CN211498333U - A subgrade drainage structure for municipal road construction - Google Patents
A subgrade drainage structure for municipal road construction Download PDFInfo
- Publication number
- CN211498333U CN211498333U CN201922017584.4U CN201922017584U CN211498333U CN 211498333 U CN211498333 U CN 211498333U CN 201922017584 U CN201922017584 U CN 201922017584U CN 211498333 U CN211498333 U CN 211498333U
- Authority
- CN
- China
- Prior art keywords
- drainage channel
- drainage
- road construction
- municipal road
- subgrade
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及道路施工的技术领域,尤其是涉及一种市政道路施工用路基排水结构。The utility model relates to the technical field of road construction, in particular to a roadbed drainage structure for municipal road construction.
背景技术Background technique
道路排水包括路面排水部和路边排水部,所述路面排水部从下至上依次为:基层、防水层、透水层,所述防水层上方设有路面排水沟槽;所述路边排水部包括设置于道路两侧与所述路面排水部相邻的透水路沿石,以及所述透水路沿石下方的路边排水沟槽;所述透水路沿石包括:透水表层和透水强化层,所述透水表层中含有透水材料,所述透水强化层与所述透水表层内表面相邻接;所述透水强化层内具有空腔。The road drainage includes a pavement drainage part and a roadside drainage part. The pavement drainage part consists of a base layer, a waterproof layer and a water-permeable layer in order from bottom to top. A pavement drainage groove is arranged above the waterproof layer; the roadside drainage part includes The permeable road edge stones arranged on both sides of the road and adjacent to the road drainage part, and the roadside drainage grooves below the permeable road edge stones; The water-permeable surface layer contains a water-permeable material, the water-permeable reinforcement layer is adjacent to the inner surface of the water-permeable surface layer, and the water-permeable reinforcement layer has a cavity.
现有技术中授权公告号为 CN209384053U 的实用新型专利公布了一种公路用路基排水装置,包括原土夯实层、细粒式沥青混凝土路面和斜坡一,所述原土夯实层上端设置有混凝土挡水层,所述混凝土挡水层上端铺设有粗砂石垫层,所述粗砂石垫层上端铺设有细砂石垫层,所述细砂石垫层上端设置有粗粒式沥青混凝土层,所述粗粒式沥青混凝土层上端设置有所述细粒式沥青混凝土路面,所述细粒式沥青混凝土路面上端两侧设置有道牙,所述道牙一侧设置有过滤盖,所述过滤盖下端设置有下水道。有益效果在于:本实用新型通过粗砂石垫层以及混凝土挡水层中间高两边低的铺设方式,使从细粒式沥青混凝土路面渗入路基的水可被导引至道路两侧,防止路基泡水,使路基的结构更加稳固,增加公路的使用寿命。The utility model patent with the authorization announcement number CN209384053U in the prior art discloses a roadbed drainage device, which includes an original soil compaction layer, a fine-grained asphalt concrete pavement and a slope 1. The upper end of the original soil compaction layer is provided with a concrete block water layer, the upper end of the concrete water retaining layer is laid with a coarse sandstone cushion, the upper end of the coarse sandstone cushion is laid with a fine sandstone cushion, and the upper end of the fine sandstone cushion is provided with a coarse-grained asphalt concrete layer , the upper end of the coarse-grained asphalt concrete layer is provided with the fine-grained asphalt concrete pavement, the upper end of the fine-grained asphalt concrete pavement is provided with road teeth on both sides, and a filter cover is provided on one side of the road teeth, and the The lower end of the filter cover is provided with a sewer. The beneficial effect is as follows: the utility model adopts the laying method of the coarse sandstone cushion and the concrete water retaining layer in which the middle is high and the two sides are low, so that the water infiltrating into the roadbed from the fine-grained asphalt concrete pavement can be guided to both sides of the road, preventing the roadbed from foaming. Water makes the structure of the roadbed more stable and increases the service life of the road.
上述中的现有技术方案存在以下缺陷:由于山脚的市政道路一侧需要承接大流量的积水排放,但上述结构两侧的排水渠都承受水流排放的孔径比较小,因此上述结构中的公路用路基排水结构不太适合用于山脚上的市政道路进行排水。The prior art scheme in the above has the following defects: because one side of the municipal road at the foot of the mountain needs to undertake the discharge of large-flow stagnant water, but the drainage channels on both sides of the above-mentioned structure have relatively small apertures to withstand the discharge of water flow, so the road in the above-mentioned structure is relatively small. The use of subgrade drainage structure is not suitable for drainage of municipal roads at the foot of the mountain.
实用新型内容Utility model content
本实用新型的目的是提供一种市政道路施工用路基排水结构,其具有适于山脚市政道路的排水的效果。The purpose of the utility model is to provide a subgrade drainage structure for municipal road construction, which has the effect of being suitable for the drainage of municipal roads at the foot of a mountain.
本实用新型的上述实用新型目的是通过以下技术方案得以实现的:The above-mentioned utility model purpose of the present utility model is achieved through the following technical solutions:
一种市政道路施工用路基排水结构,位于山脚,一侧为山体,另一侧为城市,包括路面层和排水渠,排水渠位于路面层的两侧,所述排水渠包括排水渠一和排水渠二,排水渠一的截面孔径大于排水渠二的截面孔径,排水渠一和排水渠二的顶端开口宽度一致,排水渠一与路面层之间设置有挡土栏,挡土栏与路面层之间设置有地漏,地漏与排水渠一连通。A subgrade drainage structure for municipal road construction is located at the foot of a mountain, with a mountain on one side and a city on the other, including a pavement layer and a drainage channel, the drainage channels are located on both sides of the pavement layer, and the drainage channel includes a drainage channel 1 and a drainage channel. For
通过采用上述技术方案,靠近山体一侧的排水渠一孔径大于排水渠二的孔径,因为在暴雨的情况下,山上的积水比路面上的积水流量更大,因此排水渠一孔径大于排水渠二的孔径更加合理。排水渠一与路面层之间设置挡土栏,当山上的泥土冲下来时,挡土栏将泥土挡至路面外侧的排水渠一内。By adopting the above technical solution, the diameter of the first drainage channel close to the mountain is larger than that of the second drainage channel, because in the case of heavy rain, the water flow on the mountain is larger than that on the road surface, so the diameter of the first drainage channel is larger than that of the drainage channel. The diameter of the second channel is more reasonable. A retaining fence is set between the drainage channel 1 and the pavement layer. When the soil on the mountain is washed down, the retaining bar will block the soil into the drainage channel 1 outside the road surface.
本实用新型进一步设置为:所述排水渠一的顶部截面为矩形,排水渠二下端截面为圆形。The utility model is further configured as follows: the top section of the first drainage channel is rectangular, and the lower section of the second drainage channel is circular.
通过采用上述技术方案,将排水渠二下端截面设置为圆形,这样设置是为了当水流过大过急时,排水渠二的能够更加容易容易承受大流量水流的冲击。By adopting the above technical solution, the cross-section of the lower end of the second drainage channel is set to be circular, so that when the water flow is too large and too fast, the second drainage channel can more easily withstand the impact of the large flow of water.
本实用新型进一步设置为:所述排水渠二的截面为上底长于下底的等腰梯形。The utility model is further arranged as follows: the cross section of the second drainage channel is an isosceles trapezoid with an upper bottom longer than a lower bottom.
通过采用上述技术方案,排水渠二的截面为上底长于下底的等腰梯形,那么水流在通过排水渠二时,排水渠二承压更低。By adopting the above technical solution, the section of the second drainage channel is an isosceles trapezoid with the upper bottom longer than the lower bottom, so that the second drainage channel bears lower pressure when the water flows through the second drainage channel.
本实用新型进一步设置为:所述排水渠一的腰部和排水渠二的底端通过管道一连通。The utility model is further provided that: the waist of the first drainage channel and the bottom end of the second drainage channel are communicated through the first pipeline.
通过采用上述技术方案,排水渠一的腰部与排水渠的底端通过管道一连通,当某一段路的排水渠一或者排水渠二堵塞能够暂时不会影响排水。By adopting the above technical solution, the waist of the drainage channel 1 is connected with the bottom end of the drainage channel 1 through the pipeline 1. When the drainage channel 1 or
本实用新型进一步设置为:所述路面层的表面沿路面层长度方向轴线方向设置有绿化带,绿化带下方的管道一上连通有一个球状的蓄水池。The utility model is further configured as follows: the surface of the pavement layer is provided with a green belt along the longitudinal axis direction of the pavement layer, and a spherical reservoir is communicated with a pipe below the green belt.
通过采用上述技术方案,路面层的表面设置有绿化带,绿化带设置有球状蓄水池,将蓄水池设置球状是为了蓄水池能够更加耐压。By adopting the above technical solution, the surface of the pavement layer is provided with a green belt, and the green belt is provided with a spherical water reservoir.
本实用新型进一步设置为:所述绿化带与蓄水池通过管道二连通,管道二上设置有喷头一和喷头二,喷头一朝向绿化带,喷头二朝向路面。The utility model is further configured as follows: the green belt and the reservoir are communicated through a second pipe, and the second pipe is provided with a nozzle 1 and a
通过采用上述技术方案,绿化带与蓄水池连通,当绿化带上需要浇灌时开启喷头一,当夏天路面过于炎热时,打开喷头二,将蓄水池中的水抽出,从而可以将给沥青路面进行降温,避免沥青由于炎热天气发生软化。By adopting the above technical solution, the green belt is connected with the reservoir. When the green belt needs to be watered, the first sprinkler is turned on. When the road is too hot in summer, the second sprinkler is turned on, and the water in the reservoir is pumped out, so that the asphalt can be pumped out. The road surface is cooled to prevent the asphalt from softening due to hot weather.
本实用新型进一步设置为:所述排水渠一和排水渠二顶端侧壁上预埋有螺纹管,排水渠一和排水渠二上端口盖有雨篦,雨篦与螺纹孔通过螺栓固定。The utility model is further configured as follows: threaded pipes are pre-buried on the top side walls of the first drainage channel and the second drainage channel, the upper ports of the drainage channel 1 and the second drainage channel are covered with rain grate, and the rain grate and the threaded hole are fixed by bolts.
通过采用上述技术方案,在雨篦与排水渠一或者排水渠二的抵接面上预埋螺纹管,雨篦上设置有若干个相适配的螺纹孔,因此可以将雨篦固定于排水渠上,避免雨水将雨篦移位。By adopting the above technical solution, the threaded pipe is pre-embedded on the abutting surface of the rain grate and the drainage channel 1 or the
本实用新型进一步设置为:所述排水渠一每隔100米设置一个能够供人通过的淤泥井。The utility model is further arranged as follows: a silt well for people to pass through is arranged every 100 meters in the drainage channel.
通过采用上述技术方案,由于靠近山体的排水渠一内非常容易积留山上带下来的淤泥,因此当每隔一百米通过设置这个能够供人通过的淤泥井,可以将大多数淤泥沉积至淤泥井内进行清淤。By adopting the above technical solution, since the silt brought down from the mountain is very easy to accumulate in the drainage channel close to the mountain, when this silt well for people to pass through is set every 100 meters, most of the silt can be deposited into the silt. Desilting in the well.
综上所述,本实用新型的有益技术效果为:To sum up, the beneficial technical effects of the present utility model are:
1.靠近山体一侧的排水渠一孔径大于排水渠二的孔径,因为在暴雨的情况下,山上的积水比路面上的积水流量更大,因此排水渠一孔径大于排水渠二的孔径更加合理。排水渠一与路面层之间设置挡土栏,当山上的泥土冲下来时,挡土栏将泥土挡至路面外侧的排水渠一内;1. The diameter of the drainage channel 1 near the side of the mountain is larger than that of the
2.将排水渠二下端截面设置为圆形,这样设置是为了当水流过大过急时,排水渠二的能够更加容易容易承受大流量水流的冲击。2. The cross section of the lower end of the second drainage channel is set to be circular, so that when the water flow is too large and too fast, the second drainage channel can more easily withstand the impact of the large flow of water.
附图说明Description of drawings
图1是本实用新型的整体结构示意图。Figure 1 is a schematic diagram of the overall structure of the present invention.
图2是图1中沿A-A的剖视图。FIG. 2 is a cross-sectional view taken along A-A in FIG. 1 .
图3是图1中沿B-B的剖视图。FIG. 3 is a cross-sectional view taken along B-B in FIG. 1 .
图4是图2中C部分的放大示意图。FIG. 4 is an enlarged schematic view of part C in FIG. 2 .
图中,1、路面层;2、排水渠;21、排水渠一;22、排水渠二;3、蓄水池;4、管道一;5、绿化带;6、管道二;7、雨篦;71、螺纹管;72、螺栓;8、淤泥井;9、挡土栏;10、山体。In the figure, 1. Pavement layer; 2. Drainage channel; 21. Drainage channel 1; 22.
具体实施方式Detailed ways
以下结合附图对本实用新型作进一步详细说明。The present utility model will be described in further detail below in conjunction with the accompanying drawings.
参照图1和图2,为本实用新型公开的一种市政道路施工用路基排水结构,位于山体10的山脚和城市之间,本实用新型包括路面层1和位于路面层1两侧的排水渠2,排水渠2包括排水渠一21和排水渠二22,排水渠一21位于路面层1与山体10之间,排水渠二22位于路面层1远离山体10的一侧,排水渠一21和路面层1之间设置有挡土栏9,挡土栏9与路面层1之间设置有地漏,地漏与排水渠一21连通。1 and 2, a subgrade drainage structure for municipal road construction disclosed by the utility model is located between the foot of the
排水渠一21的顶部截面为矩形,排水渠一21的底端截面为圆形,排水渠二22的截面为上底长于下底的等腰梯形,这样是设置是为了使得排水渠一21和排水渠二22的内壁更加耐水流的冲击。The top section of the drainage channel 1 21 is a rectangle, the bottom section of the drainage channel 1 21 is a circle, and the section of the
排水渠一21的腰部和排水渠二22的底端通过管道一4相连通,路面层1上表面沿路面层1长度方向还设置有绿化带5,绿化带5的正下方通过管道一4连通有蓄水池3,蓄水池3与绿化带5通过管道二6连通,这样设置是为了将排水渠2内部的水进行存储,当下暴雨时,排水渠一21内多余的水就会流经管道一4从而被蓄水池3存储起来,当下小雨时,由于排水渠二22浅于排水渠一21,排水渠二22内的水就会流经管道一4从而被存储起来。The waist of the drainage channel 1 21 is connected with the bottom end of the
由于夏天沥青容易在高温环境下降温,因此需要在无雨的天气里将在沥青路面上进行定期洒水降温,当路面暴晒时,蓄水池3内部的水就可以用来给路面进行降温。另外蓄水池3内的水还可以用于绿化带5的浇灌。Since asphalt tends to cool down in a high temperature environment in summer, it is necessary to regularly sprinkle water on the asphalt pavement to cool down in rainless weather. When the pavement is exposed to the sun, the water in the
蓄水池3为球状,这样设置是为了使得蓄水池3在承受路面上车流的压力时不容易发生破裂。The
参照图2和图4,排水渠2上还设置有雨篦7,这样设置的目的是为了避免排水渠2内进入树叶等固体堵塞蓄水池3的进水口,排水渠一21和排水渠二22顶端内壁上预埋有螺纹管71,雨篦7与排水渠一21和排水渠二22上的螺纹管71之间通过螺栓72连接,从而可以避免积流使得雨篦7发生位移。2 and 4, the
参照图3,排水渠一(21)每隔100米到200米设置一个能够供人通过的淤泥井8,排水渠一21内的淤泥沉积到淤泥井8可以使得人定期去清理,从而达到疏通的效果。Referring to Fig. 3, the drainage channel 1 (21) is provided with a silt well 8 every 100 meters to 200 meters for people to pass through, and the silt in the drainage channel 1 21 is deposited into the silt well 8 so that people can clean it regularly, so as to achieve dredging. Effect.
本实施例的实施原理为:当山上的雨水留下来时被挡土栏9挡住穿过雨篦7流入排水渠一21,避免过量雨水流至路面层1上,即使一部分雨篦7被堵住,流水也会被挡土栏9导流至未堵塞的雨篦7上。路面层1上的雨水则会流入至排水渠二22 中进行导流,排水渠一21的径宽大于排水渠二22的径宽设置更为合理。The implementation principle of the present embodiment is as follows: when the rainwater on the mountain remains, it is blocked by the
排水渠一21的截面为圆形,排水渠二22的截面为上底宽大于下底宽的等腰梯形可以排水更加耐冲击。当路面层1温度过高时,可以抽取蓄水池3内的水进行喷洒降温,以及将蓄水池3内的水抽取灌溉绿化带5,蓄水池3的内壁为球状是运用了拱形更加耐压的原理。The cross-section of the
本具体实施方式的实施例均为本实用新型的较佳实施例,并非依此限制本实用新型的保护范围,故:凡依本实用新型的结构、形状、原理所做的等效变化,均应涵盖于本实用新型的保护范围之内。The examples of this specific embodiment are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore: all equivalent changes made according to the structure, shape and principle of the present invention are not It should be covered within the protection scope of the present invention.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922017584.4U CN211498333U (en) | 2019-11-20 | 2019-11-20 | A subgrade drainage structure for municipal road construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922017584.4U CN211498333U (en) | 2019-11-20 | 2019-11-20 | A subgrade drainage structure for municipal road construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211498333U true CN211498333U (en) | 2020-09-15 |
Family
ID=72410539
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922017584.4U Expired - Fee Related CN211498333U (en) | 2019-11-20 | 2019-11-20 | A subgrade drainage structure for municipal road construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211498333U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112160239A (en) * | 2020-09-22 | 2021-01-01 | 杨二建 | Stifled drainage device is prevented to city view bridge |
| CN114941366A (en) * | 2022-03-30 | 2022-08-26 | 宋鹏 | Gradient flood prevention device and method for municipal garden |
-
2019
- 2019-11-20 CN CN201922017584.4U patent/CN211498333U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112160239A (en) * | 2020-09-22 | 2021-01-01 | 杨二建 | Stifled drainage device is prevented to city view bridge |
| CN112160239B (en) * | 2020-09-22 | 2021-04-06 | 杨二建 | Stifled drainage device is prevented to city view bridge |
| CN114941366A (en) * | 2022-03-30 | 2022-08-26 | 宋鹏 | Gradient flood prevention device and method for municipal garden |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2008138218A1 (en) | Water draining method and the draining pipe therefore | |
| CN109267445B (en) | Sponge urban ecological road rainwater regulation and storage system | |
| CN108193758B (en) | Sponge city road collection and drainage structure | |
| CN105297872A (en) | LID type city rainwater closed conduit with functions of water permeating, storing, purifying and draining | |
| CN218621638U (en) | Municipal administration road that permeates water | |
| CN105421562A (en) | Green belt with initial rainwater road surface runoff purifying function and water storage function | |
| CN205171305U (en) | Bituminous paving with drainage structures | |
| CN113550397A (en) | Road water storage and drainage system and road construction method | |
| CN211368282U (en) | Municipal road pavement structure based on sponge city | |
| CN106759778A (en) | For the scattered collection mating type waterproof and water drainage system of highway median strip | |
| CN205224230U (en) | LID type urban rainwater oozes and holds clean drainage closed conduit | |
| CN214994492U (en) | Biological detention structure in sponge city | |
| CN214656073U (en) | A kind of natural permeable quarry pavement structure in sponge city | |
| JPH09177016A (en) | Water permeable drain | |
| CN210856844U (en) | Sewage intercepting and draining system suitable for sunken type pedestrian ways beside greenbelts | |
| CN218951878U (en) | A sunken green belt structure for municipal roads | |
| CN209836713U (en) | A hard road with a modified permeable structure | |
| CN207988098U (en) | A kind of road oozes drainage system | |
| CN214530022U (en) | Hard pavement surface runoff storage and seepage tree pit and storage and seepage system | |
| CN206448131U (en) | Pavement underdrain structure | |
| CN206503213U (en) | Scattered collection mating type waterproof and water drainage system for highway median strip | |
| CN210117624U (en) | Urban drainage component | |
| CN215252082U (en) | Concave type green belt system of urban road sponge facility | |
| CN214271526U (en) | Road based on LID facility | |
| CN112647379B (en) | Municipal works road richly lays structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 610031 No. 4, building 8, No. 8, Tongcheng Road, Qingyang District, Chengdu, Sichuan Patentee after: Sichuan Lutong construction (Group) Co.,Ltd. Address before: 610031 No. 4, building 8, No. 8, Tongcheng Road, Qingyang District, Chengdu, Sichuan Patentee before: Sichuan Lutong Construction Engineering Co.,Ltd. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CF01 | Termination of patent right due to non-payment of annual fee |