CN211601945U - Electric power engineering cost construction levelness check out test set - Google Patents
Electric power engineering cost construction levelness check out test set Download PDFInfo
- Publication number
- CN211601945U CN211601945U CN202020519606.7U CN202020519606U CN211601945U CN 211601945 U CN211601945 U CN 211601945U CN 202020519606 U CN202020519606 U CN 202020519606U CN 211601945 U CN211601945 U CN 211601945U
- Authority
- CN
- China
- Prior art keywords
- fixed
- base
- wall
- electric power
- welded fastening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 238000001514 detection method Methods 0.000 claims abstract description 36
- 238000009434 installation Methods 0.000 claims description 13
- 238000005096 rolling process Methods 0.000 claims description 13
- 230000001105 regulatory effect Effects 0.000 claims description 6
- 239000000725 suspension Substances 0.000 claims description 6
- 238000004804 winding Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)
Abstract
The utility model discloses an electric power engineering cost construction levelness check out test set, including base, positive and negative motor, detection piece and fixed column, the bottom symmetric weld of base is fixed with two sets of support sleeves, sliding connection support column in the support sleeve, welded fastening has fixing device on one side outer wall of support sleeve, there is positive and negative motor through the bolt fastening on one side outer wall of base, positive and negative motor's output welded fastening has adjusting screw, the guide way has been seted up to the left side outer wall of base, adjusting screw's outer wall threaded connection movable block, the movable block removes in the guide way of base, one side outer wall welded fastening of movable block has the detection piece, the surface weld of base is fixed with the fixed column. This electric power engineering cost construction levelness check out test set not only can detect the levelness of construction, can also detect the straightness that hangs down of construction, and application scope is more extensive.
Description
Technical Field
The utility model belongs to the technical field of the levelness check out test set, concretely relates to electric power engineering cost construction levelness check out test set.
Background
In the electric power engineering construction process, the detection of levelness almost runs through the whole engineering construction process, and the levelness must be detected from template installation, concrete pouring, wall masonry, surface course plastering to equipment installation. In recent years, the construction quality of electric power engineering is steadily improved, the construction technology of high-precision wall building and thin plastering is widely applied, and higher requirements on the levelness of building components are improved; and in the same way, the detection of the verticality is also indispensable in the construction process of the electric power engineering. However, the existing levelness detection equipment for electric power engineering construction does not have detection of verticality, so that the detection efficiency is influenced.
Therefore, aiming at the current situation, the design and production of the detection equipment for the construction levelness of the electric power engineering cost are urgently needed to meet the requirement of practical use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power engineering cost construction levelness check out test set to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a detection device for the construction levelness of electric power engineering cost comprises a base, a positive and negative motor, a detection block and a fixed column, four groups of self-locking universal wheels are symmetrically fixed at the bottom of the base through bolts, two groups of supporting sleeves are symmetrically welded and fixed at the bottom of the base, the supporting sleeve is connected with a supporting column in a sliding way, the bottom of the supporting column is fixedly welded with a supporting block, a fixing device is welded and fixed on the outer wall of one side of the supporting sleeve, a positive and negative motor is fixed on the outer wall of one side of the base through a bolt, the output end of the positive and negative motor is fixedly welded with an adjusting screw rod, the outer wall of the left side of the base is provided with a guide groove, the outer wall of the adjusting screw is connected with a moving block in a threaded manner, the moving block moves in a guide groove of the base, the outer wall of one side of the moving block is fixedly welded with a detection block, and the surface of the base is fixedly welded with a fixing column.
Preferably, the installation groove has been seted up in the detection piece, welded fastening has supporting spring in the installation groove of detection piece, supporting spring's bottom welded fastening has the sliding block, and the bottom welded fastening of sliding block has the installation piece, and the installation piece extends to and detects the piece below, rotates through the pivot in the installation piece to be connected with the removal wheel, the shifting chute has been seted up on the surface of detecting the piece, and one side outer wall of sliding block has the pointer through connecting rod welded fastening, is equipped with the scale on the detection piece of pointer one side.
Preferably, fixing device includes fixed block and locking post, the adjustment tank has been seted up in the fixed block, the shifting chute has been seted up on the surface of fixed block, the welded fastening has fixed spring in the shifting chute of fixed block, fixed spring's opposite side welded fastening has the regulating plate, welded fastening has the locking post on the opposite side outer wall of regulating plate, the locking post slides in the adjustment tank of fixed block.
Preferably, a sliding groove is formed in the fixing column, the lifting column is connected in the sliding groove of the fixing column in a sliding mode, a threaded groove is formed in the upper half portion of the fixing column, the threaded groove of the upper half portion of the fixing column is in threaded connection with the locking ring, and the lifting column is fixedly connected with the fixing column through the locking ring.
Preferably, the top welded fastening of lift post has the connecting plate, and the right half of connecting plate is connected with the rolling dish through the bearing rotation, the winding has the suspension wire in the rolling dish, and the bottom of suspension wire is fixed with the line weight.
The utility model discloses a technological effect and advantage: according to the electric power engineering construction cost levelness detection device, the positive and negative motors drive the adjusting screw to rotate, the moving block and the detection block can be driven to move, when a moving wheel below the detection block moves on a detected plane and meets an uneven plane, the mounting block moves in the detection block, a pointer on the sliding block moves on the surface of the detection block, and the levelness of the detected plane can be visually displayed by matching with a scale on the detection block; through the height of adjustment lift post in the fixed column, the cooperation line weighs down, can detect the straightness that hangs down of electric power engineering's wall body, equipment, and this electric power engineering cost construction levelness check out test set not only can detect the levelness of construction, can also detect the straightness that hangs down of construction, and application scope is more extensive.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a cross-sectional view of the present invention;
fig. 3 is a left side view of the present invention;
FIG. 4 is a cross-sectional view of a support sleeve and support post of the present invention;
fig. 5 is a schematic structural view of the fixing device of the present invention;
fig. 6 is a left side view of the detection block of the present invention.
In the figure: the device comprises a base 1, a self-locking universal wheel 2, a supporting sleeve 3, a supporting column 4, a fixing device 5, a positive and negative motor 6, an adjusting screw 7, a moving block 8, a detection block 9, a supporting spring 10, a fixing column 11, a lifting column 12, a locking ring 13, a winding disc 14, a line weight 15, a fixing block 16, a fixing spring 17, an adjusting plate 18 and a locking column 19.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Unless the direction is defined separately, the directions of up, down, left, right, front, back, etc. referred to herein are the directions of up, down, left, right, front, back, etc. in the drawings of the present invention, and are herein incorporated by reference.
The utility model provides a as shown in fig. 1-6 electric power engineering cost construction levelness check out test set, including base 1, positive and negative motor 6, detection piece 9 and fixed column 11, base 1's bottom is fixed with four group's auto-lock universal wheels 2 through the bolt symmetry, base 1's bottom symmetry welded fastening has two sets of support sleeve 3, sliding connection support column 4 in the support sleeve 3, two sets of locking holes have been seted up on one side outer wall of support column 4, the bottom welded fastening of support column 4 has the supporting shoe, welded fastening has fixing device 5 on one side outer wall of support sleeve 3, there is positive and negative motor 6 through the bolt fastening on one side outer wall of base 1, positive and negative motor 6's model does: b2212-920KV, an adjusting screw 7 is fixedly welded at the output end of the positive and negative motor 6, a guide groove is formed in the outer wall of the left side of the base 1, the adjusting screw 7 extends into the guide groove of the base 1, the adjusting screw 7 is rotatably connected with the base 1 through a bearing, a moving block 8 is connected to the outer wall of the adjusting screw 7 in a threaded mode, the moving block 8 moves in the guide groove of the base 1, a detection block 9 is fixedly welded on the outer wall of one side of the moving block 8, and a fixed column 11 is fixedly welded on the surface of the base 1.
It is specific, it has the mounting groove to detect the interior setting of piece 9, the welded fastening of the mounting groove of detecting piece 9 has supporting spring 10, supporting spring 10's bottom welded fastening has the sliding block, and the bottom welded fastening of sliding block has the installation piece, the bottom of detecting piece 9 has seted up logical groove, and the installation piece passes the logical groove of detecting piece 9 bottom, extends to and detects 9 below of piece, rotates through the pivot in the installation piece to be connected with the removal wheel, the shifting chute has been seted up on the surface of detecting piece 9, and one side outer wall of sliding block passes through connecting rod welded fastening has the pointer, is equipped with the scale on the detection piece 9 of pointer one side.
Specifically, fixing device 5 includes fixed block 16 and locking post 19, the adjustment tank has been seted up in the fixed block 16, the shifting chute has been seted up on the surface of fixed block 16, fixed spring 17 is fixed with in the shifting chute welding of fixed block 16, fixed spring 17's opposite side welded fastening has regulating plate 18, welded fastening has locking post 19 on regulating plate 18's the opposite side outer wall, locking post 19 slides in the adjustment tank of fixed block 16, the through-hole has been seted up on the support sleeve 3, locking post 19 passes the through-hole of support sleeve 3 to extend to in the locking hole of support column 4, thereby fix the position of support column 4.
Specifically, a sliding groove is formed in the fixed column 11, the lifting column 12 is slidably connected in the sliding groove of the fixed column 11, a thread groove is formed in the upper half portion of the fixed column 11, the thread groove of the upper half portion of the fixed column 11 is in external thread connection with the locking ring 13, the lifting column 12 is fixedly connected with the fixed column 11 through the locking ring 13, a fixing ring is arranged in the locking ring 13, and the fixing ring is attached to the outer wall of the lifting column 12, so that the position of the lifting column 12 in the fixed column 11 is kept still.
Specifically, the top welded fastening of lift post 12 has the connecting plate, and the right half of connecting plate is rotated through the bearing and is connected with rolling dish 14, seted up the locating hole on the rolling dish 14, seted up spacing hole on the connecting plate, it has the gag lever post to peg graft in the locating hole on the rolling dish 14, and the gag lever post extends to the spacing downthehole of connecting plate, fixes the position of rolling dish 14 after rolling of rolling dish 14, the winding has the suspension wire in the rolling dish 14, and the bottom of suspension wire is fixed with plumb 15.
The working principle of the detection equipment for the construction levelness of the electric power engineering cost is that when the detection equipment is used, after the equipment is moved to a proper position, an external power supply is connected, an adjusting plate 18 is pulled outwards to compress a fixing spring 17, a locking column 19 is separated from a locking hole on a supporting column 4, the supporting column 4 is pulled downwards to enable a supporting block at the bottom of the supporting column 4 to be contacted with the ground, a self-locking universal wheel 2 is far away from the ground to fix the equipment, the adjusting plate 18 is loosened, the fixing spring 17 is reset, the locking column 19 is meshed with the locking hole on the supporting column 4 to fix the position of the supporting column 4, a forward and reverse motor 6 is started, the forward and reverse motor 6 drives an adjusting screw 7 to rotate, the adjusting screw 7 drives a moving block 8 and a detection block 9 to move, when a moving wheel below the detection block 9 moves on a detected plane, when the detection block meets an uneven, compress supporting spring 10, move on detecting the piece 9 surface through the pointer on the sliding block, the cooperation detects the scale on the piece 9, can audio-visual show by the detected planar levelness, when needs detect the straightness that hangs down, adjusts the height of lift post 12 in fixed column 11, and the height that detects as required adjusts suitable height with rolling dish 14, rotates rolling dish 14 and puts down line weight 15, detects the straightness that hangs down of wall or equipment.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.
Claims (5)
1. The utility model provides an electric power engineering cost construction levelness check out test set, includes base (1), positive and negative motor (6), detects piece (9) and fixed column (11), its characterized in that: four groups of self-locking universal wheels (2) are symmetrically fixed at the bottom of the base (1) through bolts, two groups of supporting sleeves (3) are symmetrically welded and fixed at the bottom of the base (1), the supporting sleeves (3) are connected with the supporting columns (4) in a sliding manner, the supporting blocks are welded and fixed at the bottoms of the supporting columns (4), a fixing device (5) is welded and fixed on the outer wall of one side of each supporting sleeve (3), a positive and negative motor (6) is fixed on the outer wall of one side of the base (1) through bolts, an adjusting screw (7) is welded and fixed at the output end of the positive and negative motor (6), a guide groove is formed in the outer wall of the left side of the base (1), a moving block (8) is in threaded connection with the outer wall of the adjusting screw (7), the moving block (8) moves in the guide groove of the base (1), and a detection block (, the surface of the base (1) is fixedly welded with a fixing column (11).
2. The electric power engineering cost construction levelness detection apparatus according to claim 1, characterized in that: it has the mounting groove to examine to have seted up in the piece (9), the mounting groove internal weld who examines piece (9) is fixed with supporting spring (10), the bottom welded fastening of supporting spring (10) has the sliding block, and the bottom welded fastening of sliding block has the installation piece, and the installation piece extends to and examines piece (9) below, rotates through the pivot in the installation piece to be connected with and removes the wheel, the shifting chute has been seted up on the surface that examines piece (9), and one side outer wall of sliding block has the pointer through connecting rod welded fastening, is equipped with the scale on the detection piece (9) of pointer one side.
3. The electric power engineering cost construction levelness detection apparatus according to claim 1, characterized in that: fixing device (5) include fixed block (16) and locking post (19), set up the adjustment tank in fixed block (16), the shifting chute has been seted up on the surface of fixed block (16), the welded fastening has fixed spring (17) in the shifting chute of fixed block (16), the opposite side welded fastening of fixed spring (17) has regulating plate (18), welded fastening has locking post (19) on the opposite side outer wall of regulating plate (18), locking post (19) slide in the adjustment tank of fixed block (16).
4. The electric power engineering cost construction levelness detection apparatus according to claim 1, characterized in that: a sliding groove is formed in the fixing column (11), a lifting column (12) is connected in the sliding groove of the fixing column (11) in a sliding mode, a thread groove is formed in the upper half portion of the fixing column (11), a locking ring (13) is connected to the thread groove of the upper half portion of the fixing column (11) through external threads, and the lifting column (12) is fixedly connected with the fixing column (11) through the locking ring (13).
5. The electric power engineering cost construction levelness detection apparatus according to claim 4, characterized in that: the top welded fastening of lift post (12) has the connecting plate, and the right half of connecting plate is rotated through the bearing and is connected with rolling dish (14), the winding has the suspension wire in rolling dish (14), and the bottom of suspension wire is fixed with line weight (15).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020519606.7U CN211601945U (en) | 2020-04-10 | 2020-04-10 | Electric power engineering cost construction levelness check out test set |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020519606.7U CN211601945U (en) | 2020-04-10 | 2020-04-10 | Electric power engineering cost construction levelness check out test set |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211601945U true CN211601945U (en) | 2020-09-29 |
Family
ID=72583548
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020519606.7U Expired - Fee Related CN211601945U (en) | 2020-04-10 | 2020-04-10 | Electric power engineering cost construction levelness check out test set |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211601945U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117782028A (en) * | 2023-12-27 | 2024-03-29 | 柴林水 | A method for detecting project cost levelness |
-
2020
- 2020-04-10 CN CN202020519606.7U patent/CN211601945U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117782028A (en) * | 2023-12-27 | 2024-03-29 | 柴林水 | A method for detecting project cost levelness |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211601945U (en) | Electric power engineering cost construction levelness check out test set | |
| CN107130793B (en) | Die carrier system with accurate vertical elevation and horizontal positioning functions | |
| CN219426796U (en) | Intelligent mechanical arm system for assisting in adjusting verticality of vertical prefabricated part | |
| CN115110528B (en) | Real-time monitoring system and method for verticality adjustment of pile foundation steel upright post | |
| CN215003504U (en) | Foundation pit displacement detection device | |
| CN212776362U (en) | But total powerstation for elevator of quick leveling | |
| CN113915478A (en) | High-precision vertical moving platform device | |
| CN111059422A (en) | VR locator with quick locate function | |
| CN221275083U (en) | Installation and fixation of hydropower station cantilever crane device | |
| CN217632260U (en) | Positioning device for drilling engineering pile | |
| CN217874923U (en) | Deformation monitoring device for high formwork construction engineering construction of building construction engineering | |
| CN214122416U (en) | Test bench clamping tool for outer rotor motor | |
| CN214330113U (en) | Inspection and maintenance platform for adjusting ring polishing equipment | |
| CN211299112U (en) | Engineering construction drawing is drawn and is used positioner | |
| CN219189313U (en) | Gantry machining center sliding seat convenient to adjust | |
| CN212203836U (en) | Engineering detection tripod | |
| CN220104696U (en) | Clamp for spring stretch-proofing detection | |
| CN216809959U (en) | Based on ground detection device for efficient hydraulic engineering | |
| CN222779497U (en) | Adjusting device for portal frame track installation | |
| CN220122535U (en) | Cable installation regulating frame | |
| CN220490043U (en) | Measurement control point capable of early warning offset | |
| CN217384102U (en) | Adjustable glass straightness detection device | |
| CN213900566U (en) | Support that building engineering quality measurement was adjusted with convenience | |
| CN218412980U (en) | Adapter locking device applied to optical detector | |
| CN113233311B (en) | Novel machine tool assembling and hoisting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200929 |