CN211189669U - Overflow pipe anti-blocking device of wet desulphurization absorption tower and wet desulphurization absorption tower - Google Patents

Overflow pipe anti-blocking device of wet desulphurization absorption tower and wet desulphurization absorption tower Download PDF

Info

Publication number
CN211189669U
CN211189669U CN201920458910.2U CN201920458910U CN211189669U CN 211189669 U CN211189669 U CN 211189669U CN 201920458910 U CN201920458910 U CN 201920458910U CN 211189669 U CN211189669 U CN 211189669U
Authority
CN
China
Prior art keywords
overflow pipe
control valve
absorption tower
flushing pipeline
flushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920458910.2U
Other languages
Chinese (zh)
Inventor
刘畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yingkou Power Plant of Huaneng Power International Inc
Original Assignee
Yingkou Power Plant of Huaneng Power International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yingkou Power Plant of Huaneng Power International Inc filed Critical Yingkou Power Plant of Huaneng Power International Inc
Priority to CN201920458910.2U priority Critical patent/CN211189669U/en
Application granted granted Critical
Publication of CN211189669U publication Critical patent/CN211189669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treating Waste Gases (AREA)
  • Gas Separation By Absorption (AREA)

Abstract

本实用新型公开了一种湿法脱硫吸收塔的溢流管防堵塞装置,包括:冲洗管路、进水控制阀、流量计、压力表和出水控制阀;其中,冲洗管路一端为冲洗水入口,另一端与湿法脱硫吸收塔的塔体的溢流管连接,冲洗管路上依次设置压力表、流量计和进水控制阀;出水控制阀设在溢流管上,处于连接冲洗管路处下方的溢流管上。该装置通过设置与吸收塔塔体上的溢流管连接的冲洗管路,并在冲洗管路上依次设置压力表、流量计和进水控制阀,同时在溢流管的出水端设置出水控制阀,通过冲洗管路配合出水控制阀,能方便的对溢流管进行冲洗,避免溢流管堵塞,也避免了溢流管堵塞引起的各种问题。

Figure 201920458910

The utility model discloses an overflow pipe anti-clogging device of a wet desulfurization absorption tower, comprising: a flushing pipeline, a water inlet control valve, a flow meter, a pressure gauge and a water outlet control valve; wherein, one end of the flushing pipeline is flushing water The inlet and the other end are connected to the overflow pipe of the tower body of the wet desulfurization absorption tower. The flushing pipeline is provided with a pressure gauge, a flow meter and a water inlet control valve in sequence; the outlet water control valve is set on the overflow pipe and is connected to the flushing pipeline. on the overflow pipe below. The device is provided with a flushing pipeline connected to the overflow pipe on the tower body of the absorption tower, and a pressure gauge, a flowmeter and a water inlet control valve are arranged in sequence on the flushing pipeline, and a water outlet control valve is set at the outlet end of the overflow pipe. , Through the flushing pipeline and the water outlet control valve, the overflow pipe can be easily flushed, so as to avoid the blockage of the overflow pipe and various problems caused by the blockage of the overflow pipe.

Figure 201920458910

Description

湿法脱硫吸收塔的溢流管防堵塞装置及湿法脱硫吸收塔Anti-clogging device for overflow pipe of wet desulfurization absorption tower and wet desulfurization absorption tower

技术领域technical field

本实用新型涉及湿法脱硫吸收塔领域,尤其涉及一种湿法脱硫吸收塔的溢流管防堵塞装置及湿法脱硫吸收塔。The utility model relates to the field of wet desulfurization absorption towers, in particular to an overflow pipe anti-clogging device of a wet desulfurization absorption tower and a wet desulfurization absorption tower.

背景技术Background technique

现有的湿法脱硫吸收塔上设有溢流管,当吸收塔在高液位运行易出现液位计失真、起泡、氧化风机运行中跳闸、增加喷淋量等情况,经常会造成吸收塔溢流,吸收塔溢流时正常会通过溢流管排至地坑,溢流后溢流管与塔壁连接处会有浆液部分沉积,多次溢流后,溢流管与塔壁连接处沉积物堆积长大,长时间会造成溢流管与塔壁连接处堵塞,溢流管堵塞后再发生溢流时,由于不能从溢流管排出,大量浆液会通过原烟气入口倒灌至引风机入口,轻者会造成引风机因入口通流面积减小跳闸,严重的会造成引风机叶片损坏,堵塞时无法判断和处理,很多厂出现浆液倒灌现象。The existing wet desulfurization absorption tower is provided with an overflow pipe. When the absorption tower operates at a high liquid level, distortion of the liquid level gauge, foaming, tripping of the oxidation fan during operation, and increase of the spray volume are likely to occur, which often cause absorption. The tower overflows. When the absorption tower overflows, it will normally be discharged to the pit through the overflow pipe. After overflowing, there will be partial sedimentation of the slurry at the connection between the overflow pipe and the tower wall. After multiple overflows, the overflow pipe will be connected to the tower wall. The accumulation of sediment at the place will cause the connection between the overflow pipe and the tower wall to be blocked for a long time. When the overflow pipe is blocked and then overflow occurs, since it cannot be discharged from the overflow pipe, a large amount of slurry will be poured back through the original flue gas inlet. At the inlet of the induced draft fan, the light one will cause the induced draft fan to trip due to the reduction of the inlet flow area, and the serious one will cause the damage of the induced draft fan blade.

实用新型内容Utility model content

基于现有技术所存在的问题,本实用新型的目的是提供一种湿法脱硫吸收塔的溢流管防堵塞装置及湿法脱硫吸收塔,能解决现有湿法脱硫吸收塔溢流管堵塞,避免因溢流管堵塞大量浆液通过原烟气入口倒灌至引风机入口造成的问题。Based on the problems existing in the prior art, the purpose of this utility model is to provide an overflow pipe anti-clogging device of a wet desulfurization absorption tower and a wet desulfurization absorption tower, which can solve the clogging of the overflow pipe of the existing wet desulfurization absorption tower. , to avoid the problem caused by the overflow pipe blocking a large amount of slurry through the original flue gas inlet to the inlet of the induced draft fan.

本实用新型的目的是通过以下技术方案实现的:The purpose of this utility model is to realize through the following technical solutions:

本实用新型实施方式提供一种湿法脱硫吸收塔的溢流管防堵塞装置,包括:The embodiment of the present utility model provides an overflow pipe anti-clogging device of a wet desulfurization absorption tower, comprising:

冲洗管路、进水控制阀、流量计、压力表和出水控制阀;其中,Flushing lines, inlet water control valves, flow meters, pressure gauges and outlet water control valves; of which,

所述冲洗管路一端为冲洗水入口,另一端与湿法脱硫吸收塔的塔体的溢流管连接,所述冲洗管路上依次设置压力表、流量计和进水控制阀;One end of the flushing pipeline is a flushing water inlet, and the other end is connected to the overflow pipe of the tower body of the wet desulfurization absorption tower, and a pressure gauge, a flow meter and a water inlet control valve are arranged on the flushing pipeline in sequence;

所述出水控制阀设在所述溢流管上,处于连接所述冲洗管路处下方的所述溢流管上。The water outlet control valve is arranged on the overflow pipe, and is located on the overflow pipe below where the flushing pipeline is connected.

本实用新型实施方式还提供一种湿法脱硫吸收塔,包括:塔体和连接在所述塔体上的溢流管,还包括:溢流管防堵塞装置;Embodiments of the present utility model further provide a wet desulfurization absorption tower, comprising: a tower body and an overflow pipe connected to the tower body, and further comprising: an overflow pipe anti-clogging device;

所述溢流管防堵塞装置包括:冲洗管路、流量计、压力表和出水控制阀;The overflow pipe anti-clogging device includes: a flushing pipeline, a flow meter, a pressure gauge and a water outlet control valve;

其中,所述溢流管防堵塞装置包括:冲洗管路、进水控制阀、流量计、压力表和出水控制阀;Wherein, the overflow pipe anti-clogging device includes: a flushing pipeline, a water inlet control valve, a flow meter, a pressure gauge and a water outlet control valve;

其中,所述冲洗管路一端为冲洗水入口,另一端与湿法脱硫吸收塔的塔体的溢流管连接,所述冲洗管路上依次设置压力表、流量计和进水控制阀;Wherein, one end of the flushing pipeline is a flushing water inlet, and the other end is connected to the overflow pipe of the tower body of the wet desulfurization absorption tower, and a pressure gauge, a flow meter and a water inlet control valve are arranged on the flushing pipeline in sequence;

所述出水控制阀设在所述溢流管上,处于连接所述冲洗管路处下方的所述溢流管上。The water outlet control valve is arranged on the overflow pipe, and is located on the overflow pipe below where the flushing pipeline is connected.

由上述本实用新型提供的技术方案可以看出,本实用新型实施例提供的湿法脱硫吸收塔的溢流管防堵塞装置及湿法脱硫吸收塔,其有益效果为:It can be seen from the technical solutions provided by the above utility model that the overflow pipe anti-clogging device of the wet desulfurization absorption tower and the wet desulfurization absorption tower provided by the embodiment of the present utility model have the following beneficial effects:

通过设置与吸收塔塔体上的溢流管连接的冲洗管路,并在冲洗管路上依次设置压力表、流量计和进水控制阀,同时在溢流管的出水端设置出水控制阀,通过冲洗管路配合出水控制阀,能方便的对溢流管进行冲洗,避免溢流管堵塞,也避免了溢流管堵塞引起的各种问题。By setting a flushing pipeline connected to the overflow pipe on the tower body of the absorption tower, and setting a pressure gauge, a flow meter and a water inlet control valve in sequence on the flushing pipeline, and at the same time setting a water outlet control valve at the water outlet of the overflow pipe, through the The flushing pipeline is matched with the water outlet control valve, which can easily flush the overflow pipe, avoid the blockage of the overflow pipe, and avoid various problems caused by the blockage of the overflow pipe.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域的普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他附图。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments. Obviously, the drawings in the following description are only some embodiments of the present invention. , for those of ordinary skill in the art, other drawings can also be obtained based on these drawings without any creative effort.

图1为本实用新型实施例提供的湿法脱硫吸收塔的溢流管防堵塞装置的示意图;Fig. 1 is the schematic diagram of the overflow pipe anti-clogging device of the wet desulfurization absorption tower provided by the embodiment of the utility model;

图中各标号为:1-冲洗管路;2-进水控制阀;3-流量计;4-压力表;5-出水控制阀;6-溢流管;7-水封罐;8-塔体;9-原烟气入口;10-引风机;A-冲洗水入口;B-液位。The symbols in the figure are: 1- flushing pipeline; 2- water inlet control valve; 3- flow meter; 4- pressure gauge; 5- water outlet control valve; 6- overflow pipe; 7- water sealing tank; 8- tower body; 9 - original flue gas inlet; 10 - induced draft fan; A - flushing water inlet; B - liquid level.

具体实施方式Detailed ways

下面结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型的保护范围。本实用新型实施例中未作详细描述的内容属于本领域专业技术人员公知的现有技术。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. . Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention. Contents that are not described in detail in the embodiments of the present invention belong to the prior art known to those skilled in the art.

如图1所示,本实用新型实施例提供一种湿法脱硫吸收塔的溢流管防堵塞装置,包括:As shown in Figure 1, the embodiment of the present utility model provides an overflow pipe anti-clogging device of a wet desulfurization absorption tower, including:

冲洗管路、进水控制阀、流量计、压力表和出水控制阀;其中,Flushing lines, inlet water control valves, flow meters, pressure gauges and outlet water control valves; of which,

所述冲洗管路一端为冲洗水入口,另一端与湿法脱硫吸收塔的塔体的溢流管连接,所述冲洗管路上依次设置压力表、流量计和进水控制阀;One end of the flushing pipeline is a flushing water inlet, and the other end is connected to the overflow pipe of the tower body of the wet desulfurization absorption tower, and a pressure gauge, a flow meter and a water inlet control valve are arranged on the flushing pipeline in sequence;

所述出水控制阀设在所述溢流管上,处于连接所述冲洗管路处下方的所述溢流管上。The water outlet control valve is arranged on the overflow pipe, and is located on the overflow pipe below where the flushing pipeline is connected.

上述溢流管防堵塞装置的进水控制阀和出水控制阀优选均采用电动蝶阀。方便实现自动控制冲洗溢流管。The water inlet control valve and the water outlet control valve of the above-mentioned overflow pipe anti-clogging device are preferably electric butterfly valves. It is convenient to realize automatic control of flushing overflow pipe.

优选的,压力表、流量计和进水控制阀按冲洗管路的进水方向依次设置在冲洗管路上。这样设置能在溢流管正常溢流时,通过进水控制阀隔离溢流液,避免流入冲洗管路。Preferably, the pressure gauge, the flow meter and the water inlet control valve are sequentially arranged on the flushing pipeline according to the water inflow direction of the flushing pipeline. In this way, when the overflow pipe overflows normally, the overflow liquid can be isolated through the water inlet control valve to avoid flowing into the flushing pipeline.

参见图1,本实用新型实施例还提供一种湿法脱硫吸收塔,包括:塔体和连接在所述塔体上的溢流管,还包括:溢流管防堵塞装置;Referring to FIG. 1 , an embodiment of the present utility model further provides a wet desulfurization absorption tower, comprising: a tower body and an overflow pipe connected to the tower body, and further comprising: an overflow pipe anti-clogging device;

所述溢流管防堵塞装置包括:冲洗管路、进水控制阀、流量计、压力表和出水控制阀;The overflow pipe anti-clogging device includes: a flushing pipeline, a water inlet control valve, a flow meter, a pressure gauge and a water outlet control valve;

其中,所述冲洗管路一端为冲洗水入口,另一端与湿法脱硫吸收塔的塔体的溢流管连接,所述冲洗管路上依次设置压力表、流量计和进水控制阀;Wherein, one end of the flushing pipeline is a flushing water inlet, and the other end is connected to the overflow pipe of the tower body of the wet desulfurization absorption tower, and a pressure gauge, a flow meter and a water inlet control valve are arranged on the flushing pipeline in sequence;

所述出水控制阀设在所述溢流管上,处于连接所述冲洗管路处下方的所述溢流管上。The water outlet control valve is arranged on the overflow pipe, and is located on the overflow pipe below where the flushing pipeline is connected.

上述溢流管防堵塞装置的进水控制阀和出水控制阀优选均采用电动蝶阀。方便实现自动控制冲洗溢流管。The water inlet control valve and the water outlet control valve of the above-mentioned overflow pipe anti-clogging device are preferably electric butterfly valves. It is convenient to realize automatic control of flushing overflow pipe.

优选的,压力表、流量计和进水控制阀按冲洗管路的进水方向依次设置在冲洗管路上。这样设置能在溢流管正常溢流时,通过进水控制阀隔离溢流液,避免流入冲洗管路。Preferably, the pressure gauge, the flow meter and the water inlet control valve are sequentially arranged on the flushing pipeline according to the water inflow direction of the flushing pipeline. In this way, when the overflow pipe overflows normally, the overflow liquid can be isolated through the water inlet control valve to avoid flowing into the flushing pipeline.

本实用新型通过设置具有进水控制阀、流量计和压力表的冲洗管路,配合溢流管的出水控制阀,能在溢流管溢流后,及时对溢流管内进行冲洗,实现了在线解决湿法脱硫吸收塔的溢流管的堵塞问题。实际应用时,该装置能解决在线判断是否全堵塞、部分堵塞并在线处理到彻底通畅,具体是通过压力和流量的定值(该定值为预先实验取得)能有效的判断是否堵塞,如果偏离压力及流量数据定值一部分,说明部分堵塞,彻底偏离这个定值,就是完全堵塞。The utility model can flush the overflow pipe in time after the overflow pipe overflows, and realize the online Solve the clogging problem of the overflow pipe of the wet desulfurization absorption tower. In practical application, the device can solve the problem of online judgment of whether it is fully blocked or partially blocked, and can process it to complete smoothness on-line. Part of the fixed value of the pressure and flow data indicates a partial blockage, and a complete deviation from this fixed value is a complete blockage.

下面将结合附图对本实用新型实施例作进一步地详细描述。The embodiments of the present utility model will be described in further detail below with reference to the accompanying drawings.

如图1所示,本实用新型实施例提供一种湿法脱硫吸收塔的溢流管防堵塞装置,该装置包括:冲洗管路、进水控制阀、流量计、压力表和出水控制阀;其中,出水控制阀采用电动蝶阀,设在溢流管的出水端处;冲洗管路与溢流管上端连接,冲洗管路上依次设置电动蝶阀(作为进水控制阀)、流量计和压力表。使用该装置冲洗时,关闭溢流管上作为出水控制阀的电动蝶阀、打开冲洗管路上作为进水控制阀的电动蝶阀,通过压力表及流量计的读数判断,控制冲洗,若正常停止冲洗,压力高流量低说明存在堵塞则延长冲洗时间直至正常。(可根据每座吸收塔的溢流管直径的不同,设置引入冲洗水的冲洗管路的直径,安装后可通过试验取得压力及流量数据作为定值,只要能保证完成溢流管的冲洗即可),通过设置该装置,可在溢流后马上对溢流管冲洗,定期冲洗时通过压力、流量判断是否堵塞,及时处理保证吸收塔可靠运行,目前该装置已在营口电厂保密状态下实验运行一年多效果良好。As shown in FIG. 1 , an embodiment of the present utility model provides a device for preventing clogging of an overflow pipe of a wet desulfurization absorption tower. The device includes: a flushing pipeline, a water inlet control valve, a flow meter, a pressure gauge and a water outlet control valve; Among them, the water outlet control valve adopts an electric butterfly valve, which is located at the outlet end of the overflow pipe; the flushing pipeline is connected to the upper end of the overflow pipe, and an electric butterfly valve (as the water inlet control valve), a flow meter and a pressure gauge are arranged on the flushing pipeline in sequence. When using this device for flushing, close the electric butterfly valve on the overflow pipe as the water outlet control valve, open the electric butterfly valve on the flushing pipeline as the water inlet control valve, and judge by the readings of the pressure gauge and flowmeter to control the flushing, if the flushing is stopped normally, High pressure and low flow indicate a blockage. Extend the flushing time until normal. (According to the different diameters of the overflow pipes of each absorption tower, the diameter of the flushing pipes introduced into the flushing water can be set. After installation, the pressure and flow data can be obtained through tests as fixed values, as long as the flushing of the overflow pipes can be guaranteed to be completed. Yes), by setting this device, the overflow pipe can be flushed immediately after overflowing. During regular flushing, the pressure and flow rate can be used to determine whether it is blocked, and timely treatment can ensure the reliable operation of the absorption tower. At present, the device has been tested in the confidential state of Yingkou Power Plant. Worked well for over a year.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型披露的技术范围内,可轻易想到的变化或替换,都应涵盖在本实用新型的保护范围之内。因此,本实用新型的保护范围应该以权利要求书的保护范围为准。The above are only the preferred specific embodiments of the present invention, but the protection scope of the present invention is not limited to this. The changes or replacements should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims (4)

1.一种湿法脱硫吸收塔的溢流管防堵塞装置,其特征在于,包括:1. an overflow pipe anti-clogging device of a wet desulfurization absorption tower, is characterized in that, comprises: 冲洗管路、进水控制阀、流量计、压力表和出水控制阀;其中,Flushing lines, inlet water control valves, flow meters, pressure gauges and outlet water control valves; of which, 所述冲洗管路一端为冲洗水入口,另一端与湿法脱硫吸收塔的塔体的溢流管连接,所述冲洗管路上依次设置压力表、流量计和进水控制阀;One end of the flushing pipeline is a flushing water inlet, and the other end is connected to the overflow pipe of the tower body of the wet desulfurization absorption tower, and a pressure gauge, a flow meter and a water inlet control valve are arranged on the flushing pipeline in sequence; 所述出水控制阀设在所述溢流管上,处于连接所述冲洗管路处下方的所述溢流管上。The water outlet control valve is arranged on the overflow pipe, and is located on the overflow pipe below where the flushing pipeline is connected. 2.根据权利要求1所述的湿法脱硫吸收塔的溢流管防堵塞装置,其特征在于,所述进水控制阀和出水控制阀均采用电动蝶阀。2 . The overflow pipe anti-clogging device of a wet desulfurization absorption tower according to claim 1 , wherein the water inlet control valve and the water outlet control valve both use electric butterfly valves. 3 . 3.一种湿法脱硫吸收塔,包括:塔体和连接在所述塔体上的溢流管,其特征在于,还包括:溢流管防堵塞装置;3. A wet desulfurization absorption tower, comprising: a tower body and an overflow pipe connected on the tower body, characterized in that, also comprising: an overflow pipe anti-clogging device; 所述溢流管防堵塞装置包括:冲洗管路、进水控制阀、流量计、压力表和出水控制阀;The overflow pipe anti-clogging device includes: a flushing pipeline, a water inlet control valve, a flow meter, a pressure gauge and a water outlet control valve; 其中,所述冲洗管路一端为冲洗水入口,另一端与湿法脱硫吸收塔的塔体的溢流管连接,所述冲洗管路上依次设置压力表、流量计和进水控制阀;Wherein, one end of the flushing pipeline is a flushing water inlet, and the other end is connected to the overflow pipe of the tower body of the wet desulfurization absorption tower, and a pressure gauge, a flow meter and a water inlet control valve are arranged on the flushing pipeline in sequence; 所述出水控制阀设在所述溢流管上,处于连接所述冲洗管路处下方的所述溢流管上。The water outlet control valve is arranged on the overflow pipe, and is located on the overflow pipe below where the flushing pipeline is connected. 4.根据权利要求3所述的湿法脱硫吸收塔,其特征在于,所述进水控制阀和出水控制阀均采用电动蝶阀。4 . The wet desulfurization absorption tower according to claim 3 , wherein the water inlet control valve and the water outlet control valve both use electric butterfly valves. 5 .
CN201920458910.2U 2019-04-04 2019-04-04 Overflow pipe anti-blocking device of wet desulphurization absorption tower and wet desulphurization absorption tower Active CN211189669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920458910.2U CN211189669U (en) 2019-04-04 2019-04-04 Overflow pipe anti-blocking device of wet desulphurization absorption tower and wet desulphurization absorption tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920458910.2U CN211189669U (en) 2019-04-04 2019-04-04 Overflow pipe anti-blocking device of wet desulphurization absorption tower and wet desulphurization absorption tower

Publications (1)

Publication Number Publication Date
CN211189669U true CN211189669U (en) 2020-08-07

Family

ID=71847274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920458910.2U Active CN211189669U (en) 2019-04-04 2019-04-04 Overflow pipe anti-blocking device of wet desulphurization absorption tower and wet desulphurization absorption tower

Country Status (1)

Country Link
CN (1) CN211189669U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111871154A (en) * 2020-06-10 2020-11-03 华能国际电力股份有限公司营口电厂 A device for preventing clogging of overflow pipe of wet desulfurization absorption tower
CN113750771A (en) * 2021-08-12 2021-12-07 华能国际电力股份有限公司营口电厂 Absorption tower system with overflow detection device
CN117225153A (en) * 2023-09-20 2023-12-15 宝武水务科技有限公司 Atomizer top tank overflow prevention device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111871154A (en) * 2020-06-10 2020-11-03 华能国际电力股份有限公司营口电厂 A device for preventing clogging of overflow pipe of wet desulfurization absorption tower
CN113750771A (en) * 2021-08-12 2021-12-07 华能国际电力股份有限公司营口电厂 Absorption tower system with overflow detection device
CN117225153A (en) * 2023-09-20 2023-12-15 宝武水务科技有限公司 Atomizer top tank overflow prevention device

Similar Documents

Publication Publication Date Title
CN211189669U (en) Overflow pipe anti-blocking device of wet desulphurization absorption tower and wet desulphurization absorption tower
CN205080024U (en) Wet flue gas desulfurization absorption tower slurry density pH value integration measuring device
CN204439491U (en) In lime (stone)-gypsum wet desulfurizer, serum density and PH measure integrated apparatus
CN102012352B (en) Device for measuring density and pH value of slurry
CN111871154A (en) A device for preventing clogging of overflow pipe of wet desulfurization absorption tower
CN108362610A (en) A kind of density that can be self-cleaning and pH value accurate measuring systems and measurement method
CN113155671A (en) Measuring method of continuous automatic measuring and sampling device for density and pH value of slurry of desulfurization absorption tower
CN204389336U (en) Serosity density measurement system
CN107844150A (en) A kind of device and flow monitoring and maximum stream flow control method and anti-down irrigation method based on the device
CN212061891U (en) Waste resin flushing system of nuclear power station
CN203772778U (en) PH online measuring device for desulfurization absorption tower
CN206772890U (en) A kind of outer pH meter on-bne repair system of tower
CN214310022U (en) Accurate measurement system of wet flue gas desulfurization thick liquid density and PH meter
CN209989111U (en) A water treatment equipment with broken siphon structure
CN201247222Y (en) Device for testing gypsum slurry pH
CN204649667U (en) The measurement mechanism of slurry pH value in absorption tower
CN113899491A (en) Pressure transmitter mounting structure of desulfurization absorption tower
CN212432407U (en) Pressure transmitter mounting structure of desulfurization absorption tower
CN205013824U (en) Take gas collection metering device's air bleeding valve
CN209459861U (en) A kind of experimental bench for analyzing round pier stress condition
CN205216569U (en) Two -way measurement system of pH value
CN210347387U (en) Device for synchronously measuring pH value and density of wet desulphurization slurry
CN207717734U (en) Desulphurization system slurry pH value, density comprehensive measurement device
CN207436196U (en) A kind of device on pipeline
CN107653972A (en) A kind of device and the flow control methods based on the device and anti-down irrigation method on pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: HUANENG INTERNATIONAL POWER CO.,LTD. DANDONG POWER PLANT

Assignor: HUANENG POWER INTERNATIONAL Co.,Ltd. YINGKOU POWER PLANT

Contract record no.: X2025980000979

Denomination of utility model: Overflow pipe anti blocking device of wet desulfurization absorption tower and wet desulfurization absorption tower

Granted publication date: 20200807

License type: Common License

Record date: 20250113

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: HUANENG JILIN POWER GENERATION Co.,Ltd. JIUTAI ELECTRIC FACTORY

Assignor: HUANENG POWER INTERNATIONAL Co.,Ltd. YINGKOU POWER PLANT

Contract record no.: X2025980035088

Denomination of utility model: Overflow pipe anti blocking device of wet desulfurization absorption tower and wet desulfurization absorption tower

Granted publication date: 20200807

License type: Common License

Record date: 20251118

EE01 Entry into force of recordation of patent licensing contract