CN211229803U - Rail for engineering construction - Google Patents

Rail for engineering construction Download PDF

Info

Publication number
CN211229803U
CN211229803U CN201921867476.XU CN201921867476U CN211229803U CN 211229803 U CN211229803 U CN 211229803U CN 201921867476 U CN201921867476 U CN 201921867476U CN 211229803 U CN211229803 U CN 211229803U
Authority
CN
China
Prior art keywords
block
engineering construction
blocks
base
cardboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921867476.XU
Other languages
Chinese (zh)
Inventor
黄晓峰
林国键
杨文钗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Academy Of Building Research Co ltd
Fujian Jianyan Engineering Testing Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921867476.XU priority Critical patent/CN211229803U/en
Application granted granted Critical
Publication of CN211229803U publication Critical patent/CN211229803U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a rail is used in engineering construction, the on-line screen storage device comprises a base, the equal fixed mounting in both sides at base top has the support column, the inboard fixed mounting of support column has the cardboard, the inside joint of cardboard has the fixture block, and one side fixed mounting of fixture block has the protection network, and the front of cardboard runs through and is provided with the locating pin. The utility model discloses an aim at the cardboard with the fixture block at protection network both ends and block into, can fix the fixture block through the locating pin, install the riser on the base when connecting other blocks afterwards, it is parallel with the support column, the inside of connecting block is fixed through the bolt to the manual rotation card of movable block of riser side goes into, and the inside of locating piece is inserted to the one end of inserted block, the constant head tank card on inserted block surface is accomplished on the surface of fastening lug and is fixed the connection of riser this moment, this mounting means easy operation, firm in connection, do not need to use a lot of screws simultaneously, can divide batch equipment to the not block of equidimension in proper order.

Description

Rail for engineering construction
Technical Field
The utility model relates to a construction rail technical field specifically is a rail is used in engineering construction.
Background
Common in the life have aluminum alloy rail and zinc steel rail, the application is also most extensive, use aluminum alloy rail and zinc steel rail usually in road construction, can divide into fixed rail and activity rail in these current road construction rails, it is great to the general area of road construction, what adopt at will all is the activity rail, but this activity rail need assemble before the use, current road construction rail equipment is complicated, need use a plurality of screws to fix, and it topples over to be touched by the mistake very easily in the use, perhaps because of the constructor mistake bumps to the road in, cause inconvenience for the driving.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a rail for engineering construction possesses the fixed advantage of installation of being convenient for, and it is complicated to have solved current road construction rail equipment, needs to use a plurality of screws to fix to touched the problem of empting by the mistake very easily in the use.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a rail for engineering construction, includes the base, the equal fixed mounting in both sides at base top has the support column, the inboard fixed mounting of support column has the cardboard, the inside joint of cardboard has the fixture block, one side fixed mounting of fixture block has the protection network, the front of cardboard runs through and is provided with the locating pin, the top of base and the both sides that are located the support column are all pegged graft and are had the riser, the equal fixed mounting in upper and lower both ends that the riser is inboard has the inserted block, it has the locating piece to peg graft on the surface of inserted block one end, the inserted block is located the surface of the inside one end of locating piece and has seted up the constant head tank, peg graft in the inside of constant head tank and have.
Preferably, the upper end and the lower end of one side of the vertical plate and located on the outer side of the insertion block are both fixedly provided with moving blocks, a connecting block is fixedly arranged on one side of the supporting column and corresponding to the moving blocks, and one end of each moving block penetrates into the connecting block.
Preferably, the upper and lower both sides that the inserted block is located the inside one end of locating piece are equal fixed mounting have the stopper, the one end joint of stopper is to the inside and sliding connection of locating piece.
Preferably, the front surface of the connecting block is provided with a bolt, and one end of the bolt penetrates through the connecting block and extends into the moving block.
Preferably, the upper end and the lower end of the outer side of the vertical plate are fixedly provided with connecting rods, and one ends of the connecting rods are fixedly arranged with one ends of the external reinforcing barrier nets.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a with the fixture block at protection network both ends aim at the cardboard and go into, can fix the fixture block through the locating pin, install the riser on the base when connecting other blocks afterwards, it is parallel with the support column, the inside of connecting block is fixed through the bolt to the manual rotation card of movable block of riser side goes into, and the inside of locating piece is inserted to the one end of inserted block, the constant head tank card on inserted block surface is accomplished on the surface of fastening lug and is fixed the connection of riser this moment, this mounting means easy operation, firm in connection, need not use a lot of screws simultaneously, can divide batch equipment to the not block of equidimension in proper order, it is complicated to have solved current road construction rail equipment simultaneously, need use a plurality of screws to fix, and touch the problem of empting by the mistake very easily in the use.
2. The utility model discloses an inserted block slides along the inside of locating piece through driving the stopper when the locating piece is inside to be removed, increases the stability that the inserted block removed, increases the firm degree to its installation, and difficult production is rocked.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a sectional view of the internal structure of the connecting block of the present invention;
fig. 3 is a sectional view of the internal structure of the positioning block of the present invention.
In the figure: 1. a base; 2. a support pillar; 3. clamping a plate; 4. a clamping block; 5. a protective net; 6. positioning pins; 7. a vertical plate; 8. inserting a block; 9. positioning blocks; 10. positioning a groove; 11. fastening the lug; 12. a limiting block; 13. a moving block; 14. and (4) connecting the blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description herein, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings to facilitate the description of the patent and to simplify the description, but do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus are not to be considered limiting of the patent. In the description of the present application, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can, for example, be fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Referring to fig. 1-3, a fence for engineering construction comprises a base 1, wherein support columns 2 are fixedly mounted on both sides of the top of the base 1, clamping plates 3 are fixedly mounted on the inner sides of the support columns 2, clamping blocks 4 are clamped inside the clamping plates 3, a protective screen 5 is fixedly mounted on one side of each clamping block 4, positioning pins 6 are arranged on the front surfaces of the clamping plates 3 in a penetrating manner, vertical plates 7 are respectively inserted into both sides of the support columns 2 at the top of the base 1, moving blocks 13 are respectively fixedly mounted on the upper and lower ends of one side of each vertical plate 7 and on the outer sides of the corresponding insertion blocks 8, connecting blocks 14 are fixedly mounted on one side of the support columns 2 and corresponding to the moving blocks 13, one ends of the moving blocks 13 penetrate into the connecting blocks 14, bolts are arranged on the front surfaces of the connecting blocks 14, one ends of the bolts penetrate through the, one end of the connecting rod is fixedly installed with one end of an external reinforcing block net, the upper end and the lower end of the inner side of the vertical plate 7 are fixedly provided with inserting blocks 8, the upper end and the lower end of the inner side of the vertical plate 7 are fixedly provided with limiting blocks 12 which slide along the inside of the positioning block 9 when the inserting blocks 8 move in the positioning block 9, the moving stability of the inserting blocks 8 is increased, the fixing degree of the inserting blocks is increased, the shaking is not easy to generate, the upper side and the lower side of the end, located in the positioning block 9, of the inserting block 8 are fixedly provided with the limiting blocks 12, one end of the limiting block 12 is clamped in the positioning block 9 and is in sliding connection, the positioning block 9 is inserted in the surface of one end of the inserting block 8, located in the positioning block 9, the surface of one end of the inserting block 8 is provided with a positioning groove 10, the inside of the, can fix fixture block 4 through locating pin 6, install riser 7 on base 1 when connecting other barrier nets afterwards, it is parallel with support column 2, the inside of connecting block 14 is fixed through the bolt to the manual rotation card of movable block 13 of riser 7 side, and the inside of locating piece 9 is inserted to the one end of inserted block 8, the constant head tank 10 card on inserted block 8 surface is accomplished the connection to riser 7 on fastening lug 11's surface and is fixed this mounting means easy operation this moment, firm in connection, need not use a lot of screws simultaneously, can divide batch equipment to the barrier net of equidimension not in proper order, it is complicated to have solved current road construction rail equipment simultaneously, need use a plurality of screws to fix, and touched the problem of empting by the mistake very easily in the use.
The standard parts used in the application document can be purchased from the market, all the parts in the application document can be customized according to the description of the specification and the description of the attached drawings, the specific connection mode of all the parts adopts conventional means such as bolts, rivets, welding and the like mature in the prior art, and machines, parts and equipment adopt conventional models in the prior art, and detailed description is not given here.
During the use, at first aim at cardboard 3 with the fixture block 4 at protection network 5 both ends and block into, can fix fixture block 4 through locating pin 6, install riser 7 on base 1 when connecting other blocks afterwards, it is parallel with support column 2, the inside of connecting block 14 is gone into to the movable block 13 manual rotation card of riser 7 side is fixed through the bolt, and the inside of locating piece 9 is inserted to the one end of inserted block 8, the constant head tank 10 card on inserted block 8 surface accomplishes the connection fixed to riser 7 on fastening lug 11's surface this moment, this mounting means easy operation, firm in connection, need not use a lot of screws simultaneously, can divide batch equipment to the block of equidimension not in proper order.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a rail for engineering construction, includes base (1), its characterized in that: the two sides of the top of the base (1) are both fixedly provided with supporting columns (2), the inner sides of the supporting columns (2) are fixedly provided with clamping plates (3), a clamping block (4) is clamped in the clamping plate (3), a protective net (5) is fixedly arranged on one side of the clamping block (4), the front surface of the clamping plate (3) is provided with a positioning pin (6) in a penetrating way, the top of the base (1) and two sides of the supporting column (2) are inserted with vertical plates (7), the upper end and the lower end of the inner side of the vertical plate (7) are fixedly provided with inserting blocks (8), a positioning block (9) is inserted on the surface of one end of the insertion block (8), a positioning groove (10) is arranged on the surface of one end of the insertion block (8) positioned in the positioning block (9), a fastening lug (11) is inserted into the positioning groove (10), and one side of the fastening lug (11) is fixedly installed with one side of the inner cavity of the positioning block (9).
2. The fence for engineering construction according to claim 1, wherein: the vertical plate (7) is characterized in that moving blocks (13) are fixedly mounted at the upper end and the lower end of one side of the vertical plate (7) and positioned on the outer side of the inserting block (8), connecting blocks (14) are fixedly mounted at one side of the supporting column (2) and corresponding to the positions of the moving blocks (13), and one ends of the moving blocks (13) penetrate through the connecting blocks (14).
3. The fence for engineering construction according to claim 1, wherein: the plug block (8) is located the equal fixed mounting in upper and lower both sides of the inside one end of locating piece (9) and has stopper (12), the inside and sliding connection of one end joint to locating piece (9) of stopper (12).
4. The fence for engineering construction according to claim 2, wherein: the front surface of the connecting block (14) is provided with a bolt, and one end of the bolt penetrates through the connecting block (14) and extends into the moving block (13).
5. The fence for engineering construction according to claim 1, wherein: the upper end and the lower end of the outer side of the vertical plate (7) are fixedly provided with connecting rods, and one ends of the connecting rods and one ends of the external reinforcing barrier nets are fixedly arranged.
CN201921867476.XU 2019-11-01 2019-11-01 Rail for engineering construction Active CN211229803U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921867476.XU CN211229803U (en) 2019-11-01 2019-11-01 Rail for engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921867476.XU CN211229803U (en) 2019-11-01 2019-11-01 Rail for engineering construction

Publications (1)

Publication Number Publication Date
CN211229803U true CN211229803U (en) 2020-08-11

Family

ID=71924711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921867476.XU Active CN211229803U (en) 2019-11-01 2019-11-01 Rail for engineering construction

Country Status (1)

Country Link
CN (1) CN211229803U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282505A (en) * 2020-11-30 2021-01-29 曹淑华 Protective fence for building construction
CN112727244A (en) * 2020-12-24 2021-04-30 浙江水利水电学院 Protective guard structure for plain river dredging engineering and mounting method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282505A (en) * 2020-11-30 2021-01-29 曹淑华 Protective fence for building construction
CN112727244A (en) * 2020-12-24 2021-04-30 浙江水利水电学院 Protective guard structure for plain river dredging engineering and mounting method thereof
CN112727244B (en) * 2020-12-24 2022-06-17 浙江水利水电学院 Protective guard structure for plain river dredging engineering and mounting method thereof

Similar Documents

Publication Publication Date Title
CN211229803U (en) Rail for engineering construction
CN113235958B (en) Diversified guide system that supports of assembly type structure wall assembly
CN215167946U (en) Attached scaffold convenient to dismouting protection network
CN206225126U (en) A kind of device for strengthening transformer stability
CN218856015U (en) Welding positioning structure for inner plate of side wall plate
CN209179186U (en) A kind of construction steel structure fitting fastening
CN212386848U (en) Unload piece frock subassembly and unload piece frock
CN110051174A (en) A kind of stand column and beam hanger type connection structure of shelf
CN208519318U (en) A kind of slidably concrete pump pipe pump line support
CN210462207U (en) Shunt fixing support
CN220267381U (en) Self-fixing device for protective fence foundation
CN210214596U (en) Support suitable for installing large-scale electric cabinet of hoist
CN223781249U (en) A type of bamboo-shell courtyard wall fence
CN215518393U (en) High mound construction creeping formwork centre form gallows
CN219371961U (en) Special line bridge for weak current machine room
CN217078494U (en) Highway subgrade landslide prevention device
CN221420534U (en) A jack bottom structure
CN217054449U (en) Security protection device for construction
CN221627346U (en) Enclosure wall formed by splicing light wallboards
CN217400548U (en) Railway bridge construction is with protection hurdle
CN220312270U (en) Welding tool for base of air conditioner outdoor unit
CN217683957U (en) Frame roof beam bearing structure
CN204090348U (en) Assembling type cabinet
CN216947874U (en) Bridge faces limit protection fixed foot rest
CN216446858U (en) Karst foundation pile drilling platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210514

Address after: Floor 19, building 3, Wanfu center, No.8 Chuangye Road, Fuzhou hi tech Zone, Fuzhou City, Fujian Province, 350108

Patentee after: FUJIAN ACADEMY OF BUILDING RESEARCH Co.,Ltd.

Patentee after: Fujian Jianyan Engineering Testing Co.,Ltd.

Address before: 362011 No.8 neiyang, Hongsi village, Luoxi Town, Luojiang District, Quanzhou City, Fujian Province

Patentee before: Huang Xiaofeng

TR01 Transfer of patent right