en) Pipe connector for installing water falling system
CN218064846U (en) Low low temperature economizer overhauls leak hunting and connects drainage pipeline
CN210770658U (en) A fixture for municipal pipeline installation
CN217494119U (en) Sealing Ring Mounting Mechanism for Ductile Iron Pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201009