CN211240745U - Saline-alkali soil salt elimination and prevention ecological structure - Google Patents

Saline-alkali soil salt elimination and prevention ecological structure Download PDF

Info

Publication number
CN211240745U
CN211240745U CN201921590595.5U CN201921590595U CN211240745U CN 211240745 U CN211240745 U CN 211240745U CN 201921590595 U CN201921590595 U CN 201921590595U CN 211240745 U CN211240745 U CN 211240745U
Authority
CN
China
Prior art keywords
saline
bamboo tube
straw
thick bamboo
salt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921590595.5U
Other languages
Chinese (zh)
Inventor
田佳伟
周亮亮
周伟国
韦菁
范昕宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Xinyuanlin Industrial Co ltd
Original Assignee
Shanghai Xinyuanlin Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Xinyuanlin Industrial Co ltd filed Critical Shanghai Xinyuanlin Industrial Co ltd
Priority to CN201921590595.5U priority Critical patent/CN211240745U/en
Application granted granted Critical
Publication of CN211240745U publication Critical patent/CN211240745U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The utility model relates to a saline and alkaline land salt elimination, salt prevention ecological structure, including the saline and alkaline land, be provided with the salt elimination blind ditch in the saline and alkaline land, the subaerial metalling of grading, straw isolation layer, the planting soil layer of having laid in proper order from bottom to top of saline and alkaline land, the first thick bamboo tube that a plurality of interval is the same has been laid at the top of straw isolation layer, and the second thick bamboo tube that a plurality of interval is the same has been laid on the upper strata of first thick bamboo tube, and every second thick bamboo tube is located two adjacent first thick bamboo tube interval regions. Setting a graded crushed stone layer and a straw isolation layer to prevent underground saline-alkali water in the saline-alkali soil from entering a planting soil layer through capillary action; arranging a first bamboo tube and a second bamboo tube for storing rainwater or irrigation water seeped from the planting soil for plants planted in the planting soil to absorb and utilize; the first bamboo tube, the second bamboo tube and the straw forming the straw isolation layer are all obtained by natural plants, artificial chemical materials are not introduced, chemical pollution to soil is avoided, and the straw can be used as fertilizer after rotting.

Description

一种盐碱地排盐、防盐生态结构A saline-alkali soil discharge and salt control ecological structure

技术领域technical field

本实用新型涉及盐碱地生态修复技术领域,尤其涉及一种盐碱地排盐、防盐生态结构。The utility model relates to the technical field of ecological restoration of saline-alkali land, in particular to an ecological structure for discharging salt and preventing salt in saline-alkali land.

背景技术Background technique

滨海盐碱地绿化技术是当前园林绿化和生态环境修复等领域重要研究热点。我国沿海各省、市、自治区约有1.8万公里的滨海地带和岛屿沿岸,广泛分布着各种类型滨海盐碱土,总面积达5万平方公里。滨海地区是我国经济最发达区域之一,天津滨海新区、辽宁沿海经济带、上海浦东新区以及江苏沿海经济带等滨海地区,都已纳入国家发展战略,城市的快速发展使滨海地区绿化问题尤为突出。Coastal saline-alkali land greening technology is currently an important research hotspot in the fields of landscaping and ecological environment restoration. There are about 18,000 kilometers of coastal areas and islands along the coastal provinces, municipalities and autonomous regions of my country, and various types of coastal saline-alkali soils are widely distributed, with a total area of 50,000 square kilometers. The coastal area is one of the most economically developed areas in my country. The coastal areas such as Tianjin Binhai New Area, Liaoning Coastal Economic Belt, Shanghai Pudong New Area and Jiangsu Coastal Economic Belt have all been included in the national development strategy. The rapid development of cities has made the problem of greening in coastal areas particularly prominent. .

滨海地区土壤含盐量高,地下水位高,以常规方法种植植物,植物无法存活,绿化难度极大。采用现有的物理、化学和生物等改良措施,一般会引入人工化学材料造成土地污染。The coastal area has high soil salinity and high groundwater level. Plants can not survive by conventional methods, and greening is extremely difficult. With the existing physical, chemical and biological improvement measures, artificial chemical materials are generally introduced to cause land pollution.

实用新型内容Utility model content

本实用新型的目的在于克服现有技术存在的以上问题,提供一种盐碱地排盐、防盐生态结构。The purpose of the utility model is to overcome the above problems existing in the prior art, and to provide an ecological structure for discharging salt and preventing salt in saline-alkali land.

为实现上述技术目的,达到上述技术效果,本实用新型通过以下技术方案实现:In order to realize the above-mentioned technical purpose and achieve the above-mentioned technical effect, the present invention realizes through the following technical solutions:

一种盐碱地排盐、防盐生态结构,包括盐碱地,所述盐碱地中设置有排盐暗沟,所述盐碱地的地面上自下向上依次铺设有级配碎石层、秸秆隔离层、种植土层,所述秸秆隔离层的顶部铺设有若干个间隔相同的第一竹筒,所述第一竹筒的上层铺设有若干个间隔相同的第二竹筒,每个第二竹筒位于相邻两个第一竹筒间隔区域的上方,所述种植土层表面堆积形成一条凸起的乔木种植区,乔木种植区的一侧堆积形成多条台阶形的灌木种植区。A salt-discharging and salt-preventing ecological structure of a saline-alkali land, comprising a saline-alkali land, a salt-discharging underdrain is arranged in the saline-alkali land, and a graded gravel layer, a straw isolation layer, and a planting soil layer are sequentially laid on the ground of the saline-alkali land from bottom to top. Several first bamboo tubes with the same interval are laid on the top of the straw isolation layer, and several second bamboo tubes with the same interval are laid on the upper layer of the first bamboo tube, and each second bamboo tube is located between two adjacent first bamboo tubes. Above the area, the surface of the planting soil layer is piled up to form a raised arbor planting area, and one side of the arbor planting area is piled up to form a plurality of stepped shrub planting areas.

进一步的,所述第一竹筒和所述第二竹筒均由直径为5~8cm的竹子沿其轴向对半切开得到,并且第一竹筒和第二竹筒的切面朝上。Further, both the first bamboo tube and the second bamboo tube are obtained by cutting a bamboo having a diameter of 5 to 8 cm in half along its axial direction, and the cut surfaces of the first bamboo tube and the second bamboo tube are upward.

进一步的,所述灌木种植区的表面从远离最近的乔木种植区的一侧向靠近最近的乔木种植区的一侧倾斜。Further, the surface of the shrub planting area is inclined from the side away from the nearest tree planting area to the side close to the nearest tree planting area.

进一步的,所述乔木种植区和灌木种植区的表面均铺设有草皮。Further, the surfaces of the tree planting area and the shrub planting area are covered with turf.

进一步的,所述排盐暗沟中装填有由级配碎石和粗砂混合而成的填充物。Further, the salt drain underdrain is filled with a filler mixed with graded crushed stone and coarse sand.

进一步的,所述排盐暗沟位于最高地下水位以上。Further, the salt drain underdrain is located above the highest groundwater level.

本实用新型的有益效果是:设置级配碎石层和秸秆隔离层,阻隔盐碱地内地下盐碱水通过毛细管作用进入种植土层;设置第一竹筒和第二竹筒用于储存从种植土中渗下的雨水或灌溉水,供种植在种植土中的植物吸收利用;该种植结构中设置的第一竹筒、第二竹筒、构成秸秆隔离层的秸秆均由天然植物得到,没有引入人工化学材料,不仅不会造成土壤化学污染,而且腐烂后能够作为肥料。The beneficial effects of the utility model are as follows: a graded gravel layer and a straw isolation layer are arranged to prevent the underground saline-alkali water in the saline-alkali land from entering the planting soil layer through capillary action; the first bamboo tube and the second bamboo tube are arranged for storing the seepage from the planting soil The rainwater or irrigation water under the planting soil is absorbed and utilized by the plants planted in the planting soil; the first bamboo tube, the second bamboo tube, and the straw constituting the straw isolation layer set in the planting structure are all obtained from natural plants, and no artificial chemical materials are introduced. Not only will it not cause soil chemical pollution, but it can also be used as fertilizer after decay.

附图说明Description of drawings

此处所说明的附图用来提供对本实用新型的进一步理解,构成本申请的一部分,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。在附图中:The accompanying drawings described here are used to provide further understanding of the present invention and constitute a part of the present application. The schematic embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation of the present invention. In the attached image:

图1是本实用新型实施例的结构示意图。FIG. 1 is a schematic structural diagram of an embodiment of the present invention.

具体实施方式Detailed ways

下面将参考附图并结合实施例,来详细说明本实用新型。The present utility model will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

在本实用新型的描述中,需要理解的是,术语“开孔”、“上”、“下”、“厚度”、“顶”、“中”、“长度”、“内”、“四周”等指示方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的组件或元件必须具有特定的方位,以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "opening", "upper", "lower", "thickness", "top", "middle", "length", "inside", "surrounding" It is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the components or elements referred to must have a specific orientation, are constructed and operated in a specific orientation, and therefore cannot be understood as a reference to the present utility model. New type of restriction.

如图1所示,一种盐碱地排盐、防盐生态结构,包括盐碱地1,盐碱地1中设置有排盐暗沟7,并且排盐暗沟7位于最高地下水位以上,盐碱地1的地面上自下向上依次铺设有级配碎石层2、秸秆隔离层3、种植土层6,秸秆隔离层3的顶部铺设有若干个间隔相同的第一竹筒4,所述第一竹筒4的上层铺设有若干个间隔相同的第二竹筒5,每个第二竹筒5位于相邻两个第一竹筒4间隔区域,种植土层6表面堆积形成一条凸起的乔木种植区9,乔木种植区9的一侧堆积形成多条台阶形的灌木种植区10。As shown in FIG. 1 , a saline-alkali land discharge and salt control ecological structure includes a saline-alkali land 1, and a salt-discharging underdrain 7 is provided in the saline-alkali land 1, and the salt-discharging underdrain 7 is located above the highest groundwater level, and the ground of the saline-alkali land 1 is from bottom to top. A graded gravel layer 2, a straw isolation layer 3, and a planting soil layer 6 are laid successively, and the top of the straw isolation layer 3 is laid with several first bamboo tubes 4 with the same interval, and the upper layer of the first bamboo tube 4 is laid with several Identical second bamboo tube 5 at interval, each second bamboo tube 5 is located in adjacent two first bamboo tube 4 interval area, and the arbor planting area 9 of a raised arbor planting area is formed by the accumulation of planting soil layer 6 surface, and one side of the arbor planting area 9 is piled up. A plurality of stepped shrub planting areas 10 are formed.

设置级配碎石层2和秸秆隔离层3,阻隔盐碱地1内地下盐碱水通过毛细管作用进入种植土层6中;设置第一竹筒4和第二竹筒5用于储存从种植土6中渗下的雨水或灌溉水,供种植在种植土6中的植物吸收利用;该种植结构中设置的第一竹筒4、第二竹筒5、构成秸秆隔离层3的秸秆均由天然植物得到,没有引入人工化学材料,不仅不会造成土壤化学污染,而且腐烂后能够作为肥料。The graded gravel layer 2 and the straw isolation layer 3 are set to block the underground saline-alkali water in the saline-alkali land 1 from entering the planting soil layer 6 through capillary action; the first bamboo tube 4 and the second bamboo tube 5 are set for storage and seepage from the planting soil 6 The rainwater or irrigation water down is for the absorption and utilization of the plants planted in the planting soil 6; the first bamboo tube 4, the second bamboo tube 5, the straw that constitute the straw isolation layer 3 are all obtained by natural plants that are set in this planting structure, and do not introduce Artificial chemical materials not only do not cause soil chemical pollution, but also can be used as fertilizer after decay.

第一竹筒4和所述第二竹筒5均由直径为5~8cm的竹子沿其轴向对半切开得到,并且第一竹筒4和第二竹筒5的切面朝上。The first bamboo tube 4 and the second bamboo tube 5 are both obtained by cutting a bamboo having a diameter of 5 to 8 cm in half along its axial direction, and the cut surfaces of the first bamboo tube 4 and the second bamboo tube 5 are upward.

灌木种植区10的表面从远离最近的乔木种植区9的一侧向靠近最近的乔木种植区9的一侧倾斜,避免雨水或灌溉水汇流至相邻两条乔木种植区9之间的低洼区,造成雨水或灌溉水积聚在种植土表面而挥发浪费。The surface of the shrub planting area 10 is inclined from the side away from the nearest arbor planting area 9 to the side close to the nearest arbor planting area 9 to avoid the confluence of rainwater or irrigation water to the low-lying area between two adjacent arbor planting areas 9 , causing rainwater or irrigation water to accumulate on the surface of the planting soil and volatilize and waste.

在乔木种植区9上种植乔木,在灌木种植区10上种植灌木,乔木种植区9和灌木种植区10的表面均铺设有草皮,草皮一方面对种植土层6表面起到防止水土流失的作用,另一方面增加种植植物的层次。Arbors are planted in the tree planting area 9, and shrubs are planted in the shrub planting area 10. The surfaces of the tree planting area 9 and the shrub planting area 10 are paved with turf, and the turf plays a role in preventing soil erosion on the surface of the planting soil layer 6 on the one hand. , on the other hand to increase the level of planting plants.

排盐暗沟7中装填有由级配碎石和粗砂混合而成的填充物8。首先对盐碱地1进行初次平整,然后在盐碱地1上开设下凹的排盐沟,然后在排盐沟的底部铺设由级配碎石和粗砂混合而成的填充物8,然后在填充物8的上方回填开挖排盐沟时的原土至设计标高,最后对盐碱地进行二次平整即在盐碱地中形成排盐暗沟7。The salt drain 7 is filled with a filler 8 mixed with graded crushed stone and coarse sand. First, the saline-alkali land 1 is first leveled, then a concave salt drain ditch is opened on the saline-alkali land 1, and then a filler 8 mixed with graded gravel and coarse sand is laid at the bottom of the salt drain ditch, and then the filler 8 Backfill the original soil from the excavation of the salt-draining ditch to the design elevation, and finally carry out the secondary leveling of the saline-alkali land to form a salt-draining underdrain 7 in the saline-alkali land.

在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本实用新型的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, description with reference to the terms "one embodiment", "example", "specific example", etc. means that a specific feature, structure, material or characteristic described in connection with the embodiment or example is included in the present invention. in at least one embodiment or example. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。The basic principles, main features and advantages of the present invention are shown and described above. It should be understood by those skilled in the art that the present invention is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention The new model will also have various changes and improvements, which all fall within the scope of the claimed invention.

Claims (5)

1. The utility model provides a saline and alkaline land salt elimination, salt-proof ecological structure, includes saline and alkaline land, its characterized in that: be provided with the salt elimination underdrain in the saline and alkaline land, the subaerial graded broken stone layer, straw isolation layer, the planting soil layer of having laid in proper order from bottom to top of saline and alkaline land, the first thick bamboo tube that a plurality of interval is the same has been laid at the top of straw isolation layer, the second thick bamboo tube that a plurality of interval is the same has been laid on the upper strata of first thick bamboo tube, and every second thick bamboo tube is located two adjacent first thick bamboo tube interval regions, it piles up to form a bellied arbor kind district to plant the soil layer surface, and arbor kind one side in district is piled up and is formed the bush kind district of many step shapes.
2. The saline-alkali soil salt elimination and prevention ecological structure of claim 1, which is characterized in that: the first bamboo tube and the second bamboo tube are obtained by cutting bamboos with the diameters of 5-8 cm into halves along the axial direction of the bamboos, and the sections of the first bamboo tube and the second bamboo tube face upwards.
3. The saline-alkali soil salt elimination and prevention ecological structure of claim 1, which is characterized in that: the surface of the shrub planting area is inclined from a side away from the nearest tree planting area to a side close to the nearest tree planting area.
4. The saline-alkali soil salt elimination and prevention ecological structure of claim 1, which is characterized in that: turf is paved on the surfaces of the arbor planting area and the shrub planting area.
5. The saline-alkali soil salt elimination and prevention ecological structure of claim 1, which is characterized in that: the salt-removing underdrain is positioned above the highest underground water level.
CN201921590595.5U 2019-09-24 2019-09-24 Saline-alkali soil salt elimination and prevention ecological structure Expired - Fee Related CN211240745U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921590595.5U CN211240745U (en) 2019-09-24 2019-09-24 Saline-alkali soil salt elimination and prevention ecological structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921590595.5U CN211240745U (en) 2019-09-24 2019-09-24 Saline-alkali soil salt elimination and prevention ecological structure

Publications (1)

Publication Number Publication Date
CN211240745U true CN211240745U (en) 2020-08-14

Family

ID=71952918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921590595.5U Expired - Fee Related CN211240745U (en) 2019-09-24 2019-09-24 Saline-alkali soil salt elimination and prevention ecological structure

Country Status (1)

Country Link
CN (1) CN211240745U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111903269A (en) * 2020-08-17 2020-11-10 盐城工学院 A drainage desalination system for saline-alkali land improvement
CN116420604A (en) * 2023-04-26 2023-07-14 中国建筑设计研究院有限公司 A multifunctional light roof planting module

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111903269A (en) * 2020-08-17 2020-11-10 盐城工学院 A drainage desalination system for saline-alkali land improvement
CN116420604A (en) * 2023-04-26 2023-07-14 中国建筑设计研究院有限公司 A multifunctional light roof planting module
CN116420604B (en) * 2023-04-26 2023-12-19 中国建筑设计研究院有限公司 Multifunctional light roof planting module

Similar Documents

Publication Publication Date Title
CN201495549U (en) Waste car tires and filler composite ecological slope protection
CN105961120A (en) Mine ecological remediation and slope vegetation fast restoring method suitable for arid region
CN105230323B (en) A kind of growth-promoting binary stereoscopic configurations pattern against corrosion suitable for feldspathic sandstone small watershed
US20180368341A1 (en) Water storage system and manufacturing method therefor
CN102835203A (en) Stony desertization management method utilizing stony desertized area geographical characteristics
CN106818167A (en) A kind of method for administering the discarded ground of khoai in-situ ionic rare earth leaching ore deposit
CN209941695U (en) Comprehensive treatment structure for steep slope type coal gangue dump
CN112136410B (en) A method for rapid establishment of plants in the floodplain wetland of Jiangxin Island in the Yangtze River
CN112970469A (en) Ecological restoration structure for hydro-fluctuation belt in reservoir area
CN1943316A (en) Anti-leakage, water conversion, water-saving fertilizer nutrition liquid irrigation planting method for thin film horizontal band ditch and bucket type bag
Islam et al. Study on growth of vetiver grass in tropical region for slope protection
CN211240745U (en) Saline-alkali soil salt elimination and prevention ecological structure
CN104846912A (en) Dune area water collection irrigation system
CN104594445A (en) Method for performing water retention and wetting irrigation by use of horizontal water storage tanks with contour line and structure
CN114215003A (en) Construction method of water and soil conservation ecological system during construction of landscape terrain in estuary region
CN104294830A (en) Side slope ecological protection and recovery method and arrangement structure
CN207869802U (en) A kind of economizing type Rain Garden for mine greening
CN103125296B (en) Plant water retention pit and water retention method of Yunnan phosphorite refuse dumps
CN107905208B (en) Water and soil conservation structure for accelerating rock weathering in stony desertification region and construction method thereof
CN215301407U (en) Utilize kind of grass to implement restoration structure that mining area was administered
CN206245320U (en) A kind of rare earth slash protecting slope ecology system
CN114606961A (en) A method of soil and water conservation on hillside
CN109930611A (en) A kind of capillary retardance coating and its preparation method and application for side slope protection
CN105200998B (en) ecological slope protection structure
CN209457126U (en) A rainwater ecological seepage well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200814

CF01 Termination of patent right due to non-payment of annual fee