CN211281136U - Material handling equipment for bridge road - Google Patents
Material handling equipment for bridge road Download PDFInfo
- Publication number
- CN211281136U CN211281136U CN201922101918.6U CN201922101918U CN211281136U CN 211281136 U CN211281136 U CN 211281136U CN 201922101918 U CN201922101918 U CN 201922101918U CN 211281136 U CN211281136 U CN 211281136U
- Authority
- CN
- China
- Prior art keywords
- assembly box
- fixedly connected
- track
- sliding wheel
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a material handling equipment for bridge roads, the telescoping device comprises a telescopic rod, a track B, a sliding wheel A and a sliding wheel B, the two sides of an assembly box are arc-shaped, the arc-shaped surfaces of the two sides of the assembly box are fixedly connected with a plurality of tracks A, the bottom of the assembly box is provided with a support plate, the support plate is connected with the assembly box through the sliding wheel A and the tracks A, the lower surface of the support plate is provided with a base plate, the lower surface of the base plate is fixedly connected with two rotating rods, and the two ends of the two rotating rods are fixedly connected with moving wheels; has the advantages that: when in eminence or corner department, at this moment extension track B, extension telescopic link afterwards transports the assembly case to the height, then moves the assembly case outwards through the effect of movable pulley B, then can transport the assembly case to the corner of eminence like this, and the assembly case overturns through track A and movable pulley A's effect afterwards, is convenient for get the material.
Description
Technical Field
The utility model relates to a haulage equipment technical field particularly, relates to a material haulage equipment for bridge road.
Background
The bridge is generally a structure which is erected on rivers, lakes and seas and allows vehicles, pedestrians and the like to smoothly pass through. In order to adapt to the modern high-speed developed traffic industry, bridges are also extended to be constructed to span mountain stream, unfavorable geology or meet other traffic needs, so that the buildings are convenient to pass. The bridge generally comprises an upper structure, a lower structure, a support and an auxiliary structure, wherein the upper structure is also called a bridge span structure and is a main structure for spanning obstacles; the lower structure comprises a bridge abutment, a bridge pier and a foundation; the support is a force transmission device arranged at the supporting positions of the bridge span structure and the bridge pier or the bridge abutment; the auxiliary structures refer to bridge end butt straps, tapered revetments, diversion works and the like.
The bridge road needs to be transported in the process of laying, and particularly, the common transporting equipment for materials needing to be transported to a high place cannot complete the operation, and needs to be applied to a crane, so that the cost is increased.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a material handling equipment for bridge road to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a material handling equipment for bridge road, is including assembly box and telescoping device, the telescoping device is including telescopic link, track B and movable pulley A, movable pulley B, the both sides of assembly box are the arc, a plurality of track A of both sides arcwall face fixed surface of assembly box, the bottom of assembly box is provided with the backup pad, the backup pad with the assembly box pass through movable pulley A track A is connected, the lower surface of backup pad is provided with the bed plate, two dwangs, two of the lower fixed surface of bed plate the both ends fixedly connected with of dwang removes the wheel, two be provided with the motor group between the dwang, the motor group passes through screw nut fixed connection and is in the lower surface of bed plate.
Preferably, the upper surface of the base plate is fixedly connected with a plurality of rails B, and sliding wheels B are embedded in the rails B.
Preferably, the supporting plate and the base plate are connected through the rail B and the sliding wheel B.
Preferably, the both sides surface of bed plate is through screw nut fixedly connected with telescopic link, the one end of telescopic link with the backup pad is connected, the other end of telescopic link with the bed plate is connected.
Preferably, the motor set is connected with the telescopic rod, the sliding wheel A and the sliding wheel B through couplers, and the motor set is electrically connected with an external controller.
Preferably, the rail B is a telescopic rail, and the longest length of the rail B is the sum of the heights of the base plate and the assembly box.
Compared with the prior art, the utility model discloses following beneficial effect has:
(1) the material is placed in the assembly box and is moved and transported under the action of the rotating rod and the moving wheel, and when the material is moved and unloaded, the material is moved in the track A under the action of the sliding wheel A, so that the assembly box can be inclined, and the material is conveniently taken out;
(2) when in eminence or corner department, at this moment extension track B, extend the telescopic link afterwards, will assemble the case and transport to the height, then outwards remove the assembly case through the effect of movable pulley B, then can transport the corner of eminence with the assembly case like this, the assembly case overturns through track A and movable pulley A's effect afterwards, is convenient for get the material.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a material handling apparatus for a bridge roadway according to an embodiment of the present invention;
fig. 2 is a schematic view of a connecting structure of a supporting plate and a base plate of the material handling equipment for bridge roads according to the embodiment of the invention;
FIG. 3 is a schematic structural view of a material handling apparatus for bridge roads after a mounting box is moved according to an embodiment of the present invention;
fig. 4 is a schematic side-turning structure diagram of an assembly box in the material handling equipment for a bridge road according to the embodiment of the present invention.
Reference numerals: 1. assembling a box; 2. a track A; 3. a sliding wheel A; 4. a support plate; 5. a track B; 6. a telescopic rod; 7. a motor unit; 8. rotating the rod; 9. a moving wheel; 10. a base plate; 11. and a sliding wheel B.
Detailed Description
The following description of the preferred embodiments of the present invention will be made with reference to the accompanying drawings:
referring to fig. 1-4, a material handling apparatus for bridge road according to an embodiment of the present invention comprises an assembly box 1 and a telescopic device, the telescopic device comprises a telescopic rod 6, a track B5, a sliding wheel A3 and a sliding wheel B11, the two sides of the assembly box 1 are arc-shaped, the surfaces of the arc-shaped surfaces of the two sides of the assembly box 1 are fixedly connected with a plurality of rails A2, the bottom of the assembly box 1 is provided with a support plate 4, the support plate 4 is connected with the assembly box 1 through a sliding wheel A3 and the track A2, the lower surface of backup pad 4 is provided with bed plate 10, two dwang 8, two of the lower fixed surface of bed plate 10 are connected with the both ends fixedly connected with of dwang 8 removes wheel 9, two be provided with motor group 7 between the dwang 8, motor group 7 passes through screw nut fixed connection and is in the lower surface of bed plate 10.
Through the above technical scheme of the utility model, when using, place the material in the inside of assembly box 1, the effect through dwang 8 and removal wheel 9 removes the transportation, and when removing and unloading, the effect through movable pulley A3 is inside to be removed at track A2, assembly box 1 then can incline like this, make things convenient for taking out of material, and work as in eminence or corner department, at this moment extension track B5, extend telescopic link 6 afterwards, with assembly box 1 fortune to the height, effect through movable pulley B11 will assemble box 1 outside removal afterwards, then can transport the corner of eminence with assembly box 1 like this, assembly box 1 overturns through track A2 and movable pulley A3's effect afterwards, be convenient for get the material.
When specifically using, the last fixed surface of bed plate 10 is connected with a plurality of track B5, the inside of track B5 is embedded to have movable pulley B11, backup pad 4 with pass through between the bed plate 10 track B5 movable pulley B11 is connected, the both sides surface of bed plate 10 passes through screw nut fixedly connected with telescopic link 6, the one end of telescopic link 6 with backup pad 4 is connected, the other end of telescopic link 6 with the bed plate 10 is connected, motor group 7 with telescopic link 6 movable pulley A3 movable pulley B11 is connected through the shaft coupling, motor group 7 links to each other with external control ware electrical property, track B5 is scalable track, track B5's longest length be the bed plate 10 with the total of assembly box 1 height.
In conclusion, with the aid of the technical scheme of the utility model, when using, place the material in the inside of assembly box 1, move the transportation through the effect of dwang 8 with removal wheel 9, and when removing, move inside track A2 through the effect of movable pulley A3, assembly box 1 then can incline like this, make things convenient for taking out of material, and when in eminence or corner department, at this moment stretch track B5, extend telescopic link 6 afterwards, transport assembly box 1 to the height, then outwards move assembly box 1 through the effect of movable pulley B11, then can transport assembly box 1 to the corner of eminence like this, then assembly box 1 overturns through the effect of track A2 with movable pulley A3, be convenient for get the material.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The material carrying equipment for the bridge roads is characterized by comprising an assembly box (1) and a telescopic device, wherein the telescopic device comprises a telescopic rod (6), a track B (5), a sliding wheel A (3) and a sliding wheel B (11), the two sides of the assembly box (1) are arc-shaped, the surfaces of arc-shaped surfaces of the two sides of the assembly box (1) are fixedly connected with a plurality of tracks A (2), a support plate (4) is arranged at the bottom of the assembly box (1), the support plate (4) is connected with the assembly box (1) through the sliding wheel A (3) and the tracks A (2), a base plate (10) is arranged on the lower surface of the support plate (4), two rotating rods (8) are fixedly connected with the lower surface of the base plate (10), two moving wheels (9) are fixedly connected with the two ends of the rotating rods (8), and a motor group (7) is arranged between the rotating rods (8), the motor set (7) is fixedly connected to the lower surface of the base plate (10) through screws and nuts.
2. The material handling equipment for bridge roads as claimed in claim 1, wherein a plurality of rails B (5) are fixedly connected to the upper surface of said base plate (10), and sliding wheels B (11) are embedded inside said rails B (5).
3. The material handling equipment for bridge roads as claimed in claim 1, wherein said support plate (4) and said foundation plate (10) are connected by said rail B (5) and said sliding wheels B (11).
4. The material handling apparatus for bridge roads as claimed in claim 1, wherein the base plate (10) is fixedly connected at both side surfaces thereof with telescopic rods (6) by means of screws and nuts, one end of the telescopic rod (6) is connected with the support plate (4), and the other end of the telescopic rod (6) is connected with the base plate (10).
5. The material carrying equipment for the bridge and road as claimed in claim 1, wherein the motor set (7) is connected with the telescopic rod (6), the sliding wheel A (3) and the sliding wheel B (11) through shaft couplings, and the motor set (7) is electrically connected with an external controller.
6. The material handling apparatus for bridge roads as claimed in claim 1, wherein said rail B (5) is a retractable rail, and the longest length of said rail B (5) is the sum of the heights of said foundation plate (10) and said assembly box (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922101918.6U CN211281136U (en) | 2019-11-27 | 2019-11-27 | Material handling equipment for bridge road |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922101918.6U CN211281136U (en) | 2019-11-27 | 2019-11-27 | Material handling equipment for bridge road |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211281136U true CN211281136U (en) | 2020-08-18 |
Family
ID=72033979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922101918.6U Expired - Fee Related CN211281136U (en) | 2019-11-27 | 2019-11-27 | Material handling equipment for bridge road |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211281136U (en) |
-
2019
- 2019-11-27 CN CN201922101918.6U patent/CN211281136U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101287455B1 (en) | System and method for launching upper structure of bridege | |
KR101234090B1 (en) | Method for changing girder of railway plate girder bridge | |
CN210392614U (en) | Material conveying device for roadbed high slope protection construction | |
CN211281136U (en) | Material handling equipment for bridge road | |
CN110777681B (en) | Whole hole Liang Huan sets of equipment | |
JP2017048635A (en) | Bridge dismantling method using erection girder | |
CN114808567A (en) | Railway line component replacement gantry crane device and operation method thereof | |
CN110804958A (en) | A method for changing the frame of a whole-hole beam | |
JPH01223204A (en) | Bridge girder replacement method and device thereof | |
CN211256692U (en) | Transport beam structure of newly-built upper bridge on current bridge | |
CN103498427B (en) | Quick replacement method of overpass bridge section | |
CN108505441A (en) | A kind of bridge machinery maintenance platform | |
CN108004930A (en) | The construction method of vertical shift bowstring arch bridge | |
CN105603882B (en) | A construction method and structure for closing the mid-span of catenary non-stop continuous beam | |
CN216734252U (en) | Assembled high-speed railway platform cross-line platform | |
CN104294763B (en) | A kind of mobile formwork reinforced mesh transporter | |
JP2006336392A (en) | Bridge batch removal method | |
CN208778011U (en) | Concrete- liner tunnel side wall steel formwork trolley | |
CN207862785U (en) | A kind of mobile platform for trestle construction | |
CN211944897U (en) | Steel conveyer is used in bridge construction | |
CN211256693U (en) | Transit structure of the bridge on the transport beam | |
CN204139067U (en) | A kind of mobile formwork reinforced mesh transporter | |
CN113373786A (en) | Novel UHPC simply supported box girder assembling method | |
CN110804950B (en) | Safe and energy-saving beam transporting method for building bridge on bridge | |
CN219446972U (en) | Rail transport vehicle for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200818 Termination date: 20201127 |