CN211596449U - Bridge construction strutting arrangement - Google Patents
Bridge construction strutting arrangement Download PDFInfo
- Publication number
- CN211596449U CN211596449U CN202020096612.6U CN202020096612U CN211596449U CN 211596449 U CN211596449 U CN 211596449U CN 202020096612 U CN202020096612 U CN 202020096612U CN 211596449 U CN211596449 U CN 211596449U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- bridge construction
- base
- stand
- push rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 230000005611 electricity Effects 0.000 claims abstract description 9
- 230000000694 effects Effects 0.000 claims description 10
- 238000000034 method Methods 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Golf Clubs (AREA)
Abstract
The utility model discloses a bridge construction supporting device, which comprises a base, wherein the bottom of the base is provided with four moving parts which are uniformly distributed, the upper surface of the base is provided with a supporting part, the supporting part comprises a sleeve, a first electric push rod and a stand column, the stand column is movably inserted into the sleeve, the fixed end of the first electric push rod is fixed inside the stand column, and the bottom of the first electric push rod is fixedly connected with the upper surface of the base; the top of stand is equipped with the detachable roof, and the upper surface of roof is equipped with evenly distributed's spin, and telescopic side is equipped with the switch block, and first electric putter's input is connected with the output electricity of switch block, and the input of switch block is connected with external power source's output electricity. This bridge construction strutting arrangement, simple structure, it is with low costs, can remove, can support the different positions of bridge, can adjust the device height moreover, adaptability is good, easy operation, convenient to use.
Description
Technical Field
The utility model relates to a construction equipment technical field specifically is a bridge construction strutting arrangement.
Background
The bridge generally refers to a structure which is erected on rivers, lakes and seas and enables vehicles, pedestrians and the like to smoothly pass through. In order to adapt to the modern high-speed developed traffic industry, bridges are also extended to be constructed to span mountain stream, unfavorable geology or meet other traffic needs, so that the buildings are convenient to pass.
The existing supporting mode is that a supporting frame is usually built to support or a large machine is used to support, but the cost is high when the large machine is used to support, when the supporting frame is built to support, the supporting frame can only be positioned and supported, the supporting frame cannot be moved, the height adjustment is inconvenient, and the adaptability is poor.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome current defect, provide a bridge construction strutting arrangement, simple structure, it is with low costs, can remove, can support the different positions of bridge, can highly adjust the device moreover, adaptability is good, easy operation, and convenient to use can effectively solve the problem in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a bridge construction strutting arrangement, includes the base, the bottom of base is equipped with four evenly distributed's moving member, the upper surface of base is equipped with support piece, support piece includes sleeve, first electric putter and stand, the stand activity alternates inside the sleeve, and first electric putter's stiff end is fixed inside the stand, first electric putter's bottom and the last fixed surface of base are connected.
The top of stand is equipped with the detachable roof, the upper surface of roof is equipped with evenly distributed's spin, telescopic side is equipped with the switch block, and first electric putter's input is connected with the output electricity of switch block, and the input of switch block is connected with external power source's output electricity.
As a preferred technical scheme of the utility model, the moving member includes pivot, bearing and rail wheel, the side upper end of pivot is passed through the bearing and is connected with the base rotation, and the bottom of pivot is passed through mount pad and rail wheel fixed connection.
As a preferred technical scheme of the utility model, the side of stand is equipped with vertical evenly distributed's draw-in groove, telescopic side is equipped with fixed sleeve, fixed sleeve's inside is equipped with auxiliary positioning spare.
As a preferred technical scheme of the utility model, supplementary setting element is including fixing the bracing piece at the fixed sleeve is inside, the side of bracing piece is equipped with second electric putter, second electric putter's flexible end is equipped with the mounting panel, the side of mounting panel is equipped with the latch with draw-in groove activity joint, and second electric putter's input is connected with the output electricity of switch block.
As an optimal technical scheme of the utility model, the bottom of roof is equipped with the lantern ring, lantern ring activity joint is in the side upper end of stand.
As an optimized technical scheme of the utility model, the height of stand is less than telescopic height.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses the bridge construction strutting arrangement of example can drive whole strutting arrangement through the base that has the rail wheel and remove, and the pivot can drive the rail wheel simultaneously and rotate, makes things convenient for the multi-angle of rail wheel to rotate, improves the suitability of whole device.
2. The utility model discloses bridge construction strutting arrangement of example, first electric putter can drive the stand and remove along the sleeve, and the stand can drive the roof and remove to highly supporting the roof, the roof can support the bridge.
3. The utility model discloses bridge construction strutting arrangement of example, second electric putter can drive the mounting panel and remove, and the mounting panel can drive the draw-in groove of bayonet catch to play the effect of location to the stand, can reduce the stand simultaneously to first electric putter's pressure, improve device's life.
4. The utility model discloses bridge construction strutting arrangement of example, simple structure, it is with low costs, can remove, can support the different positions of bridge, can highly adjust the device moreover, adaptability is good, easy operation, convenient to use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic bottom view of the structure of FIG. 1;
fig. 3 is a schematic sectional structure view of fig. 1.
In the figure: the device comprises a base 1, a moving part 2, a rotating shaft 21, a bearing 22, a rail wheel 23, a supporting part 3, a sleeve 31, a first electric push rod 32, a column 33, a clamping groove 4, a fixing sleeve 5, an auxiliary positioning part 6, a supporting rod 61, a second electric push rod 62, a mounting plate 63, a clamping tooth 64, a top plate 7, a lantern ring 71, a rolling ball 72 and a switch group 8.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a bridge construction strutting arrangement, including base 1, base 1's bottom is equipped with four evenly distributed's moving member 2, moving member 2 includes pivot 21, bearing 22 and rail wheel 23, the side upper end of pivot 21 is passed through bearing 22 and is rotated with base 1 and be connected, and the bottom of pivot 21 passes through mount pad and rail wheel 23 fixed connection, can drive whole strutting arrangement through base 1 that has rail wheel 23 and remove, pivot 21 can drive rail wheel 23 simultaneously and rotate, make things convenient for the multi-angle of rail wheel 23 to rotate, improve the suitability of whole device.
The upper surface of base 1 is equipped with support piece 3, support piece 3 includes sleeve 31, first electric putter 32 and stand 33, the activity of stand 33 alternates inside sleeve 31, and the stiff end of first electric putter 32 is fixed inside stand 33, the bottom of first electric putter 32 and base 1's last fixed surface are connected, stand 33 highly is less than sleeve 31's height, first electric putter 32 can drive stand 33 and remove along sleeve 31 to highly adjusting whole device.
The side of the upright column 33 is provided with clamping grooves 4 which are uniformly distributed in the longitudinal direction, the side of the sleeve 31 is provided with a fixed sleeve 5, and an auxiliary positioning piece 6 is arranged inside the fixed sleeve 5.
Auxiliary positioning piece 6 is including fixing at the inside bracing piece 61 of fixed sleeve 5, the side of bracing piece 61 is equipped with second electric putter 62, the flexible end of second electric putter 62 is equipped with mounting panel 63, the side of mounting panel 63 is equipped with the latch 64 with 4 activity joints of draw-in groove, and second electric putter 62's input is connected with the output electricity of switch group 8, second electric putter 62 can drive mounting panel 63 and remove, mounting panel 63 can drive latch 64 joint to draw-in groove 4, thereby play the effect of location to stand 33, can reduce the pressure of stand 33 to first electric putter 32 simultaneously, the life of high-speed device.
The top of stand 33 is equipped with detachable roof 7, first electric putter 32 can drive stand 33 and remove along sleeve 31, stand 33 can drive roof 7 and remove, thereby highly supporting roof 7, roof 7 can support the bridge, the bottom of roof 7 is equipped with lantern ring 71, lantern ring 71 activity joint is in the side upper end of stand 33, the upper surface of roof 7 is equipped with evenly distributed's spin 72, spin 72 inlays in the recess on roof 7 upper surface, concrete mounting method is the same with the mounting method of ball on the present universal ball conveyer, spin 72 can reduce the friction between roof 7 and the bridge, be convenient for the removal of device.
The side of the sleeve 31 is provided with a switch group 8, and the input end of the first electric push rod 32 is electrically connected with the output end of the switch group 8, and the input end of the switch group 8 is electrically connected with the output end of the external power supply.
The switch group 8 is provided with control buttons corresponding to the first electric push rod 32 and the second electric push rod 62, and the first electric push rod 32 and the second electric push rod 62 are electrical components commonly used in the prior art.
Whole bridge construction strutting arrangement, simple structure, it is with low costs, can remove, can support the different positions of bridge, can adjust the device height moreover, adaptability is good, easy operation, convenient to use.
When in use:
an external rail is paved in advance, and the rail wheels 23 can move on the rail;
placing the device on a track and clamping the track wheels 23 with the track;
the first electric push rod 32 is controlled to move by the switch group 8, the first electric push rod 32 drives the upright post 33 to move upwards along the sleeve 31, the sleeve 31 drives the top plate 7 to move upwards, and the rolling ball 72 is in contact with the bottom of the bridge;
the switch group 8 is used for controlling the second electric push rod 62 to work, the second electric push rod 62 pushes the mounting plate 63 to move, and the mounting plate 63 drives the latch 64 to move into the clamping groove 4, so that the upright column 33 is positioned;
when the device needs to be moved, the external trolley pushing device moves on the external track, so that different positions of the bridge are supported.
The utility model discloses simple structure, it is with low costs, can remove, can support the different positions of bridge, can highly adjust the device moreover, adaptability is good, easy operation, convenient to use.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a bridge construction strutting arrangement, includes base (1), its characterized in that: the bottom of the base (1) is provided with four moving parts (2) which are uniformly distributed, the upper surface of the base (1) is provided with a supporting part (3), the supporting part (3) comprises a sleeve (31), a first electric push rod (32) and an upright post (33), the upright post (33) is movably inserted into the sleeve (31), the fixed end of the first electric push rod (32) is fixed inside the upright post (33), and the bottom of the first electric push rod (32) is fixedly connected with the upper surface of the base (1);
the top of stand (33) is equipped with detachable roof (7), the upper surface of roof (7) is equipped with evenly distributed's spin (72), the side of sleeve (31) is equipped with switch block (8), and the input of first electric putter (32) is connected with the output electricity of switch block (8), and the input of switch block (8) is connected with external power source's output electricity.
2. The bridge construction support device of claim 1, wherein: the moving piece (2) comprises a rotating shaft (21), a bearing (22) and a rail wheel (23), the upper end of the side face of the rotating shaft (21) is rotatably connected with the base (1) through the bearing (22), and the bottom of the rotating shaft (21) is fixedly connected with the rail wheel (23) through a mounting seat.
3. The bridge construction support device of claim 1, wherein: the side of stand (33) is equipped with vertical evenly distributed's draw-in groove (4), the side of sleeve (31) is equipped with fixed sleeve (5), the inside of fixed sleeve (5) is equipped with auxiliary positioning piece (6).
4. The bridge construction support device of claim 3, wherein: auxiliary positioning spare (6) are including fixing bracing piece (61) inside fixed sleeve (5), the side of bracing piece (61) is equipped with second electric putter (62), the flexible end of second electric putter (62) is equipped with mounting panel (63), the side of mounting panel (63) is equipped with latch (64) with draw-in groove (4) activity joint, and the input of second electric putter (62) is connected with the output electricity of switch group (8).
5. The bridge construction support device of claim 1, wherein: the bottom of roof (7) is equipped with lantern ring (71), lantern ring (71) activity joint is in the side upper end of stand (33).
6. The bridge construction support device of claim 1, wherein: the height of the upright post (33) is less than the height of the sleeve (31).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020096612.6U CN211596449U (en) | 2020-01-16 | 2020-01-16 | Bridge construction strutting arrangement |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020096612.6U CN211596449U (en) | 2020-01-16 | 2020-01-16 | Bridge construction strutting arrangement |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211596449U true CN211596449U (en) | 2020-09-29 |
Family
ID=72578435
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020096612.6U Expired - Fee Related CN211596449U (en) | 2020-01-16 | 2020-01-16 | Bridge construction strutting arrangement |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211596449U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113210991A (en) * | 2021-05-13 | 2021-08-06 | 中国一冶集团有限公司 | Device and method for quickly positioning and mounting bridge stand column and supporting arm |
| CN114561877A (en) * | 2022-04-08 | 2022-05-31 | 周敬库 | Bridge supports adjusting device for bridge construction |
-
2020
- 2020-01-16 CN CN202020096612.6U patent/CN211596449U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113210991A (en) * | 2021-05-13 | 2021-08-06 | 中国一冶集团有限公司 | Device and method for quickly positioning and mounting bridge stand column and supporting arm |
| CN114561877A (en) * | 2022-04-08 | 2022-05-31 | 周敬库 | Bridge supports adjusting device for bridge construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109763767B (en) | A drilling machine for construction in subway tunnels | |
| CN210232081U (en) | Intelligent welding equipment of street lamp pole base | |
| CN213869913U (en) | Protection device for coal mining of coal mine | |
| CN210053053U (en) | Mobile power station | |
| CN217991417U (en) | Bridge U floor welding machine | |
| CN210621469U (en) | Support frame for bridge building with stabilizing function | |
| CN215107711U (en) | Lifting stage in water | |
| CN213626815U (en) | Support arrangement is used in construction of green building engineering | |
| CN213093841U (en) | Convenient municipal works who adjusts uses line support | |
| CN213672009U (en) | Drilling machine is used in processing of high-speed railway bumper shock absorber part nodular iron direction lid | |
| CN220593098U (en) | Special frock of horizontal adjustment of generator part processing | |
| CN220698671U (en) | Welding mechanism for reinforcing mesh production | |
| CN216228282U (en) | Adjustable vertical lathe workstation in inclination | |
| CN222730369U (en) | A temporary support device for installing a steel structure bridge | |
| CN212744007U (en) | Tunnel engineering excavation construction table | |
| CN211974352U (en) | Building templates strutting arrangement | |
| CN212768181U (en) | Pump house track pusher | |
| CN220954502U (en) | A travelling bogie device for subway open cut station | |
| CN212527735U (en) | Precision installation on-rail mechanical arm device | |
| CN216474291U (en) | Travelling crane wiping line and track maintenance equipment | |
| CN222503736U (en) | An LED solar street light with easy-to-replace lamps | |
| CN216244030U (en) | Solar energy projecting lamp with adjustable light projection direction | |
| CN222255717U (en) | An installation machine for on-site main structure detection | |
| CN220462778U (en) | R-angle raised head positioning ladder frame convenient for welding trapezoid bridge robot | |
| CN218095148U (en) | Electric automation equipment installation device for building electrical engineering |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200929 |