CN211621686U - Inspection well capable of being stably installed - Google Patents
Inspection well capable of being stably installed Download PDFInfo
- Publication number
- CN211621686U CN211621686U CN201922303275.3U CN201922303275U CN211621686U CN 211621686 U CN211621686 U CN 211621686U CN 201922303275 U CN201922303275 U CN 201922303275U CN 211621686 U CN211621686 U CN 211621686U
- Authority
- CN
- China
- Prior art keywords
- well seat
- concrete base
- manhole
- mounting groove
- stably
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007689 inspection Methods 0.000 title claims abstract description 25
- 230000001681 protective effect Effects 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 4
- 239000007787 solid Substances 0.000 claims 2
- 238000010030 laminating Methods 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 18
- 238000000034 method Methods 0.000 abstract description 8
- 230000000694 effects Effects 0.000 abstract description 4
- 239000002689 soil Substances 0.000 description 4
- 238000011900 installation process Methods 0.000 description 3
- 238000007789 sealing Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及一种检查井,更具体地说它涉及一种可稳定安装的检查井。The utility model relates to an inspection well, in particular to an inspection well that can be stably installed.
背景技术Background technique
检查井是为城市地下基础设施的供电、给水、排水、排污、通讯、有线电视、煤气管、路灯线路等维修,安装方便而设置的。一般设在管道交汇处、转弯处、管径或坡度改变处、以及直线管段上每隔一定距离处,是便于定期检查附属构筑物。The inspection well is set up for the maintenance of power supply, water supply, drainage, sewage, communication, cable television, gas pipe, street light circuit, etc. of urban underground infrastructure, and is easy to install. It is generally located at the intersection of pipelines, turns, changes in pipe diameter or slope, and at certain distances on straight pipe sections, which is convenient for regular inspection of auxiliary structures.
目前,装配式检查井在使用过程中,多是直接将各个部件直接装配,然后对连接处进行密封,但是在实际的装配过程中,检查井安装到地基处时,大多缺少定位,因此后续填充砂浆或封土时,很容易造成检查井偏移,影响其正常使用。At present, in the process of using prefabricated inspection wells, most of the components are directly assembled, and then the joints are sealed. However, in the actual assembly process, when the inspection wells are installed to the foundation, most of them lack positioning, so the subsequent filling When mortar or soil is used, it is easy to cause the deviation of the inspection well and affect its normal use.
实用新型内容Utility model content
针对现有技术存在的不足,本实用新型的目的在于提供一种可稳定安装的检查井,其优点在于可使装配式检查井的安装更加稳定,定位过程中不易偏移。Aiming at the deficiencies of the prior art, the purpose of the present invention is to provide an inspection well that can be stably installed, which has the advantages of making the installation of the assembled inspection well more stable, and is not easy to shift during the positioning process.
为实现上述目的,本实用新型提供了如下技术方案:To achieve the above object, the utility model provides the following technical solutions:
一种可稳定安装的检查井,包括混凝土底座和井座,所述井座的底部固定连接有底板,所述底板与混凝土底座相匹配,所述混凝土底座的内壁两侧均开设有定位槽,所述底板的两侧均开设有安装槽,所述安装槽的内壁设置有弹簧,所述弹簧的一端固定连接有卡块,所述卡块贯穿安装槽并与定位槽插接,所述井座的顶部设置有井筒,所述井座的顶部设置有定位装置,所述定位装置套设在井筒的表面。An inspection well that can be stably installed includes a concrete base and a well base, the bottom of the well base is fixedly connected with a bottom plate, the bottom plate is matched with the concrete base, and both sides of the inner wall of the concrete base are provided with positioning grooves, Both sides of the bottom plate are provided with installation grooves, the inner wall of the installation groove is provided with a spring, and one end of the spring is fixedly connected with a clamping block, the clamping block penetrates the installation groove and is inserted into the positioning groove, the well. The top of the seat is provided with a wellbore, the top of the well seat is provided with a positioning device, and the positioning device is sleeved on the surface of the wellbore.
通过采用上述技术方案,在需要安装检查井时,在安装点预先设置好混凝土底座,然后使用吊设工具将井座吊设到混凝土底座内,使底板置入到混凝土底座内部,在置入的过程,混凝土底座的内壁挤压卡块,使卡块缩入到安装槽内部,当底板完全置入到混凝土底座后,弹簧将卡块顶出,使其卡在定位槽内部,此时即可对检查井进行定位,在对装配处浇筑混凝土或覆盖土壤时,检查井的位置不会偏移,从而使检查井的安装过程更加稳定。By adopting the above technical solution, when the inspection well needs to be installed, the concrete base is pre-set at the installation point, and then the well base is hoisted into the concrete base with a hoisting tool, so that the base plate is placed inside the concrete base. In the process, the inner wall of the concrete base squeezes the clamping block, so that the clamping block is retracted into the installation groove. When the bottom plate is completely placed in the concrete base, the spring pushes the clamping block out to make it stuck in the positioning groove. The manhole is positioned so that the position of the manhole will not shift when concrete is poured or soil is covered at the assembly site, making the manhole installation process more stable.
本实用新型进一步设置为:所述混凝土底座为预制件,且混凝土底座的底部设置有钢筋预埋件。The utility model is further provided that: the concrete base is a prefabricated part, and the bottom of the concrete base is provided with a steel embedded part.
通过采用上述技术方案,在混凝土底座下方设置钢筋,使混凝土底座与地基之间的连接更加紧密。By adopting the above-mentioned technical scheme, steel bars are arranged under the concrete base, so that the connection between the concrete base and the foundation is more tightly.
本实用新型进一步设置为:所述井座包括有上井座和下井座,且井座由上井座和下井座装配而成。The utility model is further provided that: the well seat includes an upper well seat and a lower well seat, and the well seat is assembled from the upper well seat and the lower well seat.
通过采用上述技术方案,井座采用转配时,方便了安装支管,安装支管时,将支管注入到下井座内壁,将上井座装好即可。By adopting the above technical solution, when the well seat adopts the transfer configuration, it is convenient to install the branch pipe. When installing the branch pipe, the branch pipe is injected into the inner wall of the lower well seat, and the upper well seat is installed.
本实用新型进一步设置为:所述上井座的底部设置有凸起,所述下井座的顶部开设有凹槽,所述凸起与凹槽间隙配合,且间隙处填充有混凝土。The utility model is further provided that: the bottom of the upper well seat is provided with a protrusion, the top of the lower well seat is provided with a groove, the protrusion and the groove are gap-fitted, and the gap is filled with concrete.
通过采用上述技术方案,通过凸起与凹槽配合,使上井座和下井座的对位更加方便,且在间隙处填充混凝土可有效的增强连接处的稳定性,密封效果更好。By adopting the above technical solution, the alignment of the upper well seat and the lower well seat is more convenient through the cooperation of the protrusion and the groove, and filling the gap with concrete can effectively enhance the stability of the connection, and the sealing effect is better.
本实用新型进一步设置为:所述安装槽的内壁截面形状为直角梯形,且卡块延伸出安装槽的一端形状也为直角梯形。The utility model is further provided that: the cross-sectional shape of the inner wall of the installation groove is a right-angled trapezoid, and the shape of one end of the clamping block extending out of the installation groove is also a right-angled trapezoid.
通过采用上述技术方案,使底板置入到混凝土底座的过程中,混凝土底座能够挤压到卡块,而卡块卡在定位槽内部时,卡块卡在定位槽的内壁,从而使底板无法在混凝土底座内部偏移。By adopting the above technical solution, when the bottom plate is placed in the concrete base, the concrete base can be squeezed to the clamping block, and when the clamping block is stuck inside the positioning groove, the clamping block is stuck on the inner wall of the positioning groove, so that the base plate cannot be The concrete base is internally offset.
本实用新型进一步设置为:所述定位装置包括有固定环,所述固定环的顶部固定连接有连接杆,所述连接杆的顶部固定连接有套环,所述套环的两侧均螺纹连接有螺纹杆,所述螺纹杆的相对一端均贯穿套环并转动连接有卡板,所述卡板与井筒贴合。The utility model is further provided as follows: the positioning device includes a fixing ring, the top of the fixing ring is fixedly connected with a connecting rod, the top of the connecting rod is fixedly connected with a collar, and both sides of the collar are threadedly connected A threaded rod is provided, and opposite ends of the threaded rod pass through the collar and are rotatably connected with a clamping plate, and the clamping plate is fitted with the wellbore.
通过采用上述技术方案,在安装井筒时,将井筒从固定环和套环穿过,使井筒与井座装配好,然后转动螺纹杆,螺纹杆转动推动卡板靠近井筒,使其将井筒卡住,从而可对井筒进行限位,使其与井座之间的连接更加紧密。By adopting the above technical solution, when installing the wellbore, the wellbore is passed through the fixing ring and the casing ring, so that the wellbore and the well seat are assembled, and then the threaded rod is rotated, and the threaded rod rotates and pushes the clamping plate close to the wellbore, so that the wellbore is stuck. , so that the wellbore can be limited and the connection between the wellbore and the well seat can be tighter.
本实用新型进一步设置为:所述卡板与井筒的连接处设置有防护垫,且防护垫为橡胶材料构件。The utility model is further configured as follows: a protective pad is arranged at the connection between the clamping plate and the wellbore, and the protective pad is a rubber material component.
通过采用上述技术方案,防护垫设置为橡胶材料,可避免卡板对井筒的表面造成损伤。By adopting the above technical solution, the protective pad is set to be a rubber material, so that damage to the surface of the wellbore caused by the clamping plate can be avoided.
本实用新型进一步设置为:所述卡板与螺纹杆的连接处设置有轴承,且轴承的内缘与螺纹杆套接。The utility model is further configured as follows: a bearing is arranged at the connection between the clamping plate and the threaded rod, and the inner edge of the bearing is sleeved with the threaded rod.
通过采用上述技术方案,使螺纹杆转动时,卡板能够可不跟随其转动,避免出现卡板卡死,导致卡板无法卡在井筒表面的现象发生。By adopting the above technical solution, when the threaded rod rotates, the clamping plate can rotate without following it, so as to avoid the phenomenon that the clamping plate is stuck and the clamping plate cannot be stuck on the surface of the wellbore.
综上所述,本实用新型具有以下优点:To sum up, the utility model has the following advantages:
1、在需要安装检查井时,在安装点预先设置好混凝土底座,然后使用吊设工具将井座吊设到混凝土底座内,使底板置入到混凝土底座内部,在置入的过程,混凝土底座的内壁挤压卡块,使卡块缩入到安装槽内部,当底板完全置入到混凝土底座后,弹簧将卡块顶出,使其卡在定位槽内部,此时即可对检查井进行定位,在对装配处浇筑混凝土或覆盖土壤时,检查井的位置不会偏移,从而使检查井的安装过程更加稳定;1. When the inspection well needs to be installed, set the concrete base in advance at the installation point, and then use the hoisting tool to hoist the well base into the concrete base, so that the base plate is placed inside the concrete base. When the bottom plate is completely placed into the concrete base, the spring pushes the block out to make it stuck in the positioning groove, and the inspection well can be checked at this time. Positioning, when pouring concrete or covering soil at the assembly place, the position of the inspection well will not be shifted, so that the installation process of the inspection well is more stable;
2、在安装井筒时,将井筒从固定环和套环穿过,使井筒与井座装配好,然后转动螺纹杆,螺纹杆转动推动卡板靠近井筒,使其将井筒卡住,从而可对井筒进行限位,使其与井座之间的连接更加紧密;2. When installing the wellbore, pass the wellbore through the fixing ring and the collar to assemble the wellbore and the well base, and then turn the threaded rod, and the threaded rod rotates to push the clamping plate close to the wellbore to lock the wellbore, so that the The wellbore is limited to make the connection with the well seat more tightly;
3、通过凸起与凹槽配合,使上井座和下井座的对位更加方便,且在间隙处填充混凝土可有效的增强连接处的稳定性,密封效果更好。3. The alignment of the upper well seat and the lower well seat is more convenient through the cooperation of the protrusion and the groove, and the filling of concrete at the gap can effectively enhance the stability of the connection and the sealing effect is better.
附图说明Description of drawings
图1是本实施例的立体图;Fig. 1 is the perspective view of this embodiment;
图2是本实施例的结构示意图;Fig. 2 is the structural representation of this embodiment;
图3是本实施例图2中A处的放大图;Fig. 3 is the enlarged view of place A in Fig. 2 of the present embodiment;
图4是本实施例图2中B处的放大图。FIG. 4 is an enlarged view of B in FIG. 2 of the present embodiment.
附图标记说明:1、混凝土底座;2、井座;3、底板;4、定位槽;5、安装槽;6、弹簧;7、卡块;8、井筒;9、定位装置;91、固定环;92、连接杆;93、套环;94、螺纹杆;95、卡板。Description of reference numerals: 1. Concrete base; 2. Well seat; 3. Bottom plate; 4. Positioning groove; 5. Installation groove; 6. Spring; 7. Block; 8. Wellbore; 9. Positioning device; Ring; 92, connecting rod; 93, collar; 94, threaded rod; 95, card plate.
具体实施方式Detailed ways
以下结合附图对本实用新型作进一步详细说明。The present utility model will be described in further detail below in conjunction with the accompanying drawings.
一种可稳定安装的检查井,如图1所示,包括混凝土底座1和井座2,井座2的底部固定连接有底板3,底板3与混凝土底座1相匹配,混凝土底座1的内壁两侧均开设有定位槽4,底板3的两侧均开设有安装槽5,安装槽5的内壁设置有弹簧6,弹簧6的一端固定连接有卡块7,卡块7贯穿安装槽5并与定位槽4插接,井座2的顶部设置有井筒8,井座2的顶部设置有定位装置9,定位装置9套设在井筒8的表面。An inspection well that can be stably installed, as shown in Figure 1, includes a
如图2所示,混凝土底座1为预制件,且混凝土底座1的底部设置有钢筋预埋件,在混凝土底座1下方设置钢筋,使混凝土底座1与地基之间的连接更加紧密。As shown in FIG. 2 , the
如图2所示,井座2包括有上井座和下井座,且井座2由上井座和下井座装配而成,井座2采用转配时,方便了安装支管,安装支管时,将支管注入到下井座内壁,将上井座装好即可。As shown in Figure 2, the
如图2所示,上井座的底部设置有凸起,下井座的顶部开设有凹槽,凸起与凹槽间隙配合,且间隙处填充有混凝土,通过凸起与凹槽配合,使上井座和下井座的对位更加方便,且在间隙处填充混凝土可有效的增强连接处的稳定性,密封效果更好。As shown in Figure 2, the bottom of the upper well seat is provided with a protrusion, and the top of the lower well seat is provided with a groove, the protrusion and the groove are gap-fitted, and the gap is filled with concrete. The alignment with the downhole seat is more convenient, and filling the gap with concrete can effectively enhance the stability of the connection, and the sealing effect is better.
如图3所示,安装槽5的内壁截面形状为直角梯形,且卡块7延伸出安装槽5的一端形状也为直角梯形,使底板3置入到混凝土底座1的过程中,混凝土底座1能够挤压到卡块7,而卡块7插接到定位槽4内部时,卡块7卡在定位槽4的内壁,从而使底板3无法在混凝土底座1内部偏移。As shown in FIG. 3 , the cross-sectional shape of the inner wall of the installation groove 5 is a right-angled trapezoid, and the shape of one end of the
如图4所示,定位装置9包括有固定环91,固定环91的顶部固定连接有连接杆92,连接杆92的顶部固定连接有套环93,套环93的两侧均螺纹连接有螺纹杆94,螺纹杆94的相对一端均贯穿套环93并转动连接有卡板95,卡板95与井筒8贴合,在安装井筒8时,将井筒8从固定环91和套环93穿过,使井筒8与井座2装配好,然后转动螺纹杆94,螺纹杆94转动推动卡板95靠近井筒8,使其将井筒8卡住,从而可对井筒8进行限位,使其与井座2之间的连接更加紧密。As shown in FIG. 4 , the
如图4所示,卡板95与井筒8的连接处设置有防护垫,且防护垫为橡胶材料构件,防护垫设置为橡胶材料,可避免卡板95对井筒8的表面造成损伤。As shown in FIG. 4 , a protective pad is provided at the connection between the clamping
如图4所示,卡板95与螺纹杆94的连接处设置有轴承,且轴承的内缘与螺纹杆94套接,使螺纹杆94转动时,卡板95能够可不跟随其转动,避免出现卡板95卡死,导致卡板95无法卡在井筒8表面的现象发生。As shown in FIG. 4 , a bearing is provided at the connection between the clamping
本实用新型的工作过程及有益效果如下:在需要安装检查井时,在安装点预先设置好混凝土底座1,然后使用吊设工具将井座2吊设到混凝土底座1内,使底板3置入到混凝土底座1内部,在置入的过程,混凝土底座1的内壁挤压卡块7,使卡块7缩入到安装槽5内部,当底板3完全置入到混凝土底座1后,弹簧6将卡块7顶出,使其卡在定位槽4内部,此时即可对检查井进行定位,在对装配处浇筑混凝土或覆盖土壤时,检查井的位置不会偏移,从而使检查井的安装过程更加稳定。The working process and beneficial effects of the utility model are as follows: when the inspection well needs to be installed, the
以上所述仅为本实用新型的较佳实施例,并不用于限制本实用新型,凡在本实用新型的设计构思之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the design concept of the present invention shall be included in the present invention. within the scope of the new protection.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922303275.3U CN211621686U (en) | 2019-12-20 | 2019-12-20 | Inspection well capable of being stably installed |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922303275.3U CN211621686U (en) | 2019-12-20 | 2019-12-20 | Inspection well capable of being stably installed |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211621686U true CN211621686U (en) | 2020-10-02 |
Family
ID=72630616
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922303275.3U Active CN211621686U (en) | 2019-12-20 | 2019-12-20 | Inspection well capable of being stably installed |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211621686U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119615970A (en) * | 2025-02-14 | 2025-03-14 | 福州市规划设计研究院集团有限公司 | Prefabricated assembled inspection well with bracket structure |
-
2019
- 2019-12-20 CN CN201922303275.3U patent/CN211621686U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119615970A (en) * | 2025-02-14 | 2025-03-14 | 福州市规划设计研究院集团有限公司 | Prefabricated assembled inspection well with bracket structure |
| CN119615970B (en) * | 2025-02-14 | 2025-05-23 | 福州市规划设计研究院集团有限公司 | Prefabricated assembled inspection well with bracket structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205377242U (en) | Assembly -type cable trench | |
| CN110311343A (en) | A prefabricated steel cylinder concrete circular power pipe gallery with pipe seat | |
| CN205712137U (en) | Foundation pit supporting construction | |
| CN109811779A (en) | A kind of prefabricated caisson segment and caisson construction method | |
| CN104452949A (en) | Embedded leak-proof joint | |
| CN211621686U (en) | Inspection well capable of being stably installed | |
| CN217053673U (en) | Connecting structure for plastic pipeline and concrete prefabricated inspection well | |
| CN218236612U (en) | Reinforced concrete pipeline repairing device | |
| CN211621685U (en) | Assembled inspection shaft | |
| CN207260191U (en) | A kind of class rectangle pipe gallery section of jurisdiction connection structure | |
| CN219388806U (en) | Assembled back wall for pipe jacking construction | |
| CN116122335B (en) | Straight-through electric inspection well structure suitable for rapid assembly and construction method thereof | |
| CN204728365U (en) | A kind of aqueduct valve well mounting structure | |
| CN105971016A (en) | Utility tunnel internode connection structure | |
| CN205743275U (en) | Assembled enclosing wall | |
| CN204532379U (en) | The pre-buried gutter structure of subway sectional tunnel waste water pump house | |
| CN206706831U (en) | Transverse joint precast assembly pipe gallery | |
| CN103774620B (en) | A vertical water-stop structure fixture for expansion joints in concrete engineering | |
| CN209723030U (en) | A prefabricated integrated pipe gallery assembly unit | |
| CN207452948U (en) | The inspection shaft of adjustable manhole cover height | |
| CN205857240U (en) | A kind of prefabricated pipe gallery | |
| CN207176764U (en) | End head formwork fixes rubber water-proof band structure | |
| CN222910069U (en) | Drainage structure between pipe joints of push pipe | |
| CN205475123U (en) | Rotatory steel dam of hydraulic pressure | |