CN211396750U - Detachable temporary support for building construction - Google Patents

Detachable temporary support for building construction Download PDF

Info

Publication number
CN211396750U
CN211396750U CN201922148319.XU CN201922148319U CN211396750U CN 211396750 U CN211396750 U CN 211396750U CN 201922148319 U CN201922148319 U CN 201922148319U CN 211396750 U CN211396750 U CN 211396750U
Authority
CN
China
Prior art keywords
support
rod
support plate
plate
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922148319.XU
Other languages
Chinese (zh)
Inventor
曹富
张钦龙
陈晓燕
李德刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Enke Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922148319.XU priority Critical patent/CN211396750U/en
Application granted granted Critical
Publication of CN211396750U publication Critical patent/CN211396750U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种建筑工程施工用可拆卸式临时支护,包括底座和第一支撑板,所述底座的上表面固定连接有支撑杆,所述支撑杆的底端插接有升降杆,所述升降杆的侧面固定连接有隔板,所述升降杆的外部滑动连接有滑块,所述滑块的侧面螺纹连接有定位螺栓,所述滑块的侧面固定连接有支撑块,所述支撑块的上表面通过铰链铰接有连接板。该建筑工程施工用可拆卸式临时支护,通过第一支撑板、支撑杆、升降杆、连接板和第二支撑板的设置,施工人员便于与各个结构进行拆卸和安装,而且连接板还能对第一支撑板和第二支撑板起到支撑作用,不仅增强了该临时支护的稳定性,还为施工人员拆卸和移动该装置提供了方便。

Figure 201922148319

The utility model discloses a detachable temporary support for building engineering construction, comprising a base and a first support plate, a support rod is fixedly connected to the upper surface of the base, and a lifting rod is inserted into the bottom end of the support rod , the side of the lifting rod is fixedly connected with a partition plate, the outer side of the lifting rod is slidably connected with a slider, the side of the slider is threadedly connected with a positioning bolt, and the side of the slider is fixedly connected with a support block, so The upper surface of the support block is hinged with a connecting plate through a hinge. The detachable temporary support used in the construction of the construction project is easy for the construction personnel to disassemble and install with each structure through the arrangement of the first support plate, the support rod, the lifting rod, the connecting plate and the second support plate, and the connecting plate can also The first support plate and the second support plate play a supporting role, which not only enhances the stability of the temporary support, but also provides convenience for the construction personnel to disassemble and move the device.

Figure 201922148319

Description

一种建筑工程施工用可拆卸式临时支护Detachable temporary support for building construction

技术领域technical field

本实用新型涉及建筑工程辅助装置技术领域,具体为一种建筑工程施工用可拆卸式临时支护。The utility model relates to the technical field of auxiliary devices for construction projects, in particular to a detachable temporary support for construction of construction projects.

背景技术Background technique

临时支护是指在建筑工程作业时,为了防止刚建成的墙体发生坍塌或者倾斜,采取相关措施支住顶板,使施工得以继续进行的一种暂时的支护方式。Temporary support refers to a temporary support method in which relevant measures are taken to support the roof to prevent the newly built wall from collapsing or tilting during construction operations, so that the construction can continue.

建筑工程中因为施工量巨大,施工的进度也相对较快,但是有部分墙体因为需要一定时间的支撑才能保证墙体的稳固,因此需要一种临时的支撑装置来对墙体进行支撑,传统的临时支护都是采用钢架或者木头支柱,这些临时支护的结构简单,只能应用于固定的位置,不仅不利于人们的使用,而且还不能拆卸,非常不便于施工人员的移动和使用,拖延了施工进度。In construction projects, due to the huge amount of construction, the construction progress is relatively fast, but some walls need a certain period of support to ensure the stability of the wall, so a temporary support device is needed to support the wall. Traditional The temporary supports are all made of steel frames or wood pillars. These temporary supports have a simple structure and can only be used in a fixed position, which is not only unfavorable for people's use, but also cannot be disassembled, which is very inconvenient for construction personnel to move and use. , delaying the construction progress.

实用新型内容Utility model content

(一)解决的技术问题(1) Technical problems solved

针对现有技术的不足,本实用新型提供了一种建筑工程施工用可拆卸式临时支护,解决了上述背景技术中提出的问题。Aiming at the deficiencies of the prior art, the utility model provides a detachable temporary support for building engineering construction, which solves the problems raised in the above background technology.

(二)技术方案(2) Technical solutions

为实现以上目的,本实用新型通过以下技术方案予以实现:一种建筑工程施工用可拆卸式临时支护,包括底座和第一支撑板,所述底座的上表面固定连接有支撑杆,所述支撑杆的底端插接有升降杆,所述升降杆的侧面固定连接有隔板,所述升降杆的外部滑动连接有滑块,所述滑块的侧面螺纹连接有定位螺栓,所述滑块的侧面固定连接有支撑块,所述支撑块的上表面通过铰链铰接有连接板,所述升降杆的顶端通过铰链铰接有第一支撑板,所述第一支撑板的一端通过铰链铰接有第二支撑板。In order to achieve the above purpose, the present utility model is realized through the following technical solutions: a detachable temporary support for building engineering construction, comprising a base and a first support plate, the upper surface of the base is fixedly connected with a support rod, the A lift rod is inserted into the bottom end of the support rod, a baffle is fixedly connected to the side of the lift rod, a slider is slidably connected to the outside of the lift rod, and a positioning bolt is threadedly connected to the side of the slider. The side of the block is fixedly connected with a support block, the upper surface of the support block is hinged with a connecting plate through a hinge, the top end of the lifting rod is hinged with a first support plate, and one end of the first support plate is hinged with a hinge. second support plate.

可选的,所述升降杆的数量为两个,且两个所述升降杆分别铰接在第一支撑板和第二支撑板的下表面。Optionally, the number of the lifting rods is two, and the two lifting rods are hinged on the lower surfaces of the first support plate and the second support plate, respectively.

可选的,所述底座的上表面螺纹连接有固定螺栓,所述固定螺栓的数量为八个,且八个所述固定螺栓平均分为两组,两组所述固定螺栓分别设置在两个底座的上表面。Optionally, the upper surface of the base is threadedly connected with fixing bolts, the number of the fixing bolts is eight, and the eight fixing bolts are equally divided into two groups, and the fixing bolts in the two groups are respectively arranged in two groups. the top surface of the base.

可选的,所述升降杆侧面的顶端开设有定位孔,所述升降杆侧面的底端开设有卡孔,所述支撑杆侧面的顶端螺纹连接有卡紧螺栓。Optionally, the top end of the side surface of the lifting rod is provided with a positioning hole, the bottom end of the side surface of the lifting rod is provided with a clamping hole, and the top end of the side surface of the support rod is threadedly connected with a clamping bolt.

可选的,所述定位螺栓贯穿滑块侧面的一端与定位孔螺纹连接,所述卡紧螺栓贯穿支撑杆侧面的一端与卡孔螺纹连接。Optionally, one end of the positioning bolt penetrating the side surface of the slider is threadedly connected to the locating hole, and one end of the clamping bolt penetrating the side surface of the support rod is threadedly connected to the clamping hole.

可选的,所述连接板的顶端通过铰链与第一支撑板的下表面铰接,所述连接板的数量为两个,且两个所述连接板分别铰接在两个滑块侧面的支撑块上。Optionally, the top end of the connecting plate is hinged with the lower surface of the first support plate through a hinge, the number of the connecting plate is two, and the two connecting plates are hinged on the support blocks on the sides of the two sliders respectively. superior.

(三)有益效果(3) Beneficial effects

本实用新型提供了一种建筑工程施工用可拆卸式临时支护,具备以下有益效果:The utility model provides a detachable temporary support for building engineering construction, which has the following beneficial effects:

1、该建筑工程施工用可拆卸式临时支护,通过第一支撑板、支撑杆、升降杆、连接板和第二支撑板的设置,施工人员便于与各个结构进行拆卸和安装,而且连接板还能对第一支撑板和第二支撑板起到支撑作用,不仅增强了该临时支护的稳定性,还为施工人员拆卸和移动该装置提供了方便。1. The detachable temporary support for the construction of the building project is easy for the construction personnel to disassemble and install with each structure through the setting of the first support plate, the support rod, the lifting rod, the connecting plate and the second support plate, and the connecting plate It can also support the first support plate and the second support plate, which not only enhances the stability of the temporary support, but also provides convenience for construction personnel to disassemble and move the device.

2、该建筑工程施工用可拆卸式临时支护,通过升降杆、滑块、定位螺栓、支撑块和连接板的设置,施工人员将滑块沿升降杆向下拉,连接板便可以将第一支撑板和第二支撑板撑起成一个平面,定位螺栓起到了固定滑块的作用,该临时支护便可以支撑平面墙体,施工人员向上滑动一侧的滑块,调整升降杆的高度,使第一支撑板和第二支撑板垂直,该装置便可以支撑起垂直墙体,增加了该装置的多样性,方便了施工人员的使用。2. Detachable temporary support is used for the construction of the construction project. Through the setting of the lifting rod, the slider, the positioning bolt, the support block and the connecting plate, the construction personnel pull the slider down along the lifting rod, and the connecting plate can The support plate and the second support plate are supported to form a plane, and the positioning bolts play the role of fixing the slider. The temporary support can support the plane wall. The construction personnel slide the slider on one side upward to adjust the height of the lifting rod. By making the first support plate and the second support plate vertical, the device can support the vertical wall, which increases the variety of the device and facilitates the use of construction personnel.

附图说明Description of drawings

图1为本实用新型立体结构示意图;1 is a schematic diagram of the three-dimensional structure of the present utility model;

图2为本实用新型正视结构示意图;Fig. 2 is the front view structure schematic diagram of the utility model;

图3为本实用新型图1中A处放大结构示意图。FIG. 3 is an enlarged schematic view of the structure at A in FIG. 1 of the present utility model.

图中:1、底座;2、第一支撑板;3、支撑杆;4、升降杆;5、隔板;6、滑块;7、定位螺栓;8、支撑块;9、连接板;10、第二支撑板;11、固定螺栓;12、定位孔;13、卡孔;14、卡紧螺栓。In the figure: 1. Base; 2. First support plate; 3. Support rod; 4. Lifting rod; 5. Partition plate; 6. Slider; 7. Positioning bolt; 8. Support block; 9. Connecting plate; 10 11, fixing bolts; 12, positioning holes; 13, clamping holes; 14, clamping bolts.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example.

请参阅图1至图3,本实用新型提供一种技术方案:一种建筑工程施工用可拆卸式临时支护,包括底座1和第一支撑板2,底座1的上表面固定连接有支撑杆3,支撑杆3的底端插接有升降杆4,升降杆4的侧面固定连接有隔板5,升降杆4的外部滑动连接有滑块6,滑块6的侧面螺纹连接有定位螺栓7,滑块6的侧面固定连接有支撑块8,支撑块8的上表面通过铰链铰接有连接板9;Please refer to FIG. 1 to FIG. 3, the present utility model provides a technical solution: a detachable temporary support for building engineering construction, comprising a base 1 and a first support plate 2, and a support rod is fixedly connected to the upper surface of the base 1 3. The bottom end of the support rod 3 is plugged with a lifting rod 4, the side of the lifting rod 4 is fixedly connected with a partition 5, the outer side of the lifting rod 4 is slidably connected with a slider 6, and the side of the slider 6 is threadedly connected with a positioning bolt 7 , the side of the slider 6 is fixedly connected with a support block 8, and the upper surface of the support block 8 is hinged with a connecting plate 9 through a hinge;

通过升降杆4、滑块6、定位螺栓7、支撑块8和连接板9的设置,施工人员将滑块6沿升降杆4向下拉,连接板9便可以将第一支撑板2和第二支撑板10撑起成一个平面,定位螺栓7起到了固定滑块6的作用,该临时支护便可以支撑平面墙体,施工人员向上滑动一侧的滑块6,调整升降杆4的高度,使第一支撑板2和第二支撑板10垂直,该装置便可以支撑起垂直墙体,增加了该装置的多样性,方便了施工人员的使用;Through the arrangement of the lifting rod 4, the slider 6, the positioning bolt 7, the support block 8 and the connecting plate 9, the construction worker pulls the sliding block 6 down along the lifting rod 4, and the connecting plate 9 can connect the first support plate 2 and the second support plate 9. The support plate 10 is supported into a plane, and the positioning bolts 7 play the role of fixing the sliding block 6. The temporary support can support the plane wall. The construction personnel slide the sliding block 6 on one side upward to adjust the height of the lifting rod 4. By making the first support plate 2 and the second support plate 10 vertical, the device can support the vertical wall, which increases the diversity of the device and facilitates the use of construction personnel;

升降杆4的顶端通过铰链铰接有第一支撑板2,第一支撑板2的一端通过铰链铰接有第二支撑板10;The top end of the lift rod 4 is hinged with a first support plate 2 through a hinge, and one end of the first support plate 2 is hinged with a second support plate 10 through a hinge;

通过第一支撑板2、支撑杆3、升降杆4、连接板9和第二支撑板10的设置,施工人员便于与各个结构进行拆卸和安装,而且连接板9还能对第一支撑板2和第二支撑板10起到支撑作用,不仅增强了该临时支护的稳定性,还为施工人员拆卸和移动该装置提供了方便;Through the arrangement of the first support plate 2 , the support rod 3 , the lift rod 4 , the connecting plate 9 and the second support plate 10 , the construction personnel can easily disassemble and install each structure, and the connecting plate 9 can also be used for the first support plate 2 . and the second support plate 10 play a supporting role, which not only enhances the stability of the temporary support, but also provides convenience for the construction personnel to disassemble and move the device;

升降杆4的数量为两个,且两个升降杆4分别铰接在第一支撑板2和第二支撑板10的下表面,底座1的上表面螺纹连接有固定螺栓11,固定螺栓11的数量为八个,且八个固定螺栓11平均分为两组,两组固定螺栓11分别设置在两个底座1的上表面,升降杆4侧面的顶端开设有定位孔12,升降杆4侧面的底端开设有卡孔13,支撑杆3侧面的顶端螺纹连接有卡紧螺栓14,定位螺栓7贯穿滑块6侧面的一端与定位孔12螺纹连接,卡紧螺栓14贯穿支撑杆3侧面的一端与卡孔13螺纹连接,连接板9的顶端通过铰链与第一支撑板2的下表面铰接,连接板9的数量为两个,且两个连接板9分别铰接在两个滑块6侧面的支撑块8上。The number of lifting rods 4 is two, and the two lifting rods 4 are hinged on the lower surfaces of the first support plate 2 and the second support plate 10 respectively. The upper surface of the base 1 is screwed with fixing bolts 11. The number of fixing bolts 11 There are eight, and the eight fixing bolts 11 are equally divided into two groups. The two groups of fixing bolts 11 are respectively arranged on the upper surfaces of the two bases 1. The top of the side of the lifting rod 4 is provided with a positioning hole 12, and the bottom of the side of the lifting rod 4 is provided with a positioning hole 12. The end is provided with a clamping hole 13, the top end of the side of the support rod 3 is threadedly connected with a clamping bolt 14, one end of the positioning bolt 7 penetrates through the side of the slider 6 and is threadedly connected with the positioning hole 12, and the clamping bolt 14 penetrates one end of the side of the supporting rod 3 and The clamping holes 13 are screwed together, the top of the connecting plate 9 is hinged with the lower surface of the first support plate 2 through a hinge, the number of the connecting plates 9 is two, and the two connecting plates 9 are hinged on the support of the sides of the two sliders 6 respectively. on block 8.

工作原理和操作方法:该建筑工程施工用可拆卸式临时支护,使用时,施工人员便于与各个结构进行拆卸和安装,而且连接板9还能对第一支撑板2和第二支撑板10起到支撑作用,不仅增强了该临时支护的稳定性,还为施工人员拆卸和移动该装置提供了方便,施工人员将滑块6沿升降杆4向下拉,连接板9便可以将第一支撑板2和第二支撑板10撑起成一个平面,定位螺栓7起到了固定滑块6的作用,该临时支护便可以支撑平面墙体,施工人员向上滑动一侧的滑块6,调整升降杆4的高度,使第一支撑板2和第二支撑板10垂直,该装置便可以支撑起垂直墙体,增加了该装置的多样性,方便了施工人员的使用。Working principle and operation method: The detachable temporary support is used for the construction of the construction project. When in use, the construction personnel are easy to disassemble and install with each structure, and the connecting plate 9 can also support the first support plate 2 and the second support plate 10. It plays a supporting role, which not only enhances the stability of the temporary support, but also provides convenience for the construction personnel to disassemble and move the device. The construction personnel pull the slider 6 down along the lifting rod 4, and the connecting plate 9 can The support plate 2 and the second support plate 10 are supported to form a plane, the positioning bolts 7 play the role of fixing the sliding block 6, and the temporary support can support the plane wall. The construction personnel slide the sliding block 6 on one side upward to adjust The height of the lifting rod 4 makes the first support plate 2 and the second support plate 10 vertical, and the device can support the vertical wall, which increases the variety of the device and facilitates the use of the construction personnel.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. Equivalent replacement or modification of the new technical solution and its utility model concept shall be included within the protection scope of the present utility model.

Claims (6)

1.一种建筑工程施工用可拆卸式临时支护,包括底座(1)和第一支撑板(2),其特征在于:所述底座(1)的上表面固定连接有支撑杆(3),所述支撑杆(3)的底端插接有升降杆(4),所述升降杆(4)的侧面固定连接有隔板(5),所述升降杆(4)的外部滑动连接有滑块(6),所述滑块(6)的侧面螺纹连接有定位螺栓(7),所述滑块(6)的侧面固定连接有支撑块(8),所述支撑块(8)的上表面通过铰链铰接有连接板(9),所述升降杆(4)的顶端通过铰链铰接有第一支撑板(2),所述第一支撑板(2)的一端通过铰链铰接有第二支撑板(10)。1. A detachable temporary support for building engineering construction, comprising a base (1) and a first support plate (2), characterized in that: the upper surface of the base (1) is fixedly connected with a support rod (3) The bottom end of the support rod (3) is plugged with a lift rod (4), the side of the lift rod (4) is fixedly connected with a partition (5), and the outside of the lift rod (4) is slidably connected with a A sliding block (6), the side surface of the sliding block (6) is screwed with positioning bolts (7), and the side surface of the sliding block (6) is fixedly connected with a support block (8). The upper surface is hinged with a connecting plate (9) through a hinge, the top of the lift rod (4) is hinged with a first support plate (2) through a hinge, and one end of the first support plate (2) is hinged with a second support plate (2) through a hinge. Support plate (10). 2.根据权利要求1所述的一种建筑工程施工用可拆卸式临时支护,其特征在于:所述升降杆(4)的数量为两个,且两个所述升降杆(4)分别铰接在第一支撑板(2)和第二支撑板(10)的下表面。2. A detachable temporary support for building engineering construction according to claim 1, wherein the number of the lifting rods (4) is two, and the two lifting rods (4) are respectively It is hinged on the lower surfaces of the first support plate (2) and the second support plate (10). 3.根据权利要求1所述的一种建筑工程施工用可拆卸式临时支护,其特征在于:所述底座(1)的上表面螺纹连接有固定螺栓(11),所述固定螺栓(11)的数量为八个,且八个所述固定螺栓(11)平均分为两组,两组所述固定螺栓(11)分别设置在两个底座(1)的上表面。3. A detachable temporary support for building construction according to claim 1, characterized in that: the upper surface of the base (1) is threadedly connected with fixing bolts (11), and the fixing bolts (11) ) is eight, and the eight fixing bolts (11) are equally divided into two groups, and the two groups of fixing bolts (11) are respectively arranged on the upper surfaces of the two bases (1). 4.根据权利要求1所述的一种建筑工程施工用可拆卸式临时支护,其特征在于:所述升降杆(4)侧面的顶端开设有定位孔(12),所述升降杆(4)侧面的底端开设有卡孔(13),所述支撑杆(3)侧面的顶端螺纹连接有卡紧螺栓(14)。4. A detachable temporary support for building construction according to claim 1, characterized in that: a positioning hole (12) is provided at the top of the side of the lifting rod (4), and the lifting rod (4) is provided with a positioning hole (12). A clamping hole (13) is provided at the bottom end of the side surface of the support rod (3), and a clamping bolt (14) is threadedly connected to the top end of the side surface of the support rod (3). 5.根据权利要求4所述的一种建筑工程施工用可拆卸式临时支护,其特征在于:所述定位螺栓(7)贯穿滑块(6)侧面的一端与定位孔(12)螺纹连接,所述卡紧螺栓(14)贯穿支撑杆(3)侧面的一端与卡孔(13)螺纹连接。5. A detachable temporary support for building construction according to claim 4, wherein the positioning bolt (7) penetrates one end of the side surface of the slider (6) and is threadedly connected to the positioning hole (12) The clamping bolt (14) penetrates one end of the side surface of the support rod (3) and is threadedly connected to the clamping hole (13). 6.根据权利要求1所述的一种建筑工程施工用可拆卸式临时支护,其特征在于:所述连接板(9)的顶端通过铰链与第一支撑板(2)的下表面铰接,所述连接板(9)的数量为两个,且两个所述连接板(9)分别铰接在两个滑块(6)侧面的支撑块(8)上。6. A detachable temporary support for building construction according to claim 1, characterized in that: the top of the connecting plate (9) is hinged with the lower surface of the first support plate (2) through a hinge, The number of the connecting plates (9) is two, and the two connecting plates (9) are respectively hinged on the support blocks (8) on the sides of the two sliding blocks (6).
CN201922148319.XU 2019-12-04 2019-12-04 Detachable temporary support for building construction Expired - Fee Related CN211396750U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922148319.XU CN211396750U (en) 2019-12-04 2019-12-04 Detachable temporary support for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922148319.XU CN211396750U (en) 2019-12-04 2019-12-04 Detachable temporary support for building construction

Publications (1)

Publication Number Publication Date
CN211396750U true CN211396750U (en) 2020-09-01

Family

ID=72208390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922148319.XU Expired - Fee Related CN211396750U (en) 2019-12-04 2019-12-04 Detachable temporary support for building construction

Country Status (1)

Country Link
CN (1) CN211396750U (en)

Similar Documents

Publication Publication Date Title
CN106088587B (en) A kind of Combined formwork support system
CN215254379U (en) Overhanging type moving operation frame
CN212224316U (en) A prefabricated building wall
CN211396750U (en) Detachable temporary support for building construction
CN203257123U (en) Building supporting frame convenient to fold
CN204715741U (en) A kind of wall form for building
CN218375101U (en) Reinforced concrete corridor construction supporting structure for building construction technology
CN205894292U (en) Prefabricated assembly structure tip beam column node fixed knot constructs
CN211524002U (en) An adjustable construction frame for water conservancy construction with high space utilization
CN205400124U (en) Building template supporting rod
CN204689525U (en) A kind of equipment jacking apparatus being convenient to measure
CN210858100U (en) A new type of civil construction support structure
CN211058009U (en) Assembled steel construction building dysmorphism post
CN207464565U (en) A kind of assembling measure moulding bed of positive six ribs box shape steel structure
CN207974148U (en) Sliding plate device for underground pipe gallery
CN218667487U (en) Positioning ring of steel reinforcement cage
CN205894293U (en) Beam column node fixed knot constructs in middle of prefabricated assembly structure
CN206000188U (en) Rim of a cup basis steel column installs perpendicularity adjustment holding device
CN210493197U (en) Over-and-under type workstation for engineering cost
CN211899829U (en) Combined top support device convenient for building
CN219431293U (en) Scalable scaffold convenient to indoor, outside mutual transfer
CN205363548U (en) Platform of polishing
CN218970565U (en) Multifunctional scaffold
CN218623473U (en) Building reinforcing apparatus suitable for wall body is prosthetic
CN206359154U (en) A kind of steel construction secondary member hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20241106

Address after: Unit 2, Attachment 8, No. 35 Huanghe East Road, Xiaohe District, Guiyang City, Guizhou Province, 550000

Patentee after: Zeng Huaide

Country or region after: China

Address before: 261205 no.6999 Jiankang East Street, high tech Zone, Weifang City, Shandong Province

Patentee before: Cao Fu

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20241121

Address after: No. 5-03, Unit 1, Building 4, Jiulong City, Nanhuan Road, Yinhu Street, Liuzhi Special District, Liupanshui City, Guizhou Province, China, 553000

Patentee after: Guizhou Enke Construction Co.,Ltd.

Country or region after: China

Address before: Unit 2, Attachment 8, No. 35 Huanghe East Road, Xiaohe District, Guiyang City, Guizhou Province, 550000

Patentee before: Zeng Huaide

Country or region before: China

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200901

CF01 Termination of patent right due to non-payment of annual fee