CN211347473U - A coring device for testing and testing of cement mixing piles - Google Patents

A coring device for testing and testing of cement mixing piles Download PDF

Info

Publication number
CN211347473U
CN211347473U CN201922362583.3U CN201922362583U CN211347473U CN 211347473 U CN211347473 U CN 211347473U CN 201922362583 U CN201922362583 U CN 201922362583U CN 211347473 U CN211347473 U CN 211347473U
Authority
CN
China
Prior art keywords
core
coring
cement mixing
frame
barrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922362583.3U
Other languages
Chinese (zh)
Inventor
王志华
张盼盼
高洪梅
刘璐
申志福
孙晋晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Jiou Underground Space Technology Co ltd
Nanjing Tech University
Original Assignee
Nanjing Jiou Underground Space Technology Co ltd
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Jiou Underground Space Technology Co ltd, Nanjing Tech University filed Critical Nanjing Jiou Underground Space Technology Co ltd
Priority to CN201922362583.3U priority Critical patent/CN211347473U/en
Application granted granted Critical
Publication of CN211347473U publication Critical patent/CN211347473U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种用于水泥搅拌桩试验检测的取芯装置,取芯装置包括上拔部件、贯入部件、移动部件;其中,上拔部件由液压电机、卷轮、固定钢架、支撑架、钢丝绳、锁扣组成;贯入部件由液压装置、岩心管、取芯钻筒、合金钢钻头组成;移动部件由履带、底架体、手扶柄组成;采用液压装置引导岩心管下部的带合金钢钻头的取芯钻筒进行水泥搅拌桩取芯作业,可保证取芯过程的稳定性并有效钻取地下桩基进行取芯操作,利用液压电机带动卷轮并通过钢丝绳及锁扣上拔取芯钻筒,能够大幅度提高取芯速率,利用履带式装置带动机体移动进行钻取作业,具有操作方便、现场移动快捷、作业效率高等优势,是现场水泥搅拌桩取芯的理想装置。

Figure 201922362583

The utility model discloses a coring device for cement mixing pile test detection. The coring device comprises an up-drawing part, a penetration part and a moving part; The support frame, wire rope and lock are composed of; the penetration part is composed of hydraulic device, core pipe, core drilling barrel, and alloy steel drill bit; the moving part is composed of crawler, underframe body, and handrail; hydraulic device is used to guide the lower part of the core pipe The core drilling barrel with alloy steel bit is used for the core operation of cement mixing piles, which can ensure the stability of the core core process and effectively drill the underground pile foundation for core operation. The hydraulic motor is used to drive the reel and the wire rope and lock Pulling the core drill pipe upwards can greatly improve the coring rate. The crawler-type device is used to drive the body to move for the drilling operation. It has the advantages of convenient operation, fast on-site movement and high operating efficiency. It is an ideal device for on-site cement mixing pile coring.

Figure 201922362583

Description

一种用于水泥搅拌桩试验检测的取芯装置A coring device for testing and testing of cement mixing piles

技术领域technical field

本实用新型涉及建筑施工的技术领域,更为具体的,涉及一种用于水泥搅拌桩试验检测的取芯装置。The utility model relates to the technical field of building construction, in particular to a coring device for cement mixing pile test detection.

背景技术Background technique

水泥搅拌桩的检测一般采用取芯法,即用钻机在桩体上钻取芯样,截取芯样制成试块以检测水泥搅拌桩桩长、桩身缺陷、桩身强度、均匀性和连续性,从而判定桩身质量。在水泥搅拌桩的取芯设备当中,目前国内所采用的取芯办法通常是采用螺旋钻头进行钻孔,待钻头到达指定深度时压入环刀进行取样。此种方法取芯效率低,尤其在大规模水泥土搅拌桩施工时,此种设备取芯过于缓慢。中国专利CN 206110201U公开了一种新的建筑桩基取芯装置,其方法采用盘式摇柄带动取芯钻筒进行建筑桩基取芯作业,并通过手推式移动轮进行移动完成取芯作业,此种方法在复杂的施工现场,其轮式钻机移动很不方便,且盘式摇柄作业效率低,很难完成深度取芯作业,极大地浪费人力和物力,无法满足施工需求。The detection of cement mixing piles generally adopts the coring method, that is, the core sample is drilled on the pile body with a drilling rig, and the core sample is cut to make a test block to detect the length of the cement mixing pile, the defects of the pile body, the strength, uniformity and continuity of the pile body. properties, so as to determine the quality of the pile body. Among the coring equipment for cement mixing piles, the coring method currently used in China is usually to use a auger bit to drill holes, and when the drill bit reaches the specified depth, it is pressed into the ring cutter for sampling. This method has low coring efficiency, especially in the construction of large-scale cement-soil mixing piles, the coring of this equipment is too slow. Chinese patent CN 206110201U discloses a new construction pile foundation coring device, the method adopts a disc-type crank to drive a coring drill barrel to perform the construction pile foundation coring operation, and moves through a hand-pushed moving wheel to complete the coring operation , This method is very inconvenient to move the wheel drill in the complex construction site, and the operation efficiency of the disc crank is low, it is difficult to complete the deep coring operation, greatly wastes manpower and material resources, and cannot meet the construction needs.

发明内容SUMMARY OF THE INVENTION

本实用新型所要解决的技术问题是,提供一种用于水泥搅拌桩试验检测的取芯装置,以解决现有技术中在大规模水泥搅拌桩施工中机器操作性不便、稳定性较差、不易移动、取芯深度达不到检测要求的问题。The technical problem to be solved by the utility model is to provide a coring device for cement mixing pile test detection, so as to solve the problem of inconvenient machine operability, poor stability, and difficulty in the construction of large-scale cement mixing piles in the prior art. The problem that the movement and coring depth cannot meet the detection requirements.

为解决以上技术问题,本实用新型提供如下技术方案:In order to solve the above technical problems, the utility model provides the following technical solutions:

本实用新型首先提出一种用于水泥搅拌桩试验检测的取芯装置,包括上拔部件、贯入部件、底架体;所述上拔部件包括液压电机、卷轮、固定钢架、支撑架、钢丝绳、锁扣;所述贯入部件包括液压装置、岩心管、取芯钻筒、合金钢钻头;The utility model firstly proposes a coring device for cement mixing pile test and detection, which includes a pulling part, a penetration part, and a bottom frame body; the pulling part includes a hydraulic motor, a reel, a fixed steel frame, and a support frame , wire rope, lock; the penetration components include hydraulic device, core pipe, core drilling barrel, alloy steel drill bit;

其中,所述支撑架沿着底架体的一侧设置,由两组支撑体对称分布形成,两组支撑体的上部通过一横杆连接;Wherein, the support frame is arranged along one side of the bottom frame body, and is formed by two sets of support bodies symmetrically distributed, and the upper parts of the two sets of support bodies are connected by a cross bar;

所述固定钢架安装于支撑架的下方,且与底架体固定连接;The fixed steel frame is installed below the support frame and is fixedly connected with the bottom frame body;

所述液压电机安装于固定钢架的一侧,且通过底座与底架体连接;所述卷轮安装于固定钢架的上方,且通过传动带与液压电机连接;所述液压装置安装于固定钢架的另一侧,且通过U形板连接于固定钢架;The hydraulic motor is installed on one side of the fixed steel frame, and is connected with the chassis body through the base; the reel is installed above the fixed steel frame and connected with the hydraulic motor through a transmission belt; the hydraulic device is installed on the fixed steel frame The other side of the frame is connected to the fixed steel frame through a U-shaped plate;

所述钢丝绳缠绕设置于卷轮的外部,且钢丝绳的一端与卷轮固定连接,所述钢丝绳的另一端穿过支撑架的横杆后安装一锁扣;The wire rope is wound on the outside of the reel, and one end of the wire rope is fixedly connected to the reel, and the other end of the wire rope passes through the cross bar of the support frame and is installed with a lock;

所述岩心管依次贯穿于液压装置、底架体且垂直设置,所述取芯钻筒安装在岩心管的下部,所述合金钢钻头安装于取芯钻筒的底端,且合金钢钻头与取芯钻筒为一体结构。The core pipe runs through the hydraulic device and the chassis body in sequence and is vertically arranged, the core drill pipe is installed at the lower part of the core pipe, the alloy steel drill bit is installed on the bottom end of the core drill pipe, and the alloy steel drill bit is connected with the core drill pipe. The core drilling barrel is an integrated structure.

作为进一步的优化方案,本实用新型的一种用于水泥搅拌桩试验检测的取芯装置,还包括履带、手扶柄;其中,所述履带安装于底架体的下方,且履带设置有两个,所述手扶柄位于底架体表面且相对于液压电机的另一侧。As a further optimization scheme, the core device for cement mixing pile test and detection of the present invention further includes a crawler belt and a handrail; wherein, the crawler belt is installed under the underframe body, and the crawler belt is provided with two One, the handhold is located on the other side of the surface of the chassis body and opposite to the hydraulic motor.

作为进一步的优化方案,本实用新型的一种用于水泥搅拌桩试验检测的取芯装置,所述支撑架的两组支撑体均为三角形支撑结构,其底部两端设置有加强支撑作用的横向梁;且支撑架的横杆上开设有孔洞,孔洞的直径略大于钢丝绳的直径。As a further optimization scheme, a coring device for cement mixing pile test and detection of the present invention, the two groups of support bodies of the support frame are all triangular support structures, and the two ends of the bottom are provided with transverse support to strengthen the support effect. Beam; and the cross bar of the support frame is provided with a hole, and the diameter of the hole is slightly larger than the diameter of the wire rope.

作为进一步的优化方案,本实用新型的一种用于水泥搅拌桩试验检测的取芯装置,所述底架体上在岩心管所处的贯穿位置开设有限位孔,限位孔的直径略大于取芯钻筒的直径。As a further optimization scheme, according to a coring device for cement mixing pile test detection of the present invention, a limit hole is provided on the underframe body at the penetration position where the core pipe is located, and the diameter of the limit hole is slightly larger than The diameter of the coring barrel.

作为进一步的优化方案,本实用新型的一种用于水泥搅拌桩试验检测的取芯装置,所述卷轮内部焊接有传动轴,传动轴的一端连接于传动带。As a further optimized solution, the present invention relates to a coring device for cement mixing pile test detection, wherein a drive shaft is welded inside the reel, and one end of the drive shaft is connected to a drive belt.

作为进一步的优化方案,本实用新型的一种用于水泥搅拌桩试验检测的取芯装置,所述固定钢架呈中空结构,其上部两侧设置有三角形侧板,且三角形侧板开设有圆形孔洞,孔洞的直径大于传动轴的直径。As a further optimization scheme, a coring device for cement mixing pile test and detection of the present invention is provided. The diameter of the hole is larger than the diameter of the drive shaft.

作为进一步的优化方案,本实用新型的一种用于水泥搅拌桩试验检测的取芯装置,所述U形板一端焊接于液压装置,另一端通过销钉方式连接于固定钢架,并带动液压装置左右转动。As a further optimization scheme, a coring device for cement mixing pile test and detection of the present invention, one end of the U-shaped plate is welded to the hydraulic device, and the other end is connected to the fixed steel frame by means of pins, and drives the hydraulic device. Turn left and right.

作为进一步的优化方案,本实用新型的一种用于水泥搅拌桩试验检测的取芯装置,所述岩心管顶部的外壁上设置有外螺纹,底部的内壁上设置有内螺纹,岩心管之间通过螺纹连接,所述取芯钻筒的外壁上设置有外螺纹,取芯钻筒与岩心管通过螺纹连接。As a further optimization scheme, according to a coring device for cement mixing pile test detection of the present invention, the outer wall of the top of the core pipe is provided with an external thread, the inner wall of the bottom is provided with an internal thread, and the core pipe is provided with an internal thread. Through threaded connection, external threads are provided on the outer wall of the core drilling barrel, and the core drilling barrel and the core pipe are connected by threads.

与现有技术相比,本实用新型采用以上技术方案所具有的有益效果是:Compared with the prior art, the utility model adopts the beneficial effects of the above technical solutions as follows:

本实用新型的装置稳定性好,保证在没有晃动、移位的情况下钻孔取芯,从而避免在取芯的过程中芯样受损,并能快速的拔出钻筒,取出芯样。具体具有如下优点:The device of the utility model has good stability, ensures that the core sample can be drilled without shaking and displacement, so as to avoid damage to the core sample during the core removal process, and can quickly pull out the drill barrel and take out the core sample. Specifically, it has the following advantages:

(1)本实用新型在底架体下部安装有履带,履带底盘着地面积比车轮式大,所以在着地时压强小,另外与路面粘着力较强,所能提供的驱动力大,使得在现场复杂且场地不平稳的施工中,可方便将装置整体移动到任意施工地点进行钻孔取芯,节省了人力并提高了装置整体的使用效率。(1) The utility model is equipped with a crawler on the lower part of the underframe body. The ground area of the crawler chassis is larger than that of the wheel type, so the pressure is small when it hits the ground. In addition, the adhesion to the road surface is strong, and the driving force that can be provided is large. In complex and unstable construction, the whole device can be easily moved to any construction site for drilling and coring, which saves manpower and improves the overall use efficiency of the device.

(2)通过安装液压装置,可方便对岩心管的高度进行调节,使装置在一个点进行不同深度的钻孔取芯作业,满足深度的取芯工作,同时提高装置的工作稳定性。(2) By installing the hydraulic device, it is convenient to adjust the height of the core tube, so that the device can carry out drilling and coring operations of different depths at one point, which can meet the depth of coring work and improve the working stability of the device.

(3)合金钢钻头质地坚硬,保证装置挖孔取芯的可靠性,手扶柄的安装保证人员在取芯工作过程中的安全性。(3) The alloy steel drill bit is hard in texture, which ensures the reliability of the device to dig holes and cores, and the installation of the handle ensures the safety of personnel during the coring work.

(4)在取芯钻筒达到深度要求,利用液压电机为动力,通过卷轮、钢丝绳及锁扣将取芯钻筒快速提起,可大幅度缩短取芯作业时间,并减少人力,加快工作进度。(4) When the core drilling barrel reaches the depth requirements, the hydraulic motor is used as the power to quickly lift the core drilling barrel through the reel, wire rope and lock, which can greatly shorten the core drilling operation time, reduce manpower, and speed up the work progress. .

附图说明Description of drawings

图1是本实用新型的结构示意图。Figure 1 is a schematic structural diagram of the present invention.

图2是本实用新型的液压电机与卷轮示意图。Figure 2 is a schematic diagram of the hydraulic motor and the reel of the present invention.

图3是本实用新型的固定钢架与卷轮的示意图。FIG. 3 is a schematic diagram of the fixed steel frame and the reel of the present invention.

其中,附图标记为:1、液压电机;2、卷轮;3、固定钢架;4、支撑架;5、钢丝绳;6、锁扣;7、液压装置;8、岩心管;9、取芯钻筒;10、合金钢钻头;11、履带;12、底架体;13、手扶柄;14、U形板;15、横向梁;16、传动轴;17、三角形侧板;18、底座;19、传动带。Wherein, the reference signs are: 1. Hydraulic motor; 2. Roller; 3. Fixed steel frame; 4. Support frame; 5. Steel wire rope; 6. Lock; 7. Hydraulic device; 8. Core pipe; 9. Take Core drill pipe; 10. Alloy steel drill bit; 11. Track; 12. Underframe body; 13. Hand handle; 14. U-shaped plate; 15. Transverse beam; 16. Transmission shaft; 17. Triangular side plate; 18. Base; 19. Transmission belt.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清除、完整地描述,显然,所描述的实施例仅仅是本实用新型中的一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域的普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In the following, the technical solutions in the embodiments of the present utility model will be cleared and completely described with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, but not all of them. example. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative work fall within the protection scope of the present invention.

参照图1-3,一种用于水泥搅拌桩试验检测的取芯装置,包括上拔部件、液压部件、移动部件,上拔部件由液压电机1、卷轮2、固定钢架3、支撑架4、钢丝绳5、锁扣6组成;贯入部件由液压装置7、岩心管8、取芯钻筒9、合金钢钻头10组成;移动部件由履带11、底架体12、手扶柄13组成;采用液压装置7引导岩心管8下部的带合金钢钻头10的取芯钻筒9进行水泥搅拌桩取芯作业,可保证取芯过程的稳定性并有效钻取地下桩基进行取芯操作,利用液压电机1带动卷轮2并通过钢丝绳5及锁扣6上拔取芯钻筒9,能够大幅度提高取芯速率,利用履带式装置带动机体移动进行钻取作业,具有操作方便、现场移动快捷、作业效率高等优势,是现场水泥搅拌桩取芯的理想装置。Referring to Figures 1-3, a coring device for cement mixing pile test and detection includes an upper pulling part, a hydraulic part, and a moving part. The upper pulling part consists of a hydraulic motor 1, a reel 2, a fixed steel frame 3, and a support frame. 4. The steel wire rope 5 and the lock buckle 6 are composed; the penetration part is composed of the hydraulic device 7, the core pipe 8, the core drilling barrel 9, and the alloy steel drill bit 10; Using the hydraulic device 7 to guide the core drilling barrel 9 with the alloy steel drill bit 10 at the lower part of the core pipe 8 to carry out the coring operation of the cement mixing pile, which can ensure the stability of the coring process and effectively drill the underground pile foundation for the coring operation, The hydraulic motor 1 is used to drive the reel 2 and the core drill barrel 9 is pulled out through the wire rope 5 and the lock 6, which can greatly improve the core removal rate. The crawler-type device is used to drive the body to move for drilling operations, which has the advantages of convenient operation and fast on-site movement. It has the advantages of high operating efficiency and is an ideal device for on-site cement mixing pile core extraction.

如图1所示,底架体12的下方安装有履带11,且履带11设置有两个,所述底架体12的上方安装有手扶柄13,且手扶柄13位于底架体12的一端。履带11底盘着地面积比车轮式大,所以在着地时压强小,另外与路面粘着力较强,所能提供的驱动力大。在现场复杂且场地不平稳的施工中,可方便将装置整体移动到任意施工地点进行钻孔取芯,节省了人力并提高了装置整体的使用效率。As shown in FIG. 1 , the crawler belts 11 are installed below the bottom frame body 12 , and there are two crawler belts 11 , and a handhold 13 is installed above the bottom frame body 12 , and the handhold handle 13 is located on the bottom frame body 12 . one end. The ground area of the track 11 chassis is larger than that of the wheel type, so the pressure is small when it hits the ground, and the adhesion to the road surface is strong, which can provide a large driving force. In complex and unstable construction on site, it is convenient to move the device as a whole to any construction site for drilling and core removal, which saves manpower and improves the overall use efficiency of the device.

所述手扶柄13的一侧安装有支撑架4,且支撑架4沿着底架体12对称分布,所述支撑架4的下方安装有固定钢架3,且固定钢架3与底架体12焊接固定,所述固定钢架3的左侧安装有液压电机1,且液压电机通过底座18与底架体12连接,所述固定钢架3的上方安装有卷轮2,且卷轮通过传动带8与左侧液压电机1连接,所述固定钢架3的一侧安装有液压装置7,且液压装置7通过U形板14连接于固定钢架3。通过安装液压装置,可方便对岩心管的高度进行调节,使装置在一个点进行不同深度的钻孔取芯作业,满足深度的取芯工作,同时提高装置的工作稳定性。A support frame 4 is installed on one side of the handle 13, and the support frames 4 are symmetrically distributed along the chassis body 12. A fixed steel frame 3 is installed below the support frame 4, and the fixed steel frame 3 and the bottom frame are installed The body 12 is welded and fixed, the hydraulic motor 1 is installed on the left side of the fixed steel frame 3, and the hydraulic motor is connected with the bottom frame body 12 through the base 18, the reel 2 is installed above the fixed steel frame 3, and the reel Connected to the left hydraulic motor 1 through a transmission belt 8 , a hydraulic device 7 is installed on one side of the fixed steel frame 3 , and the hydraulic device 7 is connected to the fixed steel frame 3 through a U-shaped plate 14 . By installing the hydraulic device, the height of the core tube can be easily adjusted, so that the device can perform drilling and coring operations of different depths at one point, which can satisfy the deep coring work and improve the working stability of the device.

所述卷轮2外部安装有钢丝绳5,且钢丝绳5的一端与卷轮2固定连接,所述钢丝绳5的另一端安装有锁扣6,所述岩心管8的下部安装有取芯钻筒9,所述取芯钻筒9的底端安装有合金钢钻头10,且合金钢钻头10与取芯钻筒9为一体结构。合金钢钻头质地坚硬,保证装置挖孔取芯的可靠性,手扶柄的安装保证人员在取芯工作过程中的安全性。A wire rope 5 is installed on the outside of the reel 2, and one end of the wire rope 5 is fixedly connected to the reel 2, the other end of the wire rope 5 is installed with a lock 6, and the lower part of the core pipe 8 is installed with a core drilling barrel 9 , the bottom end of the core drilling barrel 9 is installed with an alloy steel drill bit 10, and the alloy steel drill bit 10 and the core drilling barrel 9 have an integral structure. The alloy steel drill bit is hard in texture, which ensures the reliability of the device for digging holes and coring, and the installation of the handrail ensures the safety of personnel during the coring work.

支撑架4的两端设置有横向梁15,加强支撑作用,且支撑架4的顶部开设有孔洞,孔洞的直径略大于钢丝绳5的直径。底架体12的右侧开设有限位孔,限位孔的直径略大于取芯钻筒9的直径。如图2所示,卷轮2内部焊接有传动轴16,传动轴16的一端连接于传动带19。固定钢架3呈中空结构,其上部两侧设置有三角形侧板17,且三角形侧板17开设有圆形孔洞,孔洞的直径大于传动轴16的直径。如图3所示,U形板14一端焊接于液压装置7,另一端通过销钉方式连接于固定钢架3,并带动液压装置7左右转动。岩心管8顶部的外壁上设置有外螺纹,底部的内壁上设置有内螺纹,岩心管8之间通过螺纹连接,所述取芯钻筒9的外壁上设置有外螺纹,取芯钻筒9与岩心管8通过螺纹连接。在取芯钻筒达到深度要求,利用液压电机为动力,通过卷轮、钢丝绳及锁扣将取芯钻筒快速提起,可大幅度缩短取芯作业时间,并减少人力,加快工作进度。The two ends of the support frame 4 are provided with transverse beams 15 to enhance the supporting effect, and the top of the support frame 4 is provided with a hole, and the diameter of the hole is slightly larger than the diameter of the wire rope 5 . The right side of the bottom frame body 12 is provided with a limiting hole, and the diameter of the limiting hole is slightly larger than the diameter of the core drilling barrel 9 . As shown in FIG. 2 , a drive shaft 16 is welded inside the reel 2 , and one end of the drive shaft 16 is connected to a drive belt 19 . The fixed steel frame 3 has a hollow structure, and the upper two sides of the upper part are provided with triangular side plates 17 , and the triangular side plates 17 are provided with circular holes, and the diameter of the holes is larger than the diameter of the transmission shaft 16 . As shown in FIG. 3 , one end of the U-shaped plate 14 is welded to the hydraulic device 7 , and the other end is connected to the fixed steel frame 3 by means of pins, and drives the hydraulic device 7 to rotate left and right. The outer wall of the top of the core pipe 8 is provided with external threads, the inner wall of the bottom is provided with internal threads, the core pipes 8 are connected by threads, the outer wall of the core drilling barrel 9 is provided with external threads, and the core drilling barrel 9 It is connected with the core pipe 8 through threads. When the core drilling barrel reaches the depth requirement, the hydraulic motor is used as the power to quickly lift the core drilling barrel through the reel, wire rope and lock, which can greatly shorten the core drilling time, reduce manpower and speed up the work progress.

本实用新型的工作原理是:The working principle of the utility model is:

使用本装置之前需要对本装置进行检查,检查装置各个部件是否完好,检查完毕后方可使用。首先,通过履带将装置整体驱动到指定地点,然后,将首节岩心管安装于液压装置并穿过限位孔,在岩心管底部连接取芯钻筒。启动液压装置进行钻孔取芯,待首节岩心管的顶部快低于液压装置时,在岩心管顶部人工安装第二节岩心管,并继续钻孔取芯。在取芯钻筒达到一定深度,液压装置停止工作,将顶部岩心管与下端的岩心管分开,并利用U形板把液压装置转动到一侧。将卷轮外部的钢丝绳穿过支撑架顶部的孔洞并在端部安装锁扣,锁扣与岩心管的顶部连接,利用液压电机将取芯钻筒匀速拔起,直至取芯钻筒拔出地面,完成取芯作业,工作人员对取出的桩基芯进行检测即可。Before using the device, it is necessary to check the device, check whether all parts of the device are in good condition, and use it after the inspection. First, drive the whole device to the designated location through the crawler, then install the first section of the core pipe on the hydraulic device and pass through the limit hole, and connect the core drill pipe at the bottom of the core pipe. Start the hydraulic device for drilling and coring. When the top of the first section of the core pipe is almost lower than the hydraulic device, manually install the second section of the core pipe on the top of the core pipe, and continue to drill and core. When the core drill pipe reaches a certain depth, the hydraulic device stops working, separates the top core tube from the lower end core tube, and uses the U-shaped plate to turn the hydraulic device to one side. Pass the wire rope outside the reel through the hole at the top of the support frame and install a lock at the end, the lock is connected to the top of the core tube, and the core drilling barrel is pulled up at a constant speed by the hydraulic motor until the core drilling barrel is pulled out of the ground. , to complete the core removal operation, the staff can test the removed pile foundation core.

该装置中未涉及部分与现有技术相同或可采用现有技术加以实现,以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本实用新型的保护范围之内。The part not involved in the device is the same as the prior art or can be realized by using the prior art. The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this, any Changes or substitutions that those skilled in the art can easily think of within the technical scope disclosed by the present invention should be included within the protection scope of the present invention.

Claims (8)

1. The utility model provides a coring device for experimental detection of cement mixing stake which characterized in that: comprises an upper pulling part, a penetration part and a chassis body (12); the upward pulling part comprises a hydraulic motor (1), a rolling wheel (2), a fixed steel frame (3), a support frame (4), a steel wire rope (5) and a lock catch (6); the penetration component comprises a hydraulic device (7), a core tube (8), a core barrel (9) and an alloy steel drill bit (10);
the support frame (4) is arranged along one side of the chassis body (12) and is formed by symmetrically distributing two groups of support bodies, and the upper parts of the two groups of support bodies are connected through a cross rod;
the fixed steel frame (3) is arranged below the support frame (4) and is fixedly connected with the underframe body (12);
the hydraulic motor (1) is arranged on one side of the fixed steel frame (3) and is connected with the bottom frame body (12) through a base (18); the winding wheel (2) is arranged above the fixed steel frame (3) and is connected with the hydraulic motor (1) through a transmission belt (19); the hydraulic device (7) is installed on the other side of the fixed steel frame (3) and is connected to the fixed steel frame (3) through a U-shaped plate (14);
the steel wire rope (5) is wound outside the winding wheel (2), one end of the steel wire rope (5) is fixedly connected with the winding wheel (2), and the other end of the steel wire rope (5) penetrates through the cross rod of the support frame and then is provided with a lock catch (6);
core barrel (8) run through in hydraulic means, the chassis body and set up perpendicularly in proper order, the lower part at core barrel (8) is installed in core drill barrel (9), alloy steel drill bit (10) are installed in the bottom of core drill barrel (9), and alloy steel drill bit (10) and core drill barrel (9) structure as an organic whole.
2. The coring device for cement mixing pile test detection as claimed in claim 1, further comprising a track (11), a hand-held handle (13); the crawler belts (11) are arranged below the chassis body (12), the number of the crawler belts (11) is two, and the hand-held handle (13) is located on the surface of the chassis body (12) and opposite to the other side of the hydraulic motor (1).
3. The coring device for cement mixing pile test detection as recited in claim 1, wherein two groups of supporting bodies of the supporting frame (4) are triangular supporting structures, and both ends of the bottom of the supporting frame are provided with transverse beams (15) for strengthening the supporting function; and the cross rod of the support frame is provided with holes, and the diameter of each hole is slightly larger than that of the steel wire rope (5).
4. The coring device for cement mixing pile test detection as claimed in claim 1, wherein a limiting hole is formed in the through position of the core barrel (8) on the chassis body (12), and the diameter of the limiting hole is slightly larger than that of the coring drill barrel (9).
5. The coring device for cement mixing pile test detection as claimed in claim 1, wherein a transmission shaft (16) is welded inside the winding wheel (2), and one end of the transmission shaft (16) is connected to a transmission belt (19).
6. The coring device for cement mixing pile test detection as claimed in claim 1, wherein the fixed steel frame (3) is of a hollow structure, triangular side plates (17) are arranged on two sides of the upper portion of the fixed steel frame, circular holes are formed in the triangular side plates (17), and the diameter of each hole is larger than that of the transmission shaft (16).
7. The coring device for cement mixing pile test detection as claimed in claim 1, wherein one end of the U-shaped plate (14) is welded to the hydraulic device (7), and the other end is connected to the fixed steel frame (3) in a pin manner and drives the hydraulic device (7) to rotate left and right.
8. The coring device for cement mixing pile test detection as claimed in claim 1, wherein the outer wall of the top of the core tube (8) is provided with external threads, the inner wall of the bottom is provided with internal threads, the core tube (8) is connected through threads, the outer wall of the coring drill barrel (9) is provided with external threads, and the coring drill barrel (9) is connected with the core tube (8) through threads.
CN201922362583.3U 2019-12-25 2019-12-25 A coring device for testing and testing of cement mixing piles Expired - Fee Related CN211347473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922362583.3U CN211347473U (en) 2019-12-25 2019-12-25 A coring device for testing and testing of cement mixing piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922362583.3U CN211347473U (en) 2019-12-25 2019-12-25 A coring device for testing and testing of cement mixing piles

Publications (1)

Publication Number Publication Date
CN211347473U true CN211347473U (en) 2020-08-25

Family

ID=72101086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922362583.3U Expired - Fee Related CN211347473U (en) 2019-12-25 2019-12-25 A coring device for testing and testing of cement mixing piles

Country Status (1)

Country Link
CN (1) CN211347473U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111024436A (en) * 2019-12-25 2020-04-17 南京工业大学 Coring device and method for cement mixing pile test detection
CN114164872A (en) * 2021-11-19 2022-03-11 天津市金帆工程建设监理有限公司 Sampling device for detecting construction quality of cement mixing pile and operation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111024436A (en) * 2019-12-25 2020-04-17 南京工业大学 Coring device and method for cement mixing pile test detection
CN111024436B (en) * 2019-12-25 2024-06-28 南京工业大学 A coring device and method for testing cement mixing piles
CN114164872A (en) * 2021-11-19 2022-03-11 天津市金帆工程建设监理有限公司 Sampling device for detecting construction quality of cement mixing pile and operation method thereof
CN114164872B (en) * 2021-11-19 2023-03-10 天津市金帆工程建设监理有限公司 Sampling device for detecting construction quality of cement mixing pile and operation method thereof

Similar Documents

Publication Publication Date Title
CN111024436B (en) A coring device and method for testing cement mixing piles
CN107217910A (en) Supply line's electric pole plants lever apparatus and its plants bar method
CN207332754U (en) Electric pole is digged pit upright bar integrated apparatus
CN107524141B (en) Construction method of cast-in-situ bored pile of rock soil foundation
CN211347473U (en) A coring device for testing and testing of cement mixing piles
CN108266122A (en) One kind can the multi-functional middle pick agitation driller of tuning and its construction method
CN113250193A (en) Construction equipment based on synchronous drilling and precast pile splicing and construction method thereof
CN105113976B (en) Wire brush bit convolution rig and solve burying, fall bore, the method for bit freezing
CN220791171U (en) Drilling machine with automatic drill rod adding and connecting function
CN113530476B (en) A drill rod lifting and lowering device for down-the-hole hammer drilling process of rotary drilling rig
CN215211021U (en) Construction equipment based on synchronous drilling and precast pile splicing
CN210370522U (en) Drilling pile machine provided with double guide rails and double drilling machines
CN219391398U (en) Underground Mining Drilling Sampling Device
CN217053362U (en) Larsen steel sheet pile inslot soil descaling machine
CN215170115U (en) High-efficient anchor rig
CN216950237U (en) Drilling device for piling on soft foundation ground
CN205742131U (en) A kind of intelligent drill rod detector of automatic moving type
CN117627531A (en) Ultra-long spiral drilling rig and construction method for cast-in-place piles in beach areas
CN210507443U (en) Pile pulling device
CN210341918U (en) A new type of vibratory pile driving device
CN206769796U (en) One kind can the multi-functional middle pick agitation driller of tuning
CN205711681U (en) Hydraulic ceiling coil slip casting machine
CN223075532U (en) Bridge engineering is with bridge survey drilling equipment convenient to it is fixed
CN220621752U (en) Ground anchor compaction machine
CN116289874B (en) A ground drilling equipment and a ground drilling grouting method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200825

CF01 Termination of patent right due to non-payment of annual fee