CN211262202U - A leveler for controlling construction height difference of ballastless track base plate - Google Patents

A leveler for controlling construction height difference of ballastless track base plate Download PDF

Info

Publication number
CN211262202U
CN211262202U CN202020088278.XU CN202020088278U CN211262202U CN 211262202 U CN211262202 U CN 211262202U CN 202020088278 U CN202020088278 U CN 202020088278U CN 211262202 U CN211262202 U CN 211262202U
Authority
CN
China
Prior art keywords
height difference
leveler
ballastless track
base plate
controlling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020088278.XU
Other languages
Chinese (zh)
Inventor
康飞
万应强
杨利平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202020088278.XU priority Critical patent/CN211262202U/en
Application granted granted Critical
Publication of CN211262202U publication Critical patent/CN211262202U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本实用新型公开了一种控制无砟轨道底座板施工高差的水平器,包括龙门架,所述龙门架的水平段顶部安装有水平仪,龙门架的底部设有槽型底座,龙门架与槽型底座折叠式连接。本实用新型解决了在底座板混凝土浇筑时,在伸缩缝两侧架设本水平器,可测得伸缩缝前后高差是否满足要求,解决了传统水平尺无法测量,肉眼又无法判断前后高差的问题,通过技术改进,该水平器的使用不仅保证了伸缩缝前后高差在2mm以内,而且还加快了混凝土浇筑速度,减少了工人来回增添混凝土或清除多余混凝土。

Figure 202020088278

The utility model discloses a leveler for controlling the construction height difference of a ballastless track base plate. Type base foldable connection. The utility model solves the problem that the leveler is erected on both sides of the expansion joint during the concrete pouring of the base plate, which can measure whether the height difference between the front and rear of the expansion joint meets the requirements, and solves the problem that the traditional level cannot measure and the naked eye cannot judge the height difference between the front and rear. Problem, through technical improvement, the use of this leveler not only ensures that the height difference between the front and rear of the expansion joint is within 2mm, but also speeds up the concrete pouring speed, reducing the need for workers to add concrete back and forth or remove excess concrete.

Figure 202020088278

Description

一种控制无砟轨道底座板施工高差的水平器A leveler for controlling construction height difference of ballastless track base plate

技术领域technical field

本实用新型涉及仪器技术领域,尤其涉及一种控制无砟轨道底座板施工高差的水平器。The utility model relates to the technical field of instruments, in particular to a leveler for controlling the construction height difference of a ballastless track base plate.

背景技术Background technique

无砟轨道底座板要求精度高,前后高差不超过2mm,并且每单元底座板有2cm断缝(伸缩缝),底座板混凝土厚度只有20cm,方量小、浇筑快、现场用水准仪跟随测量慢。浇筑时,伸缩缝位置易产生10-20mm高差,该高差直接用传统水平尺无法测量,导致混凝土浇筑速度较慢。The ballastless track base plate requires high precision, the height difference between front and rear does not exceed 2mm, and each unit base plate has a 2cm fracture (expansion joint), the concrete thickness of the base plate is only 20cm, the square volume is small, the pouring is fast, and the field level is slow to follow the measurement. . During pouring, a height difference of 10-20mm is likely to occur in the position of the expansion joint, which cannot be measured directly with a traditional level, resulting in a slow concrete pouring speed.

实用新型内容Utility model content

本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种控制无砟轨道底座板施工高差的水平器,本实用新型的使用不仅保证了伸缩缝前后高差在2mm以内,而且还加快了混凝土浇筑速度,减少了工人来回增添混凝土或清除多余混凝土。The purpose of this utility model is to solve the shortcomings existing in the prior art, and propose a leveler for controlling the construction height difference of the base plate of the ballastless track. The use of the utility model not only ensures that the height difference between the front and rear of the expansion joint is within 2mm , and it also speeds up concrete placement, reducing the need for workers to add concrete back and forth or remove excess concrete.

为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:

一种控制无砟轨道底座板施工高差的水平器,包括龙门架,所述龙门架的水平段顶部安装有水平仪,龙门架的底部设有槽型底座,龙门架与槽型底座折叠式连接。A leveler for controlling the construction height difference of a ballastless track base plate, including a gantry, a level is installed on the top of the horizontal section of the gantry, a groove base is arranged at the bottom of the gantry, and the gantry is folded with the groove base. .

优选地,所述龙门架包括水平杆和立杆,两个立杆安装在水平杆的端部,水平杆与立杆垂直设置。Preferably, the gantry includes a horizontal rod and a vertical rod, the two vertical rods are installed at the ends of the horizontal rod, and the horizontal rod and the vertical rod are vertically arranged.

优选地,所述立杆的下端转动插接有固定销,固定销转动连接在槽型底座的内壁,所述槽型底座和立杆上均设有相对应的通孔,通孔内设有活动销。Preferably, a fixed pin is rotatably inserted into the lower end of the vertical rod, and the fixed pin is rotatably connected to the inner wall of the slot-shaped base. The slot-shaped base and the vertical rod are provided with corresponding through holes, and the through holes are provided with corresponding through holes. activity pin.

优选地,所述活动销的端部转动连接有拉环。Preferably, a pull ring is rotatably connected to the end of the movable pin.

优选地,所述活动销和固定销平行设置,且活动销和固定销位于同一竖直平面内。Preferably, the movable pin and the fixed pin are arranged in parallel, and the movable pin and the fixed pin are located in the same vertical plane.

与现有技术相比,本实用新型的有益效果是:本实用新型解决了在底座板混凝土浇筑时,在伸缩缝两侧架设本水平器,可测得伸缩缝前后高差是否满足要求,解决了传统水平尺无法测量,肉眼又无法判断前后高差的问题,通过技术改进,该水平器的使用不仅保证了伸缩缝前后高差在2mm以内,而且还加快了混凝土浇筑速度,减少了工人来回增添混凝土或清除多余混凝土。Compared with the prior art, the beneficial effects of the present utility model are: the utility model solves the problem that the leveling device is erected on both sides of the expansion joint when the base plate concrete is poured, and whether the height difference between the front and the rear of the expansion joint can be measured to meet the requirements, the solution is to solve the problem. The traditional level cannot be measured, and the naked eye cannot judge the height difference between the front and rear. Through technical improvement, the use of this level not only ensures that the height difference between the front and rear of the expansion joint is within 2mm, but also speeds up the concrete pouring speed and reduces the number of workers going back and forth. Add concrete or remove excess concrete.

附图说明Description of drawings

图1为本实用新型提出的结构示意图;Fig. 1 is the structural representation proposed by the utility model;

图2为图1的侧视图;Fig. 2 is the side view of Fig. 1;

图3为本实用新型的工作结构示意图。Figure 3 is a schematic diagram of the working structure of the utility model.

图中:立杆1、水平杆2、水平仪3、槽型底座4、活动销5、拉环6、固定销7。In the figure: vertical rod 1, horizontal rod 2, level 3, groove base 4, movable pin 5, pull ring 6, fixed pin 7.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example.

参照图1-3,本案设计了一种控制无砟轨道底座板施工高差的水平器,具体包括龙门架,龙门架的水平段顶部安装有水平仪3,龙门架的底部设有槽型底座4,龙门架与槽型底座4折叠式连接,龙门架包括水平杆2和立杆1,两个立杆1安装在水平杆2的端部,水平杆2与立杆1垂直设置。Referring to Figures 1-3, this case designs a leveler for controlling the construction height difference of the base plate of the ballastless track, which specifically includes a gantry frame, a level 3 is installed on the top of the horizontal section of the gantry frame, and a groove base 4 is installed at the bottom of the gantry frame. , the gantry frame is foldably connected with the groove base 4, the gantry frame includes a horizontal rod 2 and a vertical rod 1, the two vertical rods 1 are installed at the ends of the horizontal rod 2, and the horizontal rod 2 and the vertical rod 1 are arranged vertically.

由于每单元底座板浇筑混凝土时,伸缩缝位置需要设置端模板,直接用传统水平尺无法测量,肉眼又无法判断前后高差,通过设计一种水平器,在浇筑混凝土时,将龙门架架设在其上,横跨伸缩缝,利用水平仪3来观察伸缩缝的两侧是否处于同一水平高度,该水平器的使用不仅保证了伸缩缝前后高差在2mm以内,而且还加快了混凝土浇筑速度,减少了工人来回增添混凝土或清除多余混凝土。Since the position of the expansion joint needs to be set with end formwork when pouring concrete for each unit base plate, it cannot be measured directly with a traditional level, and the height difference between the front and rear cannot be judged with the naked eye. On it, across the expansion joint, use the spirit level 3 to observe whether the two sides of the expansion joint are at the same level. Workers go back and forth to add concrete or remove excess concrete.

其中,立杆1的下端转动插接有固定销7,固定销7转动连接在槽型底座4的内壁,槽型底座4和立杆1上均设有相对应的通孔,通孔内设有活动销5,将活动销5拔掉,立杆1可相对槽型底座4绕固定销7自由转动,进行折叠收纳,方便携带,反之,活动销5可将立杆1和槽型底座4相对固定,进行正常使用。The lower end of the vertical rod 1 is rotatably connected with a fixed pin 7, and the fixed pin 7 is rotatably connected to the inner wall of the slotted base 4. The slotted base 4 and the vertical rod 1 are provided with corresponding through holes, and the through holes are provided with corresponding through holes. There is a movable pin 5, unplug the movable pin 5, the vertical rod 1 can freely rotate around the fixed pin 7 relative to the groove base 4, and can be folded and stored for easy carrying. On the contrary, the movable pin 5 can connect the vertical rod 1 and the groove base 4. Relatively fixed for normal use.

活动销5的端部转动连接有拉环6,方便拉拔活动销5,活动销5和固定销7平行设置,且活动销5和固定销7位于同一竖直平面内。A pull ring 6 is rotatably connected to the end of the movable pin 5, which is convenient for pulling the movable pin 5. The movable pin 5 and the fixed pin 7 are arranged in parallel, and the movable pin 5 and the fixed pin 7 are located in the same vertical plane.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above are only the preferred specific embodiments of the present invention, but the protection scope of the present invention is not limited to this. Equivalent replacement or modification of the new technical solution and its utility model concept shall be included within the protection scope of the present utility model.

Claims (5)

1. The utility model provides a control spirit level of ballastless track bed plate construction difference of elevation, includes the portal frame, its characterized in that, spirit level (3) are installed at the horizontal segment top of portal frame, and the bottom of portal frame is equipped with cell type base (4), and the portal frame is connected with cell type base (4) foldable.
2. The leveler for controlling the construction height difference of the ballastless track bed plate according to claim 1, wherein the portal frame comprises a horizontal rod (2) and vertical rods (1), the two vertical rods (1) are installed at the end parts of the horizontal rod (2), and the horizontal rod (2) is perpendicular to the vertical rods (1).
3. The level controlling the ballastless track bed plate construction elevation difference according to claim 2, wherein the lower end of the vertical rod (1) is rotatably inserted with a fixed pin (7), the fixed pin (7) is rotatably connected to the inner wall of the groove-shaped base (4), the groove-shaped base (4) and the vertical rod (1) are respectively provided with a corresponding through hole, and a movable pin (5) is arranged in the through hole.
4. The leveler for controlling the construction height difference of the ballastless track bed plate of claim 3, wherein the end of the movable pin (5) is rotatably connected with a pull ring (6).
5. The level device for controlling the construction height difference of the ballastless track bed plate according to claim 3, wherein the movable pin (5) and the fixed pin (7) are arranged in parallel, and the movable pin (5) and the fixed pin (7) are located in the same vertical plane.
CN202020088278.XU 2020-01-16 2020-01-16 A leveler for controlling construction height difference of ballastless track base plate Active CN211262202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020088278.XU CN211262202U (en) 2020-01-16 2020-01-16 A leveler for controlling construction height difference of ballastless track base plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020088278.XU CN211262202U (en) 2020-01-16 2020-01-16 A leveler for controlling construction height difference of ballastless track base plate

Publications (1)

Publication Number Publication Date
CN211262202U true CN211262202U (en) 2020-08-14

Family

ID=71958779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020088278.XU Active CN211262202U (en) 2020-01-16 2020-01-16 A leveler for controlling construction height difference of ballastless track base plate

Country Status (1)

Country Link
CN (1) CN211262202U (en)

Similar Documents

Publication Publication Date Title
CN110207602B (en) Engineering construction supervision quality acceptance actual measurement device and method
CN211262202U (en) A leveler for controlling construction height difference of ballastless track base plate
CN215598424U (en) Portable device capable of measuring higher verticality
CN211472518U (en) Removable supporting is used in building engineering construction
CN218263509U (en) A Formwork Adjusting Mechanism for High Squat Construction
CN203654695U (en) Foldable support frame
CN217913775U (en) Auxiliary device for pressure pipeline installation
CN112729227B (en) Tower crane attaches wall and measures auxiliary device
CN213828935U (en) Interval positioning and scribing measuring tool
CN205898049U (en) A road level measuring instrument
CN211114873U (en) Concrete leveling device for floor construction
CN221630714U (en) A level for construction engineering quality inspection
CN219714239U (en) Convenient detection ruler for thickness of cast-in-place concrete floor slab
CN217323145U (en) An attachment rod for tower cranes
CN220566921U (en) A level gauge for building construction
CN220583403U (en) Real measuring tool for rapidly measuring perpendicularity actual measurement of template
CN206583441U (en) A kind of folding leveling rod for being easy to righting
CN217005726U (en) 3D laser scanning mobile scanning trolley
CN215635834U (en) Height measuring device for construction of steel-concrete composite beam bridge
CN212988349U (en) Roadbed slope detection device
CN221898403U (en) Special measuring device for house main body structure design
CN220725749U (en) A formwork support jacking mechanism
CN222419083U (en) Balance weight type total station centering rod support
CN212256852U (en) Building engineering cost is with supplementary mapping device
CN218211293U (en) Building inclination measuring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant