CN211422025U - Assembling structure of power grid line iron tower - Google Patents

Assembling structure of power grid line iron tower Download PDF

Info

Publication number
CN211422025U
CN211422025U CN201922246626.1U CN201922246626U CN211422025U CN 211422025 U CN211422025 U CN 211422025U CN 201922246626 U CN201922246626 U CN 201922246626U CN 211422025 U CN211422025 U CN 211422025U
Authority
CN
China
Prior art keywords
plug
rod
rotating rod
handle
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922246626.1U
Other languages
Chinese (zh)
Inventor
唐小春
鲜小康
屈子翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Guangshu Electric Power Engineering Co ltd
Original Assignee
Sichuan Guangshu Electric Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Guangshu Electric Power Engineering Co ltd filed Critical Sichuan Guangshu Electric Power Engineering Co ltd
Priority to CN201922246626.1U priority Critical patent/CN211422025U/en
Application granted granted Critical
Publication of CN211422025U publication Critical patent/CN211422025U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型涉及一种电网线路铁塔的组立结构,涉及一种铁塔,解决了现有的铁塔拆卸十分麻烦的问题,其包括多段塔节,所述塔节包括塔框,所述塔框下表面四角位置均固定连有插接杆,所述塔框上表面四角位置均固定连接有供所述插接杆插接的插接筒,所述插接杆为中空设置,所述插接杆内沿插接杆长度方向设置有转动杆,所述转动杆转动连接在所述插接杆上,所述转动杆外周壁上设有若干插板,所述插接杆上开设有供所述插板卡入的开口一,所述插接筒上开设有供所述插板卡入的开口二,所述开口一和所述开口二一一对应,所述转动杆上铰接有连接杆,所述连接杆远离所述转动杆的一端铰接所述插。本实用新型具有方便拆卸铁塔的效果。

Figure 201922246626

The utility model relates to an assembly structure of an iron tower of a power grid line, and relates to an iron tower, which solves the problem that the existing iron tower is very troublesome to disassemble. The four corners of the surface are fixedly connected with plug-in rods, and the four corners of the upper surface of the tower frame are fixedly connected with plug-in cylinders for the plug-in rods to be plugged in. The plug-in rods are hollow. A rotating rod is arranged along the length direction of the plugging rod, the rotating rod is rotatably connected to the plugging rod, a plurality of plug boards are arranged on the outer peripheral wall of the rotating rod, and the plugging rod is provided with a Opening 1 for inserting the plug-in board, the plug-in barrel is provided with an opening 2 for the plug-in board to be plugged in, the opening 1 and the opening 2 are in one-to-one correspondence, and a connecting rod is hinged on the rotating rod, One end of the connecting rod away from the rotating rod is hinged to the plug. The utility model has the effect of facilitating the disassembly of the iron tower.

Figure 201922246626

Description

一种电网线路铁塔的组立结构An assembly structure of a power grid line tower

技术领域technical field

本实用新型涉及一种铁塔,尤其是涉及一种电网线路铁塔的组立结构。The utility model relates to an iron tower, in particular to an assembly structure of an iron tower of a power grid line.

背景技术Background technique

目前铁塔的组立一般有两种施工方法,即整体立塔法和分解组塔法。At present, there are generally two construction methods for the grouping of iron towers, namely the overall tower method and the decomposed group tower method.

现有的授权公告号为CN205077964U的中国实用新型专利公开了一种减重的铁塔结构,包括铁塔和多个分体塔基,铁塔为若干立管、斜撑管构成,铁塔自下而上分为若干段,每段铁塔为多个立管构成的矩形框,斜撑管交叉的设置在矩形框内,其中,多个分体塔基排列在一个水平面上,多个分体塔基通过锁杆贯穿并连接为一体;每段铁塔之间设置有圈梁,圈梁呈矩形状,圈梁的壁上一体成型的设置有多个拼接孔,相邻两段铁塔的立管之间的十字形槽插合连接,且插合处位于圈梁的拼接孔内;圈梁的四角一体成型的设置有插接槽,相邻的两个圈梁之间的插接槽与斜撑管插合连接并通过螺栓锁紧固定,立管、斜撑管,圈梁为高强度460钢。The existing Chinese utility model patent with the authorization announcement number CN205077964U discloses a weight-reducing iron tower structure, including an iron tower and a plurality of split tower bases, the iron tower is composed of a number of risers and inclined support pipes, and the iron tower is divided from bottom to top. There are several sections, each section of the tower is a rectangular frame composed of a plurality of standpipes, and the diagonal braces are arranged in the rectangular frame crossed, wherein, a plurality of split tower bases are arranged on a horizontal plane, and a plurality of split tower bases pass through the lock. The rod runs through and is connected as a whole; a ring beam is arranged between each section of the iron tower, the ring beam is rectangular, the wall of the ring beam is integrally formed with a plurality of splicing holes, and the cross-shaped groove between the risers of the two adjacent iron towers The inserting connection, and the inserting place is located in the splicing hole of the ring beam; the four corners of the ring beam are integrally formed with inserting grooves, and the inserting grooves between the two adjacent ring beams are inserted and connected with the diagonal brace pipe. Fastened and fixed by bolts, the riser, diagonal brace and ring beam are made of high-strength 460 steel.

上述中的现有技术方案存在以下缺陷:但该结构由于每段铁塔和每段铁塔之间是通过螺钉固定连接的,在拆卸铁塔时,需要拧下多颗螺钉,十分麻烦。The above-mentioned prior art solutions have the following defects: However, in this structure, since each section of the iron tower is fixedly connected with each section of the iron tower, it is very troublesome to unscrew a plurality of screws when disassembling the iron tower.

实用新型内容Utility model content

针对现有技术存在的不足,本实用新型的目的是提供一种电网线路铁塔的组立结构,其优点是方便拆卸铁塔。Aiming at the deficiencies of the prior art, the purpose of the present invention is to provide an assembly structure of an iron tower of a power grid line, the advantage of which is that it is convenient to disassemble the iron tower.

本实用新型的上述实用新型目的是通过以下技术方案得以实现的:The above-mentioned utility model purpose of the present utility model is achieved through the following technical solutions:

一种电网线路铁塔的组立结构,包括多段塔节,所述塔节包括塔框,所述塔框下表面四角位置均固定连有插接杆,所述塔框上表面四角位置均固定连接有供所述插接杆插接的插接筒,所述插接杆为中空设置,所述插接杆内沿插接杆长度方向设置有转动杆,所述转动杆转动连接在所述插接杆上,所述转动杆外周壁上设有若干插板,所述插接杆上开设有供所述插板卡入的开口一,所述插接筒上开设有供所述插板卡入的开口二,所述开口一和所述开口二一一对应,所述转动杆上铰接有连接杆,所述连接杆远离所述转动杆的一端铰接所述插板。An assembly structure of a power grid line iron tower includes a multi-section tower section, the tower section includes a tower frame, the four corners of the lower surface of the tower frame are fixedly connected with plug-in rods, and the four corners of the upper surface of the tower frame are fixedly connected. There is a plug-in cylinder for the plug-in rod to be plugged in, the plug-in rod is hollow, and a rotation rod is arranged in the plug-in rod along the length direction of the plug-in rod, and the rotation rod is rotatably connected to the plug-in rod. On the connecting rod, the outer peripheral wall of the rotating rod is provided with a plurality of plug-in boards, the plug-in rod is provided with an opening 1 for the plug-in board to be inserted into, and the plug-in barrel is provided with a plug-in board for the plug-in board to be inserted into. The first opening corresponds to the opening 2 one-to-one, a connecting rod is hinged on the rotating rod, and an end of the connecting rod away from the rotating rod is hinged to the plug board.

通过采用上述技术方案,安装时,将两塔节相互拼接,拼接时,将插接杆插接在插接筒中,然后转动转动杆,带动连接杆转动,从而将插板推出开口,卡接在插接筒上的开口中,从而通过插板同时卡接在开口一和开口二中,从而可以防止插接杆脱离插接筒,保证塔节之间连接的稳定性,同时拆卸时,反转转动杆,带动连接杆转动,从而带动插板脱离开口二,即可从插接筒中取出插接杆,从而实现塔节之间的分离,从而方便拆卸铁塔。By adopting the above technical solution, during installation, the two tower sections are spliced to each other, and during splicing, the plug-in rod is inserted into the plug-in cylinder, and then the rotating rod is rotated to drive the connection rod to rotate, so that the plug-in board is pushed out of the opening and clamped on the The plug is inserted into the opening on the socket, so that the plug board is clamped in the opening 1 and the opening 2 at the same time, so that the plug rod can be prevented from being separated from the plug cylinder, and the stability of the connection between the tower sections can be ensured. Rotating the rod drives the connecting rod to rotate, thereby driving the plug-in plate to leave the opening 2, and the plug-in rod can be taken out from the plug-in cylinder, thereby realizing the separation between the tower sections, thereby facilitating the disassembly of the iron tower.

本实用新型在一较佳示例中可以进一步配置为:所述插接杆内壁固定连接有防脱块,所述插板侧壁沿其长度方向开设有滑槽,所述防脱块插接在所述滑槽内,所述防脱块抵接于所述滑槽靠近所述插接筒内壁的侧壁上时,所述插板未卡入开口二。In a preferred example of the present invention, it can be further configured as follows: the inner wall of the plug-in rod is fixedly connected with an anti-separation block; In the chute, when the anti-separation block abuts on the side wall of the chute close to the inner wall of the plug-in cylinder, the plug board is not clamped into the second opening.

通过采用上述技术方案,防止在安装时,插板脱离开口一,从而导致转动转动杆时,插板无法穿出开口一卡入到开口二中。By adopting the above technical solution, the insertion board is prevented from being separated from the opening 1 during installation, so that when the rotating rod is rotated, the insertion board cannot pass through the opening 1 and be stuck into the opening 2.

本实用新型在一较佳示例中可以进一步配置为:所述插接杆靠近所述塔框的一端穿射过所述塔框,所述转动杆靠近所述塔框的一端活动连接有手柄。In a preferred example of the present invention, it can be further configured that: one end of the plug-in rod close to the tower frame penetrates the tower frame, and one end of the rotating rod close to the tower frame is movably connected with a handle.

通过采用上述技术方案,方便转动转动杆。By adopting the above technical solution, it is convenient to rotate the rotating rod.

本实用新型在一较佳示例中可以进一步配置为:所述手柄靠近所述转动杆的一面垂直固定连接有用于套接所述转动杆的套筒,所述转动杆靠近所述手柄的一端外周壁上固定连接有卡块,所述套筒内壁上开设有供所述卡块卡入的卡槽。In a preferred example of the present invention, it can be further configured as follows: a side of the handle close to the rotating rod is vertically and fixedly connected with a sleeve for socketing the rotating rod, and the rotating rod is close to the outer circumference of one end of the handle A clamping block is fixedly connected to the wall, and a clamping slot for the clamping block to be clamped is opened on the inner wall of the sleeve.

通过采用上述技术方案,方便将手柄从转动杆上拆卸下来,防止安装完毕后由于外力而导致手柄转动,可能导致插板脱离开口二。By adopting the above technical solution, it is convenient to detach the handle from the rotating rod, so as to prevent the handle from rotating due to external force after the installation is completed, which may cause the insert plate to be separated from the second opening.

本实用新型在一较佳示例中可以进一步配置为:所述塔框上表面开设有用于限制所述手柄转动的限位槽,所述转动杆抵接在所述套筒底面时,所述手柄位于所述限位槽内,所述插板卡接在所述开口二中。In a preferred example of the present invention, it can be further configured that: the upper surface of the tower frame is provided with a limit groove for restricting the rotation of the handle, and when the rotating rod abuts on the bottom surface of the sleeve, the handle Located in the limiting slot, the plug-in board is clamped in the second opening.

通过采用上述技术方案,由于转动杆可以沿套筒长度方向滑动,从而插板插入到开口二中后,控制手柄沿转动杆长度方向下移,从而可以将手柄卡在限位槽中,从而可以防止手柄转动,避免插板脱离开口二。By adopting the above technical solution, since the rotating rod can slide along the length direction of the sleeve, after the insert plate is inserted into the second opening, the control handle moves down along the length direction of the rotating rod, so that the handle can be stuck in the limit groove, so that the Prevent the handle from turning and prevent the plug from leaving the opening two.

本实用新型在一较佳示例中可以进一步配置为:所述插接杆套接有防护筒,所述插接杆插接在所述插接筒内时,所述防护筒内壁抵接在所述插接筒外壁。In a preferred example of the present invention, it can be further configured that: the plug-in rod is sleeved with a protective cylinder, and when the plug-in rod is inserted into the plug-in cylinder, the inner wall of the protective cylinder abuts against the protective cylinder. the outer wall of the plug-in barrel.

通过采用上述技术方案,防止雨水通过开口进入到插接筒中腐蚀插板。By adopting the above technical solution, rainwater is prevented from entering the plug-in barrel through the opening to corrode the plug-in board.

本实用新型在一较佳示例中可以进一步配置为:所述手柄上表面铰接有拉环。In a preferred example of the present invention, it can be further configured that: a pull ring is hinged on the upper surface of the handle.

通过采用上述技术方案,方便拉动手柄。By adopting the above technical solution, it is convenient to pull the handle.

本实用新型在一较佳示例中可以进一步配置为:所述插接杆在所述手柄下表面上的投影在所述手柄下表面范围内。In a preferred example of the present invention, it can be further configured that: the projection of the plug-in rod on the lower surface of the handle is within the range of the lower surface of the handle.

通过采用上述技术方案,插板插接在开口二中后,将手柄置于限位槽中,从而手柄可以防止雨水进入到插接杆中,避免雨水腐蚀插板。By adopting the above technical solution, after the plug-in board is inserted into the second opening, the handle is placed in the limit groove, so that the handle can prevent rainwater from entering the plug-in rod and prevent rainwater from corroding the plug-in board.

综上所述,本实用新型包括以下至少一种有益技术效果:To sum up, the present utility model includes at least one of the following beneficial technical effects:

1.方便拆卸铁塔。1. It is convenient to dismantle the tower.

附图说明Description of drawings

图1是本实用新型中实施例的整体结构示意图。FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present invention.

图2是本实用新型中实施例的局部结构示意图。FIG. 2 is a schematic diagram of a partial structure of an embodiment of the present invention.

图3是本实用新型中实施例的插接杆和插接杆结构示意图。3 is a schematic diagram of the structure of the plug-in rod and the plug-in rod according to the embodiment of the present invention.

图4是图3中A部分的局部放大示意图。FIG. 4 is a partial enlarged schematic view of part A in FIG. 3 .

图5是本实用新型中实施例的局部结构爆炸图。FIG. 5 is an exploded view of the partial structure of the embodiment of the present invention.

图6是图3中B部分的局部放大示意图。FIG. 6 is a partial enlarged schematic view of part B in FIG. 3 .

图7是图5中C部分的局部放大示意图。FIG. 7 is a partial enlarged schematic view of part C in FIG. 5 .

附图标记:1、塔节;2、塔框;3、插接杆;4、防护筒;5、固定杆;6、插接筒;7、X形连接杆;8、转动杆;9、手柄;10、限位杆;11、加强块;12、限位槽;13、拉环;14、防脱块;15、滑槽;16、插板;17、开口一;18、开口二;19、连接杆;20、套筒;21、卡块;22、卡槽;23、插槽。Reference signs: 1, tower section; 2, tower frame; 3, plugging rod; 4, protective cylinder; 5, fixed rod; 6, plugging cylinder; 7, X-shaped connecting rod; 8, rotating rod; 9, Handle; 10, limit rod; 11, reinforcement block; 12, limit slot; 13, pull ring; 14, anti-fall block; 15, chute; 16, insert plate; 17, opening one; 18, opening two; 19, connecting rod; 20, sleeve; 21, block; 22, card slot; 23, slot.

具体实施方式Detailed ways

以下结合附图对本实用新型作进一步详细说明。The present utility model will be further described in detail below in conjunction with the accompanying drawings.

参照图1和图2,为本实用新型公开的一种电网线路铁塔的组立结构,包括多段塔节1,塔节1包括塔框2,塔框2为方形,塔框2面积沿铁塔高度方向从下至上逐渐减小。1 and 2, it is an assembly structure of a power grid line iron tower disclosed by the utility model, including a multi-section tower section 1, the tower section 1 includes a tower frame 2, the tower frame 2 is square, and the area of the tower frame 2 is along the height of the iron tower. The direction gradually decreases from bottom to top.

参照图3和图4,塔框2下表面四角位置均固定连有插接杆3,插接杆3外壁套接有防护筒4,塔框2上表面四角位置均固定连接有固定杆5,固定杆5延伸固定连接有供插接杆3插接的插接筒6,防护筒4内壁和插接杆3外壁之间的间距等于插接筒6的壁厚。Referring to Figures 3 and 4, the four corners of the lower surface of the tower frame 2 are fixedly connected with plug-in rods 3, the outer wall of the plug-in rod 3 is sleeved with a protective cylinder 4, and the four corners of the upper surface of the tower frame 2 are fixedly connected with fixed rods 5, The fixing rod 5 is extended and fixedly connected with a plug-in cylinder 6 for the plug-in rod 3 to be plugged in. The distance between the inner wall of the protective cylinder 4 and the outer wall of the plug-in rod 3 is equal to the wall thickness of the plug-in cylinder 6 .

参照图1和图2,塔节1还包括四对X形连接杆7,四对X形连接杆7分别设置在塔框2四条周边下侧,每对X形连接杆7中的其中一X形连接杆7的两端分别固定连接在相邻两固定杆5上,另一对X形连接杆7的两端分别固定连接在两相邻防护筒4上。1 and 2 , the tower section 1 further includes four pairs of X-shaped connecting rods 7 , and the four pairs of X-shaped connecting rods 7 are respectively arranged on the lower sides of the four peripheries of the tower frame 2 , and one of each pair of X-shaped connecting rods 7 is X The two ends of the connecting rods 7 are fixedly connected to two adjacent fixed rods 5 respectively, and the two ends of the other pair of X-shaped connecting rods 7 are fixedly connected to two adjacent protective cylinders 4 respectively.

参照图5和图6,插接杆3为中空设置,插接杆3内沿插接杆3长度方向设置有转动杆8,转动杆8一端转动连接在插接杆3底面,转动杆8另一端连接有手柄9。Referring to FIGS. 5 and 6 , the plug-in rod 3 is hollow, and a rotating rod 8 is provided in the plug-in rod 3 along the length direction of the plug-in rod 3. One end of the rotating rod 8 is rotatably connected to the bottom surface of the plug-in rod 3, and the other side of the rotating rod 8 A handle 9 is connected to one end.

手柄9靠近转动杆8的一面垂直固定连接有用于套接转动杆8的套筒20,套筒20上开设有供转动杆8插接的插槽23,转动杆8靠近手柄9的一端外周壁上固定连接有卡块21,插槽23内壁上开设有供卡块21卡入的卡槽22。The side of the handle 9 close to the rotating rod 8 is vertically fixedly connected with a sleeve 20 for socketing the rotating rod 8. The sleeve 20 is provided with a slot 23 for the rotating rod 8 to be inserted into. The rotating rod 8 is close to the outer peripheral wall of one end of the handle 9. A card block 21 is fixedly connected to the top, and a card slot 22 for the card block 21 to be inserted into is opened on the inner wall of the slot 23 .

手柄9外周壁固定连接有四呈等间距设置的限位杆10,塔框2于插接杆3位置处固定连接有加强块11,加强块11上开设有用于放置手柄9的限位槽12,手柄9外壁和限位槽12内壁抵接,手柄9放置在限位槽12中时,限位槽12限制手柄9转动,手柄9上表面和加强块11上表面齐平;限位槽12连通于插接杆3。The outer peripheral wall of the handle 9 is fixedly connected with four limit rods 10 arranged at equal intervals. The tower frame 2 is fixedly connected with a reinforcement block 11 at the position of the insertion rod 3. The reinforcement block 11 is provided with a limit slot 12 for placing the handle 9 , the outer wall of the handle 9 is in contact with the inner wall of the limit slot 12. When the handle 9 is placed in the limit slot 12, the limit slot 12 restricts the rotation of the handle 9, and the upper surface of the handle 9 is flush with the upper surface of the reinforcement block 11; the limit slot 12 Connected to the plug-in rod 3 .

手柄9上表面铰接有拉环13。A pull ring 13 is hinged on the upper surface of the handle 9 .

参照图4和图7,转动杆8外周壁上设有若干插板16,插接杆3上开设有供插板16卡入的开口一17,插接筒6上开设有供插板16卡入的开口二18,开口一17和开口二18一一对应,转动杆8上铰接有连接杆19,连接杆19远离转动杆8的一端铰接插板16。Referring to FIGS. 4 and 7 , the outer peripheral wall of the rotating rod 8 is provided with a plurality of plug-in boards 16, the plug-in rod 3 is provided with an opening 17 for the plug-in board 16 to be inserted into, and the plug-in cylinder 6 is provided with a plug-in board 16. The second opening 18, the first opening 17 and the second opening 18 are in one-to-one correspondence, the rotating rod 8 is hinged with a connecting rod 19, and one end of the connecting rod 19 away from the rotating rod 8 is hinged to the plug board 16.

插接杆3内壁固定连接有防脱块14,插板16侧壁沿其长度方向开设有滑槽15,防脱块14插接在滑槽15内,防脱块14抵接于滑槽15靠近插接筒6内壁的侧壁上时,插板16未卡入开口二18。An anti-separation block 14 is fixedly connected to the inner wall of the plug-in rod 3, and a chute 15 is defined on the side wall of the plug-in board 16 along its length direction. When approaching the side wall of the inner wall of the plug-in barrel 6 , the plug-in board 16 is not clamped into the second opening 18 .

本实施例的实施原理为:拆卸时,拉动拉环13,控制手柄9上的限位杆10脱离限位槽12,且控制手柄9不脱离转动杆8,然后转动手柄9,带动转动杆8转动,从而带动转动杆8上的插板16脱离插接筒6上的开口二18,然后将插接杆3从插接筒6中取出即可,从而实现塔节1和塔节1之间的分离。The implementation principle of this embodiment is as follows: when disassembling, pull the pull ring 13, the limit rod 10 on the control handle 9 is separated from the limit groove 12, and the control handle 9 is not separated from the rotating rod 8, and then the handle 9 is rotated to drive the rotating rod 8 Rotate, so as to drive the plug plate 16 on the rotating rod 8 to disengage from the opening 2 18 on the plug-in cylinder 6, and then take the plug-in rod 3 out of the plug-in cylinder 6, so as to realize the gap between the tower section 1 and the tower section 1. separation.

本具体实施方式的实施例均为本实用新型的较佳实施例,并非依此限制本实用新型的保护范围,故:凡依本实用新型的结构、形状、原理所做的等效变化,均应涵盖于本实用新型的保护范围之内。The examples of this specific embodiment are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore: all equivalent changes made according to the structure, shape and principle of the present invention are not It should be covered within the protection scope of the present invention.

Claims (8)

1.一种电网线路铁塔的组立结构,包括多段塔节(1),所述塔节(1)包括塔框(2),所述塔框(2)下表面四角位置均固定连有插接杆(3),所述塔框(2)上表面四角位置均固定连接有供所述插接杆(3)插接的插接筒(6),其特征在于:所述插接杆(3)为中空设置,所述插接杆(3)内沿插接杆(3)长度方向设置有转动杆(8),所述转动杆(8)转动连接在所述插接杆(3)上,所述转动杆(8)外周壁上设有若干插板(16),所述插接杆(3)上开设有供所述插板(16)卡入的开口一(17),所述插接筒(6)上开设有供所述插板(16)卡入的开口二(18),所述开口一(17)和所述开口二(18)一一对应,所述转动杆(8)上铰接有连接杆(19),所述连接杆(19)远离所述转动杆(8)的一端铰接所述插板(16)。1. An assembly structure of a power grid line iron tower, comprising a multi-section tower section (1), the tower section (1) comprising a tower frame (2), and the four corners of the lower surface of the tower frame (2) are fixedly connected with plugs. The connecting rod (3), the four corner positions of the upper surface of the tower frame (2) are fixedly connected with a plug-in cylinder (6) for the plug-in rod (3) to be plugged in, characterized in that: the plug-in rod ( 3) It is a hollow arrangement, and a rotating rod (8) is arranged in the plugging rod (3) along the length direction of the plugging rod (3), and the rotating rod (8) is rotatably connected to the plugging rod (3) On the outer peripheral wall of the rotating rod (8), there are several plug-in boards (16), and the plug-in rod (3) is provided with an opening (17) for the plug-in board (16) to be inserted into. The insertion cylinder (6) is provided with an opening two (18) for the insertion plate (16) to be inserted into, the opening one (17) and the opening two (18) are in one-to-one correspondence, and the rotating rod (8) A connecting rod (19) is hinged on the top, and one end of the connecting rod (19) away from the rotating rod (8) is hinged to the inserting plate (16). 2.根据权利要求1所述的一种电网线路铁塔的组立结构,其特征在于:所述插接杆(3)内壁固定连接有防脱块(14),所述插板(16)侧壁沿其长度方向开设有滑槽(15),所述防脱块(14)插接在所述滑槽(15)内,所述防脱块(14)抵接于所述滑槽(15)靠近所述插接筒(6)内壁的侧壁上时,所述插板(16)未卡入开口二(18)。2. The assembly structure of a power grid line iron tower according to claim 1, characterized in that: the inner wall of the plug-in rod (3) is fixedly connected with an anti-separation block (14), and the plug-in plate (16) side is The wall is provided with a chute (15) along its length direction, the anti-separation block (14) is inserted into the chute (15), and the anti-separation block (14) abuts against the chute (15). ) When approaching the side wall of the inner wall of the plug-in barrel (6), the plug-in board (16) is not clamped into the opening two (18). 3.根据权利要求1所述的一种电网线路铁塔的组立结构,其特征在于:所述插接杆(3)靠近所述塔框(2)的一端穿射过所述塔框(2),所述转动杆(8)靠近所述塔框(2)的一端活动连接有手柄(9)。3. The assembly structure of a power grid line iron tower according to claim 1, characterized in that: one end of the plug-in rod (3) close to the tower frame (2) passes through the tower frame (2) ), a handle (9) is movably connected to one end of the rotating rod (8) close to the tower frame (2). 4.根据权利要求3所述的一种电网线路铁塔的组立结构,其特征在于:所述手柄(9)靠近所述转动杆(8)的一面垂直固定连接有用于套接所述转动杆(8)的套筒(20),所述转动杆(8)靠近所述手柄(9)的一端外周壁上固定连接有卡块(21),所述套筒(20)内壁上开设有供所述卡块(21)卡入的卡槽(22)。4. The assembly structure of a power grid line iron tower according to claim 3, characterized in that: a side of the handle (9) close to the rotating rod (8) is vertically fixedly connected with a surface for socketing the rotating rod (8) of the sleeve (20), a clamping block (21) is fixedly connected to the outer peripheral wall of one end of the rotating rod (8) close to the handle (9), and the inner wall of the sleeve (20) is provided with a supply for The card slot (22) into which the card block (21) is locked. 5.根据权利要求4所述的一种电网线路铁塔的组立结构,其特征在于:所述塔框(2)上表面开设有用于限制所述手柄(9)转动的限位槽(12),所述转动杆(8)抵接在所述套筒(20)底面时,所述手柄(9)位于所述限位槽(12)内,所述插板(16)卡接在所述开口二(18)中。The assembling structure of a power grid line iron tower according to claim 4, characterized in that: a limit groove (12) for restricting the rotation of the handle (9) is provided on the upper surface of the tower frame (2) , when the rotating rod (8) is in contact with the bottom surface of the sleeve (20), the handle (9) is located in the limiting groove (12), and the insert plate (16) is clamped on the Opening two (18). 6.根据权利要求1所述的一种电网线路铁塔的组立结构,其特征在于:所述插接杆(3)套接有防护筒(4),所述插接杆(3)插接在所述插接筒(6)内时,所述防护筒(4)内壁抵接在所述插接筒(6)外壁。6 . The assembly structure of a power grid line iron tower according to claim 1 , characterized in that: the plugging rod (3) is sleeved with a protective cylinder (4), and the plugging rod (3) is plugged in. 7 . When inside the plug-in cylinder (6), the inner wall of the protection cylinder (4) abuts against the outer wall of the plug-in cylinder (6). 7.根据权利要求3所述的一种电网线路铁塔的组立结构,其特征在于:所述手柄(9)上表面铰接有拉环(13)。7 . The assembly structure of a power grid line iron tower according to claim 3 , wherein a pull ring ( 13 ) is hinged on the upper surface of the handle ( 9 ). 8 . 8.根据权利要求3所述的一种电网线路铁塔的组立结构,其特征在于:所述插接杆(3)在所述手柄(9)下表面上的投影在所述手柄(9)下表面范围内。8 . The assembly structure of a power grid line iron tower according to claim 3 , wherein the projection of the plug rod ( 3 ) on the lower surface of the handle ( 9 ) is projected on the handle ( 9 ). 9 . within the lower surface.
CN201922246626.1U 2019-12-14 2019-12-14 Assembling structure of power grid line iron tower Expired - Fee Related CN211422025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922246626.1U CN211422025U (en) 2019-12-14 2019-12-14 Assembling structure of power grid line iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922246626.1U CN211422025U (en) 2019-12-14 2019-12-14 Assembling structure of power grid line iron tower

Publications (1)

Publication Number Publication Date
CN211422025U true CN211422025U (en) 2020-09-04

Family

ID=72249540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922246626.1U Expired - Fee Related CN211422025U (en) 2019-12-14 2019-12-14 Assembling structure of power grid line iron tower

Country Status (1)

Country Link
CN (1) CN211422025U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502522A (en) * 2020-12-31 2021-03-16 杨金秀 Electric power iron tower easy to assemble

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502522A (en) * 2020-12-31 2021-03-16 杨金秀 Electric power iron tower easy to assemble

Similar Documents

Publication Publication Date Title
CN209837294U (en) Assembled building steel skeleton is connected
CN211422025U (en) Assembling structure of power grid line iron tower
CN206279657U (en) A kind of easy-to-dismount Building Fire Protection wall framework
CN211572880U (en) A modular protective fence for municipal garden construction or construction site
CN204517238U (en) A kind of insulated isolated device
CN206800733U (en) A kind of energy-saving replaceable units curtain wall system
CN211473663U (en) a construction enclosure
CN209083152U (en) A kind of environmentally friendly enclosing of building construction
CN103556815A (en) Building template system
CN203640266U (en) Building template system
CN109209015A (en) A kind of guardrail
CN218264334U (en) A quick connection device for building structure design wall column feet
CN209353662U (en) Climbing frame protective net frame and pole connection structure
CN209509172U (en) A kind of assembly concrete column and connecting node
CN211777140U (en) A protective device suitable for civil engineering in water plants
CN217126750U (en) Tower machine standard festival convenient to dismouting transportation
CN221956509U (en) A Bailey beam limiting device
CN223061995U (en) Scaffold wall connecting piece and wall connecting structure thereof
CN218374573U (en) Environment-friendly curtain wall of green building body
CN211229533U (en) Easy-to-remove latches for aluminum formwork assembly
CN219386661U (en) Movable board house connection structure
CN218715331U (en) Can conveniently dismantle frontier defense of repeated turnover
CN218091332U (en) Embedded part for steel structure
CN219176738U (en) A cylindrical bolt with an anti-off structure
CN216948791U (en) A detachable pre-embedded connecting wall based on steel sleeve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200904

CF01 Termination of patent right due to non-payment of annual fee