CN211114715U - A lift auxiliary device for road bridge construction - Google Patents

A lift auxiliary device for road bridge construction Download PDF

Info

Publication number
CN211114715U
CN211114715U CN201921171035.6U CN201921171035U CN211114715U CN 211114715 U CN211114715 U CN 211114715U CN 201921171035 U CN201921171035 U CN 201921171035U CN 211114715 U CN211114715 U CN 211114715U
Authority
CN
China
Prior art keywords
auxiliary device
road
bridge construction
bearing plate
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921171035.6U
Other languages
Chinese (zh)
Inventor
刘楠
聂立力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central and Southern China Municipal Engineering Design and Research Institute Co Ltd filed Critical Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Priority to CN201921171035.6U priority Critical patent/CN211114715U/en
Application granted granted Critical
Publication of CN211114715U publication Critical patent/CN211114715U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型提供一种用于路桥施工的升降辅助装置,该装置包括用于升降施工人员和物料两部分,其主要技术方案为包括一底板,所述底板的下表面安装有四个万向轮,所述底板的上表面安装有四个立柱,每个所述立柱的外表面均套设有能够上下移动的第一套管,四个所述第一套管的内侧面上固定连接有第一承载板,位于一侧的每两个所述第一套管的外侧面上固定连接有第一驱动组件,所述第一承载板通过第一套管在第一驱动组件的驱动下进行上下移动。本实用新型解决现有支撑或升降设备不利于材料运输、施工人员的施工效率低下及震动较大的问题。

Figure 201921171035

The utility model provides a lifting auxiliary device for road and bridge construction. The device includes two parts for lifting construction personnel and materials. The main technical scheme of the device is to include a base plate, and four universal wheels are installed on the lower surface of the base plate. The upper surface of the bottom plate is installed with four uprights, the outer surface of each of the uprights is sleeved with a first sleeve that can move up and down, and the inner surface of the four first sleeves is fixedly connected with a first sleeve. A carrying plate, a first drive assembly is fixedly connected to the outer surfaces of each of the two first sleeves on one side, and the first carrying plate is driven up and down by the first sleeve through the first drive assembly. move. The utility model solves the problems that the existing supporting or lifting equipment is not conducive to material transportation, the construction efficiency of construction personnel is low, and the vibration is large.

Figure 201921171035

Description

一种用于路桥施工的升降辅助装置A lifting auxiliary device for road and bridge construction

技术领域technical field

本实用新型属于路桥施工技术领域,尤其涉及一种用于路桥施工的升降辅助装置。The utility model belongs to the technical field of road and bridge construction, in particular to a lifting auxiliary device for road and bridge construction.

背景技术Background technique

在对道路桥梁进行施工时,施工人员往往需要在施工现场搭建一些支撑板或支撑架以便于进行高处施工作业。然而这种临时搭建的支撑板或支撑架缺少防护栏且结构不稳定极易发生坍塌,使施工人员在施工的操作过程中出现意外坠落的情况,极大降低了施工人员在施工过程中的人身安全;同时,这种临时搭建的支撑板或支撑架也不利于施工人员对施工材料的运输,大大影响了施工人员的操作进度,降低了施工人员的施工效率。此外,针对施工目前广泛使用的升降设备一般都是采用单向齿条、齿轮、靠紧轮的结构模式,该模式为单向受力,依靠靠紧滑轮定轨运行,震动较大,而齿条、齿轮结构也因结构缺陷存在磨损较大和损耗功率较多的不足。因此,设计一种新型的升降辅助装置来解决上述技术问题是十分必要的。When constructing roads and bridges, construction workers often need to build some support plates or support frames on the construction site to facilitate construction at heights. However, this kind of temporary support plate or support frame lacks protective fences and the structure is unstable and prone to collapse, which makes the construction personnel fall unexpectedly during the construction operation, which greatly reduces the personal injury of the construction personnel during the construction process. At the same time, this kind of temporary support plate or support frame is not conducive to the transportation of construction materials by the construction personnel, which greatly affects the operation progress of the construction personnel and reduces the construction efficiency of the construction personnel. In addition, the lifting equipment widely used in construction generally adopts the structure mode of one-way rack, pinion, and pulley. The structure of the bar and gear also has the disadvantages of greater wear and more power loss due to structural defects. Therefore, it is very necessary to design a new type of lifting auxiliary device to solve the above technical problems.

实用新型内容Utility model content

本实用新型的目的就是提供一种用于路桥施工的升降辅助装置,来解决现有支撑或升降设备不利于材料运输、施工人员的施工效率低下及震动较大的问题。The purpose of the utility model is to provide a lifting auxiliary device for road and bridge construction, to solve the problems that the existing support or lifting equipment is not conducive to material transportation, the construction efficiency of construction personnel is low, and the vibration is large.

为此,本实用新型所采用的技术方案是:For this reason, the technical scheme adopted by the present utility model is:

一种用于路桥施工的升降辅助装置,该装置包括一底板,所述底板的下表面安装有四个万向轮,所述底板的上表面安装有四个立柱,每个所述立柱的外表面均套设有能够上下移动的第一套管,四个所述第一套管的内侧面上固定连接有第一承载板,位于一侧的每两个所述第一套管的外侧面上固定连接有第一驱动组件,所述第一承载板通过第一套管在第一驱动组件的驱动下进行上下移动。A lifting auxiliary device for road and bridge construction, the device comprises a base plate, four universal wheels are installed on the lower surface of the base plate, four vertical columns are installed on the upper surface of the base plate, and the outer surface of each of the vertical columns is installed. The surfaces are covered with first sleeves that can move up and down, the inner surfaces of the four first sleeves are fixedly connected with a first bearing plate, and the outer surfaces of every two first sleeves located on one side are A first drive assembly is fixedly connected to the upper part, and the first bearing plate moves up and down through the first sleeve under the drive of the first drive assembly.

进一步地,位于一侧的两个立柱的外侧面上均固定设有匚型框架,每个匚型框架上均套有能够上下移动的第二套管,两个所述第二套管的外侧面上固定连接有第二承载板,所述第二承载板的两侧固定连接有第二驱动组件,所述第二承载板通过第二套管在第二驱动组件的驱动下进行上下移动。Further, the outer sides of the two uprights located on one side are fixedly provided with a sill-shaped frame, and each sill-shaped frame is covered with a second sleeve that can move up and down, and the outer surfaces of the two second sleeves are covered. A second bearing plate is fixedly connected to the side surface, and a second driving assembly is fixedly connected to both sides of the second bearing plate, and the second bearing plate is driven up and down by the second driving assembly through the second sleeve.

进一步地,所述第一承载板的上表面设有围栏,所述围栏包括沿第一承载板长度方向设置的第一围栏和沿第一承载板宽度方向设置的第二围栏,所述第二围栏上设有供施工人员进出的进入口。Further, a fence is provided on the upper surface of the first carrying board, and the fence includes a first fence arranged along the length direction of the first carrying board and a second fence arranged along the width direction of the first carrying board. There is an entrance on the fence for construction workers to enter and exit.

通过围栏的设置,确保了施工人员的施工过程中的安全性,第二围栏上设置的进入口便于施工人员的进出。The setting of the fence ensures the safety of the construction personnel during the construction process, and the entrance set on the second fence is convenient for the construction personnel to enter and exit.

进一步地,所述第一驱动组件包括与第一驱动电机连接的转轴、穿过转轴的两个第一滑轮、两个第二滑轮及两个传送带,两个所述第一滑轮分别固定在两个所述第一套管的外侧面,两个所述第二滑轮分别固定在底板的侧面,传送带的两端分别缠绕在位于垂直面内的第一滑轮和第二滑轮上。Further, the first drive assembly includes a rotating shaft connected with the first drive motor, two first pulleys, two second pulleys and two conveyor belts passing through the rotating shaft, and the two first pulleys are respectively fixed on the two first pulleys. The outer sides of the first sleeves, the two second pulleys are respectively fixed on the sides of the bottom plate, and the two ends of the conveyor belt are respectively wound on the first pulley and the second pulley located in the vertical plane.

进一步地,所述第一驱动电机的下方设有用于放置第一驱动电机的支撑板,所述支撑板的一端固定在立柱上。Further, a support plate for placing the first drive motor is provided below the first drive motor, and one end of the support plate is fixed on the upright column.

进一步地,所述传送带为拉绳或者皮带。Further, the conveyor belt is a pull rope or a belt.

上述技术方案通过第一驱动电机驱动转轴进行转动,带动第一滑轮与第二滑轮进行转动,第一滑轮上缠绕的传送带随着第一滑轮的转动进行收放,调节第一承载板的上下升降,实现自动调节,提高工作效率。The above technical solution drives the rotating shaft to rotate through the first drive motor, which drives the first pulley and the second pulley to rotate, and the conveyor belt wound on the first pulley is retracted and retracted along with the rotation of the first pulley, and the up and down movement of the first carrier plate is adjusted. , to achieve automatic adjustment and improve work efficiency.

进一步地,所述第二驱动组件包括与第二驱动电机连接的丝杆、与丝杆的下端螺纹连接的连接杆及与丝杆上端螺纹连接的固定块,所述第二驱动电机及丝杆垂直设置,所述连接杆的一端固定在匚型框架上,所述固定块的一端固定在第二承载板的侧面上。Further, the second drive assembly includes a lead screw connected with the second drive motor, a connecting rod threaded with the lower end of the lead screw, and a fixed block threaded with the upper end of the lead screw. The second drive motor and the lead screw Vertically arranged, one end of the connecting rod is fixed on the recessed frame, and one end of the fixing block is fixed on the side surface of the second bearing plate.

进一步地,所述第二承载板的上表面开设有放置物料的凹槽,便于物料的放置,同时防止物料在上升过程中的不掉落。Further, the upper surface of the second carrier plate is provided with a groove for placing the material, which is convenient for the material to be placed and at the same time prevents the material from falling during the rising process.

上述技术方案通过第二驱动电机驱动丝杆转动,在丝杆转动过程中,丝杆在连接杆内部进行转动,驱动固定块在丝杆上进行移动,进而相配合第二套管在匚型框架上滑动,驱动第二承载板上下移动,实现自动调节,提高工作效率。The above technical solution drives the screw to rotate through the second driving motor. During the rotation of the screw, the screw rotates inside the connecting rod, and the fixed block is driven to move on the screw, and then the second sleeve is matched with the second sleeve to be placed on the slug-shaped frame. Slide up to drive the second carrier plate to move up and down to realize automatic adjustment and improve work efficiency.

上述技术方案中的立柱不限长度,可根据施工现场的高度进行相对应的设置立柱的长度。The length of the column in the above technical solution is not limited, and the length of the column can be set correspondingly according to the height of the construction site.

与现有技术相比,本实用新型的有益效果为:Compared with the prior art, the beneficial effects of the present utility model are:

1、本实用新型提供的一种用于路桥施工的升降辅助装置,代替现有的支撑架结构,具有结构稳定不坍塌的优势,以保证施工人员的人身安全;1. A lifting auxiliary device for road and bridge construction provided by the present utility model, instead of the existing support frame structure, has the advantage of structural stability and does not collapse, so as to ensure the personal safety of construction personnel;

2、在本实用新型的第一承载板上设置围栏,且在第二围栏上设置进入口,进一步保证了施工人员的人身安全,提高了整个装置的安全性;2. A fence is arranged on the first bearing plate of the present utility model, and an entrance is arranged on the second fence, which further ensures the personal safety of construction personnel and improves the safety of the entire device;

3、本实用新型提供的一种用于路桥施工的升降辅助装置,设置了用于升降施工人员的第一承载板和用于升降物料的第二承载板,这样将升降施工人员和物料分开避免了当物料比较多、重量比较大时,都放在一起进行升降承载力过大的问题,且施工人员的脚下没有过多的物料干预,不会影响施工人员的正常施工;3. A lifting auxiliary device for road and bridge construction provided by the present utility model is provided with a first bearing plate for lifting construction personnel and a second bearing plate for lifting materials, so as to separate lifting construction personnel and materials to avoid When there are many materials and heavy weights, they are all put together to carry out the problem of excessive lifting and bearing capacity, and there is not too much material intervention under the feet of the construction workers, which will not affect the normal construction of the construction workers;

4、本实用新型通过第二驱动组件来调节第二承载板上下移动,便于施工人员的物料拿取,提高了工作效率;4. The utility model adjusts the up and down movement of the second bearing plate through the second driving component, which is convenient for construction personnel to take materials and improves the work efficiency;

5、本实用新型通过第一驱动组件中滑轮的转动,通过传送带进行调节,代替了齿轮传动,减少了齿轮的使用,进而降低了噪音。5. In the present invention, the rotation of the pulley in the first drive assembly is adjusted by the conveyor belt, which replaces the gear transmission, reduces the use of the gear, and thus reduces the noise.

附图说明Description of drawings

图1是本实用新型实施例1的整体结构示意图。FIG. 1 is a schematic diagram of the overall structure of Embodiment 1 of the present invention.

图2是图1中的第一驱动组件的结构示意图。FIG. 2 is a schematic structural diagram of the first driving assembly in FIG. 1 .

图3是图1中的第二驱动组件的结构示意图。FIG. 3 is a schematic structural diagram of the second driving assembly in FIG. 1 .

图4是本实用新型实施例2的整体结构示意图。4 is a schematic diagram of the overall structure of Embodiment 2 of the present invention.

图中所示:1-底板,2-万向轮,3-立柱,4-第一套管,5-第一承载板,6-第一驱动组件,6.1-第一驱动电机,6.2-转轴,6.3-第一滑轮,6.4-第二滑轮,6.5-传送带,6.6-支撑板,7-匚型框架,8-第二套管,9-第二承载板,10-第二驱动组件,10.1-第二驱动电机,10.2-丝杆,10.3-连接杆,10.4-固定块,11-第一围栏,12-第二围栏,13-凹槽。As shown in the picture: 1- base plate, 2- universal wheel, 3- column, 4- first sleeve, 5- first bearing plate, 6- first drive assembly, 6.1- first drive motor, 6.2- shaft , 6.3-First pulley, 6.4-Second pulley, 6.5-Conveyor belt, 6.6-Support plate, 7-Indent frame, 8-Second sleeve, 9-Second carrying plate, 10-Second drive assembly, 10.1 -Second drive motor, 10.2-screw rod, 10.3-connecting rod, 10.4-fixed block, 11-first fence, 12-second fence, 13-groove.

具体实施方式Detailed ways

为了使本实用新型的目的、技术方案及优点更加清楚明白,下面结合附图及具体实施例对本实用新型进一步详细说明。可以理解的是,此处所描写的具体实施例仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solutions and advantages of the present utility model more clearly understood, the present utility model will be further described in detail below with reference to the accompanying drawings and specific embodiments. It can be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

实施例1为一种用于路桥施工的升降辅助装置,其结构如图1所示,包括一底板1,所述底板1的下表面安装有四个万向轮2,所述底板1的上表面安装有四个立柱3,每个所述立柱3的外表面均套设有能够上下移动的第一套管4,四个所述第一套管4的内侧面上固定连接有第一承载板5,位于一侧的每两个所述第一套管4的外侧面上固定连接有第一驱动组件6,所述第一承载板5通过第一套管4在第一驱动组件6的驱动下进行上下移动。此部分用于升降施工人员,施工人员站在第一承载板5上,第一承载板5通过第一套管4在第一驱动组件6的驱动下完成升降,四个立柱3的长度根据施工现在所需要的高度具体确定。Embodiment 1 is a lifting auxiliary device for road and bridge construction, the structure of which is shown in FIG. 1 , including a bottom plate 1, four universal wheels 2 are installed on the lower surface of the bottom plate 1, and the upper surface of the bottom plate 1 is installed. Four uprights 3 are installed on the surface, the outer surface of each of the uprights 3 is covered with a first sleeve 4 that can move up and down, and the inner surface of the four first sleeves 4 is fixedly connected with a first bearing. The plate 5 is fixedly connected to the outer surface of every two first sleeves 4 on one side with a first drive assembly 6 , and the first bearing plate 5 passes through the first sleeve 4 on the outer surface of the first drive assembly 6 . Move up and down under the drive. This part is used for lifting and lowering the construction personnel. The construction personnel stand on the first bearing plate 5. The first bearing plate 5 is driven by the first driving assembly 6 to complete the lifting and lowering through the first sleeve 4. The length of the four columns 3 is based on the construction. The required height is now specified.

在上述技术方案中位于一侧的两个立柱3的外侧面上均固定设有匚型框架7,每个匚型框架7上均套有能够上下移动的第二套管8,两个所述第二套管8的外侧面上固定连接有第二承载板9,所述第二承载板9的两侧固定连接有第二驱动组件10,所述第二承载板9通过第二套管8在第二驱动组件10的驱动下进行上下移动。此部分用于升降施工所需的物料,将物料放置于第二承载板9中,第二承载板9通过第二套管8在第二驱动组件10的驱动下完成升降。In the above-mentioned technical solution, the outer sides of the two uprights 3 located on one side are fixedly provided with a recessed frame 7, and each recessed frame 7 is covered with a second sleeve 8 that can move up and down. A second bearing plate 9 is fixedly connected to the outer side of the second sleeve 8 , and a second drive assembly 10 is fixedly connected to both sides of the second bearing plate 9 , and the second bearing plate 9 passes through the second sleeve 8 It moves up and down under the driving of the second driving assembly 10 . This part is used for lifting and lowering the materials required for construction. The materials are placed in the second carrying plate 9 , and the second carrying plate 9 is lifted and lowered by the second driving assembly 10 through the second sleeve 8 .

具体的,如图2所示,所述第一驱动组件6包括与第一驱动电机6.1连接的转轴6.2、穿过转轴6.2的两个第一滑轮6.3、两个第二滑轮6.4及两个传送带6.5,两个所述第一滑轮6.3分别固定在两个所述第一套管4的外侧面,两个所述第二滑轮6.4分别固定在底板1的侧面,传送带6.5的两端分别缠绕在位于垂直面内的第一滑轮6.3和第二滑轮6.4上,所述第一驱动电机6.1的下方设有用于放置第一驱动电机6.1的支撑板6.6,所述支撑板6.6的一端固定在立柱3上,所述传送带6.5为拉绳或皮带。Specifically, as shown in FIG. 2 , the first drive assembly 6 includes a rotating shaft 6.2 connected to the first drive motor 6.1, two first pulleys 6.3, two second pulleys 6.4 and two conveyor belts passing through the rotating shaft 6.2 6.5, the two first pulleys 6.3 are respectively fixed on the outer sides of the two first sleeves 4, the two second pulleys 6.4 are respectively fixed on the side surfaces of the bottom plate 1, and the two ends of the conveyor belt 6.5 are respectively wrapped around On the first pulley 6.3 and the second pulley 6.4 located in the vertical plane, a support plate 6.6 for placing the first drive motor 6.1 is provided below the first drive motor 6.1, and one end of the support plate 6.6 is fixed on the column 3 Above, the conveyor belt 6.5 is a pull cord or a belt.

具体的,所述第一承载板5的上表面设有围栏,所述围栏包括沿第一承载板5长度方向设置的第一围栏11和沿第一承载板5宽度方向设置的第二围栏12,所述第二围栏12上设有供施工人员进出的进入口,围栏的设置可以增强本实用新型的安全性,保护施工人员的人身安全。Specifically, a fence is provided on the upper surface of the first carrying board 5 , and the fence includes a first fence 11 arranged along the length direction of the first carrying board 5 and a second fence 12 arranged along the width direction of the first carrying board 5 . , the second fence 12 is provided with an entrance for construction personnel to enter and exit, and the setting of the fence can enhance the safety of the utility model and protect the personal safety of construction personnel.

再具体的,如图3所示,所述第二驱动组件10包括与第二驱动电机10.1连接的丝杆10.2、与丝杆10.2的下端螺纹连接的连接杆10.3及与丝杆10.2上端螺纹连接的固定块10.4,所述第二驱动电机10.1及丝杆10.2垂直设置,所述连接杆10.3的一端固定在匚型框架7上,所述固定块10.4的一端固定在第二承载板9的侧面上,所述第二承载板9的上表面开设有放置物料的凹槽13,使得物料不易滑落。More specifically, as shown in FIG. 3 , the second drive assembly 10 includes a lead screw 10.2 connected to the second drive motor 10.1, a connecting rod 10.3 threadedly connected to the lower end of the lead screw 10.2, and threadedly connected to the upper end of the lead screw 10.2 The fixing block 10.4, the second driving motor 10.1 and the screw rod 10.2 are vertically arranged, one end of the connecting rod 10.3 is fixed on the indented frame 7, and one end of the fixing block 10.4 is fixed on the side of the second bearing plate 9 Above, the upper surface of the second carrier plate 9 is provided with a groove 13 for placing the material, so that the material is not easy to slip off.

本实施例的工作原理为:The working principle of this embodiment is:

在使用时,通过驱动第一驱动电机6.1,带动转轴6.2转动,进而带动第一滑轮6.3和第二滑轮6.4转动,第一滑轮6.3上缠绕的传送带6.5随着第一滑轮6.3的转动进行收放,如此驱动第一套管4在立柱3上移动,以调节第一承载板5至便于施工人员进入第一承载板上的位置,施工人员通过围栏上的进入口进入到第一承载板5上,通过再次驱动第一驱动电机6.1调节第一承载板5至施工位置;在施工人员进入到施工位置后,驱动第二驱动电机10.1,带动丝杆10.2转动,在丝杆10.2转动的过程中,丝杆10.2在连接杆10.3内部转动,驱动固定块10.4在丝杆10.2上进行移动,进而使得第二套管8在匚型框架7上滑动,这样就完成了第二承载板9的升降动作,待第二承载板9的位置调节至于施工人员便于拿取物料的位置处时停止第二驱动电机10.1,施工人员开始正常施工即可。In use, by driving the first drive motor 6.1, the rotating shaft 6.2 is driven to rotate, thereby driving the first pulley 6.3 and the second pulley 6.4 to rotate, and the conveyor belt 6.5 wound on the first pulley 6.3 is retracted with the rotation of the first pulley 6.3. In this way, the first sleeve 4 is driven to move on the column 3 to adjust the first bearing plate 5 to a position where the construction personnel can enter the first bearing plate, and the construction personnel enter the first bearing plate 5 through the entrance on the fence. , adjust the first bearing plate 5 to the construction position by driving the first driving motor 6.1 again; after the construction personnel enter the construction position, drive the second driving motor 10.1 to drive the screw 10.2 to rotate, during the rotation of the screw 10.2, The screw 10.2 rotates inside the connecting rod 10.3, and the fixed block 10.4 is driven to move on the screw 10.2, so that the second sleeve 8 slides on the grooved frame 7, thus completing the lifting action of the second carrying plate 9, When the position of the second carrying plate 9 is adjusted to a position where the construction personnel can easily take the materials, the second driving motor 10.1 is stopped, and the construction personnel can start the normal construction.

上述实施例1的技术方案将载人和载物分开进行升降,这样避免了当物料过多时载人载物放在一起升降的情况下,物料对施工人员的影响,消除了物料对施工人员造成的安全隐患,也减轻了承载板的承重。The technical solution of the above-mentioned embodiment 1 separates the manned and the load for lifting, which avoids the influence of the material on the construction personnel when the manned and the load is lifted together when there are too many materials, and eliminates the effect of the material on the construction personnel. It also reduces the load-bearing of the bearing plate.

实施例2为一种用于路桥施工的升降辅助装置的另一种形式,其结构如图4所示,只包括实施例1中的承载施工人员部分,本实施例适用于当物料很少的情况时,可以将物料和施工人员放在一起调节至施工位置处;本实施例与实施例1中载人部分的结构完全相同,故此处不再描述,具体结构请见前述。Embodiment 2 is another form of a lifting auxiliary device for road and bridge construction, the structure of which is shown in Figure 4, and only includes the part that carries the construction personnel in Embodiment 1. This embodiment is suitable for when there are few materials If necessary, the materials and construction personnel can be put together and adjusted to the construction position; the structure of this embodiment is exactly the same as that of the man-carrying part in Embodiment 1, so it will not be described here. For the specific structure, please refer to the above.

上述实施例1和实施例2都未用到齿轮、齿条结构,进而均降低了噪音。The above-mentioned Embodiment 1 and Embodiment 2 do not use the gear and rack structure, thereby reducing noise.

说明书中未阐述的部分均为现有技术或公知常识。本实施例仅用于说明该实用新型,而不用于限制本实用新型的范围,本领域技术人员对于本实用新型所做的等价置换等修改均认为是落入该实用新型权利要求书所保护范围内。The parts not described in the specification are the prior art or common knowledge. The present embodiment is only used to illustrate the utility model, not to limit the scope of the utility model. Those skilled in the art will consider the equivalent replacement and other modifications made by the utility model to fall within the protection of the utility model claims. within the range.

Claims (8)

1. The utility model provides a lift auxiliary device for road bridge construction which characterized in that: the device includes a bottom plate (1), the lower surface mounting of bottom plate (1) has four universal wheels (2), the last surface mounting of bottom plate (1) has four stands (3), every the surface of stand (3) all overlaps and is equipped with first sleeve pipe (4) that can reciprocate, four fixedly connected with first loading board (5) on the medial surface of first sleeve pipe (4), be located per two of one side first drive assembly (6) of fixedly connected with on the lateral surface of first sleeve pipe (4), first loading board (5) reciprocate under the drive of first drive assembly (6) through first sleeve pipe (4).
2. The lifting auxiliary device for road and bridge construction according to claim 1, wherein -shaped frames (7) are fixedly arranged on the outer side surfaces of two upright posts (3) on one side, each -shaped frame (7) is sleeved with a second sleeve (8) capable of moving up and down, a second bearing plate (9) is fixedly connected to the outer side surfaces of the two second sleeves (8), second driving assemblies (10) are fixedly connected to two sides of the second bearing plate (9), and the second bearing plate (9) moves up and down under the driving of the second driving assemblies (10) through the second sleeves (8).
3. The lifting auxiliary device for road and bridge construction as claimed in claim 1, wherein: the upper surface of first loading board (5) is equipped with the rail, the rail includes first rail (11) and second rail (12) that set up along first loading board (5) width direction that set up along first loading board (5) length direction, be equipped with the entry port that supplies to apply workman's business turn over on second rail (12).
4. The lifting auxiliary device for road and bridge construction as claimed in claim 1, wherein: first drive assembly (6) include pivot (6.2) be connected with first driving motor (6.1), pass two first pulleys (6.3), two second pulleys (6.4) and two conveyer belts (6.5) of pivot (6.2), two first pulley (6.3) are fixed respectively two the lateral surface of first sleeve pipe (4), two the side at bottom plate (1) is fixed respectively to second pulley (6.4), and the both ends of conveyer belt (6.5) twine respectively on first pulley (6.3) and second pulley (6.4) that are located the vertical plane.
5. The lifting auxiliary device for road and bridge construction as claimed in claim 4, wherein: a supporting plate (6.6) used for placing the first driving motor (6.1) is arranged below the first driving motor (6.1), and one end of the supporting plate (6.6) is fixed on the upright post (3).
6. The lifting auxiliary device for road and bridge construction as claimed in claim 4, wherein: the conveyor belt (6.5) is a pull rope or a belt.
7. The lifting auxiliary device for road and bridge construction according to claim 2, wherein the second driving assembly (10) comprises a screw rod (10.2) connected with the second driving motor (10.1), a connecting rod (10.3) in threaded connection with the lower end of the screw rod (10.2) and a fixing block (10.4) in threaded connection with the upper end of the screw rod (10.2), the second driving motor (10.1) and the screw rod (10.2) are vertically arranged, one end of the connecting rod (10.3) is fixed on the -shaped frame (7), and one end of the fixing block (10.4) is fixed on the side surface of the second bearing plate (9).
8. The lifting auxiliary device for road and bridge construction as claimed in claim 2, wherein: and a groove (13) for placing materials is formed in the upper surface of the second bearing plate (9).
CN201921171035.6U 2019-07-24 2019-07-24 A lift auxiliary device for road bridge construction Expired - Fee Related CN211114715U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921171035.6U CN211114715U (en) 2019-07-24 2019-07-24 A lift auxiliary device for road bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921171035.6U CN211114715U (en) 2019-07-24 2019-07-24 A lift auxiliary device for road bridge construction

Publications (1)

Publication Number Publication Date
CN211114715U true CN211114715U (en) 2020-07-28

Family

ID=71698556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921171035.6U Expired - Fee Related CN211114715U (en) 2019-07-24 2019-07-24 A lift auxiliary device for road bridge construction

Country Status (1)

Country Link
CN (1) CN211114715U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049403A (en) * 2020-09-17 2020-12-08 范习义 Civil engineering construction support
CN113006447A (en) * 2021-02-22 2021-06-22 杨建勋 Movable lifting auxiliary device for building wall and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049403A (en) * 2020-09-17 2020-12-08 范习义 Civil engineering construction support
CN113006447A (en) * 2021-02-22 2021-06-22 杨建勋 Movable lifting auxiliary device for building wall and using method thereof

Similar Documents

Publication Publication Date Title
CN205472511U (en) Stable elevating platform that overhauls
CN207072792U (en) A kind of road and bridge construction lowering or hoisting gear
CN211114715U (en) A lift auxiliary device for road bridge construction
CN110155733B (en) Lifting stacker crane
CN213895048U (en) Two lifting machine of keeping in
CN206511869U (en) A kind of high counterweight test self-powered platform of stability
CN111960328A (en) Lifting device
CN213265536U (en) Transport truck
CN220451383U (en) Hanging basket for constructional engineering
CN210683079U (en) Construction machinery material lift platform
CN204980970U (en) Single crystal hoisting device
CN219194435U (en) Lifting platform for building construction
CN219196665U (en) Lifting type building construction scaffold
CN110607756A (en) A connection structure between the main girder and outriggers of a bridge erecting machine
CN214360009U (en) Material lifting device for building decoration
CN112429667B (en) A lifting mechanism for erecting steel trusses in civil engineering
CN106629470B (en) Lift level-sensing device apparatus for examination and repair
CN207209863U (en) High heavy burden elevator
CN220317195U (en) Elevator for hydraulic support assembly pin
CN222909366U (en) Self-elevating construction engineering construction frame
CN210393617U (en) Regulation formula lift elevating gear
CN223765933U (en) An eight-rope anti-shake lifting trolley
CN220909049U (en) Mobile operation platform for construction
CN217840780U (en) A building installation and construction platform
CN219429443U (en) Reciprocating elevator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728