CN211256719U - Semicircular drainage channel - Google Patents
Semicircular drainage channel Download PDFInfo
- Publication number
- CN211256719U CN211256719U CN201921279168.5U CN201921279168U CN211256719U CN 211256719 U CN211256719 U CN 211256719U CN 201921279168 U CN201921279168 U CN 201921279168U CN 211256719 U CN211256719 U CN 211256719U
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- drainage channel
- reinforcing
- semicircular
- ribs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 24
- 239000004746 geotextile Substances 0.000 claims abstract description 12
- 238000001914 filtration Methods 0.000 claims abstract description 6
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims abstract description 4
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 4
- 229910001220 stainless steel Inorganic materials 0.000 claims abstract description 4
- 239000010935 stainless steel Substances 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 abstract description 4
- 239000002689 soil Substances 0.000 description 6
- 238000000034 method Methods 0.000 description 4
- 239000004576 sand Substances 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000011324 bead Substances 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The utility model relates to a semicircular drainage channel, which comprises a reverse filtering geotextile, a hole group, a special PVC pipe, a notch, a reinforcing rib, a bottom plate, a convex opening, a longitudinal rib and a transverse rib; the bottom plate is a reinforced concrete bottom plate, longitudinal ribs and transverse ribs are arranged in the bottom plate, and convex openings and concave openings are formed in the two ends of the bottom plate respectively; the reinforcing ribs are stainless steel semicircular arch structures and are connected with the reinforcing steel bars of the bottom plate; the special PVC pipe is of a semicircular structure, the special PVC pipe is arranged on the bottom plate and the reinforcing ribs, and the pipe wall of the special PVC pipe is provided with a hole group and covered with the reverse filter geotextile; the reinforcing ribs are connected at the intersections of the longitudinal ribs and the transverse ribs in the reinforcing mesh of the base plate; a special PVC pipe embedding groove is reserved on the bottom plate; the semicircular drainage channel unit bodies are connected through the convex openings and the concave openings. The utility model has the advantages that: the utility model discloses a semicircle form drainage channel simple structure, construction convenience, than circular tubulose drainage channel, the volume of digging the side significantly reduces, and can guarantee the drainage requirement.
Description
Technical Field
The utility model relates to a drainage channel especially relates to a semicircle form drainage channel.
Background
The urbanization process of the current society is very rapid, the ground traffic road network can achieve four directions, and the underground drainage system is more complicated, so that the ground of the city can be drained in time, and waterlogging caused by flooding can be avoided. The arrangement of the drainage system needs to be comprehensively planned, and the drainage channel is located at the lowest position of the control area as much as possible so as to achieve the purpose of automatically draining water as much as possible. The drainage channel divide into open channel and closed channel, and especially the closed channel form is various, but has excavation volume big, the loaded down with trivial details scheduling problem of construction.
In summary, it is very important to find a semicircular drainage channel which is convenient to construct, has small excavation amount and can ensure the drainage requirement.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the defects in the prior art and providing a semicircular drainage channel.
The semicircular drainage channel comprises a reverse filter geotextile, a hole group, a special PVC pipe, a notch, a reinforcing rib, a bottom plate, a convex opening, a longitudinal rib and a transverse rib; the bottom plate is a reinforced concrete bottom plate, longitudinal ribs and transverse ribs are arranged in the bottom plate, and convex openings and concave openings are formed in the two ends of the bottom plate respectively; the reinforcing ribs are stainless steel semicircular arch structures and are connected with the reinforcing steel bars of the bottom plate; the special PVC pipe is of a semicircular structure, the special PVC pipe is arranged on the bottom plate and the reinforcing ribs, and the pipe wall of the special PVC pipe is provided with a hole group and covered with the reverse filter geotextile.
Preferably, the method comprises the following steps: the reinforcing ribs are connected at the intersections of the longitudinal ribs and the transverse ribs in the reinforcing mesh of the base plate.
Preferably, the method comprises the following steps: the bottom plate is reserved with an embedded pipe groove of a special PVC pipe.
Preferably, the method comprises the following steps: the semicircular drainage channel unit bodies are connected through the convex openings and the concave openings.
The utility model has the advantages that: the utility model discloses a semicircle form drainage channel simple structure, construction convenience, than circular tubulose drainage channel, the volume of digging the side significantly reduces, and can guarantee the drainage requirement.
Drawings
FIG. 1 is a schematic view of a drainage system of a green belt;
FIG. 2 is a schematic perspective view of a semicircular drainage channel;
fig. 3 is a cross-sectional view of a semicircular drainage passage.
Description of reference numerals: 1-vegetation cover; 2-planting soil layer; 3-sand layer; 4-reverse filtration geotextile; 5-gravel cushion; 7-plain soil base course; 8-group of wells; 9-special PVC pipe; 10-a recess; 11-reinforcing ribs; 12-bottom plate; 13-a bead; 14-longitudinal bar; 15-transverse bar.
Detailed Description
The present invention will be further described with reference to the following examples. The following description of the embodiments is merely provided to aid in understanding the invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.
The semicircular drainage channel comprises a reverse filtering geotextile 4, a hole group 8, a special PVC pipe 9, a notch 10, a reinforcing rib 11, a bottom plate 12, a convex opening 13, a longitudinal rib 14 and a transverse rib 15; the bottom plate 12 is a reinforced concrete bottom plate, longitudinal ribs 14 and transverse ribs 15 are arranged in the bottom plate 12, and two ends of the bottom plate 12 are respectively provided with a convex opening 13 and a concave opening 10; the reinforcing ribs 11 are stainless steel semicircular arch structures, and the reinforcing ribs 11 are connected with the reinforcing steel bars of the bottom plate 12; the special PVC pipe 9 is of a semicircular structure, the special PVC pipe 9 is arranged on the bottom plate 12 and the reinforcing ribs 11, and the pipe wall of the special PVC pipe 9 is provided with the hole group 8 and covered with the reverse filter geotextile 4.
The reinforcing bars 11 are connected at the intersections of the longitudinal bars 14 and the transverse bars 15 in the mesh reinforcement of the base plate 12.
The bottom plate 12 is reserved with a mosaic pipe groove of a special PVC pipe 9.
The semicircular drainage channel unit bodies are connected with the notch 10 through the convex opening 13.
The semicircular drainage channel and the vegetation cover layer 1, the planting soil layer 2, the sand layer 3, the reverse filter geotextile 4, the gravel cushion layer 5 and the plain soil base layer 7 which are sequentially arranged from top to bottom form a green belt drainage system.
The construction method of the semicircular drainage channel comprises the following steps:
firstly, as shown in figure 3, prefabricating semicircular drainage channel unit bodies, reinforcing bars for a bottom plate 12, connecting reinforcing ribs 11 at the intersection of longitudinal ribs 14 and transverse ribs 15 in a reinforcing mesh, configuring C25 concrete for pouring the bottom plate 12, reserving an embedded pipe groove of a special PVC pipe 9 and a notch 10 and a convex opening 13 for connecting the semicircular drainage channel unit bodies, as shown in figure 2, opening a hole group 8 on the pipe wall of the special PVC pipe 9, after the pouring and maintenance of the bottom plate 12 are completed, installing the special PVC pipe 9 in the pipe groove on the bottom plate 12, and covering the outer wall with the anti-filtration geotextile 4.
And step two, digging a ditch, tamping a plain soil base layer 7 when a semicircular drainage channel is buried, making a waterproof measure when a notch 10 and a convex opening 13 of the channel are connected, backfilling a gravel cushion layer 5 around the drainage channel after laying, laying a layer of reverse filtering geotextile 4 about 15-20cm higher than the top of the channel, backfilling a sand layer 3 with the thickness of 10-15cm, and finally backfilling a planting soil layer 2 with the thickness of 30-40cm, so that various green landscape plants can be planted on the vegetation cover layer 1, as shown in figure 1.
Claims (4)
1. A semicircular drainage channel is characterized by comprising a reverse filter geotextile (4), a hole group (8), a special PVC pipe (9), a notch (10), a reinforcing rib (11), a bottom plate (12), a convex opening (13), a longitudinal rib (14) and a transverse rib (15); the bottom plate (12) is a reinforced concrete bottom plate, longitudinal ribs (14) and transverse ribs (15) are arranged in the bottom plate (12), and a convex opening (13) and a concave opening (10) are respectively arranged at two ends of the bottom plate (12); the reinforcing ribs (11) are of stainless steel semicircular arch structures, and the reinforcing ribs (11) are connected with the reinforcing steel bars of the bottom plate (12); the special PVC pipe (9) is of a semicircular structure, the special PVC pipe (9) is arranged on the bottom plate (12) and the reinforcing ribs (11), and the pipe wall of the special PVC pipe (9) is provided with the hole group (8) and covered with the reverse filtration geotextile (4).
2. A semicircular drainage channel according to claim 1, wherein the reinforcing bars (11) are connected to the bottom plate (12) at the intersections of the longitudinal bars (14) and the transverse bars (15) in the reinforcing mesh.
3. Semicircular drainage channel according to claim 1, characterized in that the bottom plate (12) is provided with inlaid pipe grooves for special PVC pipes (9).
4. A semicircular drainage channel according to claim 1, wherein the semicircular drainage channel unit bodies are connected with each other by the convex opening (13) and the concave opening (10).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921279168.5U CN211256719U (en) | 2019-08-08 | 2019-08-08 | Semicircular drainage channel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921279168.5U CN211256719U (en) | 2019-08-08 | 2019-08-08 | Semicircular drainage channel |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211256719U true CN211256719U (en) | 2020-08-14 |
Family
ID=71987954
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921279168.5U Active CN211256719U (en) | 2019-08-08 | 2019-08-08 | Semicircular drainage channel |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211256719U (en) |
-
2019
- 2019-08-08 CN CN201921279168.5U patent/CN211256719U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN117926849A (en) | Construction method and application of high-strength gravity retaining wall | |
| CN109024833A (en) | A kind of drainage system and its construction method in sponge city | |
| CN104499560B (en) | Combined rainwater seepage well and construction method | |
| CN217462179U (en) | Semi-bright and semi-dark tunnel protection structure | |
| CN113187068A (en) | A recessed formula greenery patches structure for rainwater is collected in sponge city | |
| CN210002425U (en) | structure of seepage roadbed side slope drainage system | |
| CN114319393B (en) | Ecological slope protection of prefabricated interlocking block of assembled embedded anchor beam and construction method | |
| CN114319557B (en) | A permeable hidden drainage ditch and its construction method | |
| CN206467677U (en) | Foundation pit side-wall drainage arrangement | |
| CN214497785U (en) | Hollow block rainwater infiltration inspection shaft | |
| CN206887669U (en) | Water storage module, drainage structure and water-storing device | |
| CN208933976U (en) | A plant-type ecological concrete slope protection | |
| CN212405178U (en) | Deep water falling hole processing structure of backfill foundation in large karst depression | |
| CN214143521U (en) | Landscape waterfront footpath system | |
| CN115679991B (en) | Semi-cut and semi-fill ecological formwork-free lightweight roadbed construction method | |
| CN204311551U (en) | Combined rainwater seepage well | |
| KR100734812B1 (en) | Concrete step retaining wall with drainage and vegetation functions and construction method | |
| CN217460460U (en) | Ecological bank protection of prefabricated interlocking piece of assembled gomphosis anchor roof beam | |
| CN214169103U (en) | Steep slope surface reinforcing and greening system | |
| KR101840708B1 (en) | construction method eco water way including slop side and a irrigation pipe using the method | |
| CN214116871U (en) | Side ditch drainage system | |
| CN210737590U (en) | Gravity type retaining wall | |
| CN109295942A (en) | Ecoscape type irrigation canal and its construction method | |
| CN112695774A (en) | Steep slope surface reinforcing and greening system and construction method thereof | |
| CN210737589U (en) | Gravity type retaining wall and wall unit thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |