CN211589058U - A frock clamp for steel construction production - Google Patents

A frock clamp for steel construction production Download PDF

Info

Publication number
CN211589058U
CN211589058U CN201922244280.1U CN201922244280U CN211589058U CN 211589058 U CN211589058 U CN 211589058U CN 201922244280 U CN201922244280 U CN 201922244280U CN 211589058 U CN211589058 U CN 211589058U
Authority
CN
China
Prior art keywords
plate
fixed
lead screw
steel structure
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922244280.1U
Other languages
Chinese (zh)
Inventor
马林军
杨海西
李方杰
韩春霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Jingye Steel Structure Technology Corp ltd
Original Assignee
Hebei Jingye Steel Structure Technology Corp ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Jingye Steel Structure Technology Corp ltd filed Critical Hebei Jingye Steel Structure Technology Corp ltd
Priority to CN201922244280.1U priority Critical patent/CN211589058U/en
Application granted granted Critical
Publication of CN211589058U publication Critical patent/CN211589058U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Gripping Jigs, Holding Jigs, And Positioning Jigs (AREA)
  • Clamps And Clips (AREA)

Abstract

The utility model relates to the technical field of steel structure production and processing, and discloses a tool clamp for steel structure production, which solves the problem that the edge of a plate can be bent when the plate is welded, two plates are difficult to splice together and are difficult to weld with another plate, and comprises a supporting seat, wherein two parallel supporting bars are slidably arranged on the upper surface of the supporting seat, supporting plates are respectively arranged on the outer sides of the two supporting bars, the two supporting plates are fixed on the supporting seat, a transverse plate is fixed between the top ends of the two supporting plates, a connecting block is slidably arranged on the transverse plate, an extending plate is fixed on one side of the connecting block, a lead screw is vertically arranged on the extending plate in a penetrating manner, the lead screw is in threaded connection with the extending plate, a pressing plate is rotatably arranged at the bottom end of the lead screw, the bending part of the plate is pressed by the, thereby facilitating the welding operation thereof.

Description

A frock clamp for steel construction production
Technical Field
The utility model relates to a steel construction production and processing technology field especially relates to a frock clamp for steel construction production.
Background
The steel structure has the advantages of high strength, light dead weight and good overall rigidity, so that the construction of a large-span, ultrahigh and extra-heavy building is particularly suitable, the material uniformity and isotropy are good, the building belongs to an ideal elastomer, the basic assumption of general engineering mechanics is met, the material plasticity and toughness are good, large deformation can be realized, and the dynamic load can be well borne.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the panel that exists among the prior art when the welding, the edge of panel can be crooked, and two panels are difficult to splice together, make it be difficult to carry out welded shortcoming with another panel, and the frock clamp who is used for steel construction production who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a frock clamp for steel construction production, includes the supporting seat, the last surface sliding of supporting seat installs two support bars that are parallel to each other, two the outside of support bar all is provided with the backup pad, two the backup pad is all fixed on the supporting seat, and is fixed with the diaphragm between two backup pad tops, slidable mounting has the connecting block on the diaphragm, one side of connecting block is fixed with the extension board, the vertical lead screw that runs through on the extension board, the lead screw with extension board threaded connection, and the bottom of lead screw is rotated and is installed the clamp plate.
Preferably, the upper surface of the supporting seat is provided with two parallel sliding grooves, and two ends of the bottom of the supporting bar are respectively fixed with a sliding block which is inserted into the sliding grooves.
Preferably, the vertical section of the sliding block is T-shaped, and the sliding block is matched with the sliding groove.
Preferably, a through groove is formed in the connecting block, the transverse plate is inserted into the through groove, and the through groove is matched with the transverse plate.
Preferably, a rotating rod is transversely fixed at the top end of the screw rod.
Preferably, the extension plate is provided with a threaded hole, the screw rod is inserted into the threaded hole, and the threaded hole is matched with the screw rod.
The utility model has the advantages that:
through placing panel on two spinal branch stay, make one end laminating to make the bend be located the below of clamp plate, through rotating the lead screw, drive the clamp plate by the lead screw and move down, press the flexion of panel through the clamp plate, make crooked panel flush with another panel surface, thereby be convenient for weld operation to it.
Drawings
Fig. 1 is a schematic structural view of a tooling fixture for steel structure production according to the present invention;
fig. 2 is the utility model provides a structural schematic of lead screw installation in a frock clamp for steel construction production.
Fig. 3 is the utility model provides a structural schematic of support bar in the frock clamp for steel construction production.
In the figure: the device comprises a supporting seat 1, a sliding groove 2, a supporting strip 3, a sliding block 4, a supporting plate 5, a transverse plate 6, a connecting block 7, an extending plate 8, a screw rod 9, a rotating rod 10 and a pressing plate 11.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a tooling clamp for steel structure production comprises a support seat 1, two parallel support bars 3 are slidably mounted on the upper surface of the support seat 1, two parallel chutes 2 are formed in the upper surface of the support seat 1, slide blocks 4 are fixed at two ends of the bottom of each support bar 3, the slide blocks 4 are inserted in the chutes 2, the vertical cross sections of the slide blocks 4 are T-shaped, the slide blocks 4 are matched with the chutes 2, support plates 5 are arranged on the outer sides of the two support bars 3, the two support plates 5 are fixed on the support seat 1, a transverse plate 6 is fixed between the top ends of the two support plates 5 through bolts, a connecting block 7 is slidably mounted on the transverse plate 6, a through groove is formed in the connecting block 7, the transverse plate 6 is inserted in the through groove, the through groove is matched with the transverse plate 6, an extension plate 8 is welded and fixed on one side of, lead screw 9 and 8 threaded connection of extension board, set up threaded hole on the extension board 8, lead screw 9 is inserted and is established in the threaded hole, threaded hole and lead screw 9 looks adaptation, and the horizontal welded fastening in top of lead screw 9 has dwang 10, is convenient for rotate lead screw 9, and the bottom of lead screw 9 is rotated and is installed clamp plate 11, and clamp plate 11 passes through the bearing and rotates and install on the lead screw 9.
In this embodiment, remove support bar 3, make support bar 3 remove in spout 2, adjust the distance between two support bars 3, make its adaptation weld the width of panel, place two blocks of panels on two support bars 3, make the one end laminating, remove connecting block 7, drive clamp plate 11 and remove, make clamp plate 11 be located the top of bend, through rotatory dwang 10, make lead screw 9 rotate, drive clamp plate 11 by lead screw 9 and move down, press the bend of panel through clamp plate 11, make crooked panel flush with another panel surface, thereby be convenient for weld the operation to it.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a frock clamp for steel construction production, includes supporting seat (1), its characterized in that, the last surface sliding of supporting seat (1) installs two support bars (3) that are parallel to each other, two the outside of support bar (3) all is provided with backup pad (5), two backup pad (5) are all fixed on supporting seat (1), and are fixed with diaphragm (6) between two backup pad (5) tops, slidable mounting has connecting block (7) on diaphragm (6), one side of connecting block (7) is fixed with extension board (8), the vertical lead screw (9) that run through is provided with on extension board (8), lead screw (9) with extension board (8) threaded connection, and the bottom of lead screw (9) is rotated and is installed clamp plate (11).
2. A tooling clamp for steel structure production according to claim 1, wherein two parallel sliding grooves (2) are formed in the upper surface of the support base (1), sliding blocks (4) are fixed at both ends of the bottom of the support bar (3), and the sliding blocks (4) are inserted into the sliding grooves (2).
3. A tool clamp for steel structure production according to claim 2, wherein the vertical section of the sliding block (4) is T-shaped, and the sliding block (4) is matched with the sliding groove (2).
4. The tooling clamp for steel structure production according to claim 1, wherein a through groove is formed in the connecting block (7), the transverse plate (6) is inserted into the through groove, and the through groove is matched with the transverse plate (6).
5. A tooling clamp for steel structure production according to claim 4, characterized in that the top end of the screw rod (9) is transversely fixed with a rotating rod (10).
6. A tool clamp for steel structure production according to claim 1, wherein the extension plate (8) is provided with a threaded hole, the screw rod (9) is inserted into the threaded hole, and the threaded hole is matched with the screw rod (9).
CN201922244280.1U 2019-12-11 2019-12-11 A frock clamp for steel construction production Active CN211589058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922244280.1U CN211589058U (en) 2019-12-11 2019-12-11 A frock clamp for steel construction production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922244280.1U CN211589058U (en) 2019-12-11 2019-12-11 A frock clamp for steel construction production

Publications (1)

Publication Number Publication Date
CN211589058U true CN211589058U (en) 2020-09-29

Family

ID=72592480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922244280.1U Active CN211589058U (en) 2019-12-11 2019-12-11 A frock clamp for steel construction production

Country Status (1)

Country Link
CN (1) CN211589058U (en)

Similar Documents

Publication Publication Date Title
CN203184374U (en) End plate bending tool
CN201494984U (en) Braced frame for elevator car
CN209748462U (en) Various steel tile roof photovoltaic power plant mounting structure
CN211589058U (en) A frock clamp for steel construction production
CN202741500U (en) Steel plate bending device for processing steel ladder tread
CN201713199U (en) Insulation structure for inner protection wall on escalator or moving sidewalk
CN213888888U (en) A frock clamp for steel construction production
CN205062578U (en) High strength track basis of construction degree of difficulty can effectively reduce
CN201620471U (en) C-shaped purline support structure
CN210917759U (en) Construction locking device for building steel structure
CN210208271U (en) Stamping equipment for processing metal air pipe
CN106968373B (en) Glass fixture for mounting ultrahigh-sitting type full-glass curtain wall and mounting method
CN112865674A (en) Photovoltaic bracket system with V-shaped supports for inclined beam and foundation
CN207813124U (en) A kind of improvement of stage lifting device lifting support
CN210622285U (en) Scaffold frame that facade was reformed transform and is used even wall device
CN210713875U (en) Tool for improving installation quality of hyperboloid special-shaped curtain wall
CN201395905Y (en) Roll table used for conveying profiled steel sheet on roof
CN212704127U (en) Steel bar bending device for machining
CN2370993Y (en) Multifunctional mobile hydraulic bed
CN2869173Y (en) Bearing plate
CN216324367U (en) Bending equipment for steel structure production
CN219411272U (en) Adjustable three-hole connecting piece convenient to install and replace
CN110681727A (en) Floor support plate correcting device and using method thereof
CN220523469U (en) Installing support for pipeline
CN216911633U (en) Steel bending device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant