CN211340387U - Assembled concrete pier - Google Patents
Assembled concrete pier Download PDFInfo
- Publication number
- CN211340387U CN211340387U CN201921888528.1U CN201921888528U CN211340387U CN 211340387 U CN211340387 U CN 211340387U CN 201921888528 U CN201921888528 U CN 201921888528U CN 211340387 U CN211340387 U CN 211340387U
- Authority
- CN
- China
- Prior art keywords
- pier
- column
- pin
- connecting rod
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型公开了装配式混凝土桥墩,包括底墩柱和节段柱,所述底墩柱的左右两侧均安装有供料机构,所述底墩柱的内部设置有槽室,且槽室的内部设置有缓冲机构,所述底墩柱的上方安装有支承柱,且支承柱的上方安装有高度调节机构,所述节段柱位于高度调节机构的上方。该装配式混凝土桥墩及其装配方法设置有缓冲机构,连接销的均匀分布能够有效的避免底板产生偏斜,使得连接弹簧和阻尼垫能够高效的缓冲混凝土桥墩受到的外力,而隔柱能够有效的缩短连接弹簧和阻尼垫的缓冲间距,使得底板能够有效的为混凝土桥墩提供稳定的支撑。
The utility model discloses a prefabricated concrete bridge pier, which comprises a bottom pier column and a segmental column, a feeding mechanism is installed on the left and right sides of the bottom pier column, a groove chamber is arranged inside the bottom pier column, and the groove chamber is A buffer mechanism is arranged inside the bottom pier column, a support column is installed above the bottom pier column, and a height adjustment mechanism is installed above the support column, and the segment column is located above the height adjustment mechanism. The assembled concrete pier and its assembling method are provided with a buffer mechanism, and the even distribution of the connecting pins can effectively avoid the deflection of the bottom plate, so that the connecting spring and the damping pad can effectively buffer the external force on the concrete pier, and the spacer can effectively Shorten the buffer distance between the connecting spring and the damping pad, so that the bottom plate can effectively provide stable support for the concrete pier.
Description
技术领域technical field
本实用新型涉及装配式混凝土桥墩技术领域,特别涉及一种装配式混凝土桥墩。The utility model relates to the technical field of assembled concrete bridge piers, in particular to an assembled concrete bridge pier.
背景技术Background technique
装配式建筑是由预制部品部件在工地装配而成的建筑,称按预制构件的形式和施工方法分为砌块建筑、板材建筑、盒式建筑、骨架板材建筑及升板升层建筑等五种类型。而多跨桥的中间支承结构称为桥墩。桥墩分为实体墩、柱式墩、和排架墩等。按平面形状可分为矩形墩、尖端形墩、圆形墩等。建筑桥墩的材料可用木料、石料、混凝土、钢筋混凝土、钢材等。Prefabricated buildings are buildings assembled from prefabricated parts at the construction site. According to the form and construction method of prefabricated components, they are divided into five types: block buildings, plate buildings, box buildings, skeleton plate buildings and lift-up buildings. type. The intermediate support structure of a multi-span bridge is called a pier. Bridge piers are divided into solid piers, column piers, and bent piers. According to the plane shape, it can be divided into rectangular pier, tip-shaped pier, circular pier, etc. The materials for building piers can be wood, stone, concrete, reinforced concrete, steel, etc.
在中国实用新型专利申请公开说明书CN110080094A中公开的装配式混凝土桥墩,该装配式混凝土桥墩,虽然,解决了拼装接缝处主要受到剪切力,承载能力低,经常存在抗剪切力和稳定性不够的问题,但是,该装配式混凝土桥墩对混凝土桥墩的支撑容易受到外力的影响,且搭建所需要的时间较长,并且对装配式混凝土桥墩高度的调节较为繁琐。The prefabricated concrete bridge pier disclosed in the Chinese Utility Model Patent Application Publication CN110080094A, although the prefabricated concrete bridge pier, solves the problem that the assembled joints are mainly subjected to shear force, the bearing capacity is low, and there are often shear resistance and stability. However, the support of the prefabricated concrete pier to the concrete pier is easily affected by external forces, and the construction takes a long time, and the adjustment of the height of the prefabricated concrete pier is cumbersome.
实用新型内容Utility model content
针对现有技术的不足,本实用新型提供了装配式混凝土桥墩,解决了上述背景技术中提出该装配式混凝土桥墩对混凝土桥墩的支撑容易受到外力的影响,且搭建所需要的时间较长,并且对装配式混凝土桥墩高度的调节较为繁琐的问题。In view of the deficiencies of the prior art, the present invention provides a prefabricated concrete bridge pier, which solves the problem that the support of the prefabricated concrete bridge pier to the concrete bridge pier is easily affected by external forces, and the time required for construction is relatively long, and The adjustment of the height of the prefabricated concrete piers is relatively cumbersome.
为实现以上目的,本实用新型通过以下技术方案予以实现:装配式混凝土桥墩,包括底墩柱和节段柱,所述底墩柱的左右两侧均安装有供料机构,所述底墩柱的内部设置有槽室,且槽室的内部设置有缓冲机构,所述底墩柱的上方安装有支承柱,且支承柱的上方安装有高度调节机构,所述节段柱位于高度调节机构的上方。In order to achieve the above purpose, the present invention is achieved through the following technical solutions: an assembled concrete bridge pier includes a bottom pier column and a segment column, the left and right sides of the bottom pier column are provided with feeding mechanisms, and the bottom pier column is provided with a feeding mechanism. A groove chamber is arranged inside the groove chamber, and a buffer mechanism is arranged inside the groove chamber, a support column is installed above the bottom pier column, and a height adjustment mechanism is installed above the support column, and the segment column is located in the height adjustment mechanism. above.
可选的,所述底墩柱包括混凝砂浆块和加强筋,所述混凝砂浆块的内部设置有加强筋。Optionally, the bottom pier column includes a concrete mortar block and a reinforcing rib, and a reinforcing rib is arranged inside the concrete mortar block.
可选的,所述加强筋通过铁丝捆绑呈垂直结构,且加强筋之间关于混凝砂浆块的竖直中心线对称分布。Optionally, the reinforcing ribs are bundled with iron wires to form a vertical structure, and the reinforcing ribs are distributed symmetrically with respect to the vertical center line of the concrete mortar block.
可选的,所述供料机构包括供料管和浇筑孔,所述浇筑孔远离底墩柱的竖直中心线的一侧安装有供料管。Optionally, the feeding mechanism includes a feeding pipe and a pouring hole, and a feeding pipe is installed on a side of the pouring hole away from the vertical centerline of the bottom pier.
可选的,所述供料管和浇筑孔之间均关于底墩柱的竖直中心线对称分布,且浇筑孔沿供料管的竖直中心线方向均匀分布,并且浇筑孔呈倾斜状结构。Optionally, both the feeding pipe and the pouring holes are symmetrically distributed with respect to the vertical centerline of the bottom pier, and the pouring holes are evenly distributed along the vertical centerline of the feeding pipe, and the pouring holes are in an inclined structure. .
可选的,所述缓冲机构包括隔柱、连接弹簧、连接销、阻尼垫和底板,所述隔柱的内部设置有连接弹簧,且连接弹簧的内部贯穿有连接销,所述连接销的上下两侧均安装有底板,且底板的内部设置有阻尼垫。Optionally, the buffer mechanism includes a spacer, a connection spring, a connection pin, a damping pad and a bottom plate, a connection spring is arranged inside the spacer, and a connection pin penetrates through the inside of the connection spring, and the upper and lower sides of the connection pin are arranged. Bottom plates are installed on both sides, and damping pads are arranged inside the bottom plates.
可选的,所述隔柱、连接弹簧和连接销三者均沿底板的水平中心线方向均匀分布,且底板之间通过连接弹簧、连接销和阻尼垫三者之间的配合构成弹性结构。Optionally, the spacers, the connecting springs and the connecting pins are evenly distributed along the horizontal centerline of the bottom plate, and the bottom plates form an elastic structure through the cooperation of the connecting springs, the connecting pins and the damping pads.
可选的,所述高度调节机构包括丝杆、限位螺帽、限位导块、锁紧销、连接杆、定位销和滑座,所述丝杆的左右两侧均安装有限位螺帽,且限位螺帽远离丝杆的一侧安装有限位导块,所述限位导块的上下两侧均安装有锁紧销,且锁紧销远离限位导块的一侧安装有连接杆,所述连接杆远离锁紧销的一侧安装有滑座,且滑座的左右两侧均贯穿有定位销。Optionally, the height adjustment mechanism includes a screw rod, a limit nut, a limit guide block, a locking pin, a connecting rod, a positioning pin and a sliding seat, and limit nuts are installed on the left and right sides of the screw rod. , and a limit guide block is installed on the side of the limit nut away from the screw rod, the upper and lower sides of the limit guide block are installed with locking pins, and the side of the locking pin away from the limit guide block is installed with a connection A sliding seat is installed on the side of the connecting rod away from the locking pin, and the left and right sides of the sliding seat are pierced with positioning pins.
可选的,所述限位螺帽、限位导块和连接杆三者之间均关于丝杆的竖直中心线对称分布,且限位导块通过锁紧销与连接杆之间相连接,并且连接杆通过定位销与滑座之间相连接。Optionally, the limit nut, the limit guide block and the connecting rod are symmetrically distributed with respect to the vertical centerline of the screw rod, and the limit guide block is connected to the connecting rod through a locking pin. , and the connecting rod is connected with the sliding seat through the positioning pin.
本实用新型提供了装配式混凝土桥墩,具备以下有益效果:The utility model provides an assembled concrete bridge pier, which has the following beneficial effects:
1.该装配式混凝土桥墩及其装配方法设置有底墩柱,通过铁丝捆绑加强筋,使得加强筋之间得到牢固连接,形成加强筋捆绑的框架,从而能够有效的增强底墩柱整体的稳定性,使得混凝砂浆块能够有效的为混凝土桥墩提供稳定的支撑。1. The prefabricated concrete bridge pier and its assembling method are provided with a bottom pier column, and the reinforcing bars are bound by iron wires, so that the reinforcing bars are firmly connected to form a frame of the reinforcing bars, which can effectively enhance the overall stability of the bottom pier column. So that the concrete mortar block can effectively provide stable support for the concrete piers.
2.该装配式混凝土桥墩及其装配方法设置有供料机构,通过浇筑孔将注浆导入至底墩柱的内部,而浇筑孔的均匀分布能够有效的增大注浆的排入速度,使得底墩柱能够得到快速成型。2. The prefabricated concrete pier and its assembling method are provided with a feeding mechanism, and the grouting is introduced into the interior of the bottom pier column through the pouring holes, and the uniform distribution of the pouring holes can effectively increase the discharge speed of the grouting, so that the The bottom piers can be rapidly formed.
3.该装配式混凝土桥墩及其装配方法设置有缓冲机构,连接销的均匀分布能够有效的避免底板产生偏斜,使得连接弹簧和阻尼垫能够高效的缓冲混凝土桥墩受到的外力,而隔柱能够有效的缩短连接弹簧和阻尼垫的缓冲间距,使得底板能够有效的为混凝土桥墩提供稳定的支撑。3. The prefabricated concrete pier and its assembling method are provided with a buffer mechanism, and the even distribution of the connecting pins can effectively avoid the deflection of the bottom plate, so that the connecting springs and damping pads can effectively buffer the external force on the concrete pier, and the spacers can Effectively shorten the buffer distance between the connecting spring and the damping pad, so that the bottom plate can effectively provide stable support for the concrete pier.
4.该装配式混凝土桥墩及其装配方法设置有高度调节机构,限位螺帽推动限位导块相互靠近,将连接杆将外力作用于滑座,使得滑座之间相互远离,可将节段柱之间调节至合适的间距,从而能够有效的改变混凝土桥墩的高度,使得混凝土桥墩的高度能够得到有效的调节。4. The assembled concrete bridge pier and its assembly method are provided with a height adjustment mechanism, the limit nut pushes the limit guide blocks to approach each other, and the connecting rod acts on the sliding seat with an external force, so that the sliding seats are far away from each other, and the joints can be moved. The distance between the segment columns is adjusted to an appropriate distance, so that the height of the concrete pier can be effectively changed, so that the height of the concrete pier can be effectively adjusted.
附图说明Description of drawings
图1为本实用新型提出的装配式混凝土桥墩的主视结构示意图;Fig. 1 is the front view structure schematic diagram of the prefabricated concrete pier proposed by the utility model;
图2为本实用新型提出的装配式混凝土桥墩中底墩柱的内部结构示意图;2 is a schematic diagram of the internal structure of the bottom pier column in the prefabricated concrete bridge pier proposed by the utility model;
图3为本实用新型提出的装配式混凝土桥墩中供料机构结构示意图;Fig. 3 is the structural schematic diagram of the feeding mechanism in the fabricated concrete pier proposed by the utility model;
图4为本实用新型提出的装配式混凝土桥墩中缓冲机构结构示意图;4 is a schematic structural diagram of the buffer mechanism in the assembled concrete pier proposed by the utility model;
图5为本实用新型提出的装配式混凝土桥墩中高度调节机构结构示意图。FIG. 5 is a schematic structural diagram of the height adjustment mechanism in the assembled concrete bridge pier proposed by the utility model.
图中:1、底墩柱;101、混凝砂浆块;102、加强筋;2、供料机构;201、供料管;202、浇筑孔;3、槽室;4、缓冲机构;401、隔柱;402、连接弹簧;403、连接销;404、阻尼垫;405、底板;5、支承柱;6、高度调节机构;601、丝杆;602、限位螺帽;603、限位导块;604、锁紧销;605、连接杆;606、定位销;607、滑座;7、节段柱。In the figure: 1. Bottom pier column; 101. Concrete mortar block; 102. Reinforcing bar; 2. Feeding mechanism; 201. Feeding pipe; 202, Pouring hole; 3. Slot chamber; 4. Buffer mechanism; 401, Partition column; 402, connecting spring; 403, connecting pin; 404, damping pad; 405, bottom plate; 5, supporting column; 6, height adjustment mechanism; 601, screw rod; 602, limit nut; 603, limit guide block; 604, locking pin; 605, connecting rod; 606, positioning pin; 607, sliding seat; 7, segment column.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example.
在本实用新型的描述中,除非另有说明,“多个”的含义是两个或两个以上;术语“上”、“下”、“左”、“右”、“内”、“外”、“前端”、“后端”、“头部”、“尾部”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”、“第三”等仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present utility model, unless otherwise specified, "multiple" means two or more; the terms "upper", "lower", "left", "right", "inner", "outer" ", "front end", "rear end", "head", "tail" and other indications of orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, only for the convenience of describing the present utility model and simplifying the description, Rather than indicating or implying that the indicated device or element must have a particular orientation, be constructed and operate in a particular orientation, it should not be construed as a limitation of the present invention. Furthermore, the terms "first," "second," "third," etc. are used for descriptive purposes only and should not be construed to indicate or imply relative importance.
在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present invention, it should be noted that, unless otherwise expressly specified and limited, the terms "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection or a detachable connection, or It can be connected integrally; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.
请参阅图1至图5,本实用新型提供一种技术方案:装配式混凝土桥墩及其装配方法,包括底墩柱1和节段柱7,底墩柱1的左右两侧均安装有供料机构2,底墩柱1包括混凝砂浆块101和加强筋102,混凝砂浆块101的内部设置有加强筋102,加强筋102通过铁丝捆绑呈垂直结构,且加强筋102之间关于混凝砂浆块101的竖直中心线对称分布,用户通过铁丝捆绑加强筋102,使得加强筋102之间得到牢固连接,形成加强筋102捆绑的框架,从而能够有效的增强底墩柱1整体的稳定性,使得混凝砂浆块101能够有效的为混凝土桥墩提供稳定的支撑;Please refer to FIG. 1 to FIG. 5 , the present utility model provides a technical solution: an assembled concrete bridge pier and an assembling method thereof, including a
供料机构2包括供料管201和浇筑孔202,浇筑孔202远离底墩柱1的竖直中心线的一侧安装有供料管201,供料管201和浇筑孔202之间均关于底墩柱1的竖直中心线对称分布,且浇筑孔202沿供料管201的竖直中心线方向均匀分布,并且浇筑孔202呈倾斜状结构,用户可将注浆导入至供料管201的内部,通过浇筑孔202将注浆导入至底墩柱1的内部,而浇筑孔202的均匀分布能够有效的增大注浆的排入速度,使得底墩柱1能够得到快速成型;The feeding mechanism 2 includes a
底墩柱1的内部设置有槽室3,且槽室3的内部设置有缓冲机构4,缓冲机构4包括隔柱401、连接弹簧402、连接销403、阻尼垫404和底板405,隔柱401的内部设置有连接弹簧402,且连接弹簧402的内部贯穿有连接销403,连接销403的上下两侧均安装有底板405,且底板405的内部设置有阻尼垫404,隔柱401、连接弹簧402和连接销403三者均沿底板405的水平中心线方向均匀分布,且底板405之间通过连接弹簧402、连接销403和阻尼垫404三者之间的配合构成弹性结构,混凝土桥墩受到外部挤压时,使得底板405沿连接销403的竖直中心线方向压缩连接弹簧402和阻尼垫404,而连接销403的均匀分布能够有效的避免底板405产生偏斜,使得连接弹簧402和阻尼垫404能够高效的缓冲混凝土桥墩受到的外力,而隔柱401能够有效的缩短连接弹簧402和阻尼垫404的缓冲间距,使得底板405能够有效的为混凝土桥墩提供稳定的支撑;The
底墩柱1的上方安装有支承柱5,且支承柱5的上方安装有高度调节机构6,高度调节机构6包括丝杆601、限位螺帽602、限位导块603、锁紧销604、连接杆605、定位销606和滑座607,丝杆601的左右两侧均安装有限位螺帽602,且限位螺帽602远离丝杆601的一侧安装有限位导块603,限位导块603的上下两侧均安装有锁紧销604,且锁紧销604远离限位导块603的一侧安装有连接杆605,连接杆605远离锁紧销604的一侧安装有滑座607,且滑座607的左右两侧均贯穿有定位销606,限位螺帽602、限位导块603和连接杆605三者之间均关于丝杆601的竖直中心线对称分布,且限位导块603通过锁紧销604与连接杆605之间相连接,并且连接杆605通过定位销606与滑座607之间相连接,用户可通过机械助力转动限位螺帽602,使得限位螺帽602推动限位导块603相互靠近,而限位导块603通过锁紧销604与连接杆605之间相连接,连接杆605通过定位销606与滑座607相连接,此时,限位导块603通过连接杆605将外力作用于滑座607,使得滑座607之间相互远离,可将节段柱7之间调节至合适的间距,从而能够有效的改变混凝土桥墩的高度,使得混凝土桥墩的高度能够得到有效的调节;A
节段柱7位于高度调节机构6的上方;The
该装配式混凝土桥墩装配方法的步骤:The steps of the prefabricated concrete bridge pier assembly method:
S1:用户通过铁丝捆绑加强筋102,将加强筋102之间相连接,形成加强筋102捆绑的框架;S1: The user binds the reinforcing
S2:由S1步骤制得的框架,将供料管201贴紧加强筋102,接着,将注浆导入至供料管201的内部,通过浇筑孔202将注浆导入至框架的内部,形成底墩柱1;S2: For the frame obtained in step S1, the feeding
S3:由底墩柱1为混凝土桥墩提供支撑,接着,混凝土桥墩受到挤压时,底板405将外力作用于连接弹簧402和阻尼垫404,缓冲混凝土桥墩受到的挤压力;S3: The
S4:用户可转动限位螺帽602,使得限位螺帽602推动限位导块603相互靠近,而限位导块603通过锁紧销604、连接杆605和定位销606三者之间的配合与滑座607相连接,此时,连接杆605将外力作用于滑座607,使得滑座607之间相互远离,可将节段柱7之间调节至合适的间距。S4: The user can rotate the
综上,该装配式混凝土桥墩及其装配方法,使用时,用户通过铁丝捆绑加强筋102,使得加强筋102之间得到牢固连接,形成加强筋102捆绑的框架,接着,用户可将注浆导入至供料管201的内部,通过浇筑孔202将注浆导入至底墩柱1的内部,使得底墩柱1能够得到快速成型;To sum up, with the prefabricated concrete bridge pier and its assembling method, when in use, the user binds the reinforcing
其次,混凝土桥墩受到外部挤压时,使得底板405沿连接销403的竖直中心线方向压缩连接弹簧402和阻尼垫404,缓冲混凝土桥墩受到的外力,使得底板405能够有效的为混凝土桥墩提供稳定的支撑;Secondly, when the concrete pier is externally squeezed, the
最后,用户可通过机械助力转动限位螺帽602,使得限位螺帽602推动限位导块603相互靠近,而限位导块603通过锁紧销604与连接杆605之间相连接,连接杆605通过定位销606与滑座607相连接,此时,限位导块603通过连接杆605将外力作用于滑座607,使得滑座607之间相互远离,可将节段柱7之间调节至合适的间距。Finally, the user can rotate the
以上,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above are only the preferred specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Equivalent replacement or modification of the technical solution and its utility model concept shall be included within the protection scope of the present utility model.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921888528.1U CN211340387U (en) | 2019-11-04 | 2019-11-04 | Assembled concrete pier |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921888528.1U CN211340387U (en) | 2019-11-04 | 2019-11-04 | Assembled concrete pier |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211340387U true CN211340387U (en) | 2020-08-25 |
Family
ID=72094082
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921888528.1U Expired - Fee Related CN211340387U (en) | 2019-11-04 | 2019-11-04 | Assembled concrete pier |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211340387U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110735389A (en) * | 2019-11-04 | 2020-01-31 | 江西科技学院 | Assembled concrete pier and assembling method thereof |
-
2019
- 2019-11-04 CN CN201921888528.1U patent/CN211340387U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110735389A (en) * | 2019-11-04 | 2020-01-31 | 江西科技学院 | Assembled concrete pier and assembling method thereof |
| CN110735389B (en) * | 2019-11-04 | 2024-01-23 | 江西科技学院 | Assembled concrete bridge pier and assembling method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110735389A (en) | Assembled concrete pier and assembling method thereof | |
| CN208039456U (en) | A kind of assembled architecture bean column node bindiny mechanism | |
| CN210622363U (en) | Building structure reinforcing apparatus | |
| CN213143950U (en) | Replacement, reinforcement and support device for concrete building shear wall | |
| CN214531500U (en) | A large-span indoor beam structure | |
| CN207739130U (en) | A kind of concrete-filled double skin steel tube bridge pier | |
| CN221321847U (en) | Support assembly of assembled outer wall | |
| CN214302389U (en) | Connecting joint of double-steel-plate combined shear wall and floor slab | |
| CN218092273U (en) | Steel construction factory building supporting mechanism | |
| CN216840129U (en) | A new type of steel skeleton floor slab stacking installation structure | |
| CN206859511U (en) | Prestressed girder combination beam | |
| CN205557602U (en) | Post -pouring belt supporting structure | |
| CN103982049A (en) | Wall body assembling straightening device for shear wall | |
| CN211229190U (en) | Stable supporting beam for building | |
| CN216476332U (en) | A kind of multi-functional combined template for the base of bridge guardrail | |
| CN213732501U (en) | Steel bar positioning device | |
| CN205399746U (en) | Steel construction shear force wall | |
| CN108589927B (en) | Reinforced concrete cast-in-place frame structure of building | |
| CN210127040U (en) | A windproof fixing mechanism of a tower crane for construction | |
| CN209538529U (en) | A kind of lateral steel bar support | |
| CN208803590U (en) | A sliding mold for vertical connection of prefabricated walls | |
| CN218345969U (en) | Assembly type high pier column pouring template | |
| CN219887145U (en) | Assembled concrete truss building structure | |
| CN205777644U (en) | A kind of existing building structure bracing means | |
| CN214885461U (en) | Anti-seismic support template for building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200825 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |