CN211574595U - Operation progress monitoring structure for building engineering - Google Patents
Operation progress monitoring structure for building engineering Download PDFInfo
- Publication number
- CN211574595U CN211574595U CN202020071890.6U CN202020071890U CN211574595U CN 211574595 U CN211574595 U CN 211574595U CN 202020071890 U CN202020071890 U CN 202020071890U CN 211574595 U CN211574595 U CN 211574595U
- Authority
- CN
- China
- Prior art keywords
- monitoring head
- monitoring
- head
- construction
- rotating seat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 132
- 238000010276 construction Methods 0.000 claims abstract description 54
- 230000001681 protective effect Effects 0.000 claims abstract description 20
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 6
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 6
- 241001330002 Bambuseae Species 0.000 claims description 6
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 6
- 239000011425 bamboo Substances 0.000 claims description 6
- 230000005484 gravity Effects 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 4
- 239000000428 dust Substances 0.000 abstract description 2
- 238000001125 extrusion Methods 0.000 abstract 1
- 238000012806 monitoring device Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a construction engineering service industry progress monitoring structure, which comprises a monitoring head protective cylinder, wherein the bottom end of the monitoring head protective cylinder is provided with a protective cylinder rotating seat, a monitoring head placing chamber is arranged inside the monitoring head protective cylinder, the bottom end of the protective cylinder rotating seat is clamped with an equipment fixing chassis, one side of the protective cylinder rotating seat is fixed with a rotating seat fixing bolt, the top end of the monitoring head protective cylinder is provided with a monitoring head fixing frame, the construction monitoring head of the utility model is arranged and fixed above the monitoring head protective cylinder, the monitoring head protective cylinder can not only adjust the monitoring direction of the construction monitoring head, but also can fold and unfold the construction monitoring head, a dustproof folding cap arranged at the top end of the monitoring head protective cylinder can not only prevent dust, but also play a protection role when the construction monitoring head is folded and unfolded and folded, and avoid the extrusion collision of the construction monitoring head in the carrying process, the construction monitoring head is more economical, and the service life of the construction monitoring head is longer.
Description
Technical Field
The utility model belongs to a construction progress monitoring device technical field, concretely relates to building engineering is as industry progress monitoring structure.
Background
In a construction site, in order to complete a project on time and prevent burglary, monitoring devices are generally arranged around the construction site to monitor the degree of the project and whether the project operation is standard or not.
However, some unreasonable factors still exist in the process of monitoring the project progress of the existing work progress monitoring structure for the building project, and when the existing work progress monitoring structure for the building project is used: because the engineering completion back, the construction site need follow the construction personnel and shift as far as possible, and monitoring device is often because the protection is improper following the in-process that the construction personnel shifted, leads to supervisory equipment to damage, influences supervisory equipment's normal use, and is economic inadequately, and the practicality is relatively poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an operation progress control structure for building engineering to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: an operation progress monitoring structure for construction engineering comprises a monitoring head protection barrel, wherein a protection barrel rotating seat is arranged at the bottom end of the monitoring head protection barrel, a monitoring head placing chamber is arranged in the monitoring head protection barrel, an equipment fixing chassis is clamped at the bottom end of the protection barrel rotating seat, a rotating seat fixing bolt is fixed at one side of the protection barrel rotating seat, a monitoring head fixing frame is arranged at the top end of the monitoring head protection barrel, dustproof folding caps are clamped at two sides of the top end of the monitoring head fixing frame, a monitoring head sliding groove is arranged in the monitoring head fixing frame, a construction monitoring head is clamped between the adjacent monitoring head fixing frames, monitoring head screw rods are fixed at two sides of the construction monitoring head, the monitoring head screw rods penetrate through the monitoring head sliding grooves, fixing nuts are bolted at the tail ends of the monitoring head screw rods, the construction monitoring head and the monitoring head fixing frame are clamped and fixed through the fixing nuts, one end of the dustproof folding cap is provided with a folding cap fixing head, and a line arranging hole is formed in the bottom end, corresponding to the monitoring head placing chamber, of the monitoring head protection barrel.
Preferably, the equipment fixing underframe and the protective cylinder rotating seat are fixed through the rotating seat fixing bolt in a clamping mode, and after the rotating seat fixing bolt is screwed on and unscrewed, the protective cylinder rotating seat can be rotated to adjust the monitoring direction of the construction monitoring head.
Preferably, the fixing nut and the monitoring head screw rod are screwed and fixed through threads, and after the fixing nut is screwed and unscrewed, the height of the construction monitoring head can be adjusted up and down and the inclination angle of the construction monitoring head can be adjusted in a rotating mode.
Preferably, dustproof folding cap and control head mount are connected fixedly through the pivot, and are adjacent through bolt fixed connection between the folding cap fixed head, dustproof folding cap can fall down automatically under the action of gravity after the bolt is dismantled.
Preferably, the diameter of the monitoring head placing chamber is larger than the maximum outer diameter of the construction monitoring head.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a first installation of construction monitoring is fixed in the top of a first protection section of thick bamboo of control, a first protection section of thick bamboo of control not only can adjust the control direction of construction monitoring head, can also receive and release the construction monitoring head, the dustproof folding cap that a first protection section of thick bamboo top set up of control not only can prevent dust, can also play the guard action when the construction monitoring head receives and releases, avoid the construction monitoring head to take place to extrude the collision at the in-process of transport, more have economic nature, make the life of construction monitoring head longer.
Drawings
Fig. 1 is a schematic front view of the present invention;
fig. 2 is a left side view structure diagram of the present invention;
FIG. 3 is a front view of the foldable dustproof cap of the present invention after it is folded;
FIG. 4 is a schematic view of the monitor head protective barrel looking down after the dustproof folding cap of the present invention is folded;
fig. 5 is a schematic view of the vertical cross-section structure of the monitor head protection cylinder of the present invention;
in the figure: 1. an equipment fixing chassis; 2. a protective cylinder rotating seat; 3. a monitor head protective cartridge; 4. rotating the base fixing bolt; 5. a monitor head chute; 6. fixing a nut; 7. a dust-proof folding cap; 8. a folding cap fixing head; 9. a monitor head fixing frame; 10. a construction monitoring head; 11. monitoring the head screw; 12. a monitoring head placement room; 13. and (4) arranging holes.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1-5, the present invention provides the following technical solutions: an operation progress monitoring structure for construction engineering comprises a monitoring head protection barrel 3, a protection barrel rotating seat 2 is arranged at the bottom end of the monitoring head protection barrel 3, a monitoring head placing chamber 12 is arranged in the monitoring head protection barrel 3, an equipment fixing underframe 1 is clamped at the bottom end of the protection barrel rotating seat 2, a rotating seat fixing bolt 4 is fixed at one side of the protection barrel rotating seat 2, a monitoring head fixing frame 9 is arranged at the top end of the monitoring head protection barrel 3, dustproof folding caps 7 are clamped at two sides of the top end of the monitoring head fixing frame 9, a monitoring head sliding groove 5 is arranged in the monitoring head fixing frame 9, a construction monitoring head 10 is clamped between the adjacent monitoring head fixing frames 9, monitoring head screws 11 are fixed at two sides of the construction monitoring head 10, the monitoring head screws 11 penetrate through the monitoring head sliding grooves 5, fixing nuts 6 are bolted at the tail ends of the monitoring head screws 11, the construction monitoring head 10 and the monitoring head fixing frame 9 are clamped and fixed through the fixing nuts 6, one end of the dustproof folding cap 7 is provided with a folding cap fixing head 8, and the bottom end of the monitoring head protective cylinder 3 corresponding to the monitoring head placing chamber 12 is provided with a wire arranging hole 13.
In order to facilitate the regulation of the monitoring direction of the construction monitoring head 10, in this embodiment, preferably, the equipment fixing chassis 1 and the protective cylinder rotating base 2 are fixed by the rotating base fixing bolt 4 in a clamping manner, and after the rotating base fixing bolt 4 is screwed on and unscrewed, the protective cylinder rotating base 2 can be rotated to regulate the monitoring direction of the construction monitoring head 10.
In order to facilitate adjustment of the height and angle monitored by the construction monitoring head 10, in this embodiment, preferably, the fixing nut 6 and the monitoring head screw 11 are screwed and fixed by threads, and after the fixing nut 6 is screwed and unscrewed, the height of the construction monitoring head 10 can be adjusted up and down and the inclination angle of the construction monitoring head 10 can be adjusted by rotation.
For better protection construction monitoring head 10 in the transport, in this embodiment, it is preferred, dustproof folding cap 7 and monitoring head mount 9 are connected fixedly through the pivot, through bolt fixed connection between the adjacent folding cap mount 8, dustproof folding cap 7 can fall down automatically under the action of gravity after the bolt is dismantled, and the plan view behind dustproof folding cap 7 and the closed monitoring head mount 9 is the drum structure, after dustproof folding cap 7 is closed, can pass through the rope, sticky tape etc. are fixed with two dustproof folding caps 7 and monitoring head mount 9.
In order to enable the construction monitoring head 10 to be placed inside the monitoring head placing chamber 12, in the present embodiment, it is preferable that the diameter of the monitoring head placing chamber 12 is larger than the maximum outer diameter of the construction monitoring head 10.
The utility model discloses a theory of operation and use flow: the utility model discloses after having installed, at first inspect the utility model discloses an installation is fixed and safety protection, then just can use, during the use, when needs transport the utility model discloses the time, earlier close soon and unscrew loose fixation nut 6 for construction monitoring head 10 can reciprocate, and the inside monitoring head placing chamber 12 of seting up of monitoring head protection section of thick bamboo 3 is put into down to the camera of construction monitoring head 10 after that inside, places the completion back, dismantles the bolt of fixing between the folding cap fixing head 8, and dustproof folding cap 7 can fall down this moment, and it can with rope or sticky tape with monitoring head fixing frame 9 and dustproof folding cap 7 fixed after dustproof folding cap 7 and monitoring head fixing frame 9 are closed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides an operation progress monitoring structure for building engineering, includes monitoring head protection section of thick bamboo (3), its characterized in that: the bottom end of the monitoring head protection cylinder (3) is provided with a protection cylinder rotating seat (2), a monitoring head placing chamber (12) is arranged inside the monitoring head protection cylinder (3), the bottom end of the protection cylinder rotating seat (2) is clamped with an equipment fixing chassis (1), a rotating seat fixing bolt (4) is fixed on one side of the protection cylinder rotating seat (2), the top end of the monitoring head protection cylinder (3) is provided with a monitoring head fixing frame (9), two sides of the top end of the monitoring head fixing frame (9) are clamped with dustproof folding caps (7), a monitoring head sliding groove (5) is arranged inside the monitoring head fixing frame (9), a construction monitoring head (10) is clamped between the adjacent monitoring head fixing frames (9), monitoring head screw rods (11) are fixed on two sides of the construction monitoring head (10), and the monitoring head screw rods (11) pass through the monitoring head sliding grooves (5), and the tail end bolt of control head screw (11) has fixation nut (6), construction monitoring head (10) and control head mount (9) are fixed through fixation nut (6) block, the one end of dustproof folding cap (7) is provided with folding cap fixed head (8), control head protection section of thick bamboo (3) correspond the bottom of control head placing chamber (12) and seted up row line hole (13).
2. A construction project service progress monitoring structure according to claim 1, wherein: the equipment fixing chassis (1) and the protective cylinder rotating seat (2) are fixed through the rotating seat fixing bolt (4) in a clamping mode, and after the rotating seat fixing bolt (4) is screwed in and unscrewed, the protective cylinder rotating seat (2) can be rotated to adjust the monitoring direction of the construction monitoring head (10).
3. A construction project service progress monitoring structure according to claim 1, wherein: the fixing nut (6) and the monitoring head screw rod (11) are screwed and fixed through threads, and after the fixing nut (6) is unscrewed through screwing, the height of the construction monitoring head (10) can be adjusted up and down, and the inclination angle of the construction monitoring head (10) can be adjusted in a rotating mode.
4. A construction project service progress monitoring structure according to claim 1, wherein: dustproof folding cap (7) and control head mount (9) are connected fixedly through the pivot, and are adjacent through bolt fixed connection between folding cap mount (8), dustproof folding cap (7) can fall down automatically under the action of gravity after the bolt is dismantled.
5. A construction project service progress monitoring structure according to claim 1, wherein: the diameter of the monitoring head placing chamber (12) is larger than the maximum outer diameter of the construction monitoring head (10).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020071890.6U CN211574595U (en) | 2020-01-14 | 2020-01-14 | Operation progress monitoring structure for building engineering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020071890.6U CN211574595U (en) | 2020-01-14 | 2020-01-14 | Operation progress monitoring structure for building engineering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211574595U true CN211574595U (en) | 2020-09-25 |
Family
ID=72556220
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020071890.6U Active CN211574595U (en) | 2020-01-14 | 2020-01-14 | Operation progress monitoring structure for building engineering |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211574595U (en) |
-
2020
- 2020-01-14 CN CN202020071890.6U patent/CN211574595U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN210372793U (en) | Installation device of monitoring camera | |
| CN211574595U (en) | Operation progress monitoring structure for building engineering | |
| CN108493795A (en) | Multifunctional power distribution cabinet | |
| CN210704565U (en) | Carrier roller quick replacement tool | |
| CN211393540U (en) | Steel member hoist and mount auxiliary device | |
| CN208519452U (en) | A kind of Drug Storage safety monitoring equipment | |
| CN214959769U (en) | Oil field video monitoring device with safety protection structure based on neural network | |
| CN113898834B (en) | Windproof monitoring camera universal bracket convenient to maintain | |
| CN212211135U (en) | Camera protective housing for slag treatment monitoring | |
| CN209511931U (en) | A kind of Lampstand structure of adjustable clearance | |
| CN208617251U (en) | A kind of adjustable anti-overturning devices of assembled for column crane mast section dismounting | |
| CN211648257U (en) | Mine tunnel roof separation layer monitoring device that dustproof ability is strong | |
| CN208578308U (en) | A kind of fixture that steel protective net is fixed to each other | |
| CN209705642U (en) | A kind of building safety monitoring equipment | |
| CN211406091U (en) | Monitoring device for building security | |
| CN216840962U (en) | Safety barrier is used in construction | |
| CN208138824U (en) | Monitoring system based on WLAN network | |
| CN214498636U (en) | Building engineering is with rail guard that has dustproof function | |
| CN208279232U (en) | A kind of derrick crane safety device being easily installed | |
| CN217928029U (en) | Construction entrance to a cave watch-dog | |
| CN217557636U (en) | Lower-hanging type walkway plate | |
| CN220487062U (en) | Top layer protection equipment of attached lifting scaffold | |
| CN208918222U (en) | A kind of high stability constructing tunnel ladder cage | |
| CN222848506U (en) | A kind of anti-fall fastening bolt | |
| CN220783808U (en) | Tool for loosening and eliminating gap of tower barrel platform bolt |