CN211223603U - Subframe assembly - Google Patents

Subframe assembly Download PDF

Info

Publication number
CN211223603U
CN211223603U CN201922143821.1U CN201922143821U CN211223603U CN 211223603 U CN211223603 U CN 211223603U CN 201922143821 U CN201922143821 U CN 201922143821U CN 211223603 U CN211223603 U CN 211223603U
Authority
CN
China
Prior art keywords
bracket
assembly
front suspension
subframe
power front
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922143821.1U
Other languages
Chinese (zh)
Inventor
刘旭晖
王亚奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qoros Automotive Co Ltd
Original Assignee
Qoros Automotive Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qoros Automotive Co Ltd filed Critical Qoros Automotive Co Ltd
Priority to CN201922143821.1U priority Critical patent/CN211223603U/en
Application granted granted Critical
Publication of CN211223603U publication Critical patent/CN211223603U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Body Structure For Vehicles (AREA)

Abstract

本实用新型提供一种副车架总成,其包括副车架和动力前悬支架,副车架具有供动力前悬支架连接的安装接口,动力前悬支架包括第一支架和第二支架,第一支架可拆卸连接于安装接口,第二支架沿水平方向设置于第一支架的一侧,并焊接于副车架的表面,第一支架和第二支架用于共同连接动力前悬总成。该副车架总成,在与连接的动力前悬总成的位置产生变更的情况下,通过将动力前悬支架分为两部分,并采用一边焊接,一边机械装配的分体安装方式,以利用原有安装接口实现与位置变更后的动力前悬总成相连的目的。该副车架总成仅仅是重新设计了动力前悬支架,因此验证周期短,有利于项目研发成本的降低以及研发时间的控制。

Figure 201922143821

The utility model provides a sub-frame assembly, which comprises a sub-frame and a power front suspension bracket, the sub-frame has an installation interface for connecting the power front suspension bracket, and the power front suspension bracket comprises a first bracket and a second bracket, The first bracket is detachably connected to the installation interface, the second bracket is arranged on one side of the first bracket along the horizontal direction, and is welded to the surface of the subframe, and the first bracket and the second bracket are used to jointly connect the power front suspension assembly . When the position of the subframe assembly is changed with the connected power front suspension assembly, the power front suspension bracket is divided into two parts, and the split installation method of welding and mechanical assembly is adopted to achieve The original installation interface is used to achieve the purpose of connecting with the power front suspension assembly after the position has been changed. The subframe assembly is only a redesigned power front suspension bracket, so the verification period is short, which is beneficial to the reduction of project development costs and the control of development time.

Figure 201922143821

Description

副车架总成Subframe assembly

技术领域technical field

本实用新型涉及车辆部件领域,特别涉及一种副车架总成。The utility model relates to the field of vehicle components, in particular to a sub-frame assembly.

背景技术Background technique

副车架总成可以看作是车辆前后车桥的骨架,是车辆结构中的重要组成部分。如图1所示,副车架总成100'包括副车架1'和动力前悬支架2',动力前悬支架2'的一端固定于副车架1'的安装接口11'处,另一端通过安装点21'与动力前悬总成(图中未示出)相连。The subframe assembly can be regarded as the skeleton of the front and rear axles of the vehicle, and is an important part of the vehicle structure. As shown in FIG. 1 , the subframe assembly 100' includes a subframe 1' and a power front suspension bracket 2'. One end of the power front suspension bracket 2' is fixed at the installation interface 11' of the subframe 1', and the other One end is connected with the power front suspension assembly (not shown in the figure) through the installation point 21'.

然而,对于电动汽车而言,由于电动机的型号众多,若因车辆改型而变更电动机型号(即变更动力总成),很容易导致动力前悬总成与动力前悬支架2'的连接位置沿水平方向A产生偏移。若上述安装点21'的位置相对安装接口11'需要大幅偏移,会使得现有的安装接口11'所在位置无法再满足连接动力前悬总成所需的强度与刚度,在这种情况下,需要对副车架1'的安装接口11'位置进行重新设计。这种设计变更会导致副车架的重新设计及开模验证,进而使得车辆设计研发流程进一步复杂化,导致研发费用的上升,不利于降本。However, for electric vehicles, since there are many models of electric motors, if the electric motor model is changed due to vehicle modification (ie, the powertrain is changed), it is easy to cause the connection position of the power front suspension assembly and the power front suspension bracket 2' to be along the edge. The horizontal direction A is offset. If the position of the above-mentioned installation point 21' needs to be greatly offset from the installation interface 11', the existing installation interface 11' will no longer be able to meet the strength and rigidity required for connecting the power front suspension assembly. In this case , it is necessary to redesign the position of the installation interface 11' of the sub-frame 1'. This design change will lead to the redesign and mold opening verification of the subframe, which will further complicate the vehicle design and development process, resulting in an increase in research and development costs, which is not conducive to cost reduction.

实用新型内容Utility model content

本实用新型要解决的技术问题是为了克服现有技术中的电动车因动力总成的变更导致副车架需要重新设计,进而产生研发成本的缺陷,提供一种副车架总成。The technical problem to be solved by the present utility model is to provide a sub-frame assembly in order to overcome the defect of the electric vehicle in the prior art that the sub-frame needs to be redesigned due to the change of the power assembly, thereby resulting in the cost of research and development.

本实用新型是通过下述技术方案来解决上述技术问题:The utility model solves the above-mentioned technical problems through the following technical solutions:

一种副车架总成,其包括副车架和动力前悬支架,所述副车架具有供所述动力前悬支架连接的安装接口,所述动力前悬支架包括第一支架和第二支架,所述第一支架可拆卸连接于所述安装接口,所述第二支架沿水平方向设置于所述第一支架的一侧,并焊接于所述副车架的表面,所述第一支架和所述第二支架用于共同连接动力前悬总成。A subframe assembly includes a subframe and a power front suspension bracket, the subframe has an installation interface for connecting the power front suspension bracket, and the power front suspension bracket includes a first bracket and a second bracket A bracket, the first bracket is detachably connected to the installation interface, the second bracket is arranged on one side of the first bracket along the horizontal direction, and is welded to the surface of the subframe, the first bracket The bracket and the second bracket are used to jointly connect the power front suspension assembly.

该副车架总成,在与连接的动力前悬总成的位置产生变更的情况下,通过将动力前悬支架分为两部分,并采用一边焊接,一边机械装配的分体安装方式,以利用原有安装接口实现与位置变更后的动力前悬总成相连的目的。When the position of the subframe assembly is changed with the connected power front suspension assembly, the power front suspension bracket is divided into two parts, and the split installation method of welding and mechanical assembly is adopted to achieve The original installation interface is used to achieve the purpose of connecting with the power front suspension assembly after the position has been changed.

该副车架总成没有在原有的副车架基础上进行改制或重新设计,而仅仅是重新设计了动力前悬支架,因此验证周期短,研发成本低,有利于项目研发成本的降低以及研发时间的控制。The subframe assembly is not remanufactured or redesigned on the basis of the original subframe, but only the power front suspension bracket is redesigned. Therefore, the verification period is short and the R&D cost is low, which is beneficial to the reduction of project R&D costs and the development of R&D. time control.

较佳地,所述第一支架具有第一安装孔,所述第二支架具有第二安装孔,所述第一安装孔和所述第二安装孔均用于连接所述动力前悬总成,所述第一安装孔和所述第二安装孔同轴设置。Preferably, the first bracket has a first installation hole, the second bracket has a second installation hole, and both the first installation hole and the second installation hole are used to connect the power front suspension assembly , the first mounting hole and the second mounting hole are coaxially arranged.

较佳地,所述动力前悬总成安装于所述第一支架和所述第二支架之间,以保证动力前悬总成与两个支架之间的固定效果。Preferably, the power front suspension assembly is installed between the first bracket and the second bracket to ensure the fixing effect between the power front suspension assembly and the two brackets.

较佳地,所述第一支架还包括连接于所述安装接口的固定点,所述固定点设置于所述第一支架的第一安装孔远离所述第二安装孔的一侧,以由此提高整个动力前悬支架与位置改变后的动力前悬总成之间的连接可靠性。Preferably, the first bracket further includes a fixing point connected to the installation interface, the fixing point is arranged on the side of the first installation hole of the first bracket away from the second installation hole, so as to This improves the connection reliability between the entire power front suspension bracket and the changed position of the power front suspension assembly.

较佳地,所述安装接口包括纵向贯穿所述副车架的螺纹孔,所述第一支架包括相互焊接的支架板和套筒,所述套筒具有沿轴线方向贯穿的通孔,所述通孔与所述安装接口的螺纹孔通过螺栓连接,所述第一安装孔形成于所述支架板的表面。Preferably, the installation interface comprises a threaded hole longitudinally penetrating the subframe, the first bracket comprises a bracket plate and a sleeve welded to each other, the sleeve has a through hole penetrating in the axial direction, the The through hole and the threaded hole of the installation interface are connected by bolts, and the first installation hole is formed on the surface of the bracket plate.

较佳地,所述安装接口还包括形成于所述副车架的表面的容纳空间,所述第一支架部分设置于所述容纳空间内,以提高安装接口与第一支架的连接效果。Preferably, the installation interface further includes an accommodating space formed on the surface of the sub-frame, and the first bracket is partially disposed in the accommodating space to improve the connection effect between the installation interface and the first bracket.

较佳地,所述支架板的两侧具有折边,所述套筒容纳于所述支架板的两个所述折边围成的空间内,两个所述折边分别覆盖所述套筒的两侧端面,并在所述通孔的所在位置处镂空,以使得套筒更牢固地与支架板固定。Preferably, the two sides of the bracket plate have folds, the sleeve is accommodated in the space enclosed by the two folds of the bracket plate, and the two folds cover the sleeve respectively. The end faces on both sides of the through hole are hollowed out at the position of the through hole, so that the sleeve is more firmly fixed with the bracket plate.

较佳地,所述支架板为钣金折弯件。Preferably, the support plate is a sheet metal bent part.

较佳地,所述第一支架还包括加强板,所述加强板设置于所述支架板的两个所述折边围成的空间内,以用于加强整个第一支架的结构强度。Preferably, the first bracket further includes a reinforcing plate, and the reinforcing plate is arranged in the space enclosed by the two folded edges of the bracket plate, so as to strengthen the structural strength of the entire first bracket.

本实用新型的积极进步效果在于:The positive progressive effect of the present utility model is:

该副车架总成,在与连接的动力前悬总成的位置产生变更的情况下,通过将动力前悬支架分为两部分,并采用一边焊接,一边机械装配的分体安装方式,以利用原有安装接口实现与位置变更后的动力前悬总成相连的目的。When the position of the subframe assembly is changed with the connected power front suspension assembly, the power front suspension bracket is divided into two parts, and the split installation method of welding and mechanical assembly is adopted to achieve The original installation interface is used to achieve the purpose of connecting with the power front suspension assembly after the position has been changed.

该副车架总成没有在原有的副车架基础上进行改制或重新设计,而仅仅是重新设计了动力前悬支架,因此验证周期短,有利于项目研发成本的降低以及研发时间的控制。The subframe assembly is not remanufactured or redesigned on the basis of the original subframe, but only the power front suspension bracket is redesigned, so the verification period is short, which is beneficial to the reduction of project development costs and the control of development time.

附图说明Description of drawings

图1为现有技术的副车架总成的结构示意图。FIG. 1 is a schematic structural diagram of a sub-frame assembly in the prior art.

图2为本实用新型一实施例的副车架总成的结构示意图。2 is a schematic structural diagram of a sub-frame assembly according to an embodiment of the present invention.

图3为本实用新型一实施例的副车架的结构示意图。3 is a schematic structural diagram of a subframe according to an embodiment of the present invention.

图4为本实用新型一实施例的第一支架的结构示意图。4 is a schematic structural diagram of a first bracket according to an embodiment of the present invention.

图5为本实用新型一实施例的加强板的结构示意图。5 is a schematic structural diagram of a reinforcing plate according to an embodiment of the present invention.

附图标记说明:Description of reference numbers:

现有技术current technology

副车架总成100'Subframe assembly 100'

副车架1'Subframe 1'

安装接口11'Installation interface 11'

动力前悬支架2'Power front suspension bracket 2'

安装点21'Mounting point 21'

本实用新型The utility model

副车架总成100Subframe assembly 100

副车架1Subframe 1

安装接口11,螺纹孔11a,容纳空间11bMounting interface 11, threaded hole 11a, accommodating space 11b

第一支架21,第一安装孔21aThe first bracket 21, the first mounting hole 21a

支架板211,折边211aBracket plate 211, folded edge 211a

套筒212,通孔212aSleeve 212, through hole 212a

加强板213Reinforcing plate 213

第二支架22,第二安装孔22aThe second bracket 22, the second mounting hole 22a

具体实施方式Detailed ways

下面举个较佳实施例,并结合附图来更清楚完整地说明本实用新型。A preferred embodiment is given below, and the present utility model will be more clearly and completely described with reference to the accompanying drawings.

如图2和图3所示,本实用新型提供一种副车架总成100,其包括括副车架1和动力前悬支架,副车架1上具有供动力前悬支架连接的安装接口11,该动力前悬支架包括第一支架21和第二支架22,其中,第一支架21与副车架1的安装接口11通过螺栓固定,而第二支架22则设置第一支架21沿水平方向A的一侧,并通过焊接固定的方式与副车架1的表面连接,该第一支架21和第二支架22用于共同连接动力前悬总成(图中未示出),实现副车架1与动力总成连接固定的目的。As shown in FIG. 2 and FIG. 3 , the present invention provides a sub-frame assembly 100, which includes a sub-frame 1 and a power front suspension bracket, and the sub-frame 1 is provided with an installation interface for connecting the power front suspension bracket 11. The power front suspension bracket includes a first bracket 21 and a second bracket 22, wherein the first bracket 21 and the mounting interface 11 of the sub-frame 1 are fixed by bolts, and the second bracket 22 is provided with the first bracket 21 along the horizontal direction. One side of the direction A, and connected to the surface of the subframe 1 by welding and fixing, the first bracket 21 and the second bracket 22 are used to jointly connect the power front suspension assembly (not shown in the figure) to realize the auxiliary frame. The purpose of connecting and fixing the frame 1 to the powertrain.

该副车架总成100,在与连接的动力前悬总成的位置产生变更的情况下,通过将动力前悬支架分为两部分,并采用一边焊接,一边机械装配的分体安装方式,以利用原有安装接口11实现与位置变更后的动力前悬总成相连的目的。When the position of the sub-frame assembly 100 is changed with the connected power front suspension assembly, the power front suspension bracket is divided into two parts, and the split installation method of welding and mechanical assembly is adopted. In order to use the original installation interface 11 to achieve the purpose of connecting with the power front suspension assembly whose position has been changed.

该副车架总成100没有在原有的副车架1基础上进行改制或重新设计,而仅仅是重新设计了动力前悬支架,因此验证周期短,研发成本低,有利于项目成本的降低以及开发时间的控制,尤其适用于电动汽车这类动力元件型号变更更为频繁的车辆。The subframe assembly 100 is not remanufactured or redesigned on the basis of the original subframe 1, but only the power front suspension bracket is redesigned, so the verification period is short, the research and development cost is low, which is beneficial to the reduction of project costs and The control of development time is especially suitable for vehicles such as electric vehicles with more frequent model changes of power components.

如图2所示,在第一支架21上设有第一安装孔21a,与之相对应地,在第二支架22上设有第二安装孔22a,这两个安装孔同轴设置,以用于共同连接于动力前悬总成,使得动力前悬总成与动力前悬支架的连接位置相对副车架1的安装接口11能够水平偏移。其中,动力前悬总成是安装在第一支架21和第二支架22之间的位置处的,以保证动力前悬总成与两个支架之间的固定效果。As shown in FIG. 2, a first mounting hole 21a is provided on the first bracket 21, and correspondingly, a second mounting hole 22a is provided on the second bracket 22, and the two mounting holes are coaxially arranged to It is used to be connected to the power front suspension assembly together, so that the connection position of the power front suspension assembly and the power front suspension bracket can be horizontally offset relative to the installation interface 11 of the subframe 1 . The power front suspension assembly is installed at a position between the first bracket 21 and the second bracket 22 to ensure the fixing effect between the power front suspension assembly and the two brackets.

如图3和图4所示,副车架1上的安装接口11包括纵向贯穿该副车架1的螺纹孔11a,在本实施例中是通过在副车架1表面的通孔上焊接螺母来实现。而第一支架21则包括有相互焊接的支架板211和套筒212,其中,套筒212具有沿轴线方向贯穿自身的通孔212a,该通孔212a与安装接口11的螺纹孔11a之间通过螺栓固定连接,而第一安装孔21a则形成于支架板211的表面。As shown in FIGS. 3 and 4 , the mounting interface 11 on the sub-frame 1 includes a threaded hole 11 a longitudinally extending through the sub-frame 1 . In this embodiment, a nut is welded to the through hole on the surface of the sub-frame 1 . to fulfill. The first bracket 21 includes a bracket plate 211 and a sleeve 212 welded to each other, wherein the sleeve 212 has a through hole 212a extending through itself in the axial direction, and the through hole 212a and the threaded hole 11a of the installation interface 11 pass through The bolts are fixedly connected, and the first mounting holes 21 a are formed on the surface of the bracket plate 211 .

此外,副车架1上的安装接口11还包括形成于副车架1的表面的容纳空间11b,第一支架21具有套筒212的一侧被容纳在该容纳空间11b内,以提高安装接口11与第一支架21的连接效果。In addition, the mounting interface 11 on the sub-frame 1 further includes an accommodating space 11b formed on the surface of the sub-frame 1, and the side of the first bracket 21 with the sleeve 212 is accommodated in the accommodating space 11b, so as to improve the mounting interface 11 and the connection effect of the first bracket 21.

支架板211的上下两侧均具有折边211a,上下两个折边211a之间形成一空间,该空间用于容纳套筒212,以使得套筒212更牢固地与支架板211固定。两个折边211a分别覆盖在套筒212的两侧端面处,并在套筒212的通孔212a所在位置处镂空,以供螺栓穿入。The upper and lower sides of the bracket plate 211 are provided with folded edges 211 a , and a space is formed between the upper and lower folded edges 211 a for accommodating the sleeve 212 , so that the sleeve 212 is more firmly fixed to the bracket plate 211 . The two folded edges 211a respectively cover the end faces on both sides of the sleeve 212, and are hollowed out at the positions of the through holes 212a of the sleeve 212 for bolts to penetrate.

第一支架21还包括有加强板213,本实施例中,加强板213如图5所示地呈“L”形,该加强板213设置在由支架板211的两个折边211a围成的空间内,其两端分别焊接至支架板211与套筒212,以用于加强整个第一支架21的结构强度,并在第一支架21从副车架1的安装接口11处伸出并单侧连接动力前悬总成时保证该连接结构的强度与刚度。The first bracket 21 also includes a reinforcing plate 213. In this embodiment, the reinforcing plate 213 is in an “L” shape as shown in FIG. In the space, its two ends are welded to the bracket plate 211 and the sleeve 212 respectively, so as to strengthen the structural strength of the entire first bracket 21, and the first bracket 21 protrudes from the installation interface 11 of the sub-frame 1 and is single. The strength and rigidity of the connecting structure are ensured when the power front suspension assembly is laterally connected.

优选地,上述的套筒212由钢管制成,上述的支架板211和加强板213由钣金折弯制成,并通过相互焊接的方式提高零件自身的强度。Preferably, the above-mentioned sleeve 212 is made of steel pipe, and the above-mentioned support plate 211 and the reinforcing plate 213 are made of sheet metal bending, and the strength of the parts is improved by mutual welding.

另外,如图2所示,该第一支架21用于与安装接口11连接的通孔212a(即固定点)位于第一支架21的第一安装孔21a远离第二安装孔22a的一侧,以使得第一支架21被固定于副车架1时,第一安装孔21a尽量朝第二支架22侧靠近,以由此提高整个动力前悬支架与位置改变后的动力前悬总成之间的连接可靠性。In addition, as shown in FIG. 2 , the through hole 212a (ie, the fixing point) of the first bracket 21 for connecting with the installation interface 11 is located on the side of the first installation hole 21a of the first bracket 21 away from the second installation hole 22a, When the first bracket 21 is fixed to the subframe 1, the first mounting hole 21a is as close as possible to the second bracket 22 side, so as to improve the distance between the entire power front suspension bracket and the power front suspension assembly after the position has been changed. connection reliability.

虽然以上描述了本实用新型的具体实施方式,但是本领域的技术人员应当理解,这仅是举例说明,本实用新型的保护范围是由所附权利要求书限定的。本领域的技术人员在不背离本实用新型的原理和实质的前提下,可以对这些实施方式做出多种变更或修改,但这些变更和修改均落入本实用新型的保护范围。Although the specific embodiments of the present invention are described above, those skilled in the art should understand that this is only an example, and the protection scope of the present invention is defined by the appended claims. Those skilled in the art can make various changes or modifications to these embodiments without departing from the principle and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.

Claims (9)

1.一种副车架总成,其包括副车架和动力前悬支架,所述副车架具有供所述动力前悬支架连接的安装接口,其特征在于,所述动力前悬支架包括第一支架和第二支架,所述第一支架可拆卸连接于所述安装接口,所述第二支架沿水平方向设置于所述第一支架的一侧,并焊接于所述副车架的表面,所述第一支架和所述第二支架用于共同连接动力前悬总成。1. A subframe assembly comprising a subframe and a power front suspension bracket, the subframe having a mounting interface for connecting the power front suspension bracket, wherein the power front suspension bracket comprises A first bracket and a second bracket, the first bracket is detachably connected to the installation interface, the second bracket is arranged on one side of the first bracket in the horizontal direction, and is welded to the subframe. On the surface, the first bracket and the second bracket are used to jointly connect the power front suspension assembly. 2.如权利要求1所述的副车架总成,其特征在于,所述第一支架具有第一安装孔,所述第二支架具有第二安装孔,所述第一安装孔和所述第二安装孔均用于连接所述动力前悬总成,所述第一安装孔和所述第二安装孔同轴设置。2 . The subframe assembly of claim 1 , wherein the first bracket has a first mounting hole, the second bracket has a second mounting hole, the first mounting hole and the The second installation holes are all used for connecting the power front suspension assembly, and the first installation holes and the second installation holes are coaxially arranged. 3.如权利要求2所述的副车架总成,其特征在于,所述动力前悬总成安装于所述第一支架和所述第二支架之间。3. The subframe assembly of claim 2, wherein the power front suspension assembly is mounted between the first bracket and the second bracket. 4.如权利要求2所述的副车架总成,其特征在于,所述第一支架还包括连接于所述安装接口的固定点,所述固定点设置于所述第一支架的第一安装孔远离所述第二安装孔的一侧。4 . The sub-frame assembly of claim 2 , wherein the first bracket further comprises a fixing point connected to the mounting interface, the fixing point being disposed on the first side of the first bracket. 5 . The mounting hole is away from the side of the second mounting hole. 5.如权利要求2所述的副车架总成,其特征在于,所述安装接口包括纵向贯穿所述副车架的螺纹孔,所述第一支架包括相互焊接的支架板和套筒,所述套筒具有沿轴线方向贯穿的通孔,所述通孔与所述安装接口的螺纹孔通过螺栓连接,所述第一安装孔形成于所述支架板的表面。5. The subframe assembly of claim 2, wherein the mounting interface comprises a threaded hole extending longitudinally through the subframe, the first bracket comprises a bracket plate and a sleeve welded to each other, The sleeve has a through hole penetrating along the axis direction, the through hole is connected with the threaded hole of the installation interface by bolts, and the first installation hole is formed on the surface of the bracket plate. 6.如权利要求5所述的副车架总成,其特征在于,所述安装接口还包括形成于所述副车架的表面的容纳空间,所述第一支架部分设置于所述容纳空间内。6 . The sub-frame assembly of claim 5 , wherein the mounting interface further comprises an accommodating space formed on a surface of the sub-frame, and the first bracket portion is disposed in the accommodating space 6 . Inside. 7.如权利要求5所述的副车架总成,其特征在于,所述支架板的两侧具有折边,所述套筒容纳于所述支架板的两个所述折边围成的空间内,两个所述折边分别覆盖所述套筒的两侧端面,并在所述通孔的所在位置处镂空。7 . The sub-frame assembly of claim 5 , wherein two sides of the bracket plate are provided with folded edges, and the sleeve is accommodated in a space surrounded by two of the folded edges of the bracket plate. 8 . In the space, the two folded edges respectively cover the end faces on both sides of the sleeve, and are hollowed out at the positions of the through holes. 8.如权利要求7所述的副车架总成,其特征在于,所述支架板为钣金折弯件。8 . The subframe assembly of claim 7 , wherein the bracket plate is a sheet metal bent part. 9 . 9.如权利要求7所述的副车架总成,其特征在于,所述第一支架还包括加强板,所述加强板设置于所述支架板的两个所述折边围成的空间内。9 . The sub-frame assembly of claim 7 , wherein the first bracket further comprises a reinforcing plate, and the reinforcing plate is disposed in the space enclosed by the two folded edges of the bracket plate. 10 . Inside.
CN201922143821.1U 2019-12-04 2019-12-04 Subframe assembly Expired - Fee Related CN211223603U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922143821.1U CN211223603U (en) 2019-12-04 2019-12-04 Subframe assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922143821.1U CN211223603U (en) 2019-12-04 2019-12-04 Subframe assembly

Publications (1)

Publication Number Publication Date
CN211223603U true CN211223603U (en) 2020-08-11

Family

ID=71940922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922143821.1U Expired - Fee Related CN211223603U (en) 2019-12-04 2019-12-04 Subframe assembly

Country Status (1)

Country Link
CN (1) CN211223603U (en)

Similar Documents

Publication Publication Date Title
CN209037663U (en) The full frame subframe of one and vehicle
CN204210564U (en) Electronlmobil fore sub frame and electronlmobil suspension system
CN203581139U (en) Automobile rear-wheel cover assembly
CN209126830U (en) A kind of floor side member joint structure and automobile
CN207826336U (en) Automobile and its subframe
CN211731552U (en) Auxiliary frame assembly structure and automobile
CN205706857U (en) Automobile front subframe
CN211731560U (en) New energy automobile front auxiliary frame structure
CN206218010U (en) Subframe welding assembly
CN211731564U (en) Frame structure before support piece and car
CN204506550U (en) A kind of detachable arch cross-beam
CN204567764U (en) A kind of auxiliary frame structure
CN210941439U (en) An automobile front seat mounting beam
CN205149979U (en) Multi -functional beam assembly is used to passenger train
CN208646963U (en) A kind of subframe and its vehicle
CN205469275U (en) Mounting structure of sub vehicle frame before car
CN203497016U (en) Instrument board cross beam and vehicle body front wall connecting structure
CN202986788U (en) Power battery supporting component
CN202429053U (en) Side-mounted-engine mounting set
CN209037665U (en) Full frame subframe and vehicle
CN206012718U (en) A kind of subframe mount structure
CN205854273U (en) Rear suspension mounting structure and there is its body of a motor car
CN204527310U (en) Subframe and vehicle
CN201941678U (en) Combination of transverse steering and supporting tube and glove box bracket
CN210116547U (en) Front subframe and vehicle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200811