CN211573535U - Large-scale karst cavity tunnel large deformation frame rock fall prevention structure - Google Patents

Large-scale karst cavity tunnel large deformation frame rock fall prevention structure Download PDF

Info

Publication number
CN211573535U
CN211573535U CN201922423632.XU CN201922423632U CN211573535U CN 211573535 U CN211573535 U CN 211573535U CN 201922423632 U CN201922423632 U CN 201922423632U CN 211573535 U CN211573535 U CN 211573535U
Authority
CN
China
Prior art keywords
tunnel
frame
sides
foundation
karst cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922423632.XU
Other languages
Chinese (zh)
Inventor
姚裕春
封志军
陈伟志
张建文
张耀
袁碧玉
房立凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201922423632.XU priority Critical patent/CN211573535U/en
Application granted granted Critical
Publication of CN211573535U publication Critical patent/CN211573535U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

一种大型岩溶空洞隧道大变形框架防落石结构,以有效解决大型岩溶空洞内隧道结构的安全性和经济性问题。隧道结构采用钢筋混凝土整体浇筑,底部坐落在位于稳定岩石地基之上的隧道基础上,横向两侧外设置由隧道弃碴填筑至隧道结构顶部高程形成的填筑保护体,上方悬挂设置断面呈三角形的框架结构,框架结构的两侧张紧包裹固定被动防护网;所述框架结构的上端与上沿线路纵向间隔锚固在岩溶空洞顶部稳定岩体中的固定锚索的下伸端固定连接,两侧底端则通过其上设置有弹拉构件的拉力锚索与沿线路纵向间隔埋设在隧道结构顶部两侧填筑保护体中拉锚基础固定连接。

Figure 201922423632

A large deformation frame rockfall prevention structure of a large karst cavity tunnel can effectively solve the safety and economic problems of the tunnel structure in the large karst cavity. The tunnel structure is cast as a whole with reinforced concrete, the bottom is located on the tunnel foundation on the stable rock foundation, and the backfill protection bodies are set up on both sides of the lateral side, which are formed by filling the tunnel with waste ballast to the top elevation of the tunnel structure. A triangular frame structure, the two sides of the frame structure are tensioned and wrapped to fix the passive protective net; the upper end of the frame structure is fixedly connected with the lower end of the fixed anchor cable anchored in the stable rock mass at the top of the karst cavity at a longitudinal interval along the line, The bottom ends of the two sides are fixedly connected to the anchor foundations embedded in the filling protection bodies on both sides of the top of the tunnel structure through the tension anchor cables on which the elastic members are arranged.

Figure 201922423632

Description

一种大型岩溶空洞隧道大变形框架防落石结构A large-scale karst cavity tunnel large deformation frame anti-rockfall structure

技术领域technical field

本实用新型涉及岩土工程,特别涉及一种大型岩溶空洞隧道大变形框架防落石结构。The utility model relates to geotechnical engineering, in particular to a large deformation frame anti-falling rock structure of a large-scale karst cavity tunnel.

背景技术Background technique

我国喀斯特地貌分布广泛,喀斯特地区可溶岩形成的岩溶空洞存在不确定性,并且通常难以准确探测,对于隧道工程而言,穿越可溶岩遇到岩溶空洞是十分常见的事,如果遇到的岩溶空洞较小,通常采用混凝土对空洞充填处理,当遇到的岩溶空洞较大时,采用混凝土进行全部充填处理则非常不经济,如果不全部处理,岩溶空洞顶部的岩石掉块会对隧道结构安全造成隐患,故提出一种大型岩溶空洞隧道大变形框架防落石结构及构筑方法具有重要意义,并应具有抗落石冲击效果好、施工方便、经济、环保和利于推广等特点。Karst landforms in my country are widely distributed. Karst cavities formed by karst rocks in karst areas are uncertain and usually difficult to detect accurately. For tunnel engineering, it is very common to encounter karst cavities through soluble rocks. When the karst cavity is large, it is very uneconomical to use concrete to fill the whole cavity. If it is not fully processed, the rocks on the top of the karst cavity will fall off, which will cause damage to the safety of the tunnel structure. Therefore, it is of great significance to propose a large deformation frame anti-rockfall structure and construction method for large-scale karst cavity tunnels, and should have the characteristics of good anti-rockfall impact effect, convenient construction, economical, environmental protection and promotion.

实用新型内容Utility model content

本实用新型所要解决的技术问题是提供一种大型岩溶空洞隧道大变形框架防落石结构,以有效解决大型岩溶空洞内隧道结构的安全性和经济性问题。The technical problem to be solved by the utility model is to provide a large deformation frame anti-rockfall structure of a large-scale karst cavity tunnel, so as to effectively solve the safety and economic problems of the tunnel structure in the large-scale karst cavity.

本实用新型解决上述技术问题所采取的技术方案如下:The technical scheme adopted by the utility model to solve the above-mentioned technical problems is as follows:

本实用新型的一种大型岩溶空洞隧道大变形框架防落石结构,包括穿越大型岩溶空洞的隧道结构,其特征是:所述隧道结构采用钢筋混凝土整体浇筑,底部坐落在位于稳定岩石地基之上的隧道基础上,横向两侧外设置由隧道弃碴填筑至隧道结构顶部高程形成的填筑保护体,上方悬挂设置断面呈三角形的框架结构,框架结构的两侧张紧包裹固定被动防护网;所述框架结构的上端与上沿线路纵向间隔锚固在岩溶空洞顶部稳定岩体中的固定锚索的下伸端固定连接,两侧底端则通过其上设置有弹拉构件的拉力锚索与沿线路纵向间隔埋设在隧道结构顶部两侧填筑保护体中拉锚基础固定连接。The large deformation frame anti-rockfall structure of a large-scale karst cavity tunnel of the utility model comprises a tunnel structure passing through a large-scale karst cavity. On the foundation of the tunnel, a filling protection body formed by filling the tunnel with waste ballast to the top elevation of the tunnel structure is installed on both sides of the lateral side, and a frame structure with a triangular cross-section is suspended above, and the two sides of the frame structure are tensioned and wrapped to fix the passive protective net; The upper end of the frame structure is fixedly connected with the lower extending end of the fixed anchor cable anchored in the stable rock mass at the top of the karst cavity at a longitudinal interval along the line, and the bottom ends on both sides are connected with the tension anchor cable on which the elastic member is provided. The anchor foundation is fixed and connected in the filling protection body on both sides of the top of the tunnel structure at the longitudinal interval along the line.

本实用新型的有益效果是,通过在隧道结构顶部以上设置包裹有被动防护网的框架结构用以阻挡岩溶空洞顶部落石,避免落石直接冲击隧道结构;框架结构采用钢管或高强复合型材构架成上小下大的三角形轻型框架结构,重量轻,其上下端通过柔性的固定锚索和拉力锚索连接固定,使得框架结构可以在左右发生可控的较大变形,从而落石对框架结构的冲击力会极大衰减,框架结构主要对落石起导向作用;框架结构下部通过设置了弹拉结构的拉力锚索连接,既可以使框架结构具有较好的平面定位,又能产生较大的变形且变形后能自动恢复位置。The beneficial effect of the utility model is that a frame structure wrapped with a passive protective net is arranged above the top of the tunnel structure to block the rockfall at the top of the karst cavity, so as to prevent the rockfall from directly impacting the tunnel structure; The lower large triangular light frame structure is light in weight, and its upper and lower ends are connected and fixed by flexible fixed anchor cables and tension anchor cables, so that the frame structure can have a large controllable deformation on the left and right sides, so that the impact force of falling rocks on the frame structure will be reduced. Great attenuation, the frame structure mainly guides the falling rocks; the lower part of the frame structure is connected by the tension anchor cable with the elastic structure, which can not only make the frame structure have better plane positioning, but also produce large deformation and after the deformation Can automatically restore the position.

附图说明Description of drawings

本说明书包括如下两幅附图:This manual includes the following two drawings:

图1是本实用新型一种大型岩溶空洞隧道大变形框架防落石结构的断面示意图;Fig. 1 is the cross-sectional schematic diagram of a large-scale karst cavity tunnel large-deformation frame anti-falling rock structure of the present utility model;

图2是本实用新型一种大型岩溶空洞隧道大变形框架防落石结构的正面示意图;2 is a schematic front view of a large-scale karst cavity tunnel large-deformation frame anti-falling rock structure of the present invention;

图中示出构件名称及所对应的标记:隧道结构1、隧道基础2、填筑保护体3、拉锚基础4、固定锚索5、框架结构6、被动防护网7、拉力锚索8、弹拉构件9、岩溶空洞边界A。Component names and corresponding marks are shown in the figure: tunnel structure 1, tunnel foundation 2, filling protection body 3, anchor foundation 4, fixed anchor cable 5, frame structure 6, passive protection net 7, tension anchor cable 8, The elastic member 9 and the boundary A of the karst cavity.

具体实施方式Detailed ways

下面结合附图和实施例对本实用新型做进一步的说明:Below in conjunction with accompanying drawing and embodiment, the utility model is further described:

参照图1,本实用新型的一种大型岩溶空洞隧道大变形框架防落石结构,包括穿越大型岩溶空洞的隧道结构1,该隧道结构1采用钢筋混凝土整体浇筑,底部坐落在位于稳定岩石地基之上的隧道基础2上,横向两侧外设置由隧道弃碴填筑至隧道结构1顶部高程形成的填筑保护体3,上方悬挂设置断面呈三角形的框架结构6,框架结构6的两侧张紧包裹固定被动防护网7。所述框架结构6的上端与上沿线路纵向间隔锚固在岩溶空洞顶部稳定岩体中的固定锚索5的下伸端固定连接,两侧底端则通过其上设置有弹拉构件9的拉力锚索8与沿线路纵向间隔埋设在隧道结构1顶部两侧填筑保护体3中拉锚基础4固定连接。1, a large-scale karst cavity tunnel large deformation frame anti-rockfall structure of the present invention includes a tunnel structure 1 passing through a large karst cavity, the tunnel structure 1 is integrally cast with reinforced concrete, and the bottom is located on the stable rock foundation. On the tunnel foundation 2 of the tunnel structure 2, a filling protection body 3 formed by filling the tunnel waste ballast to the top elevation of the tunnel structure 1 is arranged on both sides of the transverse direction, and a frame structure 6 with a triangular cross-section is suspended above, and the two sides of the frame structure 6 are tensioned. Wrap the fixed passive protective net 7. The upper end of the frame structure 6 is fixedly connected with the lower extending end of the fixed anchor cable 5 which is anchored in the stable rock mass at the top of the karst cavity at a longitudinal interval along the line, and the bottom ends of the two sides are provided with the tension force of the elastic member 9 thereon. The anchor cables 8 are fixedly connected to the anchor foundations 4 embedded in the filling protection bodies 3 on both sides of the top of the tunnel structure 1 at intervals along the line.

本实用新型在隧道结构1顶部以上设置包裹有被动防护网7的框架结构6用以阻挡岩溶空洞顶部落石,避免落石直接冲击隧道结构1。框架结构6采用钢管或高强复合型材构架成上小下大的三角形轻型框架,重量轻,其上下端通过柔性的固定锚索5和拉力锚索8连接固定,使得框架结构6可以在左右发生可控的较大变形,从而落石对框架结构6的冲击力极大衰减,框架结构6主要对落石起导向作用。框架结构6下部通过设置了弹拉结构9的拉力锚索8连接,既可以使框架结构6具有较好的平面定位,又能产生较大的变形且变形后能自动恢复位置。参照图1,所述框架结构 6由钢管或高强复合型材制成,其底部张口端宽度大于隧道结构1宽度 2-4m。所述沿线路纵向分节段设置,悬挂连接各节段的固定锚索5数量不少于两根,固定锚索5设置间距不大于5m。所述隧道基础2一般采用混凝土浇筑或浆砌片石砌筑而成。In the present invention, a frame structure 6 wrapped with a passive protection net 7 is arranged above the top of the tunnel structure 1 to block the rockfall from the top of the karst cavity and prevent the rockfall from directly impacting the tunnel structure 1 . The frame structure 6 is made of steel pipes or high-strength composite profiles to form a triangular light frame with a small upper part and a large lower part, which is light in weight. Therefore, the impact force of the rockfall on the frame structure 6 is greatly attenuated, and the frame structure 6 mainly plays a guiding role for the rockfall. The lower part of the frame structure 6 is connected by the tension anchor cable 8 provided with the elastic structure 9, which can not only make the frame structure 6 have better plane positioning, but also generate large deformation and automatically restore the position after deformation. Referring to Figure 1, the frame structure 6 is made of steel pipes or high-strength composite profiles, and the width of the bottom opening end is greater than the width of the tunnel structure 1 by 2-4m. The lengthwise sections are arranged along the line, the number of fixed anchor cables 5 suspended and connected to each section is not less than two, and the distance between the fixed anchor cables 5 is not more than 5m. The tunnel foundation 2 is generally made of concrete pouring or mortar masonry.

参照图1,本实用新型一种大型岩溶空洞隧道大变形框架防落石结构按如下步骤构筑:Referring to Figure 1, a large-scale karst cavity tunnel large-deformation frame anti-rockfall structure of the present utility model is constructed according to the following steps:

①清除隧道结构1底部对应位置的松散土石,直至稳定基岩面;①Remove the loose soil and rock at the corresponding position at the bottom of tunnel structure 1 until the bedrock surface is stabilized;

②施工隧道基础2;② Construction of tunnel foundation 2;

③待隧道基础2达到设计强度的80%以后,施工隧道结构1钢筋混凝土;③ After the tunnel foundation 2 reaches 80% of the design strength, construct the reinforced concrete for the tunnel structure 1;

④采用隧道弃碴分层对称施工填筑保护体3;④ The protection body 3 shall be constructed by layered and symmetrical construction of tunnel discarded ballast;

⑤在填筑保护体3上开挖基坑,施工拉锚基础4的钢筋混凝土,在其顶部预埋钢拉环;⑤ Excavate the foundation pit on the filling protection body 3, construct the reinforced concrete of the anchor foundation 4, and embed the steel pull ring on the top;

⑥在隧道结构1顶部对应的岩溶空洞顶板岩体上施工固定锚索5;⑥Construct fixed anchor cable 5 on the rock mass of the karst cavity roof corresponding to the top of tunnel structure 1;

⑦采用钢管或高强复合型材分段组装框架结构6;⑦ Use steel pipes or high-strength composite profiles to assemble the frame structure 6;

⑧在各分段框架结构6的两侧张紧包裹被动防护网7;⑧Tightly wrap passive protective nets 7 on both sides of each segmented frame structure 6;

⑨吊装框架结构6,其上端与固定锚索5的下伸端固定连接;⑨ The hoisting frame structure 6, the upper end of which is fixedly connected with the downwardly extending end of the fixed anchor cable 5;

⑩在拉力锚索8上安装弹拉构件9;⑩ Install the elastic member 9 on the tension anchor cable 8;

⑾将拉力锚索8的上端与框架结构6的同侧底端固定连接,下端与拉锚基础4上预埋钢拉环固定连接;⑾ The upper end of the tension anchor cable 8 is fixedly connected with the bottom end of the same side of the frame structure 6, and the lower end is fixedly connected with the embedded steel pull ring on the tension anchor foundation 4;

⑿采用防腐绳将相邻分段框架结构6绑扎固定为一体。⑿ Anti-corrosion ropes are used to bind and fix the adjacent segmented frame structures 6 as a whole.

以上所述只是用图解说明本实用新型一种大型岩溶空洞隧道大变形框架防落石结构的一些原理,并非是要将本实用新型局限在所示和所述的具体结构和构筑方法适用范围内,故凡是所有可能被利用的相应修改以及等同物,均属于本实用新型所申请的专利范围。The above is only to illustrate some principles of the large deformation frame rockfall prevention structure of a large-scale karst cavity tunnel according to the present invention, and it is not intended to limit the present invention to the scope of application of the specific structures and construction methods shown and described, Therefore, all corresponding modifications and equivalents that may be used belong to the scope of the patent application for this utility model.

Claims (4)

1. The utility model provides a large deformation frame rockfall prevention structure of large karst cavity tunnel, includes tunnel structure (1) that passes through large karst cavity, characterized by: the tunnel structure (1) is integrally cast by adopting reinforced concrete, the bottom of the tunnel structure is located on a tunnel foundation (2) positioned on a stable rock foundation, filling protective bodies (3) formed by filling tunnel waste to the top elevation of the tunnel structure (1) are arranged outside the two transverse sides of the tunnel structure, a frame structure (6) with a triangular section is hung above the tunnel structure, and two sides of the frame structure (6) are tensioned, wrapped and fixed with a passive protective net (7); the upper end of the frame structure (6) is fixedly connected with the downward extending end of a fixed anchor rope (5) which is anchored in a stable rock body at the top of the karst cavity at intervals along the longitudinal direction of the line, and the bottom ends at the two sides are fixedly connected with a pull anchor foundation (4) which is embedded in a filling protection body (3) at the two sides of the top of the tunnel structure (1) at intervals along the longitudinal direction of the line through a pull anchor rope (8) which is provided with a spring pull member (9) on the pull anchor rope.
2. The large deformation frame rockfall prevention structure of the large karst hollow tunnel as claimed in claim 1, wherein: the frame structure (6) is made of steel pipes or high-strength composite section bars, and the width of the opening end at the bottom of the frame structure is 2-4m larger than that of the tunnel structure (1).
3. The large deformation frame rockfall prevention structure of the large karst hollow tunnel as claimed in claim 2, wherein: the cable is arranged in sections along the longitudinal direction of the line, the number of the fixed anchor cables (5) which are connected with the sections in a hanging mode is not less than two, and the distance between the fixed anchor cables (5) is not more than 5 m.
4. The large deformation frame rockfall prevention structure of the large karst hollow tunnel as claimed in claim 1, wherein: the tunnel foundation (2) is formed by pouring concrete or building mortar rubble.
CN201922423632.XU 2019-12-29 2019-12-29 Large-scale karst cavity tunnel large deformation frame rock fall prevention structure Expired - Fee Related CN211573535U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922423632.XU CN211573535U (en) 2019-12-29 2019-12-29 Large-scale karst cavity tunnel large deformation frame rock fall prevention structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922423632.XU CN211573535U (en) 2019-12-29 2019-12-29 Large-scale karst cavity tunnel large deformation frame rock fall prevention structure

Publications (1)

Publication Number Publication Date
CN211573535U true CN211573535U (en) 2020-09-25

Family

ID=72552099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922423632.XU Expired - Fee Related CN211573535U (en) 2019-12-29 2019-12-29 Large-scale karst cavity tunnel large deformation frame rock fall prevention structure

Country Status (1)

Country Link
CN (1) CN211573535U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101968A (en) * 2019-12-29 2020-05-05 中铁二院工程集团有限责任公司 Large karst cavity tunnel large deformation frame rock fall prevention structure and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101968A (en) * 2019-12-29 2020-05-05 中铁二院工程集团有限责任公司 Large karst cavity tunnel large deformation frame rock fall prevention structure and construction method
CN111101968B (en) * 2019-12-29 2024-08-27 中铁二院工程集团有限责任公司 Construction method of large karst cavity tunnel large deformation frame anti-falling stone structure

Similar Documents

Publication Publication Date Title
CN103758134B (en) A kind of construction method combining Double-row Piles Support system
CN201746840U (en) Foundation pit support system equipped with a plurality of inclined rear anchors capable of recycling
CN106759376A (en) Anchored Sheet Pile Wall for Excavation system and its construction method for closing on existing underground structure
CN203654303U (en) Side slope reinforcing structure
CN204199189U (en) A kind of fin-plate type ruggedized construction of masonry arch bridge spandrel construction
CN206844120U (en) It is a kind of be adapted to adjacent foundation pits supporting to draw anchor cable structure
CN102304927B (en) Prestress anchor cable buttress-type parapet suitable for rock substrate
CN104294769A (en) Built abutment structure reinforced through combination of pile supplementing and abutment cap enlarging and construction method
CN103452120A (en) Pile top crown beam structure of high-strength prestress pipe pile for supporting foundation pit and construction method thereof
CN109083660B (en) Soft rock roadway or tunnel bottom heave treatment supporting structure and method based on reinforced concrete bottom beam
CN206035505U (en) Stride across hangar tunnel structure of debris flow gully
CN211573535U (en) Large-scale karst cavity tunnel large deformation frame rock fall prevention structure
CN211871179U (en) Arch bridge cable crane pile beam type anchorage structure
CN106194213B (en) A kind of shed hole structure and construction method across debris flow gully
CN210140832U (en) Prestressed occlusion type double-row pile foundation pit supporting structure
CN216108572U (en) Tie rod arch bridge demolishs structure based on cofferdam
CN103147443A (en) Foundation pit supporting structure and construction method thereof
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN111101968B (en) Construction method of large karst cavity tunnel large deformation frame anti-falling stone structure
CN211573530U (en) Large-scale karst cavity top filling formula tunnel prevents structure that falls into rocks
CN111058464A (en) Dangerous rock protection structure and construction method for steep slope adjacent fill engineering
CN209669718U (en) An Existing Shed-cave Combination Rock-blocking Wall Structure for Dangerous Rock Falling Protection
CN207314353U (en) A kind of supporting construction applied to foundation pit
CN203668978U (en) Anti-floating structure for subway tunnel
CN207846456U (en) A kind of prestressing force base expanding and base expanding anchor cable blower foundation for Rock Region

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200925

CF01 Termination of patent right due to non-payment of annual fee