CN211594517U - Electric power construction winding device - Google Patents
Electric power construction winding device Download PDFInfo
- Publication number
- CN211594517U CN211594517U CN201921919121.0U CN201921919121U CN211594517U CN 211594517 U CN211594517 U CN 211594517U CN 201921919121 U CN201921919121 U CN 201921919121U CN 211594517 U CN211594517 U CN 211594517U
- Authority
- CN
- China
- Prior art keywords
- wall
- plate
- block
- gear
- winding device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)
Abstract
本实用新型公开了一种电力施工绕线装置,包括支撑板,所述支撑板的底端固接有底板,所述支撑板的右侧中间前端安装有转动机构,所述支撑板的中间前端安装有调节机构,所述支撑板的左端上方固接有横板,所述横板的顶端安装有绕线机构。该电力施工绕线装置,电机输出轴带动螺纹杆转动,螺纹杆在第一竖块内左右移动,第一齿轮带动第二齿轮转动使转盘转动,顶板沿着转盘的轨迹滑动,竖杆左右摆动,使电线穿过通孔可以均匀的缠绕在线盘上,通孔跟随线盘始终在一个方向上移动,解决了现有的电力施工绕线装置在线盘上开设有卡槽,电线容易跑出卡槽,依然会使电线缠绕不均的问题。
The utility model discloses an electric construction winding device, which comprises a support plate, a bottom plate is fixedly connected to the bottom end of the support plate, a rotation mechanism is installed at the middle front end of the right side of the support plate, and the middle front end of the support plate is installed with a rotating mechanism. An adjustment mechanism is installed, a horizontal plate is fixed above the left end of the support plate, and a winding mechanism is installed on the top of the horizontal plate. In the electric construction winding device, the motor output shaft drives the threaded rod to rotate, the threaded rod moves left and right in the first vertical block, the first gear drives the second gear to rotate to make the turntable rotate, the top plate slides along the track of the turntable, and the vertical rod swings left and right , so that the wire can be evenly wound on the wire reel through the through hole, and the through hole always moves in one direction with the wire reel, which solves the problem that the existing electric construction winding device has a slot on the wire reel, and the wire is easy to run out of the card. Slots will still cause the problem of uneven winding of the wires.
Description
技术领域technical field
本实用新型涉及绕线装置技术领域,具体为一种电力施工绕线装置。The utility model relates to the technical field of winding devices, in particular to a winding device for electric construction.
背景技术Background technique
目前在电力施工过程中,放线架是经常使用到的一种装置,目前的电缆铺设是在电缆盘中间插入转轴,然后将转轴的两端搭在电缆放收线器上,施工人员通过转动电缆盘或拉动电缆头,使绕紧的电缆展开,放收线架有很多种例如,立式放绕线架、卧式放绕线架、轴式放绕线架和无轴式绕线架,但是现有的电力施工绕线装置在线盘上开设有卡槽,电线容易跑出卡槽,依然会使电线缠绕不均的问题。At present, in the process of electric power construction, the pay-off frame is a kind of device that is often used. The current cable laying is to insert the rotating shaft in the middle of the cable reel, and then put the two ends of the rotating shaft on the cable pay-off and take-up device. Cable reel or pull the cable head to unwind the tightly wound cable. There are many types of reeling racks, such as vertical reeling racks, horizontal reeling racks, shaft winding racks and shaftless winding racks However, the existing electric construction winding device is provided with a slot on the wire reel, and the wire is easy to run out of the slot, which still causes the problem of uneven winding of the wire.
实用新型内容Utility model content
本实用新型的目的在于提供一种电力施工绕线装置,以解决上述背景技术中提出的现有的电力施工绕线装置在线盘上开设有卡槽,电线容易跑出卡槽,依然会使电线缠绕不均的问题。The purpose of this utility model is to provide a kind of electric construction winding device, in order to solve the problem that the existing electric construction winding device proposed in the above-mentioned background technology is provided with a slot on the wire reel, the wire is easy to run out of the slot, and the electric wire is still made. The problem of uneven winding.
为实现上述目的,本实用新型提供如下技术方案:一种电力施工绕线装置,包括支撑板,所述支撑板的底端固接有底板,所述支撑板的右侧中间前端安装有转动机构,所述支撑板的中间前端安装有调节机构,所述支撑板的左端上方固接有横板,所述横板的顶端安装有绕线机构,所述支撑板的顶端左侧固接有第一竖块,所述支撑板的顶端右侧固接有第二竖块。In order to achieve the above purpose, the utility model provides the following technical solutions: an electric construction winding device, comprising a support plate, the bottom end of the support plate is fixed with a bottom plate, and a rotation mechanism is installed at the middle front end of the right side of the support plate , the middle front end of the support plate is installed with an adjustment mechanism, the left end of the support plate is fixed with a horizontal plate, the top of the horizontal plate is installed with a winding mechanism, and the top left side of the support plate is fixed with a first A vertical block, and a second vertical block is fixedly connected to the top right side of the support plate.
优选的,所述绕线机构包括电机、螺纹杆、线盘、横轴、第一齿轮、电线、滑块和滑板,所述电机的输出轴与螺纹杆的左端转动相连,所述螺纹杆的右侧外壁与第一竖块的中间内壁螺纹连接,所述螺纹杆的右端固接有线盘,所述线盘的右端中间固接有横轴,所述横轴的右侧外壁与第二竖块的中间内壁转动相连,所述横轴的左侧外壁套接有第一齿轮,所述线盘的右侧外壁与电线的外壁缠绕相连,所述电机的底端中间固接有滑块,所述滑块与滑板滑动卡接,所述滑板的底端固接在横板的顶端。Preferably, the winding mechanism includes a motor, a threaded rod, a wire reel, a horizontal shaft, a first gear, an electric wire, a slider and a sliding plate, and the output shaft of the motor is rotatably connected to the left end of the threaded rod. The right outer wall is threadedly connected to the middle inner wall of the first vertical block, the right end of the threaded rod is fixed with a wire reel, the middle of the right end of the wire reel is fixed with a horizontal shaft, and the right outer wall of the horizontal shaft is connected to the second vertical The middle inner wall of the block is rotatably connected, the left outer wall of the horizontal shaft is sleeved with a first gear, the right outer wall of the spool is wound and connected to the outer wall of the wire, and a slider is fixed in the middle of the bottom end of the motor. The sliding block is slidably clamped with the sliding plate, and the bottom end of the sliding plate is fixedly connected to the top end of the horizontal plate.
优选的,所述滑块与滑板构成滑动结构。Preferably, the slider and the slider form a sliding structure.
优选的,所述转动机构包括第二齿轮、转轴和转盘,所述第二齿轮的中间内壁通过转轴与支撑板的右侧中间前端转动相连,所述第二齿轮与第一齿轮啮合相连,所述转轴的前端外壁套接有转盘。Preferably, the rotating mechanism includes a second gear, a rotating shaft and a rotating plate, the middle inner wall of the second gear is rotatably connected to the middle front end of the right side of the support plate through the rotating shaft, and the second gear is meshed and connected with the first gear, so A turntable is sleeved on the outer wall of the front end of the rotating shaft.
优选的,所述调节机构包括竖杆、第一销轴、通孔、顶板、第一斜块、第二销轴、弹簧和第二斜块,所述竖杆的下方中间内壁通过第一销轴与支撑板的下方中间前端转动相连,所述竖杆的上方开设有通孔,所述通孔的外壁与电线的外壁相贴合,所述竖杆的下方右端固接有顶板,所述顶板的右侧外壁与转盘的左侧外壁相贴合,所述竖杆的下方设有第一斜块,所述第一斜块的左侧中间内壁通过第二销轴与竖杆的下方中间前端转动相连,所述第一斜块的右端与弹簧的左端相固接,所述弹簧的右端固接有第二斜块,所述第二斜块的右端固接在支撑板的右侧下方前端。Preferably, the adjustment mechanism includes a vertical rod, a first pin shaft, a through hole, a top plate, a first inclined block, a second pin shaft, a spring and a second inclined block, and the lower middle inner wall of the vertical rod passes through the first pin The shaft is rotatably connected to the lower middle front end of the support plate, a through hole is opened above the vertical rod, the outer wall of the through hole is fitted with the outer wall of the electric wire, the bottom right end of the vertical rod is fixed with a top plate, the The right outer wall of the top plate is attached to the left outer wall of the turntable, a first inclined block is arranged below the vertical rod, and the left middle inner wall of the first inclined block passes through the second pin shaft and the lower middle of the vertical rod. The front ends are connected in rotation, the right end of the first inclined block is fixed with the left end of the spring, the right end of the spring is fixed with a second inclined block, and the right end of the second inclined block is fixed under the right side of the support plate front end.
优选的,所述弹簧的弹性系数为1-100N\cm。Preferably, the spring coefficient of the spring is 1-100N\cm.
与现有技术相比,本实用新型的有益效果是:该电力施工绕线装置,通过电机、螺纹杆、线盘、第一齿轮、第二齿轮、转盘、竖杆、通孔、顶板和弹簧之间的配合,电机输出轴带动螺纹杆转动,螺纹杆在第一竖块内左右移动,第一齿轮带动第二齿轮转动使转盘转动,顶板沿着转盘的轨迹滑动,使竖杆左右摆动,竖杆使弹簧拉伸,且通过弹簧的弹性使竖杆复位,竖杆左右摆动,使电线穿过通孔可以均匀的缠绕在线盘上,通孔跟随线盘始终在一个方向上移动,解决了现有的电力施工绕线装置在线盘上开设有卡槽,电线容易跑出卡槽,依然会使电线缠绕不均的问题。Compared with the prior art, the beneficial effect of the utility model is: the electric construction winding device, through the motor, the threaded rod, the wire reel, the first gear, the second gear, the turntable, the vertical rod, the through hole, the top plate and the spring The output shaft of the motor drives the threaded rod to rotate, the threaded rod moves left and right in the first vertical block, the first gear drives the second gear to rotate to make the turntable rotate, the top plate slides along the track of the turntable, and the vertical rod swings left and right. The vertical rod stretches the spring, and the vertical rod is reset by the elasticity of the spring, and the vertical rod swings left and right, so that the wire can be evenly wound on the spool through the through hole, and the through hole always moves in one direction with the spool, which solves the problem. The existing electric construction winding device is provided with a slot on the wire reel, and the wire is easy to run out of the slot, which still causes the problem of uneven winding of the wire.
附图说明Description of drawings
图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;
图2为图1中竖杆、顶板和转盘的结构示意图;Fig. 2 is the structural representation of vertical rod, top plate and turntable in Fig. 1;
图3为图1中竖杆、通孔和电线的结构示意图;Fig. 3 is the structural representation of vertical rod, through hole and electric wire in Fig. 1;
图4为图1中滑块和滑板的结构示意图。FIG. 4 is a schematic structural diagram of the slider and the sliding plate in FIG. 1 .
图中:1、底板,2、支撑板,3、横板,4、绕线机构,401、电机,402、螺纹杆,403、线盘,404、横轴,405、第一齿轮,406、电线,407、滑块,408、滑板,5、转动机构,501、第二齿轮,502、转轴,503、转盘,6、调节机构,601、竖杆,602、第一销轴,603、通孔,604、顶板,605、第一斜块,606、第二销轴,607、弹簧,608、第二斜块,7、第一竖块,8、第二竖块。In the figure: 1. Bottom plate, 2. Supporting plate, 3. Horizontal plate, 4. Winding mechanism, 401, Motor, 402, Threaded rod, 403, Reel, 404, Horizontal shaft, 405, First gear, 406, Wire, 407, slider, 408, slide plate, 5, rotating mechanism, 501, second gear, 502, rotating shaft, 503, turntable, 6, adjusting mechanism, 601, vertical rod, 602, first pin, 603, communication Hole, 604, top plate, 605, first inclined block, 606, second pin, 607, spring, 608, second inclined block, 7, first vertical block, 8, second vertical block.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
请参阅图1-4,本实用新型提供一种技术方案:一种电力施工绕线装置,包括支撑板2,支撑板2的底端固接有底板1,底板1对支撑板2进行支撑,支撑板2的右侧中间前端安装有转动机构5,支撑板2的中间前端安装有调节机构6,支撑板2的左端上方固接有横板3,支撑板2对横板3进行支撑,横板3的顶端安装有绕线机构4,支撑板2的顶端左侧固接有第一竖块7,支撑板2的顶端右侧固接有第二竖块8,支撑板2对第一竖块7和第二竖块8进行支撑。1-4, the present utility model provides a technical solution: an electrical construction winding device, comprising a support plate 2, the bottom end of the support plate 2 is fixed with a bottom plate 1, and the bottom plate 1 supports the support plate 2,
绕线机构4包括电机401、螺纹杆402、线盘403、横轴404、第一齿轮405电线406、滑块407和滑板408,电机401的输出轴与螺纹杆402的左端转动相连,电机401的输出轴带动螺纹杆402转动,电机401的型号为250W减速电机,螺纹杆402的右侧外壁与第一竖块7的中间内壁螺纹连接,螺纹杆402在第一竖块7内左右移动,螺纹杆402的右端固接有线盘403,螺纹杆402带动线盘403转动,线盘403的右端中间固接有横轴404,横轴404的右侧外壁与第二竖块8的中间内壁转动相连,线盘403带动横轴404在第二竖块8内转动,且横轴404可以在第二竖块8内左右移动,横轴404的左侧外壁套接有第一齿轮405,横轴404带动第一齿轮405转动,线盘403的右侧外壁与电线406的外壁缠绕相连,线盘403转动将电线均匀缠在线盘403上,电机401的底端中间固接有滑块407,滑块407与滑板408滑动卡接,滑块407带动电机401在横板3上的滑板408上左右移动,滑板408的底端固接在横板3的顶端,横板3对滑板408进行支撑,滑块407与滑板408构成滑动结构,滑块407在滑板408上左右滑动。The winding mechanism 4 includes a
转动机构5包括第二齿轮501、转轴502和转盘503,第二齿轮501的中间内壁通过转轴502与支撑板2的右侧中间前端转动相连,第二齿轮501通过转轴502在支撑板2上转动,第二齿轮501与第一齿轮405啮合相连,通过第一齿轮405与第二齿轮501之间的啮合力带动第二齿轮501转动,转轴502的前端外壁套接有转盘503,转轴502带动转盘503转动。The
调节机构6包括竖杆601、第一销轴602、通孔603、顶板604、第一斜块605、第二销轴606、弹簧607和第二斜块608,竖杆601的下方中间内壁通过第一销轴602与支撑板2的下方中间前端转动相连,竖杆601通过第一销轴602在支撑板2上左右摆动,竖杆601的上方开设有通孔603,通孔603的外壁与电线406的外壁相贴合,竖杆601带动通孔603随线盘403左右移动将电线406均匀缠绕在线盘403上,竖杆601的下方右端固接有顶板604,竖杆601对顶板604进行支撑,顶板604的右侧外壁与转盘503的左侧外壁相贴合,转盘503转动使顶板604沿着转盘503的外壁滑动,竖杆601的下方设有第一斜块605,第一斜块605的左侧中间内壁通过第二销轴606与竖杆601的下方中间前端转动相连,第一斜块605通过第二销轴606在竖杆601上转动,第一斜块605的右端与弹簧607的左端相固接,竖杆601带动第一斜块605向左移动使弹簧607拉伸,弹簧607收缩则使竖杆601复位,弹簧607的右端固接有第二斜块608,第二斜块608对弹簧607进行支撑,第二斜块608的右端固接在支撑板2的右侧下方前端,支撑板2对第二斜块608进行固定,弹簧607的弹性系数为1-100N\cm。The
在使用该电力施工绕线装置时,首先接通电机401的外接电源,电机401开始工作,电机401的输出轴带动螺纹杆402在第一竖块7内左右移动,电机401通过滑块407在横板3上的滑板408上左右滑动,螺纹杆402带动线盘403转动,线盘403带动横轴404在第二竖块8内左右移动,横轴404转动带动第一齿轮405转动,通过第一齿轮405与第二齿轮501之间的啮合力带动第二齿轮501转动,第二齿轮501带动转轴502在支撑板2上转动,转轴502带动转盘503转动,转盘503转动使顶板604沿着转盘503的轨迹在转盘503上滑动,顶板604带动竖杆601通过第一销轴602在支撑板2上左右摆动,竖杆601向左摆动使弹簧607拉伸,且通过弹簧607的弹性使竖杆复位,竖杆601左右摆动,使电线406穿过通孔603可以均匀的缠绕在线盘403上,通孔603跟随线盘403始终在一个方向上移动。When using the electric construction winding device, the external power supply of the
在本实用新型的描述中,需要理解的是,术语“同轴”、“底部”、“一端”、“顶部”、“中部”、“另一端”、“上”、“一侧”、“顶部”、“内”、“前部”、“中央”、“两端”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "the other end", "upper", "one side", " The orientation or positional relationship indicated by "top", "inside", "front", "center", "both ends", etc. is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention and simplifying the description , rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be construed as a limitation on the present invention.
在本实用新型中,除非另有明确的规定和限定,术语“安装”、“设置”、“连接”、“固定”、“旋接”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定,对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In the present utility model, unless otherwise expressly specified and limited, terms such as "installation", "arrangement", "connection", "fixation", "swivel connection" should be understood in a broad sense, for example, it may be a fixed connection, It can also be detachable connection or integrated; it can be mechanical connection or electrical connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal communication of two elements or the interaction of two elements Unless otherwise clearly defined, those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention according to specific situations.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921919121.0U CN211594517U (en) | 2019-11-08 | 2019-11-08 | Electric power construction winding device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921919121.0U CN211594517U (en) | 2019-11-08 | 2019-11-08 | Electric power construction winding device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211594517U true CN211594517U (en) | 2020-09-29 |
Family
ID=72587393
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921919121.0U Active CN211594517U (en) | 2019-11-08 | 2019-11-08 | Electric power construction winding device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211594517U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112850327A (en) * | 2021-01-22 | 2021-05-28 | 曹智泓 | Fixed amplitude bearing type continuous paying-off mechanism |
| CN113264413A (en) * | 2021-05-07 | 2021-08-17 | 承德石油高等专科学校 | Adjustable ultrahigh molecular weight polyethylene fiber unwinder with traction guide mechanism |
| CN114157110A (en) * | 2021-12-14 | 2022-03-08 | 佛山市顺德区乐普达电机有限公司 | Full-automatic winding structure is used in food processing motor production |
| CN115714038A (en) * | 2022-10-09 | 2023-02-24 | 三元科技(深圳)有限公司 | High-toughness medical cable applied to endoscope |
| CN116553288A (en) * | 2023-05-04 | 2023-08-08 | 陈丽侠 | A winding equalization device for electric power engineering |
-
2019
- 2019-11-08 CN CN201921919121.0U patent/CN211594517U/en active Active
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112850327A (en) * | 2021-01-22 | 2021-05-28 | 曹智泓 | Fixed amplitude bearing type continuous paying-off mechanism |
| CN113264413A (en) * | 2021-05-07 | 2021-08-17 | 承德石油高等专科学校 | Adjustable ultrahigh molecular weight polyethylene fiber unwinder with traction guide mechanism |
| CN113264413B (en) * | 2021-05-07 | 2024-03-12 | 承德石油高等专科学校 | An adjustable ultra-high molecular weight polyethylene fiber unwinding machine with a traction guide mechanism |
| CN114157110A (en) * | 2021-12-14 | 2022-03-08 | 佛山市顺德区乐普达电机有限公司 | Full-automatic winding structure is used in food processing motor production |
| CN114157110B (en) * | 2021-12-14 | 2022-09-02 | 佛山市顺德区乐普达电机有限公司 | Full-automatic winding structure is used in food processing motor production |
| CN115714038A (en) * | 2022-10-09 | 2023-02-24 | 三元科技(深圳)有限公司 | High-toughness medical cable applied to endoscope |
| CN116553288A (en) * | 2023-05-04 | 2023-08-08 | 陈丽侠 | A winding equalization device for electric power engineering |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211594517U (en) | Electric power construction winding device | |
| CN101651232B (en) | Tape sticking device | |
| CN111302158A (en) | Adjustable winding and unwinding device for electronic equipment cable | |
| CN112027796A (en) | Winding device for electric power construction | |
| CN201178287Y (en) | Cable reel unit for mains supply in mobile systems | |
| CN208521705U (en) | A kind of winding machine transmitting device | |
| CN214779651U (en) | An automatic winding device for producing cables | |
| CN201478400U (en) | Gluing device | |
| CN211110327U (en) | Computer hardware data connection line coiling mechanism | |
| CN219321110U (en) | A cable production wrapping machine | |
| CN109353884A (en) | An automatic cable arrangement | |
| CN108545550A (en) | Anti-winding optical cable winding device | |
| CN213802256U (en) | A special pay-off machine for indoor optical cable | |
| CN116354172A (en) | An electric cable winding device | |
| CN211310401U (en) | Automatic wire arranging device suitable for cable production | |
| CN116281449A (en) | A communication cable retractable device and its laying length measurement method | |
| CN211393344U (en) | Cable fast winding equipment for power engineering | |
| CN211470318U (en) | A kind of cable winding device for communication | |
| CN208086988U (en) | Cable winding device | |
| CN208440087U (en) | A kind of wind for the communications cable | |
| CN219823223U (en) | Winding and unwinding mechanism and automatic paying-off device | |
| CN219525928U (en) | Power distribution cable recovery device | |
| CN219044771U (en) | Cable end fixing device | |
| CN218231304U (en) | Cutting and winding equipment for flexible strip cable | |
| CN216512209U (en) | Automatic well cable winding and unwinding device for power engineering construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |
