CN211204401U - Wall-mounted stove - Google Patents
Wall-mounted stove Download PDFInfo
- Publication number
- CN211204401U CN211204401U CN201922194754.6U CN201922194754U CN211204401U CN 211204401 U CN211204401 U CN 211204401U CN 201922194754 U CN201922194754 U CN 201922194754U CN 211204401 U CN211204401 U CN 211204401U
- Authority
- CN
- China
- Prior art keywords
- heat exchanger
- heating
- domestic water
- burner
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Landscapes
- Steam Or Hot-Water Central Heating Systems (AREA)
Abstract
本实用新型涉及电器技术领域,具体涉及一种壁挂炉。所述壁挂炉通过增设第二燃烧器、第二换热器以及通过设置在所述供暖出水管路上的第一三通换向阀与所述供暖出水管路连通,以及设置在所述生活用水加热回路的第二三通换向阀与所述第三换热器连通的生活用水加热回路,进而在可同时供暖和生活用水的情况下,在不使用生活用水的情况下,通过生活用水加热回路对供暖系统进行加热,提高了壁挂炉的效率。
The utility model relates to the technical field of electrical appliances, in particular to a wall-hung boiler. The wall-hung boiler is communicated with the heating water outlet pipeline by adding a second burner, a second heat exchanger, and a first three-way reversing valve arranged on the heating water outlet pipeline, and is arranged on the domestic water outlet. The domestic water heating circuit in which the second three-way reversing valve of the heating circuit is communicated with the third heat exchanger, and further, in the case that heating and domestic water can be used at the same time, when domestic water is not used, domestic water is used for heating The loop heats the heating system, increasing the efficiency of the boiler.
Description
技术领域technical field
本实用新型涉及电器技术领域,具体涉及一种壁挂炉。The utility model relates to the technical field of electrical appliances, in particular to a wall-hung boiler.
背景技术Background technique
目前,壁挂炉多为两用炉,具有采暖功能与生活用水功能。基于实际使用需求,目前的壁挂炉在使用时多采用为生活用水优先原则,在使用热水功能的同时,同时会停止采暖功能。At present, most of the wall-hung boilers are dual-purpose furnaces, which have heating functions and domestic water functions. Based on the actual needs of use, the current wall-hung boilers mostly adopt the principle of giving priority to domestic water when in use. When using the hot water function, the heating function will be stopped at the same time.
但是采用上述壁挂炉,在人们同时需要采暖和供热水的使用需求时,尤其是在冬季长时间使用生活用水时,会使得采暖管路中的水温降低,会使得室内有较大的温度下降,用户体验不佳。对此一种壁挂炉将供暖和生活用水系统脱离关联,进而可同时实现供暖和生活用水,避免相互影响,但是在不使用生活用水的情况下,生活用水系统闲置,导致不必要的能源损耗。However, when the above-mentioned wall-hung boiler is used, when people need both heating and hot water, especially when domestic water is used for a long time in winter, the water temperature in the heating pipeline will be lowered, and the indoor temperature will drop significantly. , the user experience is not good. In this regard, a wall-hung boiler disconnects the heating and domestic water systems, so that heating and domestic water can be achieved at the same time to avoid mutual influence, but when domestic water is not used, the domestic water system is idle, resulting in unnecessary energy loss.
实用新型内容Utility model content
本实用新型的主要目的在于提供一种壁挂炉,以解决现有技术中壁挂炉无法同时满足供热水和供暖,工作效率不高的问题。The main purpose of the utility model is to provide a wall-hung boiler, so as to solve the problem that the wall-hung boiler in the prior art cannot satisfy both hot water supply and heating, and the working efficiency is low.
为实现上述目的,本实用新型提供了一种壁挂炉,包括供暖进水管路、供暖出水管路、生活用水进水管路、生活用水出水管路以及生活用水加热回路,所述壁挂炉还包括:In order to achieve the above purpose, the utility model provides a wall-hung boiler, including a heating water inlet pipeline, a heating water outlet pipeline, a domestic water inlet pipeline, a domestic water outlet pipeline and a domestic water heating circuit, and the wall-hung boiler also includes:
第一换热器以及对所述第一换热器供热的第一燃烧器,所述第一换热器分别与所述供暖进水管路和所述供暖出水管路连通;a first heat exchanger and a first burner for supplying heat to the first heat exchanger, the first heat exchanger being communicated with the heating water inlet pipeline and the heating water outlet pipeline respectively;
第二换热器以及对所述第二换热器供热的第二燃烧器,所述第二换热器与所述生活用水加热回路连通;a second heat exchanger and a second burner for supplying heat to the second heat exchanger, the second heat exchanger being in communication with the domestic water heating circuit;
第三换热器,所述第三换热器包括与所述生活用水加热回路连通的第一换热通道,以及与所述生活用水进水管路和所述生活用水出水管路连通的第二换热通道,所述第三换热器供所述第一换热通道和所述第二换热通道之间换热;A third heat exchanger, the third heat exchanger includes a first heat exchange channel communicated with the domestic water heating circuit, and a second heat exchange channel communicated with the domestic water inlet pipeline and the domestic water outlet pipeline a heat exchange channel, the third heat exchanger is used for heat exchange between the first heat exchange channel and the second heat exchange channel;
其中,所述生活用水加热回路通过设置在所述供暖出水管路上的第一三通换向阀与所述供暖出水管路连通,以及设置在所述生活用水加热回路的第二三通换向阀与所述第三换热器连通。Wherein, the domestic water heating circuit is communicated with the heating water outlet pipeline through a first three-way reversing valve arranged on the heating water outlet pipeline, and a second three-way reversing valve arranged on the domestic water heating circuit A valve is in communication with the third heat exchanger.
进一步地,第一换热器为与所述第一燃烧器配合的第一加热器;第二换热器为与所述第二燃烧器配合的第二加热器。Further, the first heat exchanger is a first heater matched with the first burner; the second heat exchanger is a second heater matched with the second burner.
进一步地,第三换热器为板式换热器。Further, the third heat exchanger is a plate heat exchanger.
进一步地,所述壁挂炉还包括:Further, the wall-hung boiler also includes:
在所述第一燃烧器上游设置的第一分段阀,所述分段阀可供所述第一燃烧器分段燃烧。A first segment valve is provided upstream of the first burner, and the segment valve is used for segment combustion of the first burner.
进一步地,所述壁挂炉还包括:在所述第二燃烧器上游设置的第二分段阀,所述分段阀可供所述第二燃烧器分段燃烧。Further, the wall-hung boiler further comprises: a second segment valve arranged upstream of the second burner, and the segment valve can be used for segment combustion of the second burner.
进一步地,所述壁挂炉还包括:在所述第一分段阀和所述第二分段阀上游设置的燃气比例阀,用于控制进入所述第一分段阀和所述第二分段阀的燃气量。Further, the wall-hung boiler further includes: a gas proportional valve arranged upstream of the first segment valve and the second segment valve, for controlling the entry into the first segment valve and the second segment valve. gas volume of the segment valve.
本实用新型技术方案,具有如下优点:The technical scheme of the utility model has the following advantages:
本实用新型提供的壁挂炉中,通过在壁挂炉中增设第二燃烧器、第二换热器以及通过设置在所述供暖出水管路上的第一三通换向阀与所述供暖出水管路连通,以及设置在所述生活用水加热回路的第二三通换向阀与所述第三换热器连通的生活用水加热回路,进而在可同时供暖和生活用水的情况下,在不使用生活用水的情况下,通过生活用水加热回路对供暖系统进行加热,提高了壁挂炉的效率。In the wall-hung boiler provided by the utility model, a second burner and a second heat exchanger are added in the wall-hung boiler, and a first three-way reversing valve arranged on the heating water outlet pipeline is connected with the heating water outlet pipeline. communication, and the domestic water heating circuit in which the second three-way reversing valve provided in the domestic water heating circuit is communicated with the third heat exchanger, so that when heating and domestic water can be used at the same time, the domestic water heating circuit is not used In the case of using water, the heating system is heated through the domestic water heating circuit, which improves the efficiency of the wall-hung boiler.
附图说明Description of drawings
为了更清楚地说明本实用新型具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本实用新型的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。在附图中:In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the specific embodiments or the prior art. Obviously, the following descriptions The accompanying drawings are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained based on these drawings without creative efforts. In the attached image:
图1为本实用新型实施例中壁挂炉在的主视结构示意图,其中壁挂炉处于单采暖、高功率模式。FIG. 1 is a schematic front view of the structure of a wall-hung boiler in an embodiment of the present invention, wherein the wall-hung boiler is in a single-heating, high-power mode.
图2为图1所示壁挂炉在的主视结构示意图,其中壁挂炉处于单采暖、较高功率模式。FIG. 2 is a schematic front view of the structure of the wall-hung boiler shown in FIG. 1 , wherein the wall-hung boiler is in a single heating, higher power mode.
图3为图1所示壁挂炉在的主视结构示意图,其中壁挂炉处于单采暖、中功率模式。FIG. 3 is a schematic front view of the structure of the wall-hung boiler shown in FIG. 1 , wherein the wall-hung boiler is in a single heating and medium power mode.
图4为图1所示壁挂炉在的主视结构示意图,其中壁挂炉处于单采暖、低功率模式。FIG. 4 is a schematic front view of the structure of the wall-hung boiler shown in FIG. 1 , wherein the wall-hung boiler is in a single-heating, low-power mode.
图5为图1所示壁挂炉在的主视结构示意图,其中壁挂炉处于单生活用水、高功率模式。FIG. 5 is a schematic front view of the structure of the wall-hung boiler shown in FIG. 1 , wherein the wall-hung boiler is in a single domestic water and high power mode.
图6为图1所示壁挂炉在的主视结构示意图,其中壁挂炉处于采暖、生活用水共用模式。FIG. 6 is a schematic front view of the structure of the wall-hung boiler shown in FIG. 1 , wherein the wall-hung boiler is in a shared mode for heating and domestic water.
其中,上述附图中的附图标记为:Wherein, the reference signs in the above drawings are:
1、集烟罩;3、风压开关;6、第一换热器;9、第一燃烧器;12、第一三通换向阀;14、燃气比例阀;15、供暖进水管路;16、第一分段阀;19、供暖出水管路;22、第二分段阀;23、生活用水进水管路;24、板式换热器;25、生活用水出水管路;28、第二三通换向阀;30、第二燃烧器;34、第二换热器。1. Smoke collecting hood; 3. Air pressure switch; 6. First heat exchanger; 9. First burner; 12. First three-way reversing valve; 14. Gas proportional valve; 15. Heating water inlet pipeline; 16. First segment valve; 19. Heating water outlet pipeline; 22. Second segment valve; 23. Domestic water inlet pipeline; 24. Plate heat exchanger; 25. Domestic water outlet pipeline; 28. Second Three-way reversing valve; 30, the second burner; 34, the second heat exchanger.
具体实施方式Detailed ways
下面将结合附图对本实用新型的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are a part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
在本实用新型的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner" and "outer" The orientation or positional relationship indicated by etc. is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, with a specific orientation. Therefore, it should not be construed as a limitation on the present invention. Furthermore, the terms "first", "second", and "third" are used for descriptive purposes only and should not be construed to indicate or imply relative importance.
如图1至图6所示,根据本实施中的壁挂炉包括供暖进水管路15、供暖出水管路19、生活用水进水管路23、生活用水出水管路25以及生活用水加热回路,所述壁挂炉还包括:As shown in FIGS. 1 to 6 , the wall-hung boiler according to the present implementation includes a heating
第一换热器6以及对所述第一换热器6供热的第一燃烧器9,所述第一换热器6分别与所述供暖进水管路15和所述供暖出水管路19连通;The first heat exchanger 6 and the first burner 9 for supplying heat to the first heat exchanger 6, the first heat exchanger 6 is respectively connected with the heating
第二换热器34以及对所述第二换热器34供热的第二燃烧器30,所述第二换热器34与所述生活用水加热回路连通;a
第三换热器,所述第三换热器包括与所述生活用水加热回路连通的第一换热通道,以及与所述生活用水进水管路23和所述生活用水出水管路25连通的第二换热通道,所述第三换热器供所述第一换热通道和所述第二换热通道之间换热;A third heat exchanger, the third heat exchanger includes a first heat exchange channel that communicates with the domestic water heating circuit, and a first heat exchange channel that communicates with the domestic
其中,所述生活用水加热回路通过设置在所述供暖出水管路19上的第一三通换向阀12与所述供暖出水管路19连通,以及设置在所述生活用水加热回路的第二三通换向阀28与所述第三换热器连通。Wherein, the domestic water heating circuit communicates with the heating
进而采用本实施中的壁挂炉,通过在壁挂炉中增设第二燃烧器30、第二换热器34以及通过设置在所述供暖出水管路19上的第一三通换向阀12与所述供暖出水管路19连通,以及设置在所述生活用水加热回路的第二三通换向阀28与所述第三换热器连通的生活用水加热回路,进而在可同时供暖和生活用水的情况下,在不使用生活用水的情况下,通过生活用水加热回路对供暖系统进行加热,提高了壁挂炉的效率。Furthermore, using the wall-hung boiler in this embodiment, the
具体本实施例中的第一换热器6为与所述第一燃烧器9配合的第一加热器;第二换热器34为与所述第二燃烧器30配合的第二加热器。Specifically, the first heat exchanger 6 in this embodiment is a first heater matched with the first burner 9 ; the
具体地,第三换热器为板式换热器24。Specifically, the third heat exchanger is the
优选地,本实施例中的所述壁挂炉还包括:在所述第一燃烧器9上游设置的第一分段阀16,所述分段阀可供所述第一燃烧器9分段燃烧。所述壁挂炉还包括:在所述第二燃烧器30上游设置的第二分段阀22,所述分段阀可供所述第二燃烧器30分段燃烧。进而可扩大壁挂炉的功率调节比,进一步提升了用户体验。Preferably, the wall-hung boiler in this embodiment further comprises: a
优选地,本实施例中的所述壁挂炉还包括:在所述第一分段阀16和所述第二分段阀22上游设置的燃气比例阀14,用于控制进入所述第一分段阀16和所述第二分段阀22的燃气量,进一步提升了壁挂炉功率的可调节比。Preferably, the wall-hung boiler in this embodiment further comprises: a gas
进一步参见图1至图5,本实施例中的壁挂炉包括两个风机,两个风机可共用一个集烟罩1,也可单独用一个集烟罩1。燃气比例阀14控制燃气的开闭和燃气流量的大小。在每一燃烧系统中的燃烧器火排上方安装有检火针与点火针,用于点火与检测是否点火成功。水泵提供水循环的动力,风机提供燃烧所需的空气与排除燃烧后的烟气。风压开关3用于检测烟气通道是否正常。采暖出水感温包用于检测采暖出水温度,三通电机用于切换生活用水与采暖水。板式换热器24用于加热生活用水。生活用水感温包用于检测热水出水温度。Further referring to FIGS. 1 to 5 , the wall-hung boiler in this embodiment includes two fans, and the two fans may share a fume collecting hood 1 , or a fume collecting hood 1 may be used alone. The gas
下面已结合附图对本实施例中的壁挂炉的工作过程进行说明:The working process of the wall-hung boiler in this embodiment has been described below with reference to the accompanying drawings:
如图1所示,在壁挂炉单采暖模式,以高功率运行的情况下:当控制器主板接收到机组运行负荷大时,首先风机启动,当风压开关3检测到风机气流在文丘里管上产生的压差信号,将信号反馈给控制器主板,其次脉冲点火装置进行点火,燃气比例阀14开启向第一分段阀16和第二分段阀22输送燃气。然后分段阀电磁阀全部开启向两个分段燃烧器输送燃气,第一燃烧器9和第二燃烧器30开始燃烧。供暖水从供暖回水口进入第一水泵,通过第一换热器6进行换热,后通过第一三通换向阀12,通过第二水泵进入第二换热器34进行第二次换热,再经过第二三通换向阀28,到供暖出水口流向供暖末端,完成本次供暖循环。As shown in Figure 1, in the case of the single heating mode of the wall-hung boiler and the high power operation: when the controller main board receives a large operating load of the unit, the fan starts first, and when the
如图2所示,在壁挂炉单采暖模式,以较高功率运行时,当控制器主板接收到机组运行负荷较大时,首先风机启动,当风压开关3检测到风机气流在文丘里管上产生的压差信号,将信号反馈给控制器主板,其次脉冲点火装置进行点火,燃气比例阀14开启向第一分段阀16和第二分段阀22输送燃气。然后分段阀电磁阀除第二分段阀22外,全部开启向两个分段燃烧器输送燃气,第一燃烧器9和第二燃烧器30右侧部分开始燃烧。供暖水从供暖回水口进入第一水泵,通过第一换热器6进行换热,后通过第一三通换向阀12,通过第二水泵进入第二换热器34进行第二次换热,再经过第二三通换向阀28,到供暖出水口流向供暖末端,完成本次供暖循环。As shown in Figure 2, in the single heating mode of the wall-hung boiler, when running at a higher power, when the controller main board receives a large operating load of the unit, the fan starts first, and when the
如图3所示,在壁挂炉单采暖模式,以中功率运行时,当控制器主板接收到机组运行负荷较小时,首先风机启动,当风压开关3检测到风机气流在文丘里管上产生的压差信号,将信号反馈给控制器主板,其次脉冲点火装置进行点火,燃气比例阀14开启向第一分段阀16输送燃气。然后第一分段阀16电磁阀开启向第一燃烧器9输送燃气,第一燃烧器9开始燃烧。供暖水从供暖回水口进入第一水泵,通过第一换热器6进行换热,后通过第一三通换向阀12,到供暖出水口流向供暖末端,完成本次供暖循环。As shown in Figure 3, in the single heating mode of the wall-hung boiler, when running at medium power, when the main board of the controller receives a small operating load of the unit, the fan starts first, and when the
如图4所示,在壁挂炉单采暖模式,以低功率运行时,当控制器主板接收到机组运行负荷较小时,首先风机启动,当风压开关3检测到风机气流在文丘里管上产生的压差信号,将信号反馈给控制器主板,其次脉冲点火装置进行点火,燃气比例阀14开启向第一分段阀16输送燃气。然后第一分段阀16开启向第一燃烧器9右侧输送燃气,第一燃烧器9右侧开始燃烧。供暖水从供暖回水口进入第一水泵,通过第一换热器6进行换热,后通过第一三通换向阀12,到供暖出水口流向供暖末端,完成本次供暖循环。As shown in Figure 4, in the single heating mode of the wall-hung boiler, when running at low power, when the main board of the controller receives a small operating load of the unit, the fan starts first, and when the
如图5所示,在壁挂炉单生活用水模式,以高功率运行时:当控制器主板接收到水流量传感器反馈的生活用水需求而且机组运行负荷大时,首先风机启动,当风压开关3检测到风机气流在文丘里管上产生的压差信号,将信号反馈给控制器主板,其次脉冲点火装置进行点火,燃气比例阀14开启向第二分段阀22输送燃气。然后第二分段阀22开启向第二燃烧器30输送燃气,第二燃烧器30侧开始燃烧。供暖水从第二水泵开始进入第二换热器34进行换热,后通过第二三通换向阀28进入板式换热器24,经过板式换热器24与生活用水换热后,回到第二水泵进行循环。而生活用水从生活用水进口进入,经过板式换热器24换热后,达到设定温度,从生活用水出口出,到达生活用水末端;当生活用水功率需求较小时,仅开启第二分段阀22。As shown in Figure 5, in the single domestic water mode of the wall-hung boiler, when running at high power: when the main board of the controller receives the domestic water demand fed back by the water flow sensor and the operating load of the unit is large, the fan starts first, and when the
如图6所示,在壁挂炉采暖与生活用水同时使用模式下,当控制器主板接收到机组需进行采暖与生活用水同时使用时,首先风机启动,当风压开关3检测到风机气流在文丘里管上产生的压差信号,将信号反馈给控制器主板,其次脉冲点火装置进行点火,燃气比例阀14开启向第一分段阀16和第二分段阀22输送燃气。然后分段阀电磁阀全部开启向两个分段燃烧器输送燃气,第一燃烧器9和第二燃烧器30开始燃烧。此时第一三通换向阀12关闭。供暖水从第二水泵开始进入第二换热器34进行换热,后通过第二三通换向阀28进入板式换热器24,经过板式换热器24与生活用水换热后,回到第二水泵进行循环。而生活用水从生活用水进口进入,经过板式换热器24换热后,达到设定温度,从生活用水出口出,到达生活用水末端;供暖回水进入第一水泵,经过第一换热器6进行换热,再经过第一三通换向阀12,到供暖出水口,流向供暖末端。实现供暖模式和生活用水模式同时开启。As shown in Figure 6, in the mode of simultaneous use of wall-hung boiler heating and domestic water, when the controller main board receives that the unit needs to be used for heating and domestic water at the same time, the fan starts first, and when the
显然,上述实施例仅仅是为清楚地说明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由此所引伸出的显而易见的变化或变动仍处于本实用新型创造的保护范围之中。Obviously, the above-mentioned embodiments are only examples for clear description, and are not intended to limit the implementation manner. For those of ordinary skill in the art, changes or modifications in other different forms can also be made on the basis of the above description. There is no need and cannot be exhaustive of all implementations here. And the obvious changes or changes derived from this are still within the protection scope of the present invention.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922194754.6U CN211204401U (en) | 2019-12-09 | 2019-12-09 | Wall-mounted stove |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922194754.6U CN211204401U (en) | 2019-12-09 | 2019-12-09 | Wall-mounted stove |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211204401U true CN211204401U (en) | 2020-08-07 |
Family
ID=71854307
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922194754.6U Withdrawn - After Issue CN211204401U (en) | 2019-12-09 | 2019-12-09 | Wall-mounted stove |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211204401U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111306781A (en) * | 2019-12-09 | 2020-06-19 | 珠海格力电器股份有限公司 | Wall-mounted stove |
-
2019
- 2019-12-09 CN CN201922194754.6U patent/CN211204401U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111306781A (en) * | 2019-12-09 | 2020-06-19 | 珠海格力电器股份有限公司 | Wall-mounted stove |
CN111306781B (en) * | 2019-12-09 | 2025-02-07 | 珠海格力电器股份有限公司 | Wall-mounted boiler |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105387613A (en) | Sectionalized combustion type gas-fired water heating furnace | |
CN206019022U (en) | Segmented combustion device with double fan for wall-hung boiler | |
CN205174787U (en) | Gas heating water heater of formula of burning by stage | |
CN207422353U (en) | A kind of HVAC burnt gas wall hanging furnace branch thermostat | |
CN212274265U (en) | Low-nitrogen condensation wall-mounted furnace | |
CN211204401U (en) | Wall-mounted stove | |
CN102116501A (en) | Hybrid power wall-hung boiler | |
CN211261241U (en) | Gas self-adaptive full-premixing wall-mounted boiler | |
CN212205039U (en) | Water heater | |
CN211233353U (en) | Wall-mounted stove | |
WO2018018977A1 (en) | Gas water heater | |
CN205561250U (en) | Domestic gas water heater | |
CN211290526U (en) | Wall-mounted furnace | |
CN111426055A (en) | Water heater and control method thereof | |
CN106152229A (en) | A kind of condensed type combustion gas warm bath dual-purpose stove | |
CN107869846A (en) | Condensing gas heating stove | |
CN206001583U (en) | A kind of condensed type combustion gas warm up bath dual-purpose stove | |
CN111306781A (en) | Wall-mounted stove | |
CN210624878U (en) | Sleeve type wall-mounted furnace | |
CN216204304U (en) | gas heating water heater | |
CN206145952U (en) | High -efficient type sectional type hanging stove | |
CN211400281U (en) | Wall-mounted furnace | |
CN111306783B (en) | Wall-mounted furnace | |
CN209639236U (en) | A kind of multi-functional volume gas water heating stove | |
CN207162699U (en) | A kind of warm bath dual-purpose stove of full pre-mix condensing combustion gas |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20200807 Effective date of abandoning: 20250207 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20200807 Effective date of abandoning: 20250207 |