CN211172074U - A composite pipe gallery combined node structure - Google Patents
A composite pipe gallery combined node structure Download PDFInfo
- Publication number
- CN211172074U CN211172074U CN201920908142.6U CN201920908142U CN211172074U CN 211172074 U CN211172074 U CN 211172074U CN 201920908142 U CN201920908142 U CN 201920908142U CN 211172074 U CN211172074 U CN 211172074U
- Authority
- CN
- China
- Prior art keywords
- ventilation
- cabin
- escape
- node structure
- utility tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Ventilation (AREA)
Abstract
本申请实施例中提供了一种综合管廊组合节点结构,包括:管道舱室,所述管道舱室内设置有防火分隔结构,所述防火分隔结构将所述管道舱室沿横向方向分隔成至少两个管道小舱,每个所述管道小舱的顶部开有管道小舱逃生口;通风室,所述通风室位于所述管道舱室之上,且各个所述管道小舱逃生口连通到所述通风室内,所述通风室的顶部设置有通风室逃生口;其中,所述横向方向是所述管道舱室的长度方向。本申请实施例解决了传统的综合管廊组合节点结构安全性不足的技术问题。
An embodiment of the present application provides an integrated pipe gallery combined node structure, comprising: a pipe compartment, wherein a fire separation structure is arranged in the pipe compartment, and the fire separation structure divides the pipe compartment into at least two in the lateral direction Pipe cabins, each of which is provided with a pipe cabin escape port at the top; a ventilation room, the ventilation chamber is located above the pipe cabin, and each of the pipe cabin escape ports is connected to the ventilation Indoors, the top of the ventilation room is provided with a ventilation room escape opening; wherein, the lateral direction is the length direction of the duct cabin. The embodiments of the present application solve the technical problem of insufficient safety of the traditional integrated pipe gallery combined node structure.
Description
技术领域technical field
本申请涉及地下综合管廊技术领域,具体地,涉及一种综合管廊组合节点结构。The present application relates to the technical field of underground integrated pipe gallery, in particular, to a combined node structure of an integrated pipe gallery.
背景技术Background technique
综合管廊,就是地下城市管道综合走廊,即在城市地下建造一个隧道空间,将电力、通信,供热、给排水、燃气等各种工程管线集于一体,设有专门的检修口、吊装口和监测系统,实施统一规划、统一设计、统一建设和管理,是保障城市运行的重要基础设施和“生命线”。综合管廊的建设可有效消除城市“拉链路”,保障道路交通通畅,同时保证地下管线安全运营。综合管廊组合节点结构是形成综合管廊的单元。综合管廊组合节点结构的逃生系统的设置,直接影响工作人员的安全。The comprehensive pipe gallery is the comprehensive corridor of underground urban pipelines, that is, a tunnel space is built underground in the city, which integrates various engineering pipelines such as electricity, communication, heating, water supply and drainage, and gas, and has special maintenance ports and hoisting ports. The implementation of unified planning, unified design, unified construction and management is an important infrastructure and "lifeline" to ensure the operation of the city. The construction of the comprehensive pipe gallery can effectively eliminate the urban "pull link", ensure smooth road traffic, and ensure the safe operation of underground pipelines. The combined node structure of the comprehensive pipe gallery is the unit that forms the comprehensive pipe gallery. The setting of the escape system of the combined node structure of the integrated pipe gallery directly affects the safety of the staff.
因此,提高综合管廊组合节点结构的安全性,是本领域技术人员急需要解决的技术问题。Therefore, improving the safety of the combined node structure of the integrated pipe gallery is a technical problem that those skilled in the art urgently need to solve.
在背景技术中公开的上述信息仅用于加强对本申请的背景的理解,因此其可能包含没有形成为本领域普通技术人员所知晓的现有技术的信息。The above information disclosed in this Background section is only for enhancement of understanding of the background of the application and therefore it may contain information that does not form the prior art that is already known to a person of ordinary skill in the art.
实用新型内容Utility model content
本申请实施例中提供了一种综合管廊组合节点结构,以解决传统的综合管廊组合节点结构安全性不足的技术问题。The embodiment of the present application provides an integrated pipe gallery combined node structure to solve the technical problem of insufficient safety of the traditional integrated pipe gallery combined node structure.
本申请实施例提供了一种综合管廊组合节点结构,包括:The embodiment of the present application provides a composite pipe gallery combined node structure, including:
管道舱室,所述管道舱室内设置有防火分隔结构,所述防火分隔结构将所述管道舱室沿横向方向分隔成至少两个管道小舱,每个所述管道小舱的顶部开有管道小舱逃生口;A pipeline compartment, a fire partition structure is arranged in the pipeline compartment, and the fire partition structure divides the pipeline compartment into at least two pipeline compartments in the transverse direction, and a pipeline compartment is opened on the top of each of the pipeline compartments escape;
通风室,所述通风室位于所述管道舱室之上,且各个所述管道小舱逃生口连通到所述通风室内,所述通风室的顶部设置有通风室逃生口;a ventilation room, the ventilation room is located above the pipe cabin, and each escape port of the small pipe cabin is connected to the ventilation room, and the top of the ventilation room is provided with a ventilation room escape port;
其中,所述横向方向是所述管道舱室的长度方向。Wherein, the transverse direction is the longitudinal direction of the duct compartment.
本申请实施例由于采用以上技术方案,具有以下技术效果:Due to the adoption of the above technical solutions, the embodiments of the present application have the following technical effects:
管道舱室被防火分隔结构沿横向方向分割成至少两个管道小舱,各个所述管道小舱逃生口连通到所述通风室内,所述通风室的顶部设置有通风室逃生口。这样,当工作人员在任一管道小舱内工作,发生安全风险需要离开综合管廊组合节点结构时,能够从工作人员所在的管道小舱顶部的管道小舱逃生口直接逃离到达通风室内;之后,再从通风室顶部的通风室逃生口逃离到达综合管廊组合节点结构之上的地面区域。本申请实施例的综合管廊组合节点结构,通风室逃生口和每个管道小舱都设置的管道小舱逃生口相配合的逃生系统,安全性较高,同时,逃生系统及综合管廊组合节点结构的结构简单,施工难度较小。The duct cabin is divided into at least two duct cabins along the transverse direction by the fire partition structure, each escape port of the duct cabin is connected to the ventilation chamber, and the top of the ventilation chamber is provided with a ventilation chamber escape port. In this way, when the staff works in any pipeline cabin and needs to leave the combined node structure of the integrated pipe gallery when a safety risk occurs, they can directly escape from the pipe cabin escape opening at the top of the pipe cabin where the staff is located to reach the ventilation room; after that, Then escape from the ventilation room escape port at the top of the ventilation room to reach the ground area above the combined node structure of the integrated pipe gallery. The combined node structure of the integrated pipe gallery in the embodiment of the present application, the escape system in which the escape port of the ventilation room and the escape port of each pipe cabin are matched, has high safety, and at the same time, the escape system and the integrated pipe gallery are combined. The structure of the node structure is simple and the construction difficulty is small.
附图说明Description of drawings
此处所说明的附图用来提供对本申请的进一步理解,构成本申请的一部分,本申请的示意性实施例及其说明用于解释本申请,并不构成对本申请的不当限定。在附图中:The drawings described herein are used to provide further understanding of the present application and constitute a part of the present application. The schematic embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation of the present application. In the attached image:
图1为本申请实施例的一种综合管廊组合节点结构的顶部示意图;Fig. 1 is the top schematic diagram of a kind of integrated pipe gallery combined node structure according to the embodiment of the application;
图2为图1所示的综合管廊组合节点结构的通风室和电气室的顶部透视图;Fig. 2 is the top perspective view of the ventilation room and the electrical room of the integrated pipe gallery combined node structure shown in Fig. 1;
图3为图1所示的A-A剖视图;Fig. 3 is A-A sectional view shown in Fig. 1;
图4为图2所示的B-B剖视图。FIG. 4 is a sectional view taken along line B-B shown in FIG. 2 .
附图标记说明:Description of reference numbers:
100管道舱室层,110管道舱室,111管道小舱,120防火分隔结构,100 pipeline compartment floor, 110 pipeline compartment, 111 pipeline cabin, 120 fire partition structure,
130管道小舱逃生口,140管道小舱通风口,130-pipe cabin escape, 140-pipe cabin vent,
210通风室,220通风室逃生口,230防火盖板,240逃生井,210 ventilation room, 220 ventilation room escape, 230 fire cover, 240 escape well,
250逃生井盖板,260通风设备,270通风室通风口,280通风井,250 escape well covers, 260 ventilation equipment, 270 ventilation room vents, 280 ventilation shafts,
290防雨百叶窗,290 rain shutters,
300电气室,310防火门,320爬梯,330挡水坎。300 electrical rooms, 310 fire doors, 320 ladders, 330 water barriers.
具体实施方式Detailed ways
为了使本申请实施例中的技术方案及优点更加清楚明白,以下结合附图对本申请的示例性实施例进行进一步详细的说明,显然,所描述的实施例仅是本申请的一部分实施例,而不是所有实施例的穷举。需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。In order to make the technical solutions and advantages of the embodiments of the present application more clear, the exemplary embodiments of the present application will be described in further detail below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present application, and Not all embodiments are exhaustive. It should be noted that the embodiments in the present application and the features of the embodiments may be combined with each other in the case of no conflict.
实施例一Example 1
图1为本申请实施例的一种综合管廊组合节点结构的顶部示意图;图2为图1所示的综合管廊组合节点结构的通风室和电气室的顶部透视图;图3为图1所示的A-A剖视图;图4为图2所示的B-B剖视图。本申请实施例的综合管廊组合节点结构要具有逃生功能。Fig. 1 is the top schematic diagram of a kind of integrated pipe gallery combined node structure according to the embodiment of the application; Fig. 2 is the top perspective view of the ventilation room and the electrical room of the integrated pipe gallery combined node structure shown in Fig. 1; Fig. 3 is Fig. 1 A-A sectional view shown; FIG. 4 is a B-B sectional view shown in FIG. 2 . The combined node structure of the integrated pipe gallery in the embodiment of the present application should have an escape function.
如图1,图2,图3和图4所示,本申请实施例的综合管廊组合节点结构,包括:As shown in Figure 1, Figure 2, Figure 3 and Figure 4, the combined node structure of the integrated pipe gallery of the embodiment of the present application includes:
管道舱室110,所述管道舱室110内设置有防火分隔结构120,所述防火分隔结构120将所述管道舱室沿横向方向分隔成至少两个管道小舱111,每个所述管道小舱111的顶部开有管道小舱逃生口130;The
通风室210,所述通风室210位于所述管道舱室110之上,且各个所述管道小舱逃生口130连通到所述通风室210内,所述通风室的顶部设置有通风室逃生口220;A
其中,所述横向方向是所述管道舱室的长度方向。Wherein, the transverse direction is the longitudinal direction of the duct compartment.
本申请实施例的综合管廊组合节点结构,管道舱室被防火分隔结构沿横向方向分割成至少两个管道小舱,各个所述管道小舱逃生口连通到所述通风室内,所述通风室的顶部设置有通风室逃生口。这样,当工作人员在任一管道小舱内工作,发生安全风险需要离开综合管廊组合节点结构时,能够从工作人员所在的管道小舱顶部的管道小舱逃生口直接逃离到达通风室内;之后,再从通风室顶部的通风室逃生口逃离到达综合管廊组合节点结构之上的地面区域。本申请实施例的综合管廊组合节点结构,通风室逃生口和每个管道小舱都设置的管道小舱逃生口相配合的逃生系统,安全性较高,同时,逃生系统及综合管廊组合节点结构的结构简单,施工难度较小。In the integrated pipe gallery combined node structure of the embodiment of the present application, the pipe cabin is divided into at least two small pipe cabins along the lateral direction by the fire partition structure, and the escape ports of each of the small pipe cabins are connected to the ventilation room, and the The top is provided with a ventilation room escape. In this way, when the staff works in any pipeline cabin and needs to leave the combined node structure of the integrated pipe gallery when a safety risk occurs, they can directly escape from the pipe cabin escape opening at the top of the pipe cabin where the staff is located to reach the ventilation room; after that, Then escape from the ventilation room escape port at the top of the ventilation room to reach the ground area above the combined node structure of the integrated pipe gallery. The combined node structure of the integrated pipe gallery in the embodiment of the present application, the escape system in which the escape port of the ventilation room and the escape port of each pipe cabin are matched, has high safety, and at the same time, the escape system and the integrated pipe gallery are combined. The structure of the node structure is simple and the construction difficulty is small.
实施中,如图1,图2和图4所示,所所述综合管廊组合节点结构包括至少两种所述管道舱室110:电力舱和综合舱;In implementation, as shown in FIG. 1 , FIG. 2 and FIG. 4 , the combined node structure of the integrated pipe gallery includes at least two types of the pipeline cabins 110 : a power cabin and an integrated cabin;
所述电力舱和所述综合舱并排紧挨设置,形成管道舱室层;The electric power cabin and the integrated cabin are arranged side by side and close to each other to form a pipeline cabin layer;
其中,所述电力舱用于排布电力电缆,所述综合舱用于排布给水,通信等线路,燃气不能排布在综合舱,燃气需要单独在燃气舱排布。Wherein, the power cabin is used for arranging power cables, and the integrated cabin is used for arranging lines such as water supply and communication. Gas cannot be arranged in the integrated cabin, and gas needs to be arranged in the gas cabin alone.
这样,电力舱被防火分隔结构分隔成至少两个管道小舱,综合舱被防火分隔结构分割成至少两个管道小舱。无论在电力舱的管道小舱还是在综合舱的管道小舱,都能通过管道小舱逃生口和通风室逃生口从综合管廊组合节点结构逃离到达综合管廊组合节点结构之上的地面区域。In this way, the power compartment is divided into at least two pipeline cabins by the fire partition structure, and the integrated cabin is divided into at least two pipeline cabins by the fire partition structure. No matter the duct cabin in the power cabin or the duct cabin in the integrated cabin, it is possible to escape from the combined node structure of the integrated pipe gallery through the escape port of the pipe cabin and the escape port of the ventilation room to reach the ground area above the combined node structure of the integrated pipe gallery .
实施中,为了实现各个所述管道小舱逃生口连通到所述通风室内,需要对所述通风室的位置进行限制。所述通风室位于所述防火分隔结构之上,且至少遮盖每个所述管道小舱的一部分。In implementation, in order to realize that each of the escape ports of the duct cabins is communicated with the ventilation room, the position of the ventilation room needs to be restricted. The plenum is located above the fire separation structure and covers at least a portion of each of the ducted compartments.
上述结构的通风室能够实现各个所述管道小舱逃生口连通到所述通风室内。如果通风室没有遮盖其中一个管道小舱的至少一部分,那么这个管道小舱的管道小舱逃生口就无法连通到通风室内。The ventilation chamber of the above structure can realize that the escape ports of each of the duct cabins are communicated with the ventilation chamber. If the plenum does not cover at least a portion of one of the ducted cabins, the ducted cabin escape from that ducted cabin cannot communicate with the plenum.
实施中,如图2和图3所示,所述管道小舱逃生口130的开口朝上;In implementation, as shown in FIG. 2 and FIG. 3 , the opening of the
所述综合管廊组合节点结构还包括防火盖板230,所述防火盖板230设置在每个所述管道小舱逃生口处,用于盖住所述管道小舱逃生口以防火。The integrated pipe gallery combined node structure further includes a
防火盖板盖住所述管道小舱逃生口,这样,所述管道小舱,管道小舱逃生口和防火盖板形成了相对封闭的防火区,在发生火灾时,起到一定的隔断作用,为工作人员逃生和扑救争取更多的时间,提高综合管廊组合节点结构的安全性。The fireproof cover plate covers the escape port of the small pipeline cabin, so that the small pipe cabin, the escape port of the small pipe cabin and the fireproof cover plate form a relatively closed fireproof area, which plays a certain role of partition in the event of a fire. Buy more time for the staff to escape and save, and improve the safety of the combined node structure of the integrated pipe gallery.
实施中,如图3所示,综合管廊组合节点结构还包括:In implementation, as shown in Figure 3, the combined node structure of the integrated pipe gallery also includes:
与所述通风室逃生口220一一对应的逃生井240,所述逃生井的下井口与所述通风室逃生口连接,且所述逃生井的上井口开口朝上且高于地面;an escape well 240 corresponding to the ventilation
逃生井盖板250,所述逃生井盖板设置在所述逃生井的上井口处,所述逃生井盖板250能够从所述逃生井盖板的下方打开。The escape well cover 250 is provided at the upper wellhead of the escape well, and the escape well cover 250 can be opened from below the escape well cover.
其中,所述逃生井盖板易于从所述逃生井盖板的下方打开,且从所述逃生井盖板上方不易开启。Wherein, the escape well cover is easy to open from below the escape well cover, and difficult to open from above the escape well cover.
所述逃生井的上井口开口朝上且高于地面,所述逃生井盖板盖在所述逃生井的上井口的开口处。这样设置的方式,相比于传统的逃生口设置在逃生亭的侧墙相比,所述逃生井所需的高度较低,所述逃生井对地面道路景观的影响较小。The upper wellhead opening of the escape well is upward and higher than the ground, and the escape well cover plate is covered at the opening of the upper wellhead of the escape well. In this way, compared with the traditional escape opening set on the side wall of the escape pavilion, the required height of the escape well is lower, and the impact of the escape well on the road landscape on the ground is small.
实施中,如图1和图2所示,所述通风室逃生口220是一个,所述逃生井是240一个,所述管道舱室层的各个所述管道小舱逃生口共用同一个所述逃生井;In implementation, as shown in FIG. 1 and FIG. 2 , there is one
其中,所述逃生井的上井口作为地面之上的逃生口。Wherein, the upper wellhead of the escape well serves as the escape port above the ground.
这样,每个综合管廊组合节点结构的地面之上的逃生口是一个,露出地面的逃生井的数量较少,所述逃生井对地面道路景观的影响较小。In this way, there is one escape opening above the ground of each integrated pipe gallery combined node structure, and the number of escape wells exposed to the ground is small, and the escape wells have less impact on the road landscape on the ground.
实施中,如图1和图2所示,唯一一个所述通风室逃生口220在所述横向方向的位置为所述通风室的顶部的一端,所述通风室逃生口220在纵向方向的位置为所述通风室的顶部的中间位置;In implementation, as shown in FIG. 1 and FIG. 2 , the only position of the ventilation
其中,所述纵向方向是所述管道舱室的宽度方向。Wherein, the longitudinal direction is the width direction of the duct compartment.
所述通风室逃生口在纵向方向的位置为所述通风室的顶部的中间位置,这样,无论是综合舱还是电力舱,到通风室逃生口的距离比较接近,有利于综合舱和电力舱里的工作人员逃生;所述通风室逃生口在所述横向方向的位置为所述通风室的顶部的一端,这样设置的原因在于通风室的常规的作用在于通风,需要设置通风结构,为设置通风结构留出了较大的空间。The position of the ventilation room escape opening in the longitudinal direction is the middle position of the top of the ventilation room. In this way, whether it is the integrated cabin or the power cabin, the distance to the ventilation room escape opening is relatively close, which is beneficial to the comprehensive cabin and the power cabin. The escape port of the ventilation room is located at one end of the top of the ventilation room in the lateral direction. The reason for this setting is that the conventional function of the ventilation room is to ventilate, and a ventilation structure needs to be installed. The structure leaves a lot of space.
实施中,实现各个所述管道小舱逃生口连通到所述通风室内的结构有多中。可以是如图1,图2和图4所示的结构,所述通风室210位于所述管道舱室层100的正上方,所述通风室的横向侧墙和所述管道舱室层的横向侧墙平齐;In implementation, there are many structures for realizing that the escape ports of each of the duct cabins are connected to the ventilation chamber. 1, 2 and 4, the
其中,所述通风室的横向侧墙是所述通风室沿所述横向方向的侧墙,所述管道舱室层的横向侧墙是所述管道舱室层沿所述横向方向的侧墙。Wherein, the lateral side wall of the ventilation chamber is the side wall of the ventilation chamber along the lateral direction, and the lateral side wall of the duct cabin layer is the side wall of the duct cabin layer along the lateral direction.
上述结构,使得通风室和管道舱室层在横向方向是平齐的,一方面使得通风室能最大程度的为管道舱室层通风,另一方面,综合管廊组合节点结构的结构也比较规则,易于生产制造及运输。The above structure makes the ventilation room and the duct cabin level in the horizontal direction. On the one hand, the ventilation room can ventilate the duct cabin layer to the greatest extent. Manufacturing and shipping.
本申请实施例的综合管廊组合节点结构还要具有通风功能。The combined node structure of the integrated pipe gallery in the embodiment of the present application also has a ventilation function.
实施中,如图3和图4所示,每个所述管道小舱111的顶部还开有管道小舱通风口140,所述管道小舱通风口开口朝上;In implementation, as shown in FIG. 3 and FIG. 4 , the top of each of the
所述综合管廊组合节点结构还包括通风设备260,每个所述管道小舱通风口处设置所述通风设备260;The combined node structure of the integrated pipe gallery further includes a
各个所述管道小舱通风口连通到所述通风室内,所述通风室的顶部设置通风室通风口270。Each of the duct cabin vents communicates with the ventilation chamber, and a
这样,通风室通风口和每个管道小舱都设置的独立的管道小舱通风口,通风设备相配合的通风系统,通风效率高;同时,通风系统的结构简单,施工难度较小。In this way, the ventilation room vents and the independent ducted cabin vents are set in each ducted cabin, and the ventilation system matched with the ventilation equipment has high ventilation efficiency; at the same time, the ventilation system has a simple structure and less construction difficulty.
实施中,如图所示,综合管廊组合节点结构还包括:In implementation, as shown in the figure, the combined node structure of the integrated pipe gallery also includes:
与所述通风室通风口一一对应的通风井280,所述通风井的下井口与所述通风室通风口连接,且所述通风井的上井口开口朝上且高于地面;a ventilation well 280 corresponding to the ventilation openings of the ventilation well, the lower wellhead of the ventilation well is connected with the ventilation opening of the ventilation room, and the upper wellhead opening of the ventilation well faces upwards and is higher than the ground;
防雨百叶窗290,所述防雨百叶窗290设置在所述通风井的上井口处,且能够通风防止雨水进入。The
所述通风井的上井口开口朝上且高于地面,所述防雨百叶窗设置在所述通风井的上井口处。这样设置的方式,相比于传统的通风口设置在通风亭的侧墙相比,所述通风井所需的高度较低,所述通风井对地面道路景观的影响较小。The opening of the upper wellhead of the ventilation shaft is upward and higher than the ground, and the rainproof shutter is arranged at the upper wellhead of the ventilation shaft. With this arrangement, compared with the traditional ventilation openings arranged on the side walls of the ventilation pavilion, the required height of the ventilation shaft is lower, and the impact of the ventilation shaft on the road landscape on the ground is smaller.
实施中,如图1和图2所示,所述通风室通风口270是一个,所述通风井280是一个,所述管道舱室层的各个所述管道小舱通风口共用同一个所述通风井;In implementation, as shown in FIG. 1 and FIG. 2 , there is one
其中,所述通风井的上井口作为地面之上的通风口。Wherein, the upper wellhead of the ventilation shaft is used as the ventilation opening above the ground.
这样,每个综合管廊组合节点结构的地面之上的通风口是一个,露出地面的通风井的数量较少,所述通风井对地面道路景观的影响较小。In this way, the number of ventilation shafts above the ground of each integrated pipe gallery combined node structure is one, and the number of ventilation shafts exposed on the ground is less, and the ventilation shafts have less impact on the road landscape on the ground.
实施中,如图1所示,唯一一个所述通风室通风口270在所述横向方向的位置为所述通风室的顶部的中间位置,所述通风室通风口270在所述纵向方向的位置为所述通风室的顶部的中间位置。In implementation, as shown in FIG. 1 , the only position of the
这样,通风室通风口就是位于所述通风室的顶部的中心位置,能够均匀的为电力舱和综合舱进行通风。In this way, the ventilation opening of the ventilation room is located at the central position of the top of the ventilation room, which can evenly ventilate the power compartment and the comprehensive compartment.
实施中,如图1所示,所述通风室通风口和所述通风室的顶部是相似的形状。这样的形状,通风室通风口能够均匀的为电力舱和综合舱进行通风。In practice, as shown in FIG. 1 , the vent of the plenum and the top of the plenum are similar in shape. With this shape, the plenum vents can evenly ventilate the power compartment and the general compartment.
本申请实施例的综合管廊组合节点结构还有一些其他特点。The combined node structure of the integrated pipe gallery of the embodiment of the present application has some other features.
实施中,如图3和图4所示,通风室的底板复用所述管道舱室的顶板中的一部分。In practice, as shown in Figures 3 and 4, the bottom plate of the ventilation chamber reuses a part of the top plate of the ducted cabin.
实施中,如图2和图3所示,每个所述管道舱室在所述通风室的底板中间位置之下设置一个所述防火分隔结构120。In practice, as shown in FIG. 2 and FIG. 3 , each of the duct compartments is provided with one of the fire
这样,所述管道舱室层在所述通风室底板的中间位置之下设置两个防火分隔结构,分隔出四个管道小舱。两个防火分隔结构的位置是对应的,便于施工。In this way, two fire partition structures are arranged under the middle position of the bottom plate of the ventilation chamber on the duct cabin layer, and four duct cabins are separated. The positions of the two fire separation structures are corresponding to facilitate construction.
实施中,如图2所示,四个所述管道小舱逃生口130相对于所述防火分隔结构120对称设置,且相对于所述电力舱和所述综合舱之间的隔墙对称设置。In implementation, as shown in FIG. 2 , the four
这样,综合管廊组合节点结构的四个所述管道小舱逃生口是按规律排布的,综合管廊组合节点结构较为规则,便于施工。In this way, the four pipe cabin escape openings of the integrated pipe gallery combined node structure are regularly arranged, and the integrated pipe gallery combined node structure is relatively regular, which is convenient for construction.
实施中,如图2所示,所述管道小舱逃生口130在所述横向方向的位置为所述通风室的底部的两端,所述管道小舱逃生口130在纵向方向的位置为所述管道小舱的中间位置。In implementation, as shown in FIG. 2 , the position of the
这样,所述管道小舱逃生口在所述横向方向的位置为所述通风室的底部的两端,这样设置的原因在于管道小舱的常规的作用在于设置电力舱的设备或综合舱的设备,为设置电力舱的设备或综合舱的设备留出了较大的空间;所述管道小舱逃生口在纵向方向的位置为所述管道小舱的中间位置,有利于管道小舱里的工作人员逃生。In this way, the positions of the escape ports of the duct cabin in the lateral direction are the two ends of the bottom of the ventilation chamber. The reason for this arrangement is that the conventional function of the duct cabin is to set the equipment of the power cabin or the equipment of the integrated cabin. , leaving a large space for the equipment of the power cabin or the equipment of the integrated cabin; the position of the escape port of the small pipe cabin in the longitudinal direction is the middle position of the small pipe cabin, which is conducive to the work in the small pipe cabin personnel escape.
实施中,如图2所示,四个所述管道小舱通风口140相对于所述防火分隔结构对称设置,且相对于所述电力舱和所述综合舱之间的隔墙对称设置;即四个所述管道小舱通风口相对于所述通风室通风口对称设置。In practice, as shown in FIG. 2 , the four ducted cabin vents 140 are symmetrically arranged relative to the fire separation structure, and symmetrically arranged relative to the partition wall between the power cabin and the integrated cabin; that is, The four duct cabin vents are symmetrically arranged relative to the plenum vents.
这样,四个所述管道小舱通风口到通风室通风口的距离大致相同,同一管道舱室的两个通风设备到该管道舱室内的防火分隔结构的距离大致相等;综合管廊组合节点结构的四个所述管道小舱通风口是按规律排布的,综合管廊组合节点结构较为规则,便于施工,也有利于各个管道小舱均匀通风。In this way, the distances from the vents of the four duct cabins to the vents of the plenum are approximately the same, and the distances from the two ventilation devices of the same duct compartment to the fire separation structure in the duct compartment are approximately the same; The ventilation openings of the four pipeline cabins are arranged regularly, and the combined node structure of the integrated pipe gallery is relatively regular, which is convenient for construction and is also conducive to the uniform ventilation of each pipeline cabin.
实施中,如图2所示,同一所述管道小舱内,所述管道小舱通风口140位于所述管道小舱逃生口130和所述防火分隔结构120之间。In implementation, as shown in FIG. 2 , in the same duct cabin, the
管道小舱通风口位于管道小舱通风口的中部,有利于各个管道小舱均匀通风。The vent of the duct cabin is located in the middle of the vent of the duct cabin, which is beneficial to the uniform ventilation of each duct cabin.
实施中,如图1,图2和图3所示,综合管廊组合节点结构还包括:In implementation, as shown in Figure 1, Figure 2 and Figure 3, the combined node structure of the integrated pipe gallery also includes:
电气室300,所述电气室300沿所述横向方向与所述通风室210紧挨设置,且设置在远离所述通风室逃生口220的一侧,所述电气室300与所述通风室210通过防火门310相连通;An
其中,电气室用于设置综合管廊组合节点结构工作所需的电气设备,电气室的底板复用所述管道舱室的顶板中的一部分,所述电气室和所述通风室复用中间的侧墙。Among them, the electrical room is used to set the electrical equipment required for the operation of the combined node structure of the integrated pipe gallery. wall.
电气室和通风室逃生口分别设置在两端的原因,避免通风室逃生口受到电气室的影响。如在电气室发生故障导致需要工作人员需要逃生时,通风室逃生口没有受到影响,能够正常逃生。The reason why the electrical room and the ventilation room escape openings are set at both ends is to avoid the ventilation room escape openings being affected by the electrical room. If there is a fault in the electrical room and the staff needs to escape, the escape port of the ventilation room is not affected and can escape normally.
实施中,如图2和图3所示,综合管廊组合节点结构还包括爬梯320;In implementation, as shown in FIG. 2 and FIG. 3 , the combined node structure of the integrated pipe gallery further includes a
所述爬梯320设置在每个所述通风室逃生口和每个所述管道小舱逃生口处。The
爬梯提供了工作人员进出通风室逃生口和管道小舱逃生口的工具。Climbing ladders provide the means for staff to enter and exit the vent room escape and the ducted cabin escape.
实施中,如图3所示,综合管廊组合节点结构还包括:In implementation, as shown in Figure 3, the combined node structure of the integrated pipe gallery also includes:
挡水坎330,所述管道小舱逃生口130和所述管道小舱通风口140的下部分别设置有所述挡水坎330,防止水进入所述管道小舱内;
地漏和与所述地漏连接的排水管,所述地漏与所述挡水坎配合,将水通过所述排水管排入所述综合管廊组合节点结构的排水系统。A floor drain and a drainage pipe connected with the floor drain, the floor drain cooperates with the water retaining sill, and the water is discharged into the drainage system of the combined node structure of the comprehensive pipe gallery through the drainage pipe.
挡水坎的存在,防止了水从管道小舱逃生口和所述管道小舱通风口进入管道小舱;将通风室内进的水排入到所述综合管廊组合节点结构的排水系统,保持了综合管廊组合节点结构的干燥。The existence of the water retaining sill prevents the water from entering the small pipe cabin from the escape port of the small pipe cabin and the ventilation port of the small pipe cabin; the water entering the ventilation room is discharged into the drainage system of the combined node structure of the integrated pipe gallery, keeping the Drying of the combined node structure of the integrated pipe gallery.
实施例二Embodiment 2
本申请实施例的综合管廊组合节点结构,可以在实施例一的基础上,进行适应性的改进。如:The combined node structure of the integrated pipe gallery in the embodiment of the present application can be adapted to be improved on the basis of the first embodiment. like:
每个所述管道小舱的顶部开设的管道小舱逃生口可以根据实际需要进行数量和位置的改变;The number and position of the escape ports of the pipe cabins opened at the top of each of the pipe cabins can be changed according to actual needs;
通风室的通风室逃生口及与之一一对应的逃生井可以根据实际需要进行数量和位置的改变;The number and location of the ventilation room escape openings in the ventilation room and the corresponding escape wells can be changed according to actual needs;
每个所述管道小舱的顶部开设的管道小舱通风口可以根据实际需要进行数量和位置的改变;The number and position of the ventilation openings of the ducted cabins opened at the top of each of the ducted cabins can be changed according to actual needs;
通风室的通风室通风口及与之一一对应的通风井可以根据实际需要进行数量和位置的改变。The ventilation openings of the ventilation room and the ventilation wells corresponding to one of them can be changed in quantity and location according to actual needs.
在本申请及其实施例的描述中,需要理解的是,术语“顶”、“底”、“高度”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。In the description of the present application and its embodiments, it should be understood that the orientation or positional relationship indicated by the terms "top", "bottom", "height", etc. is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the purpose of It is convenient to describe the application and to simplify the description, rather than indicating or implying that the device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as limiting the application.
在本申请及其实施例中,除非另有明确的规定和限定,术语“设置”、“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接,还可以是通信;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本申请中的具体含义。In the present application and its embodiments, unless otherwise expressly specified and limited, the terms "arranged", "installed", "connected", "connected", "fixed" and other terms should be understood in a broad sense, for example, it may be fixed The connection can also be a detachable connection or integrated; it can be a mechanical connection, an electrical connection, or a communication; it can be a direct connection or an indirect connection through an intermediate medium, and it can be internal communication between two components or the interaction of two elements. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific situations.
在本申请及其实施例中,除非另有明确的规定和限定,第一特征在第二特征之“上”或之“下”可以包括第一和第二特征直接接触,也可以包括第一和第二特征不是直接接触而是通过它们之间的另外的特征接触。而且,第一特征在第二特征“之上”、“上方”和“上面”包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度小于第二特征。In this application and its embodiments, unless otherwise expressly specified and limited, the first feature "on" or "under" the second feature may include direct contact between the first and second features, or may include the first feature. and the second feature is not in direct contact but through another feature between them. Also, the first feature being "above", "over" and "above" the second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is level higher than the second feature. The first feature is "below", "below" and "beneath" the second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is level less than the second feature.
上文的公开提供了许多不同的实施方式或例子用来实现本申请的不同结构。为了简化本申请的公开,上文中对特定例子的部件和设置进行描述。当然,它们仅仅为示例,并且目的不在于限制本申请。此外,本申请可以在不同例子中重复参考数字和/或参考字母,这种重复是为了简化和清楚的目的,其本身不指示所讨论各种实施方式和/或设置之间的关系。此外,本申请提供了的各种特定的工艺和材料的例子,但是本领域普通技术人员可以意识到其他工艺的应用和/或其他材料的使用。The above disclosure provides many different implementations or examples for implementing different structures of the present application. In order to simplify the disclosure of the present application, the components and arrangements of specific examples are described above. Of course, they are only examples and are not intended to limit the application. Furthermore, this application may repeat reference numerals and/or reference letters in different instances for the purpose of simplicity and clarity, and does not in itself indicate a relationship between the various embodiments and/or arrangements discussed. In addition, this application provides examples of various specific processes and materials, but one of ordinary skill in the art will recognize the application of other processes and/or the use of other materials.
尽管已描述了本申请的优选实施例,但本领域内的技术人员一旦得知了基本创造性概念,则可对这些实施例作出另外的变更和修改。所以,所附权利要求意欲解释为包括优选实施例以及落入本申请范围的所有变更和修改。While the preferred embodiments of the present application have been described, additional changes and modifications to these embodiments may occur to those skilled in the art once the basic inventive concepts are known. Therefore, the appended claims are intended to be construed to include the preferred embodiment and all changes and modifications that fall within the scope of this application.
显然,本领域的技术人员可以对本申请进行各种改动和变型而不脱离本申请的精神和范围。这样,倘若本申请的这些修改和变型属于本申请权利要求及其等同技术的范围之内,则本申请也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims (20)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920908142.6U CN211172074U (en) | 2019-06-17 | 2019-06-17 | A composite pipe gallery combined node structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920908142.6U CN211172074U (en) | 2019-06-17 | 2019-06-17 | A composite pipe gallery combined node structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211172074U true CN211172074U (en) | 2020-08-04 |
Family
ID=71823667
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920908142.6U Expired - Fee Related CN211172074U (en) | 2019-06-17 | 2019-06-17 | A composite pipe gallery combined node structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211172074U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110241853A (en) * | 2019-06-17 | 2019-09-17 | 中铁第五勘察设计院集团有限公司 | A kind of pipe gallery combined joint structure |
| CN114809084A (en) * | 2022-05-17 | 2022-07-29 | 中冶京诚工程技术有限公司 | Side ventilation pipe gallery |
| CN115748809A (en) * | 2022-09-29 | 2023-03-07 | 北京市市政工程设计研究总院有限公司 | Prefabricated combination node suitable for small-size utility tunnel is under construction fast |
-
2019
- 2019-06-17 CN CN201920908142.6U patent/CN211172074U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110241853A (en) * | 2019-06-17 | 2019-09-17 | 中铁第五勘察设计院集团有限公司 | A kind of pipe gallery combined joint structure |
| CN114809084A (en) * | 2022-05-17 | 2022-07-29 | 中冶京诚工程技术有限公司 | Side ventilation pipe gallery |
| CN115748809A (en) * | 2022-09-29 | 2023-03-07 | 北京市市政工程设计研究总院有限公司 | Prefabricated combination node suitable for small-size utility tunnel is under construction fast |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107938705B (en) | Be provided with vent and mouthful node structure's of fleing double-deck utility tunnel | |
| CN107059919B (en) | An underground comprehensive pipe gallery | |
| CN102660961A (en) | Integral underground comprehensive pipe rack | |
| CN215253013U (en) | A new type of high-protection mountain data center computer room structure | |
| CN110241853A (en) | A kind of pipe gallery combined joint structure | |
| CN113309144A (en) | Energy-saving data center machine room structure arranged on mountain | |
| CN110468875B (en) | Urban integrated pipeline corridor | |
| CN206800450U (en) | A kind of underground pipe gallery ground ventilation mouth and blower fan hoisting port and escaping exit | |
| CN215977368U (en) | A process node well for shield tunnel integrated pipe gallery | |
| CN113668609A (en) | Integrated pipe gallery with intensive air inlets, air outlets and escape outlets | |
| CN217870604U (en) | City utility tunnel ventilation mouthful structure of fleing | |
| CN215630128U (en) | Integrated air inlet, air outlet and escape opening comprehensive pipe gallery | |
| CN208009471U (en) | Double-layer comprehensive pipe corridor with node structure of ventilation openings and escape openings | |
| CN209323565U (en) | A comprehensive node of an underground comprehensive utility gallery | |
| CN105178565B (en) | Underground power house cable outlet also serves as the vertical shaft of safe escape passage | |
| CN102561789B (en) | fireproof ventilated building | |
| CN105735690B (en) | Escape and the safe switchgear house for isolating faulty equipment during for fire | |
| CN115748810A (en) | Non-excavation formula utility tunnel structure of fleing | |
| CN208996085U (en) | A kind of four cabin pipe gallery systems | |
| US6874284B1 (en) | Fire safety unit | |
| CN214089978U (en) | Multifunctional auxiliary construction structure of comprehensive pipe gallery | |
| CN214695537U (en) | Ventilation and escape node structure for natural gas cabin of comprehensive pipe rack | |
| CN214832879U (en) | Comprehensive pipe rack system | |
| CN220417551U (en) | Pipe corridor ventilation structure | |
| CN109487824B (en) | A kind of underground comprehensive pipe gallery |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200804 |