CN211113221U - Bent cap steel reinforcement framework shaping and binding rack - Google Patents
Bent cap steel reinforcement framework shaping and binding rack Download PDFInfo
- Publication number
- CN211113221U CN211113221U CN201921903282.0U CN201921903282U CN211113221U CN 211113221 U CN211113221 U CN 211113221U CN 201921903282 U CN201921903282 U CN 201921903282U CN 211113221 U CN211113221 U CN 211113221U
- Authority
- CN
- China
- Prior art keywords
- steel
- main support
- movable buckle
- main
- notches
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 44
- 239000010959 steel Substances 0.000 title claims abstract description 44
- 238000007493 shaping process Methods 0.000 title claims abstract description 13
- 230000002787 reinforcement Effects 0.000 title claims abstract description 11
- 101100366060 Caenorhabditis elegans snap-29 gene Proteins 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 16
- 230000003014 reinforcing effect Effects 0.000 abstract description 2
- 238000012797 qualification Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 6
- 238000013461 design Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 239000011241 protective layer Substances 0.000 description 2
- 238000005553 drilling Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009432 framing Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
Description
技术领域technical field
本实用新型属于桥梁工程技术领域,特别涉及一种盖梁钢筋骨架定型绑扎台架。The utility model belongs to the technical field of bridge engineering, and in particular relates to a shaping and binding platform of a cover beam steel skeleton.
背景技术Background technique
盖梁钢筋的拼装过程中,通常采用脚手架或钢筋搭设简易支撑架进行拼装,盖梁钢筋的定位完全由人工控制,作业需求人数多,劳动强度大,且拼装操作难度大、效率低、成品盖梁骨架精确度不高、容易发生倾斜倒塌出现安全事故等问题。In the process of assembling cover beam steel bars, scaffolding or steel bars are usually used to set up simple support frames for assembly. The positioning of cover beam steel bars is completely controlled manually. The operation requires a large number of people and is labor-intensive, and the assembly operation is difficult, low efficiency, and finished products. The accuracy of the beam frame is not high, and it is prone to tilt and collapse, resulting in safety accidents and other problems.
甘肃路桥建设集团有限公司在甜永高速公路TY04合同段黄山根底特大桥等多座桥梁工程盖梁施工中,为了提高盖梁钢筋骨架施工质量、提高混凝土保护层厚度合格率、增强混凝土耐久性,同时加快施工进度、节省成本、降低施工安全风险,开展了盖梁骨架加工制作施工技术研究,通过自主创新设计一种盖梁钢筋骨架绑扎台架。有效解决了上述问题,保证了桥梁工程的整体质量,满足了工期要求。Gansu Road and Bridge Construction Group Co., Ltd. is in the construction of cover beams of several bridge projects such as Huangshan Gendi Bridge in the TY04 contract section of Tianyong Expressway. At the same time, to speed up the construction progress, save costs, and reduce construction safety risks, we have carried out research on the construction technology of cover beam skeleton processing, and designed a cover beam steel frame binding platform through independent innovation. The above problems are effectively solved, the overall quality of the bridge project is guaranteed, and the construction period requirements are met.
实用新型内容Utility model content
为了提高盖梁钢筋骨架施工质量、提高混凝土保护层厚度合格率、增强混凝土耐久性,同时加快施工进度、节省成本、降低施工安全风险,设计制作了本盖梁钢筋骨架绑扎台架。In order to improve the construction quality of the steel frame of the cover beam, increase the qualified rate of the thickness of the concrete protective layer, enhance the durability of the concrete, and at the same time speed up the construction progress, save the cost, and reduce the construction safety risk, the binding platform of the steel frame of the cover beam is designed and manufactured.
本实用新型是采用以下技术方案实现的,一种盖梁钢筋骨架定型绑扎台架,包括主支架、作业操作辅助台支架、端部横杆、端部立杆、底部卡槽、侧面活动卡扣和顶部活动卡扣,所述主支架包括主横梁、主支架支腿、侧梁、侧立杆,所述主支架支腿位于主横梁的下面,所述侧立杆位于一侧主支架支腿上面;作业操作辅助台支架位于主支架端部,所述端部立杆位于辅助台支架两侧,端部立杆上部设有圆孔,端部横杆位于圆孔内为抽拉式;底部卡槽上设有多个槽口,槽口间距等于骨架片钢筋间距,每个台架设置两道底部卡槽,位于主横梁上部;侧面活动卡扣横向设置,一端设于侧立杆内侧,另一端位于支架里侧,端部设有向下的槽口,槽口位置与最外侧骨架片的位置相适应;顶部固定卡扣横向设置,其上设有两个槽口,槽口间距与骨架片钢筋间距相同。The utility model is realized by adopting the following technical solutions. A cover beam steel skeleton shaping and binding platform comprises a main bracket, a work operation auxiliary platform bracket, an end cross bar, an end vertical bar, a bottom clamping slot, and a side movable buckle and the top movable buckle, the main support includes a main beam, a main support leg, a side beam, and a side pole. Above; the work operation auxiliary table bracket is located at the end of the main bracket, the end poles are located on both sides of the auxiliary table bracket, the upper part of the end pole is provided with a round hole, and the end cross bar is located in the round hole, which is a pull-out type; the bottom There are a plurality of notches on the card slot, and the gap between the notches is equal to the distance between the steel bars of the skeleton sheet. Each platform is provided with two bottom card grooves, which are located on the upper part of the main beam; The other end is located on the inner side of the bracket, and the end is provided with a downward notch, and the position of the notch is adapted to the position of the outermost skeleton sheet; the top fixed buckle is arranged horizontally, and there are two notches on it, and the distance between the notches is the same as that of the outermost frame. The spacing between the reinforcing bars of the skeleton sheet is the same.
优选地,所述支腿为6个,横梁为3道,相邻支腿的纵向间距为5m,横向间距为3m,支腿和横梁均采用I22工字钢制作。Preferably, there are 6 outriggers, 3 beams, the longitudinal distance between adjacent outriggers is 5m, and the lateral distance is 3m, and the outriggers and beams are made of I22 I-beam.
优选地,所述作业操作辅助台支架端部下面设有支腿,支腿按主支架外延0.5m设置,采用4*8方钢制作,便于操作人员站立操作。Preferably, there are legs under the end of the support of the work operation auxiliary table, and the legs are arranged according to the extension of the main support by 0.5m, and are made of 4*8 square steel, which is convenient for operators to stand and operate.
优选地,底部卡槽采用5*5角钢制作,卡槽采用螺栓与主横梁连接,单个卡槽预留3个螺栓孔,孔间距按卡槽长度等分。Preferably, the bottom card slot is made of 5*5 angle steel, the card slot is connected to the main beam by bolts, three bolt holes are reserved for a single card slot, and the hole spacing is equally divided according to the length of the card slot.
优选地,端部横杆采用Φ42圆管制作,在端部立杆打孔完成安装,待绑扎端部箍筋时拆除。Preferably, the end cross bar is made of a Φ42 round tube, and the installation is completed by drilling a hole at the end vertical bar, and it is removed when the end stirrup is bound.
优选地,侧面活动卡扣使用Φ28钢筋制作,位于侧立杆内侧一端向下回折为竖直部,竖直部套设于焊接在侧立杆内侧的竖直钢管内,侧面活动卡扣的长度按最外侧骨架片至侧立杆距离加工,位置与底板卡槽位于同一断面,便于骨架片精确定位控制。Preferably, the side movable buckle is made of Φ28 steel bar, and one end located on the inner side of the side pole is folded downward to form a vertical part, and the vertical part is sleeved in the vertical steel pipe welded on the inner side of the side pole. It is processed according to the distance from the outermost frame piece to the side vertical rod, and the position is on the same section as the bottom plate slot, which is convenient for the precise positioning and control of the frame piece.
优选地,顶部固定卡扣使用[50槽钢制作,卡扣在骨架片吊装时逐排安装,每2米设置1道,交错布置,箍筋绑扎时依次拆除。Preferably, the top fixing clips are made of [50 channel steel, and the clips are installed row by row when the skeleton pieces are hoisted, and one channel is set every 2 meters, staggered, and the stirrups are removed in sequence when tying.
采用盖梁骨架绑扎台架加工盖梁骨架与传统绑扎方式相比较,具有以下优点:Compared with the traditional binding method, the use of the cover beam frame binding bench to process the cover beam frame has the following advantages:
1、台架各构件采用模块化设计,各型号定位卡槽可实现任意拆卸替换,使不同种类盖梁钢筋骨架在同一底座上完成的制作拼装,大大缩小建设规模,提高功效的同时降低成本。1. Each component of the bench adopts a modular design, and each type of positioning slot can be disassembled and replaced at will, so that different types of cover beam steel skeletons can be fabricated and assembled on the same base, which greatly reduces the construction scale, improves efficiency and reduces costs.
2、台架底部设置钢筋定位卡槽,实现盖梁钢筋骨架片间距的精确定位;端部设置定位横杆,确保骨架片端部对齐;侧面设置立杆,用于骨架片固定及垂直度控制,避免骨架片倾斜,各定位模块有效结合,保障骨架整体尺寸实现精准控制。2. Rebar positioning grooves are set at the bottom of the gantry to achieve precise positioning of the spacing between the reinforced skeleton pieces of the cover beam; positioning bars are set at the ends to ensure that the ends of the skeleton pieces are aligned; To avoid the tilting of the skeleton piece, the positioning modules are effectively combined to ensure the precise control of the overall size of the skeleton.
3、整体台架高出地面约1m,便于操作人员在侧面、底部同时进行箍筋安装,工作效率得到明显提升的同时,安全系数大大增大。3. The overall platform is about 1m above the ground, which is convenient for operators to install stirrups on the side and bottom at the same time. The work efficiency is significantly improved, and the safety factor is greatly increased.
附图说明Description of drawings
图1是本实用新型实施例的盖梁钢筋骨架定型绑扎台架的横断面图。FIG. 1 is a cross-sectional view of the framing and binding platform of the cover beam steel bar according to the embodiment of the present invention.
图2是本实用新型实施例的盖梁钢筋骨架定型绑扎台架的纵断面图。Fig. 2 is a longitudinal sectional view of the shaping and binding platform of the cover beam reinforcement frame according to the embodiment of the present invention.
图中,1-侧立杆,2-侧部活动卡扣,3-顶部活动卡扣,4-端部横杆,5-骨架片,6-底部预留卡槽,7-拆卸螺栓,8-防护栏,9-端部横杆,10-端部立杆,11-主支架支腿,12-辅助支架支腿,13-主横梁,14-侧梁。In the figure, 1-side pole, 2-side movable clip, 3-top movable clip, 4-end crossbar, 5-frame piece, 6-reserved slot at the bottom, 7-removal bolt, 8 -Guardrail, 9-end crossbar, 10-end vertical bar, 11-main support leg, 12-auxiliary support leg, 13-main crossbeam, 14-side beam.
具体实施方式Detailed ways
如图1、2所示,本实用新型公开了一种盖梁钢筋骨架定型绑扎台架。As shown in Figures 1 and 2, the utility model discloses a shaping and binding platform of a cover beam steel skeleton.
(1)支架制作(1) Bracket production
支架分为主支架及作业操作辅助台支架,支腿11按6个设计,横梁13按3道设计,纵向间距5m,横向间距3m(可按照设计盖梁尺寸进行调整),均采用I22工字钢制作。作业操作辅助台支架位于主支架端部(侧面部分利用主支架即可),支腿12按主支架外延0.5m设置,采用4*8方钢制作,便于操作人员站立操作即可。The bracket is divided into the main bracket and the operation operation auxiliary table bracket. The
(2)模块制作(2) Module production
①底部卡槽6采用5*5角钢制作,长度、卡槽间距按照图纸设计宽度及骨架片钢筋间距切割。每个台架设置两道,位于主横梁13上部,以台架两端1/3位置控制为宜,卡槽6采用螺栓7与主横梁13连接,单个卡槽预留3个螺栓孔,孔间距按卡槽长度等分。
②端部横杆9采用Φ42圆管制作,设计为抽拉式,在端部立杆10打孔完成安装,待绑扎端部箍筋时拆除。②The end cross bar 9 is made of Φ42 round tube and designed as a pull-out type. The end
③侧面活动卡扣2使用Φ28钢筋制作,设置于侧立杆1内侧,长度按最外侧骨架片5至台架立杆距离加工,位置宜与底板卡槽6位于同一断面,便于骨架片精确定位控制。③The side
④顶部固定卡扣3使用[50槽钢制作。卡扣在骨架片吊装时逐排安装,每2米设置1道,交错布置,箍筋绑扎时依次拆除。④The
(3)骨架片吊装绑扎(3) Hoisting and binding of skeleton pieces
①骨架片加工制作完成后,由龙门吊依次吊装入台架底部卡槽,吊装时使用吊具,防止吊运过程起吊点受力不均造成变形。①After the skeleton sheet is processed and manufactured, it is hoisted into the bottom slot of the gantry by the gantry crane in turn, and the hoisting tool is used during hoisting to prevent deformation caused by uneven force on the hoisting point during the hoisting process.
②吊装时确保骨架片端部与端部横梁对齐,侧立杆卡口固定好最外侧骨架片,顶板活动卡口依次固定骨架片,防止倾覆或造成钢筋间距发生变形。② When hoisting, make sure that the end of the frame piece is aligned with the end beam, the outermost frame piece is fixed by the side pole bayonet, and the top plate movable bayonet is fixed in turn to prevent the overturning or deformation of the steel bar spacing.
③箍筋绑扎时从端部另一侧依次进行,依次拆除顶板活动卡扣,完成竖向箍筋绑扎,全部完成后拆除侧立杆卡扣,绑扎水平向箍筋。③When tying the stirrups, proceed from the other side of the end in sequence, remove the movable buckles of the top plate in turn, and complete the binding of the vertical stirrups.
实施实例Implementation example
2018年度,在甘肃路桥建设集团有限公司承建的甜水堡经庆城至永和高速公路TY04合同段施工过程中,全线435道盖梁施工中,盖梁钢筋骨架采用台架法加工盖梁钢筋骨架。盖梁钢筋骨架尺寸及间距控制精确,盖梁混凝土保护层合格率高,消除了人工测量的误差,省工省时,提高了生产效率,降低了安全风险,混凝土耐久性得到有力保障。In 2018, during the construction of the TY04 contract section of Tianshuibao via Qingcheng to Yonghe Expressway, which was built by Gansu Road and Bridge Construction Group Co., Ltd., during the construction of 435 cover beams along the entire line, the cover beam steel frame was processed by the bench method. The size and spacing of the steel reinforcement frame of the cover beam are precisely controlled, and the qualified rate of the cover beam concrete protective layer is high, which eliminates the error of manual measurement, saves labor and time, improves the production efficiency, reduces the safety risk, and effectively guarantees the durability of the concrete.
最后应说明的是:以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Finally, it should be noted that the above are only the preferred embodiments of the present invention, and are not intended to limit the present invention. , it is still possible to modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements to some of the technical features. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921903282.0U CN211113221U (en) | 2019-11-06 | 2019-11-06 | Bent cap steel reinforcement framework shaping and binding rack |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921903282.0U CN211113221U (en) | 2019-11-06 | 2019-11-06 | Bent cap steel reinforcement framework shaping and binding rack |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211113221U true CN211113221U (en) | 2020-07-28 |
Family
ID=71718368
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921903282.0U Expired - Fee Related CN211113221U (en) | 2019-11-06 | 2019-11-06 | Bent cap steel reinforcement framework shaping and binding rack |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211113221U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110685229A (en) * | 2019-11-06 | 2020-01-14 | 甘肃路桥建设集团有限公司 | Bent cap steel reinforcement framework shaping and binding rack |
| CN116025170A (en) * | 2023-01-06 | 2023-04-28 | 中交第三航务工程勘察设计院有限公司 | A device for tying and positioning device and construction method for above-water crossbeam reinforcement in wharf engineering |
-
2019
- 2019-11-06 CN CN201921903282.0U patent/CN211113221U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110685229A (en) * | 2019-11-06 | 2020-01-14 | 甘肃路桥建设集团有限公司 | Bent cap steel reinforcement framework shaping and binding rack |
| CN116025170A (en) * | 2023-01-06 | 2023-04-28 | 中交第三航务工程勘察设计院有限公司 | A device for tying and positioning device and construction method for above-water crossbeam reinforcement in wharf engineering |
| CN116025170B (en) * | 2023-01-06 | 2025-03-18 | 中交第三航务工程勘察设计院有限公司 | A device for tying and positioning steel bars of a horizontal beam on water in a wharf project and a construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN212715972U (en) | Prefabricated bed-jig suitable for multiple specification pier stud reinforcing bar | |
| CN205058277U (en) | Prefabricated T girder iron muscle mould | |
| CN211113221U (en) | Bent cap steel reinforcement framework shaping and binding rack | |
| CN204019724U (en) | Make the mold of prefabricated case beam framework of steel reinforcement | |
| CN117620566A (en) | A tire frame and prefabrication method for automatic welding of box girder steel cages | |
| CN106639328B (en) | Concrete beam steel reinforcement framework construction device and construction method | |
| CN109469083B (en) | Foundation beam reinforcement cage assembling system and construction method thereof | |
| CN105484165B (en) | Integrated prestress tensioning frame structure and manufacturing and using methods thereof | |
| CN110685229A (en) | Bent cap steel reinforcement framework shaping and binding rack | |
| CN212288134U (en) | Prefabricated case roof beam bottom web steel bar ligature bed-jig | |
| CN205369044U (en) | Integration prestressing force stretch -draw frame construction | |
| CN204817843U (en) | Prefabricated utility tunnel's steel reinforcement cage processingequipment | |
| CN219864137U (en) | An adjustable steel mesh binding mold | |
| CN217480846U (en) | Clamping fixture convenient for controlling steel bar spacing and facilitating steel bar cage to be stripped | |
| CN215544586U (en) | Prefabricated decking reinforcing bar design ligature bed-jig | |
| CN215925711U (en) | A assembled construction platform device for construction of bridge tie beam stand | |
| CN216156368U (en) | Pier tray top cap reinforcement mould | |
| CN212802615U (en) | Steel upright column attached type discharging platform | |
| CN210451503U (en) | I-steel prefabricating device | |
| CN211285306U (en) | A bridge hanging basket front upper operating platform | |
| CN208428458U (en) | A kind of reinforcing bar tire fixture of precast segment box beam | |
| CN220462085U (en) | Horizontal piping lane steel reinforcement cage ligature support | |
| CN217174394U (en) | A kind of prefabricated tire frame of cover beam | |
| CN112195802A (en) | Variable-section U-shaped hollow thin-wall pier steel bar partition prefabricated jig frame and partition installation method | |
| CN221021632U (en) | Reinforcing steel bar binding positioning fixture for prefabricated box girder templates |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200728 |