CN211114066U - Assembled lightweight concrete slab type house structure - Google Patents

Assembled lightweight concrete slab type house structure Download PDF

Info

Publication number
CN211114066U
CN211114066U CN201921697214.3U CN201921697214U CN211114066U CN 211114066 U CN211114066 U CN 211114066U CN 201921697214 U CN201921697214 U CN 201921697214U CN 211114066 U CN211114066 U CN 211114066U
Authority
CN
China
Prior art keywords
prefabricated
panel
reinforced concrete
groove
wall panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921697214.3U
Other languages
Chinese (zh)
Inventor
尚仁杰
寅志强
杨潇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Original Assignee
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Research Institute of Building and Construction Co Ltd MCC Group, China Jingye Engineering Corp Ltd filed Critical Central Research Institute of Building and Construction Co Ltd MCC Group
Priority to CN201921697214.3U priority Critical patent/CN211114066U/en
Application granted granted Critical
Publication of CN211114066U publication Critical patent/CN211114066U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本实用新型公开了一种装配式轻质混凝土板式房屋结构,包括:基础,基础埋设于地下;预制墙板,预制墙板底端与基础通过第一钢筋混凝土结构连接;预制楼板,预制楼板与预制墙板通过第二钢筋混凝土结构连接;预制屋面板,预制屋面板与预制墙板顶端通过第三钢筋混凝土结构连接。本房屋中基板、预制墙板、预制屋面板之间的连接均采用第一钢筋混凝土结构、第二钢筋混凝土结构和第三钢筋混凝土结构连接,无需在预制件中预埋型钢连接件,大大缩短了生产周期和降低了建造成本。

Figure 201921697214

The utility model discloses a prefabricated lightweight concrete slab house structure, comprising: a foundation, which is buried in the ground; a prefabricated wall panel, the bottom end of the prefabricated wall panel and the foundation are connected by a first reinforced concrete structure; a prefabricated floor slab, the prefabricated floor slab and The prefabricated wall panels are connected by the second reinforced concrete structure; the prefabricated roof panel, the prefabricated roof panel and the top of the prefabricated wall panel are connected by the third reinforced concrete structure. The connection between the base plate, the prefabricated wall panel, and the prefabricated roof panel in this house is all connected by the first reinforced concrete structure, the second reinforced concrete structure and the third reinforced concrete structure, and there is no need to pre-embed steel connectors in the prefabricated parts, which greatly shortens the The production cycle and the construction cost are reduced.

Figure 201921697214

Description

一种装配式轻质混凝土板式房屋结构A prefabricated lightweight concrete slab house structure

技术领域technical field

本实用新型涉及建筑技术领域,更具体的说是涉及一种装配式轻质混凝土板式房屋结构。The utility model relates to the technical field of construction, in particular to a prefabricated lightweight concrete slab house structure.

背景技术Background technique

目前,发展装配式建筑是实现节能环保、提高建筑质量水平,实现建筑业升级换代的有效措施。At present, the development of prefabricated buildings is an effective measure to achieve energy conservation and environmental protection, improve the level of building quality, and realize the upgrading of the construction industry.

预制装配式房屋,是用工业化的生产方式来建造住宅,是将住宅的部分或全部构件在工厂预制完成,然后运输到施工现场,将构件通过可靠的连接方式组装而建成的住宅。现有预制装配式房屋中的构件连接采用型钢连接件焊接固定,但是,这种方式需要将型钢连接件预先埋设在构件内,增加了构件生产工序,并且增加了建筑生产周期,并且对焊接操作人员要求较高,建造成本较高。Prefabricated houses are built by industrialized production methods. Part or all of the components of the house are prefabricated in factories, then transported to the construction site, and the components are assembled through reliable connections. The connection of components in the existing prefabricated houses is welded and fixed by section steel connectors. However, in this way, the section steel connectors need to be embedded in the components in advance, which increases the production process of components, and increases the construction production cycle. Higher personnel requirements and higher construction costs.

因此,如何提供一种生产周期短、建造成本低的装配式轻质混凝土板式房屋结构是本领域技术人员亟需解决的问题。Therefore, how to provide a prefabricated lightweight concrete slab house structure with a short production cycle and low construction cost is an urgent problem for those skilled in the art to solve.

实用新型内容Utility model content

有鉴于此,本实用新型提供了一种生产周期短、建造成本低的装配式轻质混凝土板式房屋结构。In view of this, the utility model provides a prefabricated lightweight concrete slab house structure with short production cycle and low construction cost.

为了实现上述目的,本实用新型采用如下技术方案:In order to achieve the above purpose, the utility model adopts the following technical solutions:

一种装配式轻质混凝土板式房屋结构,包括:A prefabricated lightweight concrete slab house structure, comprising:

基础,所述基础埋设于地下;a foundation, which is buried in the ground;

预制墙板,所述预制墙板底端与所述基础通过第一钢筋混凝土结构连接;a prefabricated wall panel, the bottom end of the prefabricated wall panel is connected with the foundation through a first reinforced concrete structure;

预制楼板,所述预制楼板与所述预制墙板通过第二钢筋混凝土结构连接;a prefabricated floor slab, wherein the prefabricated floor slab and the prefabricated wall panel are connected by a second reinforced concrete structure;

预制屋面板,所述预制屋面板与所述预制墙板顶端通过第三钢筋混凝土结构连接。The prefabricated roof panel is connected with the top end of the prefabricated wall panel through a third reinforced concrete structure.

经由上述的技术方案可知,与现有技术相比,本实用新型公开提供了一种装配式轻质混凝土板式房屋结构,本房屋中基板、预制墙板、预制屋面板之间的连接均采用第一钢筋混凝土结构、第二钢筋混凝土结构和第三钢筋混凝土结构连接,无需在预制件中预埋型钢连接件,大大缩短了生产周期和降低了建造成本。It can be seen from the above technical solutions that, compared with the prior art, the present utility model discloses a prefabricated lightweight concrete panel house structure. The first reinforced concrete structure, the second reinforced concrete structure and the third reinforced concrete structure are connected, and there is no need to pre-embed the steel connecting parts in the prefabricated parts, which greatly shortens the production cycle and reduces the construction cost.

进一步的,所述预制墙板由多个单体墙板通过第四钢筋混凝土结构连接构成。Further, the prefabricated wall panels are formed by connecting a plurality of single wall panels through a fourth reinforced concrete structure.

进一步的,所述基础上端开设有预埋孔,与所述基础相连接的所述单体墙板上设置有第一企口,所述第一企口与所述预埋孔同轴设置,所述基础与所述单体墙板之间设置有水泥砂浆找平层一,所述第一钢筋混凝土结构包括:第一钢筋,所述第一钢筋一端埋设在所述预埋孔内,另一端穿设于所述水泥砂浆找平层一向上延伸至所述第一企口内;所述预埋孔和所述第一企口内均填充有水泥砂浆一。Further, the upper end of the foundation is provided with a pre-embedded hole, the single wall plate connected with the foundation is provided with a first groove, and the first groove and the pre-buried hole are coaxially arranged, A cement mortar leveling layer is arranged between the foundation and the single wall panel. The first reinforced concrete structure includes: a first steel bar, one end of the first steel bar is embedded in the pre-embedded hole, and the other end is embedded in the pre-embedded hole. The first groove penetrated through the cement mortar leveling layer extends upward into the first groove; the pre-embedded hole and the first groove are filled with cement mortar 1.

进一步的,所述单体墙板包括:多个外墙板和多个内墙板,所述第二钢筋混凝土结构包括:钢筋混凝土连接结构一和钢筋混凝土连接结构二,所述预制楼板包括第一单体楼板和第二单体楼板,所述第一单体楼板和所述第二单体楼板外侧端均与所述外墙板通过所述钢筋混凝土连接结构一连接,所述第一单体楼板和所述第二单体楼板内侧端均与所述内墙板通过所述钢筋混凝土连接结构二连接。Further, the single wall panel includes: a plurality of outer wall panels and a plurality of inner wall panels, the second reinforced concrete structure includes: a first reinforced concrete connection structure and a second reinforced concrete connection structure, and the prefabricated floor plate includes a first reinforced concrete connection structure. A single floor slab and a second single floor slab, the outer ends of the first single floor slab and the second single floor slab are both connected with the outer wall panel through the reinforced concrete connecting structure, the first single floor slab Both the body floor slab and the inner end of the second single floor slab are connected with the inner wall panel through the reinforced concrete connecting structure II.

进一步的,所述第一单体楼板上表面和所述第二单体楼板上表面均铺设有第一混凝土层,所述第一混凝土层表面与所述外墙板之间设置有水泥砂浆找平层二,所述钢筋混凝土连接结构一包括:第一圈梁,所述第一圈梁设置在相邻所述外墙板之间,所述第一单体楼板和所述第二单体楼板外侧端均置于相邻所述外墙板之间,且该外侧端位于所述第一圈梁内侧;第二钢筋,所述第二钢筋竖向穿设于第一混凝土层和所述水泥砂浆找平层二且其两端分别置于相邻所述外墙板上开设的第二企口内,所述第二企口内均填充有水泥砂浆二。Further, a first concrete layer is laid on the upper surface of the first single floor slab and the upper surface of the second single floor slab, and a cement mortar leveling is arranged between the surface of the first concrete layer and the outer wall panel. On the second floor, the first reinforced concrete connection structure includes: a first ring beam, the first ring beam is arranged between the adjacent outer wall panels, the first single floor slab and the second single floor slab The outer ends are all placed between the adjacent outer wall panels, and the outer ends are located inside the first ring beam; the second reinforcement is vertically penetrated between the first concrete layer and the cement The mortar leveling layer 2 and its two ends are respectively placed in the second grooves opened on the adjacent outer wall panels, and the second grooves are filled with the second cement mortar.

进一步的,所述第一混凝土层与所述内墙板之间设置有水泥砂浆找平层三,所述第一单体楼板内侧端和所述第二单体楼板内侧端均相对设置,且均置于相邻所述内墙板之间,所述第一单体楼板内侧端和所述第二单体楼板内侧端之间、相邻所述第一混凝土层之间均形成互相连通的第一浇筑通道,相邻所述内墙板上均开设有第三企口,所述第三企口与所述第一浇筑通道连通;所述钢筋混凝土连接结构二包括:第三钢筋,所述第三钢筋竖向穿设于所述水泥砂浆找平层三且置于所述第一浇筑通道内和所述第三企口内,所述第三企口和所述第一浇筑通道内均填充有水泥砂浆三。Further, a third cement mortar leveling layer is arranged between the first concrete layer and the inner wall panel, and the inner end of the first single floor slab and the inner end of the second single floor slab are both oppositely arranged, and both It is placed between the adjacent inner wall panels, and the inner end of the first single floor slab and the inner end of the second single floor slab, and between the adjacent first concrete layers, form an interconnected second floor. A pouring channel, adjacent to the inner wall panels are provided with third grooves, and the third grooves are communicated with the first pouring channel; the second reinforced concrete connection structure includes: a third steel bar, the The third steel bar is vertically penetrated through the cement mortar leveling layer 3 and placed in the first pouring channel and the third groove, and both the third groove and the first pouring channel are filled with Cement mortar three.

进一步的,还包括置于所述预制屋面板上的女儿墙板;所述第三钢筋混凝土结构包括:钢筋混凝土连接结构三和钢筋混凝土连接结构四,所述预制屋面板包括第一单体屋面板和第二单体屋面板,所述第一单体屋面板和所述第二单体屋面板外侧端均与所述外墙板和所述女儿墙板通过所述钢筋混凝土连接结构三连接,所述第一单体屋面板和所述第二单体屋面板内侧端均与所述内墙板通过所述钢筋混凝土连接结构四连接。Further, it also includes a parapet board placed on the prefabricated roof panel; the third reinforced concrete structure includes: a reinforced concrete connection structure 3 and a reinforced concrete connection structure 4, and the prefabricated roof panel includes the first single house. The panel and the second single roof panel, the outer ends of the first single roof panel and the second single roof panel are both connected with the outer wall panel and the parapet wall panel through the reinforced concrete connection structure. and the inner ends of the first single roof panel and the second single roof panel are connected with the inner wall panel through the reinforced concrete connecting structure.

进一步的,所述第一单体屋面板上表面和所述第二单体屋面板上表面均铺设有第二混凝土层,所述第二混凝土层上表面与所述女儿墙板之间设置有水泥砂浆找平层四,所述钢筋混凝土连接结构三包括:第二圈梁,所述第二圈梁设置在所述外墙板与所述女儿墙板之间,所述第一单体屋面板和所述第二单体屋面板外侧端均置于所述外墙板与所述女儿墙板之间,且该外侧端位于所述第二圈梁内侧;第四钢筋,所述第四钢筋竖向穿设于第二混凝土层和所述水泥砂浆找平层四且其两端分别置于所述外墙板和所述女儿墙板上开设的第四企口内,所述第四企口内均填充有水泥砂浆四。Further, a second concrete layer is laid on the upper surface of the first single roof panel and the upper surface of the second single roof panel, and a second concrete layer is arranged between the upper surface of the second concrete layer and the parapet board. Cement mortar leveling layer 4, the reinforced concrete connection structure 3 includes: a second ring beam, the second ring beam is arranged between the outer wall panel and the parapet panel, the first single roof panel and the outer end of the second single roof panel are placed between the outer wall panel and the parapet panel, and the outer end is located inside the second ring beam; the fourth reinforcing bar, the fourth reinforcing bar It is vertically penetrated in the second concrete layer and the cement mortar leveling layer 4 and its two ends are respectively placed in the fourth grooves opened on the outer wall panels and the parapet wall panels, and the fourth grooves are both Filled with cement mortar IV.

进一步的,所述第一单体屋面板内侧端和所述第二单体屋面板内侧端均相对设置,且均置于所述内墙板上,且所述第一单体屋面板内侧端和所述第二单体屋面板内侧端之间形成第二浇筑通道,所述内墙板上开设有第五企口,所述第五企口与所述第二浇筑通道连通;所述钢筋混凝土连接结构二包括:第五钢筋,所述第五钢筋竖向置于所述第二浇筑通道内和所述第五企口内,所述第五企口和所述第二浇筑通道内均填充有水泥砂浆五。Further, the inner side end of the first single-piece roof panel and the inner side end of the second single-piece roof panel are disposed opposite to each other, and both are placed on the inner wall panel, and the inner side end of the first single-piece roof panel A second pouring channel is formed between the inner side end of the second single-body roof panel, the inner wall panel is provided with a fifth groove, and the fifth groove is communicated with the second pouring channel; the reinforcing bars The second concrete connection structure includes: a fifth steel bar, the fifth steel bar is vertically placed in the second pouring channel and the fifth groove, and the fifth groove and the second pouring channel are filled with There are cement mortar five.

进一步的,所述第四钢筋混凝土结构包括第六钢筋,所述第六钢筋置于相邻所述单体墙板之间的第六企口内,且所述第六企口内填充有水泥砂浆六。Further, the fourth reinforced concrete structure includes the sixth steel bar, and the sixth steel bar is placed in the sixth groove between the adjacent single wall panels, and the sixth groove is filled with cement mortar six. .

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据提供的附图获得其他的附图。In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description It is only an embodiment of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained according to the provided drawings without creative efforts.

图1附图为本实用新型提供的一种装配式轻质混凝土板式房屋结构的正面结构示意图。Figure 1 is a schematic diagram of the front structure of a prefabricated lightweight concrete slab house structure provided by the utility model.

图2附图为图1附图的剖面图。FIG. 2 is a cross-sectional view of the drawing of FIG. 1 .

图3附图为单体墙板布置图。Figure 3 is a drawing showing the layout of a single wall panel.

图4附图为楼按布置图。Figure 4 is a drawing of the floor plan.

图5附图为预制墙板与基础通过第一钢筋混凝土结构连接时的示意图。Figure 5 is a schematic diagram of the prefabricated wall panel and the foundation being connected by the first reinforced concrete structure.

图6-7附图为预制楼板与制墙板通过第二钢筋混凝土结构连接时的示意图。Figures 6-7 are schematic diagrams when the prefabricated floor slab and the fabricated wall slab are connected by the second reinforced concrete structure.

图8-9附图为预制屋面板与预制墙板顶端通过第三钢筋混凝土结构连接时的示意图。Figures 8-9 are schematic diagrams when the prefabricated roof panel and the top of the prefabricated wall panel are connected by a third reinforced concrete structure.

图10附图为多个单体墙板通过第四钢筋混凝土结构连接时的示意图。FIG. 10 is a schematic diagram of a plurality of single wall panels connected by a fourth reinforced concrete structure.

其中:1-基础,101-预埋孔,2-预制墙板,21-单体墙板,201-第一企口,202-第二企口,203-第三企口,204-第四企口,205-第五企口,206-第六企口,211-外墙板,212-内墙板,3-第一钢筋混凝土结构,31-第一钢筋,32-水泥砂浆一,4-预制楼板,41-第一单体楼板,42-第二单体楼板,5-第二钢筋混凝土结构,51-钢筋混凝土连接结构一,511-第一圈梁,512-第二钢筋,513-水泥砂浆二,52-钢筋混凝土连接结构二,521-第三钢筋,522-水泥砂浆三,6-预制屋面板,61-第一单体屋面板,62-第二单体屋面板,7-第三钢筋混凝土结构,71-钢筋混凝土连接结构三,711-第二圈梁,712-第四钢筋,713-水泥砂浆四,72-钢筋混凝土连接结构四,721-第五钢筋,722-水泥砂浆五,8-第四钢筋混凝土结构,81-第六钢筋,82-水泥砂浆六,9-水泥砂浆找平层一,10-第一混凝土层,11-水泥砂浆找平层二,12-水泥砂浆找平层三,13-第一浇筑通道,14-女儿墙,15-第二混凝土层,16-水泥砂浆找平层四,17-第二浇筑通道。Among them: 1- foundation, 101- embedded hole, 2- prefabricated wall panel, 21- single wall panel, 201- first tongue and groove, 202- second tongue and groove, 203- third tongue and groove, 204- fourth Tongkou, 205- fifth tongue, 206- sixth tongue, 211-exterior wall panel, 212-inner wall panel, 3-first reinforced concrete structure, 31-first steel bar, 32-cement mortar one, 4 - Prefabricated floor slab, 41- First single floor slab, 42 - Second single slab slab, 5 - Second reinforced concrete structure, 51 - Reinforced concrete connection structure one, 511 - First ring beam, 512 - Second steel bar, 513 -Cement Mortar II, 52-Reinforced Concrete Connection Structure II, 521-Third Steel Bar, 522-Cement Mortar III, 6-Prefabricated Roof Slab, 61-First Monolithic Roofing Slab, 62-Second Monolithic Roofing Slab, 7 - 3rd reinforced concrete structure, 71- reinforced concrete connection structure 3, 711- 2nd ring beam, 712- 4th rebar, 713- cement mortar 4, 72- reinforced concrete connection structure 4, 721- 5th rebar, 722- Cement mortar five, 8-fourth reinforced concrete structure, 81-sixth steel bar, 82-cement mortar six, 9-cement mortar leveling layer one, 10-first concrete layer, 11-cement mortar leveling layer two, 12-cement Mortar leveling layer three, 13-first pouring channel, 14-parapet, 15-second concrete layer, 16-cement mortar leveling layer four, 17-second pouring channel.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

本实用新型实施例公开了一种装配式轻质混凝土板式房屋结构,包括:The embodiment of the utility model discloses a prefabricated lightweight concrete slab house structure, comprising:

基础1,基础1埋设于地下;Foundation 1, Foundation 1 is buried underground;

预制墙板2,预制墙板2底端与基础1通过第一钢筋混凝土结构3连接;The prefabricated wall panel 2, the bottom end of the prefabricated wall panel 2 is connected with the foundation 1 through the first reinforced concrete structure 3;

预制楼板4,预制楼板4与预制墙板2通过第二钢筋混凝土结构5连接;The prefabricated floor slab 4, the prefabricated floor slab 4 and the prefabricated wall panel 2 are connected by the second reinforced concrete structure 5;

预制屋面板6,预制屋面板6与预制墙板2顶端通过第三钢筋混凝土结构7连接。The prefabricated roof panel 6 is connected with the top end of the prefabricated wall panel 2 through a third reinforced concrete structure 7 .

预制墙板2由多个单体墙板21通过第四钢筋混凝土结构8连接构成。The prefabricated wall panel 2 is composed of a plurality of single wall panels 21 connected by a fourth reinforced concrete structure 8 .

基础1上端开设有预埋孔101,与基础1相连接的单体墙板21上设置有第一企口201,第一企口201与预埋孔101同轴设置,基础1与单体墙板21之间设置有水泥砂浆找平层一9,第一钢筋混凝土结构3包括:第一钢筋31,第一钢筋31一端埋设在预埋孔101内,另一端穿设于水泥砂浆找平层一9向上延伸至第一企口201内;预埋孔101和第一企口201内均填充有水泥砂浆一32。The upper end of the foundation 1 is provided with a pre-embedded hole 101. The single wall panel 21 connected to the foundation 1 is provided with a first groove 201. The first groove 201 is coaxial with the pre-buried hole 101, and the foundation 1 is connected to the single wall. A cement mortar leveling layer 1 9 is arranged between the plates 21, and the first reinforced concrete structure 3 includes: a first steel bar 31, one end of the first steel bar 31 is embedded in the pre-embedded hole 101, and the other end is penetrated in the cement mortar leveling layer 1 9 It extends upwards into the first groove 201 ; the pre-buried holes 101 and the first groove 201 are filled with cement mortar 1 32 .

单体墙板21包括:多个外墙板211和多个内墙板212,第二钢筋混凝土结构5包括:钢筋混凝土连接结构一51和钢筋混凝土连接结构二52,预制楼板4包括第一单体楼板41和第二单体楼板42,第一单体楼板41和第二单体楼板42外侧端均与外墙板211通过钢筋混凝土连接结构一51连接,第一单体楼板41和第二单体楼板42内侧端均与内墙板212通过钢筋混凝土连接结构二52连接。The single wall panel 21 includes: a plurality of outer wall panels 211 and a plurality of inner wall panels 212; the second reinforced concrete structure 5 includes: a reinforced concrete connection structure 1 51 and a reinforced concrete connection structure 2 52; The body floor 41 and the second single floor 42, the outer ends of the first single floor 41 and the second single floor 42 are connected with the outer wall panel 211 through the reinforced concrete connecting structure 1 51, the first single floor 41 and the second The inner end of the single floor slab 42 is connected with the inner wall panel 212 through the second reinforced concrete connecting structure 52 .

第一单体楼板41上表面和第二单体楼板42上表面均铺设有第一混凝土层10,第一混凝土层10上表面与外墙板211之间设置有水泥砂浆找平层二11,钢筋混凝土连接结构一51包括:第一圈梁511,第一圈梁511设置在相邻外墙板211之间,第一单体楼板41和第二单体楼板42外侧端均置于相邻外墙板211之间,且该外侧端位于第一圈梁511内侧;第二钢筋512,第二钢筋512竖向穿设于第一混凝土层10和水泥砂浆找平层二11且其两端分别置于相邻外墙板211上开设的第二企口202内,第二企口202内均填充有水泥砂浆二513。The upper surface of the first single floor slab 41 and the upper surface of the second single floor slab 42 are both laid with a first concrete layer 10, and a cement mortar leveling layer 2 11 is arranged between the upper surface of the first concrete layer 10 and the outer wall panel 211, and steel bars are provided. The concrete connection structure 1 51 includes: a first ring beam 511, the first ring beam 511 is arranged between the adjacent outer wall panels 211, and the outer ends of the first single floor slab 41 and the second single floor slab 42 are placed on the adjacent outer walls. Between the wall panels 211, and the outer end is located on the inside of the first ring beam 511; the second steel bar 512, the second steel bar 512 is vertically penetrated through the first concrete layer 10 and the cement mortar leveling layer 2 11 and its two ends are respectively placed. The second grooves 202 formed on the adjacent outer wall panels 211 are filled with cement mortar II 513 .

第一混凝土层10与内墙板212之间设置有水泥砂浆找平层三12,第一单体楼板41内侧端和第二单体楼板42内侧端均相对设置,且均置于相邻内墙板212之间,第一单体楼板41内侧端和第二单体楼板42内侧端之间、相邻第一混凝土层10之间均形成互相连通的第一浇筑通道13,相邻内墙板212上均开设有第三企口203,第三企口203与第一浇筑通道13连通;钢筋混凝土连接结构二52包括:第三钢筋521,第三钢筋521竖向穿设于水泥砂浆找平层三12且置于第一浇筑通道13内和第三企口203内,第三企口203和第一浇筑通道13内均填充有水泥砂浆三522。A cement mortar leveling layer 3 12 is arranged between the first concrete layer 10 and the inner wall panel 212. The inner end of the first single floor plate 41 and the inner end of the second single floor plate 42 are arranged opposite to each other, and are placed on the adjacent inner walls. Between the slabs 212, between the inner end of the first single floor slab 41 and the inner end of the second single floor slab 42, and between the adjacent first concrete layers 10, a first pouring channel 13 that communicates with each other is formed. The 212 is provided with a third groove 203, and the third groove 203 is communicated with the first pouring channel 13; the reinforced concrete connection structure 2 52 includes: a third steel bar 521, and the third steel bar 521 is vertically penetrated in the cement mortar leveling layer The third 12 is placed in the first pouring channel 13 and the third groove 203, and the third groove 203 and the first pouring channel 13 are filled with cement mortar three 522.

本房屋还包括置于预制屋面板6上的女儿墙板14;第三钢筋混凝土结构7包括:钢筋混凝土连接结构三71和钢筋混凝土连接结构四72,预制屋面板6包括第一单体屋面板61和第二单体屋面板62,第一单体屋面板61和第二单体屋面板62外侧端均与外墙板211和女儿墙板14通过钢筋混凝土连接结构三71连接,第一单体屋面板61和第二单体屋面板62内侧端均与内墙板212通过钢筋混凝土连接结构四72连接。The house also includes a parapet board 14 placed on the prefabricated roof panel 6; the third reinforced concrete structure 7 includes: a reinforced concrete connection structure three 71 and a reinforced concrete connection structure four 72, and the prefabricated roof panel 6 includes the first single roof panel 61 and the second single roof panel 62, the outer ends of the first single roof panel 61 and the second single roof panel 62 are connected with the outer wall panel 211 and the parapet wall panel 14 through the reinforced concrete connecting structure Both the inner side ends of the body roof panel 61 and the second single roof panel 62 are connected with the inner wall panel 212 through a reinforced concrete connection structure 472 .

第一单体屋面板61上表面和第二单体屋面板62上表面均铺设有第二混凝土层15,第二混凝土层15上表面与女儿墙板14之间设置有水泥砂浆找平层四16,钢筋混凝土连接结构三71包括:第二圈梁711,第二圈梁711设置在外墙板211与女儿墙板14之间,第一单体屋面板61和第二单体屋面板62外侧端均置于外墙板211与女儿墙板14之间,且该外侧端位于第二圈梁711内侧;第四钢筋712,第四钢筋712竖向穿设于第二混凝土层15和水泥砂浆找平层四16且其两端分别置于外墙板211和女儿墙板14上开设的第四企口204内,第四企口204内均填充有水泥砂浆四713。The upper surface of the first single roof panel 61 and the upper surface of the second single roof panel 62 are both covered with a second concrete layer 15 , and a cement mortar leveling layer 4 16 is arranged between the upper surface of the second concrete layer 15 and the parapet board 14 . , the reinforced concrete connection structure 3 71 includes: a second ring beam 711, the second ring beam 711 is arranged between the outer wall panel 211 and the parapet panel 14, the outer ends of the first unit roof panel 61 and the second unit roof panel 62 Both are placed between the outer wall panel 211 and the parapet panel 14, and the outer end is located inside the second ring beam 711; the fourth steel bar 712, the fourth steel bar 712 is vertically penetrated on the second concrete layer 15 and cement mortar leveling The layer four 16 and its two ends are respectively placed in the fourth groove 204 opened on the outer wall panel 211 and the parapet wall panel 14, and the fourth groove 204 is filled with cement mortar four 713.

第一单体屋面板61内侧端和第二单体屋面板62内侧端均相对设置,且均置于内墙板212上,且第一单体屋面板61内侧端和第二单体屋面板62内侧端之间形成第二浇筑通道17,内墙板212上开设有第五企口205,第五企口205与第二浇筑通道17连通;钢筋混凝土连接结构二72包括:第五钢筋721,第五钢筋721竖向置于第二浇筑通道17内和第五企口205内,第五企口205和第二浇筑通道17内均填充有水泥砂浆五722。The inner end of the first single roof panel 61 and the inner end of the second single roof panel 62 are oppositely disposed and placed on the inner wall panel 212, and the inner end of the first single roof panel 61 and the second single roof panel A second pouring channel 17 is formed between the inner ends of 62, and a fifth groove 205 is provided on the inner wall panel 212, and the fifth groove 205 is communicated with the second pouring channel 17; the reinforced concrete connection structure two 72 includes: the fifth steel bar 721 , the fifth steel bar 721 is vertically placed in the second pouring channel 17 and the fifth groove 205, the fifth groove 205 and the second pouring channel 17 are filled with cement mortar five 722.

第四钢筋混凝土结构8包括第六钢筋81,第六钢筋81置于相邻单体墙板21之间的第六企口206内,且第六企口206内填充有水泥砂浆六82。其中,第六企口缝隙处内侧用勾缝剂(未标出),外侧用密封胶填充(未标出)。The fourth reinforced concrete structure 8 includes a sixth steel bar 81 , the sixth steel bar 81 is placed in the sixth groove 206 between the adjacent single wall panels 21 , and the sixth groove 206 is filled with cement mortar 682 . Among them, the inner side of the sixth tongue and groove gap is filled with a grout (not shown), and the outer side is filled with a sealant (not shown).

预制墙板上预留有门窗洞口,其中外墙板和内墙板的形状均有“一”型板、“L”型板和“T”型板。装配成的板式房屋结构能够承受各种载荷,满足承载力和正常使用的要求,并且各个墙板、楼板和屋面板均可采用以泡沫混凝土、聚苯颗粒混凝土、蒸压加气混凝土或轻骨料混凝土为基材,配置钢筋、钢丝网、型钢或薄壁型钢等形成的轻质混凝土预制板,具有很好的保温隔热性能,节能环保,适合于1-4层底层房屋建筑。Door and window openings are reserved on the prefabricated wall panels, and the shapes of the outer wall panels and the inner wall panels are "one" type, "L" type and "T" type. The assembled panel house structure can withstand various loads and meet the requirements of bearing capacity and normal use, and each wall panel, floor panel and roof panel can be made of foamed concrete, polystyrene particle concrete, autoclaved aerated concrete or light bone. Concrete is used as the base material, and the lightweight concrete prefabricated panels are configured with steel bars, steel wire mesh, profiled steel or thin-walled profiled steel.

本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。对于实施例公开的装置而言,由于其与实施例公开的方法相对应,所以描述的比较简单,相关之处参见方法部分说明即可。The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments, and the same and similar parts between the various embodiments can be referred to each other. As for the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant part can be referred to the description of the method.

对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本实用新型。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本实用新型的精神或范围的情况下,在其它实施例中实现。因此,本实用新型将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Thus, the present invention is not intended to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1.一种装配式轻质混凝土板式房屋结构,其特征在于,包括:1. a prefabricated lightweight concrete slab house structure, is characterized in that, comprises: 基础(1),所述基础(1)埋设于地下;a foundation (1), the foundation (1) being buried in the ground; 预制墙板(2),所述预制墙板(2)底端与所述基础(1)通过第一钢筋混凝土结构(3)连接;a prefabricated wall panel (2), wherein the bottom end of the prefabricated wall panel (2) is connected to the foundation (1) through a first reinforced concrete structure (3); 预制楼板(4),所述预制楼板(4)与所述预制墙板(2)通过第二钢筋混凝土结构(5)连接;a prefabricated floor slab (4), wherein the prefabricated floor slab (4) and the prefabricated wall panel (2) are connected by a second reinforced concrete structure (5); 预制屋面板(6),所述预制屋面板(6)与所述预制墙板(2)顶端通过第三钢筋混凝土结构(7)连接。A prefabricated roof panel (6) is provided, wherein the prefabricated roof panel (6) and the top end of the prefabricated wall panel (2) are connected by a third reinforced concrete structure (7). 2.根据权利要求1所述的一种装配式轻质混凝土板式房屋结构,其特征在于,所述预制墙板(2)由多个单体墙板(21)通过第四钢筋混凝土结构(8)连接构成。2. A prefabricated lightweight concrete panel house structure according to claim 1, wherein the prefabricated wall panel (2) is composed of a plurality of single wall panels (21) passing through a fourth reinforced concrete structure (8). ) connection composition. 3.根据权利要求2所述的一种装配式轻质混凝土板式房屋结构,其特征在于,所述基础(1)上端开设有预埋孔(101),与所述基础(1)相连接的所述单体墙板(21)上设置有第一企口(201),所述第一企口(201)与所述预埋孔(101)同轴设置,所述基础(1)与所述单体墙板(21)之间设置有水泥砂浆找平层一(9),所述第一钢筋混凝土结构(3)包括:第一钢筋(31),所述第一钢筋(31)一端埋设在所述预埋孔(101)内,另一端穿设于所述水泥砂浆找平层一(9)向上延伸至所述第一企口(201)内;所述预埋孔(101)和所述第一企口(201)内均填充有水泥砂浆一(32)。3. A prefabricated lightweight concrete slab house structure according to claim 2, characterized in that, a pre-embedded hole (101) is provided at the upper end of the foundation (1), and a hole (101) connected to the foundation (1) is provided. The single wall panel (21) is provided with a first groove (201), the first groove (201) and the pre-embedded hole (101) are coaxially arranged, and the foundation (1) is connected to the A cement mortar leveling layer (9) is arranged between the single wall panels (21), and the first reinforced concrete structure (3) includes: a first steel bar (31), and one end of the first steel bar (31) is embedded In the pre-embedded hole (101), the other end is penetrated through the cement mortar leveling layer one (9) and extends upward to the first groove (201); the pre-embedded hole (101) and the The first tongue and groove (201) are filled with cement mortar 1 (32). 4.根据权利要求2所述的一种装配式轻质混凝土板式房屋结构,其特征在于,所述单体墙板(21)包括:多个外墙板(211)和多个内墙板(212),所述第二钢筋混凝土结构(5)包括:钢筋混凝土连接结构一(51)和钢筋混凝土连接结构二(52),所述预制楼板(4)包括第一单体楼板(41)和第二单体楼板(42),所述第一单体楼板(41)和所述第二单体楼板(42)外侧端均与所述外墙板(211)通过所述钢筋混凝土连接结构一(51)连接,所述第一单体楼板(41)和所述第二单体楼板(42)内侧端均与所述内墙板(212)通过所述钢筋混凝土连接结构二(52)连接。The prefabricated lightweight concrete panel house structure according to claim 2, wherein the single wall panel (21) comprises: a plurality of outer wall panels (211) and a plurality of inner wall panels ( 212), the second reinforced concrete structure (5) comprises: a reinforced concrete connection structure one (51) and a reinforced concrete connection structure two (52), and the prefabricated floor slab (4) comprises a first single floor slab (41) and The second single floor slab (42), the outer ends of the first single floor slab (41) and the second single floor slab (42) are connected with the outer wall panel (211) through the reinforced concrete connection structure. (51) Connection, the inner ends of the first single floor slab (41) and the second single floor slab (42) are connected with the inner wall panel (212) through the reinforced concrete connecting structure II (52) . 5.根据权利要求4所述的一种装配式轻质混凝土板式房屋结构,其特征在于,所述第一单体楼板(41)上表面和所述第二单体楼板(42)上表面均铺设有第一混凝土层(10),所述第一混凝土层(10)上表面与所述外墙板(211)之间设置有水泥砂浆找平层二(11),所述钢筋混凝土连接结构一(51)包括:第一圈梁(511),所述第一圈梁(511)设置在相邻所述外墙板(211)之间,所述第一单体楼板(41)和所述第二单体楼板(42)外侧端均置于相邻所述外墙板(211)之间,且该外侧端位于所述第一圈梁(511)内侧;第二钢筋(512),所述第二钢筋(512)竖向穿设于第一混凝土层(10)和所述水泥砂浆找平层二(11)且其两端分别置于相邻所述外墙板(211)上开设的第二企口(202)内,所述第二企口(202)内均填充有水泥砂浆二(513)。The prefabricated lightweight concrete slab house structure according to claim 4, wherein the upper surface of the first single floor slab (41) and the upper surface of the second single floor slab (42) are both A first concrete layer (10) is laid, a cement mortar leveling layer two (11) is arranged between the upper surface of the first concrete layer (10) and the outer wall panel (211), and the reinforced concrete connection structure one is (51) comprising: a first ring beam (511), the first ring beam (511) is arranged between adjacent outer wall panels (211), the first single floor panel (41) and the The outer ends of the second single floor slabs (42) are placed between the adjacent outer wall panels (211), and the outer ends are located inside the first ring beams (511); the second steel bars (512), so The second reinforcing bar (512) is vertically penetrated through the first concrete layer (10) and the second cement mortar leveling layer (11), and its two ends are placed on the adjacent outer wall panels (211) respectively. In the second groove (202), the second groove (202) is filled with cement mortar II (513). 6.根据权利要求5所述的一种装配式轻质混凝土板式房屋结构,其特征在于,所述第一混凝土层(10)与所述内墙板(212)之间设置有水泥砂浆找平层三(12),所述第一单体楼板(41)内侧端和所述第二单体楼板(42)内侧端均相对设置,且均置于相邻所述内墙板(212)之间,所述第一单体楼板(41)内侧端和所述第二单体楼板(42)内侧端之间、相邻所述第一混凝土层(10)之间均形成互相连通的第一浇筑通道(13),相邻所述内墙板(212)上均开设有第三企口(203),所述第三企口(203)与所述第一浇筑通道(13)连通;所述钢筋混凝土连接结构二(52)包括:第三钢筋(521),所述第三钢筋(521)竖向穿设于所述水泥砂浆找平层三(12)且置于所述第一浇筑通道(13)内和所述第三企口(203)内,所述第三企口(203)和所述第一浇筑通道(13)内均填充有水泥砂浆三(522)。The prefabricated lightweight concrete slab house structure according to claim 5, wherein a cement mortar leveling layer is arranged between the first concrete layer (10) and the inner wall panel (212). Three (12), the inner end of the first single floor slab (41) and the inner end of the second single floor slab (42) are arranged opposite to each other, and are placed between the adjacent inner wall panels (212) , between the inner end of the first single floor slab (41) and the inner end of the second single floor slab (42), and between the adjacent first concrete layers (10), a first pouring that communicates with each other is formed A channel (13) is provided with a third groove (203) adjacent to the inner wall panel (212), and the third groove (203) is communicated with the first pouring channel (13); the The second reinforced concrete connection structure (52) comprises: a third reinforcing bar (521), the third reinforcing bar (521) vertically penetrates the third (12) cement mortar leveling layer and is placed in the first pouring channel (521). 13) and in the third groove (203), the third groove (203) and the first pouring channel (13) are filled with cement mortar three (522). 7.根据权利要求4所述的一种装配式轻质混凝土板式房屋结构,其特征在于,还包括置于所述预制屋面板(6)上的女儿墙板(14);所述第三钢筋混凝土结构(7)包括:钢筋混凝土连接结构三(71)和钢筋混凝土连接结构四(72),所述预制屋面板(6)包括第一单体屋面板(61)和第二单体屋面板(62),所述第一单体屋面板(61)和所述第二单体屋面板(62)外侧端均与所述外墙板(211)和所述女儿墙板(14)通过所述钢筋混凝土连接结构三(71)连接,所述第一单体屋面板(61)和所述第二单体屋面板(62)内侧端均与所述内墙板(212)通过所述钢筋混凝土连接结构四(72)连接。7. A prefabricated lightweight concrete panel house structure according to claim 4, characterized in that, further comprising a parapet board (14) placed on the prefabricated roof panel (6); the third reinforcing bar The concrete structure (7) includes: a reinforced concrete connecting structure three (71) and a reinforced concrete connecting structure four (72), and the prefabricated roof panel (6) includes a first single-unit roof panel (61) and a second single-unit roof panel (62), the outer ends of the first single roof panel (61) and the second single roof panel (62) both pass through the outer wall panel (211) and the parapet wall panel (14). Three (71) connections of the reinforced concrete connecting structure, the inner ends of the first single roof panel (61) and the second single roof panel (62) are connected with the inner wall panel (212) through the steel bars Concrete connection structure four (72) connections. 8.根据权利要求7所述的一种装配式轻质混凝土板式房屋结构,其特征在于,所述第一单体屋面板(61)上表面和所述第二单体屋面板(62)上表面均铺设有第二混凝土层(15),所述第二混凝土层(15)上表面与所述女儿墙板(14)之间设置有水泥砂浆找平层四(16),所述钢筋混凝土连接结构三(71)包括:第二圈梁(711),所述第二圈梁(711)设置在所述外墙板(211)与所述女儿墙板(14)之间,所述第一单体屋面板(61)和所述第二单体屋面板(62)外侧端均置于所述外墙板(211)与所述女儿墙板(14)之间,且该外侧端位于所述第二圈梁(711)内侧;第四钢筋(712),所述第四钢筋(712)竖向穿设于第二混凝土层(15)和所述水泥砂浆找平层四(16)且其两端分别置于所述外墙板(211)和所述女儿墙板(14)上开设的第四企口(204)内,所述第四企口(204)内均填充有水泥砂浆四(713)。The prefabricated lightweight concrete slab house structure according to claim 7, characterized in that, the upper surface of the first single roof panel (61) and the upper surface of the second single roof panel (62) A second concrete layer (15) is laid on the surface, and a cement mortar leveling layer four (16) is arranged between the upper surface of the second concrete layer (15) and the parapet board (14), and the reinforced concrete is connected Structure three (71) includes: a second ring beam (711), the second ring beam (711) is arranged between the outer wall panel (211) and the parapet panel (14), the first ring beam (711) The outer ends of the single roof panel (61) and the second single roof panel (62) are both placed between the outer wall panel (211) and the parapet wall panel (14), and the outer ends are located at the The inner side of the second ring beam (711); the fourth reinforcing bar (712), the fourth reinforcing bar (712) vertically penetrates the second concrete layer (15) and the cement mortar leveling layer four (16) and its Both ends are respectively placed in the fourth groove (204) opened on the outer wall panel (211) and the parapet board (14), and the fourth groove (204) is filled with cement mortar four. (713). 9.根据权利要求7所述的一种装配式轻质混凝土板式房屋结构,其特征在于,所述第一单体屋面板(61)内侧端和所述第二单体屋面板(62)内侧端均相对设置,且均置于所述内墙板(212)上,且所述第一单体屋面板(61)内侧端和所述第二单体屋面板(62)内侧端之间形成第二浇筑通道(17),所述内墙板(212)上开设有第五企口(205),所述第五企口(205)与所述第二浇筑通道(17)连通;所述钢筋混凝土连接结构四(72)包括:第五钢筋(721),所述第五钢筋(721)竖向置于所述第二浇筑通道(17)内和所述第五企口(205)内,所述第五企口(205)和所述第二浇筑通道(17)内均填充有水泥砂浆五(722)。The prefabricated lightweight concrete slab house structure according to claim 7, characterized in that, the inner end of the first single-body roof panel (61) and the inner side of the second single-unit roof panel (62) The ends are arranged opposite to each other, and are placed on the inner wall panel (212), and the inner end of the first single roof panel (61) and the inner end of the second single roof panel (62) are formed between In the second pouring channel (17), the inner wall panel (212) is provided with a fifth groove (205), and the fifth groove (205) communicates with the second pouring channel (17); the The reinforced concrete connection structure four (72) comprises: a fifth reinforcing bar (721), the fifth reinforcing bar (721) is vertically placed in the second pouring channel (17) and in the fifth groove (205) , the fifth groove (205) and the second pouring channel (17) are filled with cement mortar five (722). 10.根据权利要求2-9任一项所述的一种装配式轻质混凝土板式房屋结构,其特征在于,所述第四钢筋混凝土结构(8)包括第六钢筋(81),所述第六钢筋(81)置于相邻所述单体墙板(21)之间的第六企口(206)内,且所述第六企口(206)内填充有水泥砂浆六(82)。10. A prefabricated lightweight concrete slab house structure according to any one of claims 2-9, wherein the fourth reinforced concrete structure (8) comprises a sixth steel bar (81), and the first Six reinforcing bars (81) are placed in the sixth groove (206) between the adjacent single wall panels (21), and the sixth groove (206) is filled with cement mortar six (82).
CN201921697214.3U 2019-10-11 2019-10-11 Assembled lightweight concrete slab type house structure Expired - Fee Related CN211114066U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921697214.3U CN211114066U (en) 2019-10-11 2019-10-11 Assembled lightweight concrete slab type house structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921697214.3U CN211114066U (en) 2019-10-11 2019-10-11 Assembled lightweight concrete slab type house structure

Publications (1)

Publication Number Publication Date
CN211114066U true CN211114066U (en) 2020-07-28

Family

ID=71718333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921697214.3U Expired - Fee Related CN211114066U (en) 2019-10-11 2019-10-11 Assembled lightweight concrete slab type house structure

Country Status (1)

Country Link
CN (1) CN211114066U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006269A (en) * 2021-03-05 2021-06-22 兰州有色冶金设计研究院有限公司 Construction method of sandwich earth wall house structure system
CN114622664A (en) * 2022-03-30 2022-06-14 浙江杭加泽通建筑节能新材料有限公司 Building mixed structure with steel bar bundle
CN114922470A (en) * 2022-06-30 2022-08-19 河南省第二建设集团有限公司 Self-heat-preservation house with prefabricated assembly type structure
CN115012518A (en) * 2022-06-30 2022-09-06 河南省第二建设集团有限公司 Wall and floor connecting joint and connecting method
CN115142553A (en) * 2022-07-18 2022-10-04 山东大学 Multi-storey prefabricated concrete slab structure house and its installation method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006269A (en) * 2021-03-05 2021-06-22 兰州有色冶金设计研究院有限公司 Construction method of sandwich earth wall house structure system
CN114622664A (en) * 2022-03-30 2022-06-14 浙江杭加泽通建筑节能新材料有限公司 Building mixed structure with steel bar bundle
CN114922470A (en) * 2022-06-30 2022-08-19 河南省第二建设集团有限公司 Self-heat-preservation house with prefabricated assembly type structure
CN115012518A (en) * 2022-06-30 2022-09-06 河南省第二建设集团有限公司 Wall and floor connecting joint and connecting method
CN115012518B (en) * 2022-06-30 2024-06-11 河南省第二建设集团有限公司 Wall and floor slab connecting node and connecting method
CN114922470B (en) * 2022-06-30 2024-06-25 河南省第二建设集团有限公司 Prefabricated assembled structure self preservation temperature house
CN115142553A (en) * 2022-07-18 2022-10-04 山东大学 Multi-storey prefabricated concrete slab structure house and its installation method

Similar Documents

Publication Publication Date Title
CN211114066U (en) Assembled lightweight concrete slab type house structure
CN204960038U (en) Precast concrete shear wall structure
CN107558603A (en) A kind of assembled arthitecutral structure system and its construction method
CN107401217A (en) A kind of beamless hollow floor chamber concrete-filled steel tube shear wall combined structure system and method
CN108301531A (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node
CN110359487A (en) A kind of fabricated construction side wall prefabricated component and its with arch sheet connecting structure
CN208168032U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node
CN206329145U (en) A kind of quick assembled type enclosure wall
CN210713195U (en) A frame structure prefabricated concrete house
CN109779033B (en) Assembled house and construction method thereof
CN210194867U (en) Assembly type building structure
CN110593449A (en) Assembly type light vertical bar plate type bearing wall structure and construction method thereof
CN216475803U (en) A Novel Prefabricated Floor Structure Applied to Shear Wall System
CN207633813U (en) Assembled workshop
CN102242551B (en) Reinforcing bars building block reinforced concrete structure and shock insulation, shock absorption system
CN2931627Y (en) Frame and wall plate combined building
CN103015563B (en) Outer-block inner-masonry building structure system
CN1888344B (en) Composite thermal insulation concrete load-bearing wall
CN111980219A (en) Assembled integral steel plate composite shear wall and construction method thereof
CN115012518B (en) Wall and floor slab connecting node and connecting method
CN207194228U (en) Wall is overlapped with overlapping the vertical openings connecting node of wall
CN110080292A (en) A kind of assembled integral vault is greatly across no column underground structure
CN110080291A (en) A kind of assembled flat-top is greatly across no column underground structure
EP1063362A2 (en) System of prefabricated elements made of structural light concrete and of reinforced concrete for the total erection of 1 to 8 storey buildings
CN116446592A (en) Low energy consumption, energy saving and heat preservation multi-storey building structure and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728