CN211102639U - Be used for automatic assembly apparatus for producing of elevator switch box multistation - Google Patents

Be used for automatic assembly apparatus for producing of elevator switch box multistation Download PDF

Info

Publication number
CN211102639U
CN211102639U CN201921626635.7U CN201921626635U CN211102639U CN 211102639 U CN211102639 U CN 211102639U CN 201921626635 U CN201921626635 U CN 201921626635U CN 211102639 U CN211102639 U CN 211102639U
Authority
CN
China
Prior art keywords
station
cylinder
installation station
installation
cylinders
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921626635.7U
Other languages
Chinese (zh)
Inventor
彭来湖
戴宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Technology ZJUT
Original Assignee
Zhejiang University of Technology ZJUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Technology ZJUT filed Critical Zhejiang University of Technology ZJUT
Priority to CN201921626635.7U priority Critical patent/CN211102639U/en
Application granted granted Critical
Publication of CN211102639U publication Critical patent/CN211102639U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Automatic Assembly (AREA)

Abstract

本实用新型公开了一种用于电梯开关盒多工位自动化装配生产装置,涉及开关盒装配技术领域。本实用新型包括机架,机架上固定安装有安装底板,安装底板的中心处通过凸轮分割器连接有转盘;转盘上设有十二个呈圆周阵列的定位模具,分别对应十二个加工工位。本实用新型通过在转盘周侧布置下壳体安装工位、四方螺母安装工位、左弹片安装工位、右弹片安装工位、左带垫螺丝安装工位、右带垫螺丝安装工位、压力杯安装工位、波形垫片安装工位、盘头螺丝安装工位、上盖安装工位、空置工位、退料工位,依次对电梯开关盒的各零部件进行装配,多工位流水线装备生产,保障了生产效率,连续工作,产能高,同一机器生产的产品一致性好,且螺丝的松紧程度可调。

Figure 201921626635

The utility model discloses a multi-position automatic assembly production device for an elevator switch box, which relates to the technical field of switch box assembly. The utility model comprises a frame, an installation base plate is fixedly installed on the frame, and a turntable is connected at the center of the installation base plate through a cam divider; bit. The utility model arranges the lower casing installation station, the square nut installation station, the left shrapnel installation station, the right shrapnel installation station, the left screw installation station with pads, the right screw installation station with pads on the peripheral side of the turntable, Pressure cup installation station, wave gasket installation station, pan head screw installation station, upper cover installation station, vacant station, and material return station, assemble the various parts of the elevator switch box in turn, multi-station The production line equipment ensures the production efficiency, continuous work, high production capacity, good consistency of products produced by the same machine, and adjustable screw tightness.

Figure 201921626635

Description

一种用于电梯开关盒多工位自动化装配生产装置A multi-station automatic assembly production device for elevator switch box

技术领域technical field

本实用新型属于开关盒装配技术领域,特别是涉及一种用于电梯开关盒多工位自动化装配生产装置。The utility model belongs to the technical field of switch box assembly, in particular to a multi-position automatic assembly production device for elevator switch boxes.

背景技术Background technique

电梯开关盒如图15所示,开关盒包括:下壳体、四方螺母、弹片、带垫螺丝、压力杯、波形垫片、盘头螺丝、上盖,电梯开关盒安装过程一般为:放入下壳体->将左右四方螺母放入下壳体中->将左弹片放入下壳体-> 将右弹片放入下壳体->将带垫左螺丝拧入下壳体->将带垫右螺丝拧入下壳体->将左右压力杯放入下壳体中->将左右波形垫片放入下壳体中->将左右盘头螺丝放入下壳体中->压入上盖到下壳体->完成。The elevator switch box is shown in Figure 15. The switch box includes: lower shell, square nut, shrapnel, screw with pad, pressure cup, wave washer, pan head screw, and upper cover. The installation process of the elevator switch box is generally: put in Lower shell -> Put the left and right square nuts into the lower shell -> Put the left shrapnel into the lower shell -> Put the right shrapnel into the lower shell -> Screw the left screw with pad into the lower shell -> Put the Screw the right screw with pad into the lower shell -> put the left and right pressure cups into the lower shell -> put the left and right wave washers into the lower shell -> put the left and right pan head screws into the lower shell -> press Insert the upper cover to the lower case -> Done.

目前电梯开关盒采用人工装配的方式进行生产,需要花费大量的人力、时间,且生产成本高,次品率高,电梯开关盒的产品质量仅仅取决于装备工人的人工经验,同一批次产品质量参差不齐,电梯开关盒体积小,零部件较多,故生产效率低。At present, the elevator switch box is produced by manual assembly, which requires a lot of manpower and time, and the production cost is high and the defective rate is high. The product quality of the elevator switch box only depends on the manual experience of the equipment workers. The quality of the same batch of products Uneven, the elevator switch box is small in size and has many parts, so the production efficiency is low.

现提供一种用于电梯开关盒多工位自动化装配生产装置,多工位流水线装备生产,保障了生产效率,解决上述问题。There is now provided a multi-station automatic assembly production device for elevator switch boxes, and multi-station assembly line equipment production, which ensures production efficiency and solves the above problems.

实用新型内容Utility model content

本实用新型的目的在于提供一种用于电梯开关盒多工位自动化装配生产装置,通过在转盘周侧布置下壳体安装工位、四方螺母安装工位、左弹片安装工位、右弹片安装工位、左带垫螺丝安装工位、右带垫螺丝安装工位、压力杯安装工位、波形垫片安装工位、盘头螺丝安装工位、上盖安装工位、空置工位、退料工位,十二个加工工位依次对电梯开关盒的各零部件进行装配,多工位流水线装备生产,保障了生产效率,解决了现有的人工装配的方式花费大量的人力、时间,且生产成本高,次品率高,同一批次产品质量参差不齐,生产效率低的问题。The purpose of the utility model is to provide a multi-station automatic assembly production device for elevator switch boxes, by arranging the lower casing installation station, the square nut installation station, the left shrapnel installation station, and the right shrapnel installation station on the peripheral side of the turntable. Station, screw installation station with left pad, screw installation station with right pad, pressure cup installation station, wave gasket installation station, pan head screw installation station, cover installation station, vacant station, retreat Material station, twelve processing stations assemble the various parts of the elevator switch box in turn, multi-station assembly line equipment production, guarantees production efficiency, and solves the problem of the existing manual assembly method that consumes a lot of manpower and time. In addition, the production cost is high, the defective rate is high, the quality of the same batch of products is uneven, and the production efficiency is low.

为解决上述技术问题,本实用新型是通过以下技术方案实现的:In order to solve the above-mentioned technical problems, the utility model is realized through the following technical solutions:

本实用新型为一种用于电梯开关盒多工位自动化装配生产装置,包括一矩形框架式机架;所述机架上固定安装有一圆形安装底板,所述安装底板的中心处安装有一凸轮分割器;所述凸轮分割器连接有一与安装底板同心的圆形转盘,所述转盘上方设置有一固定台;所述转盘上开设有十二个呈圆周阵列的安装槽,十二个所述安装槽内分别安装有一定位模具,十二个所述定位模具分别对应十二个加工工位;十二个所述加工工位分别为下壳体安装工位、四方螺母安装工位、左弹片安装工位、右弹片安装工位、左带垫螺丝安装工位、右带垫螺丝安装工位、压力杯安装工位、波形垫片安装工位、盘头螺丝安装工位、上盖安装工位、空置工位、退料工位;所述下壳体安装工位、四方螺母安装工位、左弹片安装工位、右弹片安装工位、左带垫螺丝安装工位、右带垫螺丝安装工位、压力杯安装工位、波形垫片安装工位、盘头螺丝安装工位、上盖安装工位上分别通过一滑道连接有一振动盘,每一所述滑道的端部分别设有一待料槽;每一所述待料槽处均安装有一光纤传感器;所述下壳体安装工位、四方螺母安装工位、左弹片安装工位、右弹片安装工位、左带垫螺丝安装工位、右带垫螺丝安装工位、压力杯安装工位、波形垫片安装工位、盘头螺丝安装工位、上盖安装工位通过气缸分别进行相应的上下移动、横向移动、夹取/松开动作、送料、校正位置;所述气缸上均配合设置有磁性开关,所述气缸包括相应工位上的横向气缸、上下气缸,所述横向气缸固定安装在相应工位上的第一支架上,所述上下气缸固定安装在相应工位上的第二支架上;所述第一支架固定安装在安装底板上;所述横向气缸的伸缩端与相应的第二支架固定连接,所述第二支架与相应的第一支架滑动配合;所述退料工位通过相配合设置的上下退料气缸、横向退料气缸进行顶出、推出动作,所述上下退料气缸通过第一支架固定安装在安装底板上,所述横向退料气缸固定安装在固定台上,且所述安装底板上固定安装有一与横向退料气缸相配合对应的退料槽,所述上下退料气缸、横向退料气缸上均安装有磁性开关,多工位流水线装备生产,保障了生产效率,且同一机器生产的产品一致性好。The utility model relates to a multi-station automatic assembly production device for elevator switch boxes, which comprises a rectangular frame type frame; a circular mounting base plate is fixedly installed on the frame, and a cam is installed at the center of the installation base plate A divider; the cam divider is connected to a circular turntable concentric with the installation bottom plate, and a fixed platform is arranged above the turntable; twelve installation grooves in a circular array are provided on the turntable, and twelve installation grooves are arranged on the turntable. A positioning mold is installed in the groove respectively, and the twelve positioning molds are respectively corresponding to twelve processing stations; Station, right shrapnel installation station, left screw installation station with pad, right pad screw installation station, pressure cup installation station, wave gasket installation station, pan head screw installation station, upper cover installation station , vacant station, material return station; the lower shell installation station, square nut installation station, left shrapnel installation station, right shrapnel installation station, left screw installation station with pads, right pad screw installation The station, the pressure cup installation station, the wave washer installation station, the pan head screw installation station, and the upper cover installation station are respectively connected with a vibrating plate through a slideway, and the end of each slideway is respectively provided with a vibrating plate. There is a waiting trough; an optical fiber sensor is installed at each of the waiting troughs; the lower casing installation station, the square nut installation station, the left shrapnel installation station, the right shrapnel installation station, and the left screw with a pad The installation station, the right screw installation station with pad, the pressure cup installation station, the wave washer installation station, the pan head screw installation station, and the upper cover installation station are respectively moved up and down, laterally, clamped by the cylinder. Taking/releasing action, feeding, and correcting position; the cylinders are equipped with magnetic switches, the cylinders include horizontal cylinders and upper and lower cylinders on the corresponding workstations, and the horizontal cylinders are fixedly installed on the first On a bracket, the upper and lower cylinders are fixedly installed on the second brackets on the corresponding workstations; the first brackets are fixedly installed on the installation bottom plate; the telescopic ends of the horizontal cylinders are fixedly connected with the corresponding second brackets, so The second support is slidably matched with the corresponding first support; the material unloading station is ejected and pushed out through the upper and lower unloading cylinders and the horizontal unloading cylinders that are set up together, and the upper and lower unloading cylinders pass through the first support. It is fixedly installed on the installation bottom plate, and the horizontal unloading cylinder is fixedly installed on the fixed table, and a unloading groove corresponding to the horizontal unloading cylinder is fixedly installed on the installation bottom plate. Magnetic switches are installed on the return cylinders, and the production is equipped with multi-station assembly lines, which ensures the production efficiency, and the consistency of products produced by the same machine is good.

进一步地,所述下壳体安装工位上的气缸包括相应的横向气缸、上下气缸、下壳体夹取气缸;所述下壳体夹取气缸安装在一L形支架上,且L 形支架与上下气缸的伸缩端固定连接,所述L形支架与第二支架滑动配合;所述下壳体安装工位上的待料槽为与下壳体夹取气缸相配合对应的下壳体输送槽,所述下壳体输送槽固定安装在第一支架上,横向气缸、上下气缸、下壳体夹取气缸分别由1个电磁阀控制,分别有两个工作位置,由磁性开关进行检测,下壳体安装工位将下壳体送入转盘上的定位模具内。Further, the cylinder on the lower casing installation station includes a corresponding horizontal cylinder, an upper and lower cylinder, and a lower casing clamping cylinder; the lower casing clamping cylinder is mounted on an L-shaped bracket, and the L-shaped bracket is It is fixedly connected with the telescopic ends of the upper and lower cylinders, and the L-shaped brackets are slidingly matched with the second brackets; The lower casing conveying groove is fixedly installed on the first bracket, the horizontal cylinder, the upper and lower cylinders, and the lower casing clamping cylinder are controlled by a solenoid valve, respectively, and have two working positions, which are detected by a magnetic switch. The lower shell installation station sends the lower shell into the positioning mold on the turntable.

进一步地,所述四方螺母安装工位上的气缸包括相应的横向气缸、上下气缸、螺母夹取气缸;所述螺母夹取气缸安装在一直角板上,且所述直角板与上下气缸的伸缩端固定连接,所述直角板与第二支架滑动配合;所述四方螺母安装工位上的待料槽设置在螺母料道的端部,且与螺母夹取气缸的位置相配合对应,所述螺母料道固定安装在第一支架上;所述螺母料道下方安装有一直震,四方螺母安装工位将四方螺母送入下壳体。Further, the cylinder on the square nut installation station includes a corresponding horizontal cylinder, an upper and lower cylinder, and a nut clamping cylinder; the nut clamping cylinder is installed on a right-angle plate, and the right-angle plate and the upper and lower cylinders extend The ends are fixedly connected, and the right-angle plate is slidingly matched with the second bracket; the waiting slot on the square nut installation station is set at the end of the nut material channel, and corresponds to the position where the nut clamps the cylinder. The nut feeder is fixedly installed on the first bracket; a constant vibration is installed below the nut feeder, and the square nut installation station sends the square nut into the lower casing.

进一步地,所述左弹片安装工位、右弹片安装工位的结构相同且呈相对设置;所述左弹片安装工位上的气缸包括相应的横向气缸、上下气缸、压料气缸、限位气缸;所述上下气缸的端部通过支架安装有一推杆;所述压料气缸的端部固定安装有压针,所述压料气缸固定安装在一Z形支架上,所述Z形支架通过一连接板安装在固定台上;所述限位气缸的端部固定有一推杆,所述限位气缸通过一板件安装在第一支架上;所述左弹片安装工位、右弹片安装工位上的待料槽设置在弹片料道的端部,且与上下气缸、压料气缸、限位气缸的位置相配合对应,所述弹片料道下方安装有一直震;所述直震固定安装在安装底板上,上下气缸:改变推杆上下位置,横向气缸:将弹片推向指定位置,限位气缸:控制弹片推入运动轨迹,压料气缸:将弹片压入下壳体。Further, the left shrapnel installation station and the right shrapnel installation station have the same structure and are oppositely arranged; the cylinders on the left shrapnel installation station include corresponding transverse cylinders, upper and lower cylinders, pressing cylinders, and limit cylinders. The end of the upper and lower cylinders is installed with a push rod through a bracket; the end of the pressing cylinder is fixedly installed with a pressing needle, and the pressing cylinder is fixedly installed on a Z-shaped bracket, and the Z-shaped bracket passes through a The connecting plate is installed on the fixing table; the end of the limit cylinder is fixed with a push rod, and the limit cylinder is installed on the first bracket through a plate; the left shrapnel installation station and the right shrapnel installation station The upper waiting trough is arranged at the end of the shrapnel material channel, and corresponds to the positions of the upper and lower cylinders, the pressing material cylinder, and the limit cylinder. A direct shock is installed below the shrapnel material channel; the direct shock is fixedly installed in the Install the bottom plate, the upper and lower cylinders: change the up and down position of the push rod, the horizontal cylinder: push the shrapnel to the specified position, the limit cylinder: control the shrapnel to push the movement track, the pressing cylinder: press the shrapnel into the lower shell.

进一步地,所述左带垫螺丝安装工位、右带垫螺丝安装工位的结构相同且呈相对设置;所述左带垫螺丝安装工位上的气缸包括相应的横向气缸、上下气缸、第一气缸;所述第一气缸的伸缩端固定连接有一安装板,所述安装板上通过一抱箍安装有一电动螺丝批,所述第一气缸固定安装在第二支架上;所述电动螺丝批下方设有一吸嘴,所述吸嘴设于一角形板上,所述角形板与上下气缸的端部固定连接;所述安装板、角形板均与相应的第二支架滑动配合;所述左带垫螺丝安装工位、右带垫螺丝安装工位上的待料槽设置在带垫螺丝料道的端部,且与上下气缸、第一气缸的位置相配合对应,所述带垫螺丝料道下方安装有一直震;所述直震固定安装在安装底板上,上下气缸:改变带垫螺丝上下位置,横向气缸:将带垫螺丝前后位置,吸嘴:吸住/松开带垫螺丝,第一气缸:改变电动螺丝批上下位置,电动螺丝批:拧带垫螺。Further, the structure of the left screw mounting station and the right screw mounting station are the same and are oppositely arranged; the cylinders on the left screw mounting station include corresponding horizontal cylinders, upper and lower an air cylinder; an installation plate is fixedly connected to the telescopic end of the first air cylinder, an electric screwdriver is installed on the installation plate through a hoop, and the first air cylinder is fixedly installed on the second bracket; the electric screwdriver A suction nozzle is arranged below, the suction nozzle is arranged on an angular plate, and the angular plate is fixedly connected with the ends of the upper and lower cylinders; the mounting plate and the angular plate are both slidingly matched with the corresponding second brackets; The hoppers on the screw installation station with pads and the right screw installation station with pads are arranged at the ends of the screw feed channels with pads, and correspond to the positions of the upper and lower cylinders and the first cylinder. There is a direct vibration installed under the channel; the direct vibration is fixed on the installation base plate, the upper and lower cylinders: change the upper and lower positions of the screws with pads, the horizontal cylinder: the front and rear positions of the screws with pads, the suction nozzle: suck/loose the screws with pads, The first cylinder: change the upper and lower positions of the electric screwdriver, the electric screwdriver: screw the washer screw.

进一步地,所述压力杯安装工位上的气缸包括相应的横向气缸、上下气缸、压力杯夹取气缸;所述压力杯夹取气缸安装在一L形板上,且L形板与相应的上下气缸的伸缩端固定连接,所述L形板与相应的第二支架滑动配合;所述压力杯安装工位上的待料槽为与压力杯夹取气缸相配合对应的压力杯料道,所述压力杯料道下方安装有一直震,所述直震固定安装在安装底板上,上下气缸:改变压力杯夹取气缸上下位置,横向气缸:改变压力杯夹取气缸前后位置,压力杯夹取气缸:夹取/松开压力杯,振动盘:辅助送料,磁性开关:检测动作是否到达指定位置。Further, the cylinder on the pressure cup installation station includes a corresponding horizontal cylinder, an upper and lower cylinder, and a pressure cup clamping cylinder; the pressure cup clamping cylinder is installed on an L-shaped plate, and the L-shaped plate is connected to the corresponding cylinder. The telescopic ends of the upper and lower cylinders are fixedly connected, and the L-shaped plate is slidably matched with the corresponding second support; The straight vibration is installed under the pressure cup material channel, and the direct vibration is fixedly installed on the installation base plate. The upper and lower cylinders: change the upper and lower positions of the pressure cup to clamp the cylinder, and the horizontal cylinder: change the front and rear positions of the pressure cup to clamp the cylinder, and the pressure cup clamps Take cylinder: grip/release pressure cup, vibrating plate: auxiliary feeding, magnetic switch: detect whether the action reaches the designated position.

进一步地,所述波形垫片安装工位上的气缸包括相应的横向气缸、上下气缸、第一顶针导向气缸;所述第一顶针导向气缸通过一板件固定安装在安装底板上;所述上下气缸的伸缩端固定连接有一角板,所述角板上安装有吸嘴;所述角板与相应的第二支架滑动配合,上下气缸:改变波形垫片上下位置,横向气缸:改变波形垫片前后位置,吸嘴:吸住/松开波形垫片,第一顶针导向气缸:校正下壳体中压力杯位置。Further, the cylinder on the installation station of the wave gasket includes a corresponding horizontal cylinder, an upper and lower cylinder, and a first thimble guide cylinder; the first thimble guide cylinder is fixedly installed on the installation bottom plate through a plate; the upper and lower cylinders are A corner plate is fixedly connected to the telescopic end of the cylinder, and a suction nozzle is installed on the corner plate; the corner plate is slidably matched with the corresponding second bracket, the upper and lower cylinders: change the upper and lower positions of the wave washer, and the horizontal cylinder: change the wave washer Front and rear position, suction nozzle: suck/release the wave washer, the first thimble guides the cylinder: correct the position of the pressure cup in the lower casing.

进一步地,所述盘头螺丝安装工位上的气缸包括相应的横向气缸、上下气缸、第二顶针导向气缸;所述第二顶针导向气缸通过一板件固定安装在安装底板上;所述上下气缸的伸缩端固定连接有一角板,所述角板上安装有吸嘴,所述角板与相应的第二支架滑动配合,上下气缸:改变盘头螺丝上下位置,横向气缸:改变盘头螺丝前后位置,吸嘴:吸住/松开盘头螺丝,第二顶针导向气缸:校正下壳体中波形垫片位置。Further, the cylinder on the pan head screw installation station includes a corresponding horizontal cylinder, an upper and lower cylinder, and a second thimble guide cylinder; the second thimble guide cylinder is fixedly installed on the installation bottom plate through a plate; The telescopic end of the cylinder is fixedly connected with a corner plate, the corner plate is installed with a suction nozzle, and the corner plate is slidably matched with the corresponding second bracket. Front and rear position, suction nozzle: suck/release pan head screw, second thimble guide cylinder: correct the position of the wave washer in the lower casing.

进一步地,所述上盖安装工位上的上下气缸的伸缩端连接有一压块,所述压块安装在一直角架上;所述直角架与相应的第二支架滑动配合,上下气缸:改变上盖上下位置,横向气缸:改变上盖前后位置,吸嘴:吸住/ 松开上盖。Further, the telescopic ends of the upper and lower cylinders on the upper cover installation station are connected with a pressure block, and the pressure block is installed on a right-angle frame; the right-angle frame is slidably matched with the corresponding second bracket, and the upper and lower cylinders: change The upper and lower positions of the upper cover, the horizontal cylinder: change the front and rear positions of the upper cover, the suction nozzle: suck/release the upper cover.

进一步地,所述定位模具呈矩形结构,且定位模具内开设有开关盒容腔,容腔底部开设有与安装槽贯通且与上下退料气缸相配合对应的推料孔;所述定位模具嵌入相应的安装槽并通过定位模具两侧的凸耳固定安装在转盘上。Further, the positioning mold has a rectangular structure, and the positioning mold is provided with a switch box cavity, and the bottom of the cavity is provided with a pushing hole that penetrates through the installation groove and is matched with the upper and lower discharge cylinders; the positioning mold is embedded The corresponding mounting grooves are fixed on the turntable by the lugs on both sides of the positioning die.

本实用新型具有以下有益效果:The utility model has the following beneficial effects:

1、本实用新型通过在转盘周侧布置下壳体安装工位、四方螺母安装工位、左弹片安装工位、右弹片安装工位、左带垫螺丝安装工位、右带垫螺丝安装工位、压力杯安装工位、波形垫片安装工位、盘头螺丝安装工位、上盖安装工位、空置工位、退料工位,十二个加工工位依次对电梯开关盒的各零部件进行装配,多工位流水线装备生产,保障了生产效率,连续工作,产能高,同一机器生产的产品一致性好,且螺丝的松紧程度可调。1. The utility model arranges the lower casing installation station, the square nut installation station, the left shrapnel installation station, the right shrapnel installation station, the left screw installation station with a pad, and the right screw installation station on the peripheral side of the turntable. Position, pressure cup installation station, wave gasket installation station, pan head screw installation station, upper cover installation station, vacant station, material return station, twelve processing stations in turn for each elevator switch box. Parts are assembled and produced by multi-station assembly line equipment, which ensures production efficiency, continuous work, high productivity, good consistency of products produced by the same machine, and adjustable screw tightness.

2、本实用新型通过在气缸上均配合设置有磁性开关,每一待料槽处均安装有光纤传感器,磁性开关检测动作是否到达指定位置,光纤传感器检测有料/无料,保证各气缸的运动准确,加工精度较高。2. The utility model is equipped with a magnetic switch on the cylinder, and an optical fiber sensor is installed at each trough. The magnetic switch detects whether the action reaches a designated position, and the optical fiber sensor detects whether there is material or no material, so as to ensure the movement of each cylinder. Accurate and high machining accuracy.

当然,实施本实用新型的任一产品并不一定需要同时达到以上所述的所有优点。Of course, any product implementing the present invention does not necessarily need to simultaneously achieve all of the above-mentioned advantages.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例描述所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the accompanying drawings required for the description of the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.

图1为本实用新型用于电梯开关盒多工位自动化装配生产装置的结构示意图;Fig. 1 is the structural representation of the utility model for the multi-station automatic assembly production device of elevator switch box;

图2为本实用新型用于电梯开关盒多工位自动化装配生产装置的局部结构示意图;Fig. 2 is the partial structure schematic diagram of the utility model for the multi-station automatic assembly production device of the elevator switch box;

图3为图2的结构主视图;Fig. 3 is the structural front view of Fig. 2;

图4为本实用新型下壳体安装工位的结构示意图;Fig. 4 is the structural schematic diagram of the lower casing installation station of the present invention;

图5为本实用新型四方螺母安装工位的结构示意图;5 is a schematic structural diagram of a square nut installation station of the present invention;

图6为本实用新型弹片安装工位的结构示意图;Fig. 6 is the structural schematic diagram of the shrapnel installation station of the present invention;

图7为本实用新型带垫螺丝安装工位的结构示意图;Fig. 7 is the structural representation of the utility model with a pad screw installation station;

图8为本实用新型压力杯安装工位的结构示意图;Fig. 8 is the structural schematic diagram of the pressure cup installation station of the present invention;

图9为本实用新型波形垫片安装工位的结构示意图;Fig. 9 is the structural schematic diagram of the installation station of the corrugated gasket of the present invention;

图10为本实用新型盘头螺丝安装工位的结构示意图;10 is a schematic structural diagram of a pan head screw installation station of the present invention;

图11为本实用新型上盖安装工位的结构示意图;Figure 11 is a schematic structural diagram of an upper cover installation station of the present invention;

图12为本实用新型退料工位的结构示意图;Fig. 12 is the structural representation of the utility model return material station;

图13为本实用新型定位模具的结构示意图;13 is a schematic structural diagram of the positioning mold of the present invention;

图14为本实用新型定位模具、开关盒的结构示意图;14 is a schematic structural diagram of a positioning mold and a switch box of the present invention;

图15为本实用新型开关盒的结构示意图;15 is a schematic structural diagram of a switch box of the present invention;

附图中,各标号所代表的部件列表如下:In the accompanying drawings, the list of components represented by each number is as follows:

01-下壳体安装工位,02-四方螺母安装工位,03-左弹片安装工位,04- 右弹片安装工位,05-左带垫螺丝安装工位,06-右带垫螺丝安装工位,07- 压力杯安装工位,08-波形垫片安装工位,09-盘头螺丝安装工位,010-上盖安装工位,011-空置工位,012-退料工位,1-机架,2-安装底板,3-转盘,4-固定台,5-振动盘,6-凸轮分割器,7-第一支架,8-光纤传感器, 9-磁性开关,10-横向气缸,11-上下气缸,12-直震,13-吸嘴,14-定位模具,15-开关盒,0111-下壳体输送槽,0112-下壳体夹取气缸,021-螺母料道,022-螺母夹取气缸,031-弹片料道,032-压料气缸,033-限位气缸, 051-带垫螺丝料道,052-第一气缸,053-电动螺丝批,071-压力杯料道, 072-压力杯夹取气缸,081-第一顶针导向气缸,091-第二顶针导向气缸,0101-上盖输送槽,0121-上下退料气缸,0122-横向退料气缸,0123-退料槽,301-安装槽,701-第二支架,1501-下壳体,1502-四方螺母,1503-弹片,1504-带垫螺丝,1505-压力杯,1506-波形垫片,1507-盘头螺丝,1508- 上盖。01-Lower shell installation station, 02-Square nut installation station, 03-Left shrapnel installation station, 04-Right shrapnel installation station, 05-Left pad screw installation station, 06-Right pad screw installation Station, 07- pressure cup installation station, 08- wave gasket installation station, 09- pan head screw installation station, 010- upper cover installation station, 011- vacant station, 012- material withdrawal station, 1-Frame, 2-Installation base plate, 3-Turntable, 4-Fixed table, 5-Vibration plate, 6-Cam divider, 7-First bracket, 8-Fiber sensor, 9-Magnetic switch, 10-Transverse cylinder , 11-upper and lower cylinder, 12-direct shock, 13-suction nozzle, 14-positioning mold, 15-switch box, 0111-lower casing conveying trough, 0112-lower casing clamping cylinder, 021-nut feeder, 022 -Nut clamping cylinder, 031-shrapnel feeder, 032-pressing cylinder, 033-limit cylinder, 051-screw feeder with pad, 052-first cylinder, 053-electric screwdriver, 071-pressure cup feeder , 072-pressure cup clamping cylinder, 081-first thimble guide cylinder, 091-second thimble guide cylinder, 0101-top cover conveying trough, 0121-upper and lower return cylinder, 0122-horizontal return cylinder, 0123-return Slot, 301-installation slot, 701-second bracket, 1501-lower housing, 1502-square nut, 1503-shrapnel, 1504-screw with washer, 1505-pressure cup, 1506-wave washer, 1507-pan head screw , 1508- cover.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

在本实用新型的描述中,需要理解的是,术语“开孔”、“上”、“下”、“左”、“右”、“前”、“后”、“顶”、“中”、“长度”、“内”、“四周”、“侧”、“端”、“底”等指示方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的组件或元件必须具有特定的方位,以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "opening", "upper", "lower", "left", "right", "front", "rear", "top", "middle" , "length", "inside", "around", "side", "end", "bottom" and other indications of orientation or positional relationship are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that The components or elements must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention.

请参阅图1-15所示,本实用新型为一种用于电梯开关盒多工位自动化装配生产装置,用于开关盒15的装配,开关盒15包括:下壳体1501、四方螺母1502、弹片1503、带垫螺丝1504、压力杯1505、波形垫片1506、盘头螺丝1507、上盖1508,用于电梯开关盒多工位自动化装配生产装置包括一矩形框架式机架1;机架1上固定安装有一圆形安装底板2,安装底板 2的中心处安装有一凸轮分割器6;凸轮分割器6采用80DT型凸轮分割器,凸轮分割器6连接有一与安装底板2同心的圆形转盘3,转盘3上方设置有一圆形固定台4;转盘3上开设有十二个呈圆周阵列的矩形安装槽301,安装槽301贯穿转盘3,十二个安装槽301内分别安装有一定位模具14,十二个定位模具14分别对应十二个加工工位;十二个加工工位分别为下壳体安装工位01、四方螺母安装工位02、左弹片安装工位03、右弹片安装工位 04、左带垫螺丝安装工位05、右带垫螺丝安装工位06、压力杯安装工位07、波形垫片安装工位08、盘头螺丝安装工位09、上盖安装工位010、空置工位011、退料工位012,多工位流水线装备生产,保障了生产效率,且同一机器生产的产品一致性好。Please refer to Figures 1-15. The present invention is a multi-station automatic assembly production device for elevator switch boxes, which is used for the assembly of switch boxes 15. The switch boxes 15 include: a lower casing 1501, a square nut 1502, Shrapnel 1503, screw with pad 1504, pressure cup 1505, wave washer 1506, pan head screw 1507, upper cover 1508, used for elevator switch box multi-station automatic assembly The production device includes a rectangular frame type rack 1; rack 1 A circular mounting base plate 2 is fixedly installed on the top, and a cam divider 6 is installed at the center of the installation base plate 2; , a circular fixing table 4 is arranged above the turntable 3; the turntable 3 is provided with twelve rectangular installation grooves 301 in a circular array, the installation grooves 301 run through the turntable 3, and a positioning mold 14 is installed in the twelve installation grooves 301 respectively. The twelve positioning molds 14 correspond to twelve processing stations respectively; the twelve processing stations are the lower casing installation station 01, the square nut installation station 02, the left shrapnel installation station 03, and the right shrapnel installation station 04, left with pad screw installation station 05, right with pad screw installation station 06, pressure cup installation station 07, wave washer installation station 08, pan head screw installation station 09, upper cover installation station 010, The vacant station 011 and the return station 012 are equipped with multi-station assembly lines to ensure production efficiency, and the consistency of products produced by the same machine is good.

优选的,下壳体安装工位01、四方螺母安装工位02、左弹片安装工位 03、右弹片安装工位04、左带垫螺丝安装工位05、右带垫螺丝安装工位06、压力杯安装工位07、波形垫片安装工位08、盘头螺丝安装工位09、上盖安装工位010上分别通过一滑道连接有一振动盘5,振动盘5的出口结构分别依据下壳体1501、四方螺母1502、弹片1503、带垫螺丝1504、压力杯1505、波形垫片1506、盘头螺丝1507、上盖1508的结构进行选择,其中,下壳体安装工位01上的振动盘5采用直径为500的振动盘,物料走向为逆时针;四方螺母安装工位02上的振动盘5采用直径为300的双出口振动盘,物料走向为逆时针;左弹片安装工位03、右弹片安装工位04上的振动盘5采用直径为300的振动盘,物料走向为顺时针;左带垫螺丝安装工位05、右带垫螺丝安装工位06上的振动盘5采用直径为200的振动盘,物料走向为顺时针;压力杯安装工位07上的振动盘5采用直径为300的双出口振动盘,物料走向为逆时针;波形垫片安装工位08上的振动盘5采用直径为300的双出口振动盘,物料走向为逆时针;盘头螺丝安装工位09上的振动盘5采用直径为300的双出口振动盘,物料走向为逆时针;上盖安装工位010上的振动盘5采用直径为500的振动盘,物料走向为顺时针,通过振动盘5 分别对下壳体1501、四方螺母1502、弹片1503、带垫螺丝1504、压力杯 1505、波形垫片1506、盘头螺丝1507、上盖1508进行辅助送料。Preferably, the lower shell installation station 01, the square nut installation station 02, the left shrapnel installation station 03, the right shrapnel installation station 04, the left screw installation station 05, the right screw installation station 06, The pressure cup installation station 07, the wave washer installation station 08, the pan head screw installation station 09, and the upper cover installation station 010 are connected to a vibration plate 5 through a slide, and the outlet structure of the vibration plate 5 is based on the following The structure of the shell 1501, the square nut 1502, the shrapnel 1503, the screw with pad 1504, the pressure cup 1505, the wave washer 1506, the pan head screw 1507, and the upper cover 1508 are selected. Among them, the vibration on the lower shell installation station 01 Disc 5 adopts a vibrating disc with a diameter of 500, and the material direction is counterclockwise; the vibrating disc 5 on the square nut installation station 02 adopts a double-exit vibrating disc with a diameter of 300, and the material direction is counterclockwise; the left shrapnel installation station 03, The vibration plate 5 on the right shrapnel installation station 04 adopts a vibration plate with a diameter of 300, and the material direction is clockwise; the vibration plate 5 on the left screw installation station 05 and the right screw installation station 06 adopts a diameter of 200 vibrating plate, the material direction is clockwise; the vibrating plate 5 on the pressure cup installation station 07 adopts a double outlet vibrating plate with a diameter of 300, and the material direction is counterclockwise; the vibration plate 5 on the wave washer installation station 08 The double outlet vibrating plate with a diameter of 300 is used, and the material direction is counterclockwise; the vibrating plate 5 on the pan head screw installation station 09 adopts a double outlet vibrating plate with a diameter of 300, and the material direction is counterclockwise; the upper cover installation station 010 The upper vibrating disc 5 adopts a vibrating disc with a diameter of 500, and the material direction is clockwise. Through the vibrating disc 5, the lower housing 1501, the square nut 1502, the shrapnel 1503, the screw with pad 1504, the pressure cup 1505, and the wave washer 1506 , Pan head screw 1507, upper cover 1508 for auxiliary feeding.

优选的,每一滑道的端部分别设有一待料槽;每一待料槽处均安装有一光纤传感器8,待料槽的结构分别根据下壳体1501、四方螺母1502、弹片1503、带垫螺丝1504、压力杯1505、波形垫片1506、盘头螺丝1507、上盖1508的结构进行选择,通过光纤传感器8分别采集各待料槽处有料/ 无料。Preferably, the end of each slideway is respectively provided with a waiting slot; each waiting slot is installed with an optical fiber sensor 8, and the structure of the waiting slot is according to the lower casing 1501, the square nut 1502, the elastic piece 1503, the belt The structure of the pad screw 1504, the pressure cup 1505, the wave washer 1506, the pan head screw 1507, and the upper cover 1508 is selected, and the presence/absence of the material at each waiting slot is collected by the optical fiber sensor 8 respectively.

优选的,下壳体安装工位01、四方螺母安装工位02、左弹片安装工位 03、右弹片安装工位04、左带垫螺丝安装工位05、右带垫螺丝安装工位06、压力杯安装工位07、波形垫片安装工位08、盘头螺丝安装工位09、上盖安装工位010通过气缸分别进行相应的上下移动、横向移动、夹取/松开动作、送料、校正位置;气缸上均配合设置有磁性开关9,气缸包括相应工位上的横向气缸10、上下气缸11,横向气缸10固定安装在相应工位上的第一支架7上,上下气缸11固定安装在相应工位上的第二支架701上;第一支架 7固定安装在安装底板2上;横向气缸10、上下气缸11、第二支架701、第二支架701的结构不限于一种,具体可根据各工位所需结构、尺寸选择,横向气缸10的伸缩端与相应的第二支架701固定连接,第二支架701与相应的第一支架7滑动配合,通过气缸进行相应的上下移动、横向移动、夹取/松开动作、送料、校正位置等动作,控制方式简单,便于操作。Preferably, the lower shell installation station 01, the square nut installation station 02, the left shrapnel installation station 03, the right shrapnel installation station 04, the left screw installation station 05, the right screw installation station 06, The pressure cup installation station 07, the wave washer installation station 08, the pan head screw installation station 09, and the upper cover installation station 010 respectively carry out the corresponding up and down movement, lateral movement, clamping/releasing action, feeding, Correction position; a magnetic switch 9 is arranged on the cylinder, the cylinder includes a horizontal cylinder 10 and an upper and lower cylinder 11 on the corresponding station, the lateral cylinder 10 is fixedly installed on the first bracket 7 on the corresponding station, and the upper and lower cylinders 11 are fixedly installed On the second bracket 701 at the corresponding station; the first bracket 7 is fixedly installed on the installation base plate 2; According to the required structure and size selection of each station, the telescopic end of the horizontal cylinder 10 is fixedly connected with the corresponding second bracket 701, the second bracket 701 is slidingly matched with the corresponding first bracket 7, and the cylinder is used for corresponding up and down movement, lateral movement Movement, gripping/releasing action, feeding, correcting position and other actions, the control method is simple and easy to operate.

优选的如图1、4所示,下壳体夹取气缸0112安装在一L形支架上,且L形支架与上下气缸11的伸缩端固定连接,L形支架与第二支架701滑动配合;下壳体安装工位01上的待料槽为与下壳体夹取气缸0112相配合对应的下壳体输送槽0111,下壳体输送槽0111固定安装在第一支架7上,横向气缸10、上下气缸11、下壳体夹取气缸0112分别由1个电磁阀断/开控制,分别有两个工作位置,由磁性开关9进行检测,上下气缸11改变下壳体夹取气缸0112上下位置,下壳体夹取气缸01端部设有下壳体1501夹爪,横向气缸10改变下壳体夹取气缸0112前后位置,下壳体夹取气缸0112 夹取/松开下壳体1501,磁性开关9:检测动作是否到达指定位置,光纤传感器8检测有料/无料,下壳体安装工位01将下壳体1501送入转盘3上的定位模具14内。Preferably, as shown in Figures 1 and 4, the lower shell clamping cylinder 0112 is mounted on an L-shaped bracket, and the L-shaped bracket is fixedly connected with the telescopic ends of the upper and lower cylinders 11, and the L-shaped bracket is slidingly matched with the second bracket 701; The waiting trough on the lower shell installation station 01 is the lower shell conveying slot 0111 corresponding to the lower shell clamping cylinder 0112. The lower shell conveying slot 0111 is fixedly installed on the first bracket 7, and the horizontal cylinder 10 , The upper and lower cylinders 11 and the lower shell clamping cylinder 0112 are controlled by a solenoid valve to disconnect/open, respectively, and have two working positions, which are detected by the magnetic switch 9. The upper and lower cylinders 11 change the upper and lower positions of the lower shell clamping cylinder 0112. , the end of the lower casing clamping cylinder 01 is provided with a lower casing 1501 clamping jaw, the horizontal cylinder 10 changes the front and rear positions of the lower casing clamping cylinder 0112, and the lower casing clamping cylinder 0112 clamps/releases the lower casing 1501, Magnetic switch 9: Detects whether the action reaches the designated position, the fiber sensor 8 detects the presence/absence of material, and the lower casing installation station 01 sends the lower casing 1501 into the positioning mold 14 on the turntable 3.

优选的如图1、5所示,四方螺母安装工位02上的气缸包括相应的横向气缸10、上下气缸11、螺母夹取气缸022;螺母夹取气缸022端部设有螺母夹爪,螺母夹取气缸022安装在一直角板上,且直角板与上下气缸11 的伸缩端固定连接,直角板与第二支架701滑动配合;四方螺母安装工位02上的待料槽设置在螺母料道021的端部,且与螺母夹取气缸022的位置相配合对应,螺母料道021固定安装在第一支架7上;螺母料道021下方安装有一直震12,上下气缸11:改变螺母夹取气缸022上下位置;横向气缸10:改变螺母夹取气缸022前后位置;螺母夹取气缸022:夹取/松开四方螺母1502;直震12:辅助送料,四方螺母安装工位02将四方螺母1502 送入下壳体1501,横向气缸10、上下气缸11、螺母夹取气缸022分别由1 个电磁阀(断/开)控制,分别有两个工作位置,由磁性开关9进行检测。Preferably, as shown in Figures 1 and 5, the cylinders on the square nut installation station 02 include corresponding horizontal cylinders 10, upper and lower cylinders 11, and nut clamping cylinders 022; The clamping cylinder 022 is installed on the right-angle plate, and the right-angle plate is fixedly connected with the telescopic ends of the upper and lower cylinders 11, and the right-angle plate is slidingly matched with the second bracket 701; the waiting slot on the square nut installation station 02 is set in the nut material channel The end of 021 corresponds to the position of the nut clamping cylinder 022, the nut feeder 021 is fixedly installed on the first bracket 7; the nut feeder 021 is installed with a direct shock 12, and the upper and lower cylinders 11: change the nut clamping The upper and lower positions of the cylinder 022; the horizontal cylinder 10: change the front and rear positions of the nut clamping cylinder 022; the nut clamping cylinder 022: clamping/releasing the square nut 1502; Feeding into the lower casing 1501, the horizontal cylinder 10, the upper and lower cylinders 11, and the nut clamping cylinder 022 are controlled by a solenoid valve (off/on), respectively, and have two working positions, which are detected by the magnetic switch 9.

优选的如图1、6所示,左弹片安装工位03、右弹片安装工位04的结构相同且呈相对设置;左弹片安装工位03上的气缸包括相应的横向气缸10、上下气缸11、压料气缸032、限位气缸033;上下气缸11的端部通过支架安装有一推杆;压料气缸032的端部固定安装有压针,压料气缸032固定安装在一Z形支架上,Z形支架通过一连接板安装在固定台4上;限位气缸033的端部固定有一推杆,限位气缸033通过一板件安装在第一支架7上;左弹片安装工位03、右弹片安装工位04上的待料槽设置在弹片料道031的端部,且与上下气缸11、压料气缸032、限位气缸033的位置相配合对应,弹片料道031下方安装有一直震12;直震12固定安装在安装底板2上,上下气缸11:改变推杆上下位置,横向气缸10:将弹片1503推向指定位置,限位气缸033:控制弹片1503推入运动轨迹,压料气缸032:将弹片1503 压入下壳体1501。Preferably, as shown in Figures 1 and 6, the left shrapnel installation station 03 and the right shrapnel installation station 04 have the same structure and are oppositely arranged; the cylinders on the left shrapnel installation station 03 include corresponding horizontal cylinders 10, upper and lower cylinders 11 , pressure cylinder 032, limit cylinder 033; the end of the upper and lower cylinder 11 is installed with a push rod through the bracket; the end of the pressure cylinder 032 is fixedly installed with a pressure needle, and the pressure cylinder 032 is fixedly installed on a Z-shaped bracket, The Z-shaped bracket is installed on the fixing table 4 through a connecting plate; a push rod is fixed at the end of the limit cylinder 033, and the limit cylinder 033 is installed on the first bracket 7 through a plate; the left elastic plate installation station 03, right The waiting slot on the shrapnel installation station 04 is set at the end of the shrapnel material channel 031, and corresponds to the positions of the upper and lower cylinder 11, the pressing cylinder 032, and the limit cylinder 033. There is a constant vibration installed under the shrapnel material channel 031. 12; Direct vibration 12 is fixedly installed on the installation base plate 2, the upper and lower cylinders 11: change the up and down position of the push rod, the horizontal cylinder 10: push the shrapnel 1503 to the designated position, limit the cylinder 033: control the shrapnel 1503 to push into the movement track, press the material Cylinder 032: Press the elastic sheet 1503 into the lower casing 1501.

优选的如图1、7所示,左带垫螺丝安装工位05、右带垫螺丝安装工位 06的结构相同且呈相对设置;左带垫螺丝安装工位05上的气缸包括相应的横向气缸10、上下气缸11、第一气缸052;第一气缸052的伸缩端固定连接有一安装板,安装板上通过一抱箍安装有一电动螺丝批053,第一气缸 052固定安装在第二支架701上;电动螺丝批053下方设有一吸嘴13,吸嘴13设于一角形板上,角形板与上下气缸11的端部固定连接;安装板、角形板均与相应的第二支架701滑动配合;左带垫螺丝安装工位05、右带垫螺丝安装工位06上的待料槽设置在带垫螺丝料道051的端部,且与上下气缸11、第一气缸052的位置相配合对应,带垫螺丝料道051下方安装有一直震12;直震12固定安装在安装底板2上,上下气缸11:改变带垫螺丝1504上下位置,横向气缸10:将带垫螺丝1504前后位置,吸嘴13:吸住/松开带垫螺丝1504,第一气缸052:改变电动螺丝批053上下位置,电动螺丝批053:拧带垫螺1504。Preferably, as shown in Figures 1 and 7, the left screw mounting station 05 and the right screw mounting station 06 have the same structure and are oppositely arranged; the cylinder on the left screw mounting station 05 includes corresponding horizontal The air cylinder 10, the upper and lower air cylinders 11, the first air cylinder 052; the telescopic end of the first air cylinder 052 is fixedly connected with a mounting plate, an electric screwdriver 053 is installed on the mounting plate through a hoop, and the first air cylinder 052 is fixedly installed on the second bracket 701 The bottom of the electric screwdriver 053 is provided with a suction nozzle 13, the suction nozzle 13 is arranged on an angular plate, and the angular plate is fixedly connected with the ends of the upper and lower cylinders 11; ; The waiting trough on the left screw installation station 05 and the right screw installation station 06 is arranged at the end of the screw channel 051 with a pad, and corresponds to the position of the upper and lower cylinders 11 and the first cylinder 052. , There is a straight shock 12 installed under the screw feeder 051 with a gasket; the straight shock 12 is fixed on the installation base plate 2, the upper and lower cylinders 11: change the upper and lower positions of the gasketed screws 1504, the horizontal cylinder 10: put the gasketed screws 1504 in the front and rear positions, suction Mouth 13: Suck/loose the screw 1504 with pad, the first cylinder 052: Change the upper and lower position of the electric screwdriver 053, Electric screwdriver 053: Unscrew the screw 1504 with pad.

优选的如图1、8所示,压力杯安装工位07上的气缸包括相应的横向气缸10、上下气缸11、压力杯夹取气缸072;压力杯夹取气缸072安装在一L形板上,且L形板与相应的上下气缸11的伸缩端固定连接,L形板与相应的第二支架701滑动配合;压力杯安装工位07上的待料槽为与压力杯夹取气缸072相配合对应的压力杯料道071,压力杯料道071下方安装有一直震12,直震12固定安装在安装底板2上,上下气缸11:改变压力杯夹取气缸072上下位置,横向气缸10:改变压力杯夹取气缸072前后位置,压力杯夹取气缸072:夹取/松开压力杯1505,振动盘5:辅助送料,磁性开关9:检测动作是否到达指定位置。Preferably, as shown in Figures 1 and 8, the cylinders on the pressure cup installation station 07 include corresponding transverse cylinders 10, upper and lower cylinders 11, and pressure cup clamping cylinders 072; the pressure cup clamping cylinders 072 are mounted on an L-shaped plate , and the L-shaped plate is fixedly connected with the telescopic ends of the corresponding upper and lower cylinders 11, and the L-shaped plate is slidingly matched with the corresponding second bracket 701; Cooperate with the corresponding pressure cup material channel 071, there is a direct shock 12 installed under the pressure cup material channel 071, the direct shock 12 is fixedly installed on the installation base plate 2, the upper and lower cylinders 11: change the upper and lower positions of the pressure cup clamping cylinder 072, and the horizontal cylinder 10: Change the front and rear positions of pressure cup clamping cylinder 072, pressure cup clamping cylinder 072: clamping/releasing pressure cup 1505, vibrating plate 5: auxiliary feeding, magnetic switch 9: detecting whether the action reaches the designated position.

优选的如图1、9所示,波形垫片安装工位08上的气缸包括相应的横向气缸10、上下气缸11、第一顶针导向气缸081;第一顶针导向气缸081 通过一板件固定安装在安装底板2上;上下气缸11的伸缩端固定连接有一角板,角板上安装有吸嘴13;角板与相应的第二支架701滑动配合,上下气缸11:改变波形垫片1506上下位置,横向气缸10:改变波形垫片1506前后位置,吸嘴13:吸住/松开波形垫片1506,第一顶针导向气缸081:校正下壳体中压力杯1505位置。Preferably, as shown in Figures 1 and 9, the air cylinders on the wave washer installation station 08 include corresponding transverse air cylinders 10, upper and lower air cylinders 11, and a first thimble guide cylinder 081; the first thimble guide cylinder 081 is fixedly installed through a plate On the installation base plate 2; the telescopic ends of the upper and lower cylinders 11 are fixedly connected with a corner plate, and the suction nozzle 13 is installed on the corner plate; , Transverse cylinder 10: Change the front and rear positions of the wave washer 1506, suction nozzle 13: Suck/release the wave washer 1506, the first thimble guide cylinder 081: Correct the position of the pressure cup 1505 in the lower casing.

优选的如图1、10所示,盘头螺丝安装工位09上的气缸包括相应的横向气缸10、上下气缸11、第二顶针导向气缸091;第二顶针导向气缸091 通过一板件固定安装在安装底板2上;上下气缸11的伸缩端固定连接有一角板,角板上安装有吸嘴13,角板与相应的第二支架701滑动配合,上下气缸11:改变盘头螺丝1507上下位置,横向气缸10:改变盘头螺丝1507前后位置,吸嘴13:吸住/松开盘头螺丝1507,第二顶针导向气缸091:校正下壳体中波形垫片1506位置。Preferably, as shown in Figures 1 and 10, the cylinders on the pan head screw installation station 09 include corresponding horizontal cylinders 10, upper and lower cylinders 11, and a second thimble guide cylinder 091; the second thimble guide cylinder 091 is fixedly installed through a plate On the installation base plate 2; the telescopic ends of the upper and lower cylinders 11 are fixedly connected with a corner plate, the suction nozzle 13 is installed on the corner plate, the corner plate is slidingly matched with the corresponding second bracket 701, the upper and lower cylinder 11: change the upper and lower positions of the pan head screw 1507 , Horizontal cylinder 10: Change the front and rear position of pan head screw 1507, suction nozzle 13: suck/release pan head screw 1507, the second thimble guide cylinder 091: correct the position of wave washer 1506 in the lower casing.

优选的如图1、11所示,上盖安装工位010上的上下气缸11的伸缩端连接有一压块,压块安装在一直角架上;直角架与相应的第二支架701滑动配合,上下气缸11:改变上盖1508上下位置,横向气缸10:改变上盖 1508前后位置,吸嘴13:吸住/松开上盖1508。Preferably, as shown in Figures 1 and 11, a compression block is connected to the telescopic ends of the upper and lower cylinders 11 on the upper cover installation station 010, and the compression block is installed on a right angle frame; the right angle frame is slidingly matched with the corresponding second bracket 701, Up and down cylinder 11: Change the upper and lower positions of the upper cover 1508, horizontal cylinder 10: Change the front and rear positions of the upper cover 1508, suction nozzle 13: Suck/release the upper cover 1508.

优选的如图1、12所示,退料工位012通过相配合设置的上下退料气缸0121、横向退料气缸0122进行顶出、推出动作,上下退料气缸0121通过第一支架7固定安装在安装底板2上,横向退料气缸0122固定安装在固定台4上,且安装底板2上固定安装有一与横向退料气缸0122相配合对应的退料槽0123,上下退料气缸0121、横向退料气缸0122上均安装有磁性开关9,多工位流水线装备生产,保障了生产效率,且同一机器生产的产品一致性好。Preferably, as shown in FIGS. 1 and 12 , the unloading station 012 is ejected and pushed out through the upper and lower unloading cylinders 0121 and the horizontal unloading cylinders 0122 , and the upper and lower unloading cylinders 0121 are fixedly installed through the first bracket 7 On the installation base plate 2, the horizontal discharge cylinder 0122 is fixedly installed on the fixed table 4, and the installation base plate 2 is fixedly installed with a discharge groove 0123 corresponding to the horizontal discharge cylinder 0122, the upper and lower discharge cylinders 0121, the horizontal discharge The magnetic switch 9 is installed on the material cylinder 0122, and the multi-station assembly line is equipped for production, which ensures the production efficiency, and the products produced by the same machine are consistent.

优选的如图1、13-14所示,定位模具14呈矩形结构,且定位模具14 内开设有开关盒容腔,容腔底部开设有与安装槽301贯通且与上下退料气缸0121相配合对应的推料孔;定位模具14嵌入相应的安装槽301并通过定位模具14两侧的凸耳固定安装在转盘3上,将开关盒依次在定位模具14 中完成装配,定位模具14结构简单。Preferably, as shown in Figures 1 and 13-14, the positioning mold 14 has a rectangular structure, and the positioning mold 14 is provided with a switch box cavity. The corresponding push hole; the positioning mold 14 is embedded in the corresponding installation groove 301 and fixedly installed on the turntable 3 through the lugs on both sides of the positioning mold 14. The switch box is assembled in the positioning mold 14 in sequence, and the positioning mold 14 has a simple structure.

在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本实用新型的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, description with reference to the terms "one embodiment", "example", "specific example", etc. means that a specific feature, structure, material or characteristic described in connection with the embodiment or example is included in the present invention. in at least one embodiment or example. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

以上公开的本实用新型优选实施例只是用于帮助阐述本实用新型。优选实施例并没有详尽叙述所有的细节,也不限制该实用新型仅为所述的具体实施方式。显然,根据本说明书的内容,可作很多的修改和变化。本说明书选取并具体描述这些实施例,是为了更好地解释本实用新型的原理和实际应用,从而使所属技术领域技术人员能很好地理解和利用本实用新型。本实用新型仅受权利要求书及其全部范围和等效物的限制。The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details, nor do they limit the invention to only the described embodiments. Obviously, many modifications and variations are possible in light of the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principle and practical application of the present invention, so that those skilled in the art can well understand and utilize the present invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (10)

1.一种用于电梯开关盒多工位自动化装配生产装置,其特征在于,包括一矩形框架式机架(1);1. a multi-station automatic assembly production device for elevator switch box, is characterized in that, comprises a rectangular frame type rack (1); 所述机架(1)上固定安装有一圆形安装底板(2),所述安装底板(2)的中心处安装有一凸轮分割器(6);A circular mounting bottom plate (2) is fixedly mounted on the frame (1), and a cam divider (6) is mounted at the center of the mounting bottom plate (2); 所述凸轮分割器(6)连接有一与安装底板(2)同心的圆形转盘(3),所述转盘(3)上方设置有一固定台(4);The cam divider (6) is connected with a circular turntable (3) concentric with the mounting base plate (2), and a fixing table (4) is arranged above the turntable (3); 所述转盘(3)上开设有十二个呈圆周阵列的安装槽(301),十二个所述安装槽(301)内分别安装有一定位模具(14),十二个所述定位模具(14)分别对应十二个加工工位;The turntable (3) is provided with twelve mounting grooves (301) in a circular array, and a positioning mold (14) is installed in the twelve mounting grooves (301), respectively, and the twelve positioning molds (301). 14) Corresponding to twelve processing stations respectively; 十二个所述加工工位分别为下壳体安装工位(01)、四方螺母安装工位(02)、左弹片安装工位(03)、右弹片安装工位(04)、左带垫螺丝安装工位(05)、右带垫螺丝安装工位(06)、压力杯安装工位(07)、波形垫片安装工位(08)、盘头螺丝安装工位(09)、上盖安装工位(010)、空置工位(011)、退料工位(012);The twelve said processing stations are respectively a lower casing installation station (01), a square nut installation station (02), a left shrapnel installation station (03), a right shrapnel installation station (04), and a left belt gasket. Screw installation station (05), right screw installation station with pad (06), pressure cup installation station (07), wave washer installation station (08), pan head screw installation station (09), upper cover Installation station (010), vacant station (011), return station (012); 所述下壳体安装工位(01)、四方螺母安装工位(02)、左弹片安装工位(03)、右弹片安装工位(04)、左带垫螺丝安装工位(05)、右带垫螺丝安装工位(06)、压力杯安装工位(07)、波形垫片安装工位(08)、盘头螺丝安装工位(09)、上盖安装工位(010)上分别通过一滑道连接有一振动盘(5),每一所述滑道的端部分别设有一待料槽;The lower housing installation station (01), the square nut installation station (02), the left shrapnel installation station (03), the right shrapnel installation station (04), the left screw installation station (05), The screw installation station (06), the pressure cup installation station (07), the wave washer installation station (08), the pan head screw installation station (09), and the upper cover installation station (010) respectively A vibrating plate (5) is connected through a slideway, and each end of the slideway is respectively provided with a waiting slot; 每一所述待料槽处均安装有一光纤传感器(8);An optical fiber sensor (8) is installed at each of the waiting troughs; 所述下壳体安装工位(01)、四方螺母安装工位(02)、左弹片安装工位(03)、右弹片安装工位(04)、左带垫螺丝安装工位(05)、右带垫螺丝安装工位(06)、压力杯安装工位(07)、波形垫片安装工位(08)、盘头螺丝安装工位(09)、上盖安装工位(010)通过气缸分别进行相应的上下移动、横向移动、夹取/松开动作、送料、校正位置;The lower housing installation station (01), the square nut installation station (02), the left shrapnel installation station (03), the right shrapnel installation station (04), the left screw installation station (05), Right screw installation station (06), pressure cup installation station (07), wave washer installation station (08), pan head screw installation station (09), upper cover installation station (010) through the cylinder Carry out corresponding up and down movement, lateral movement, gripping/releasing action, feeding, and correcting position respectively; 所述气缸上均配合设置有磁性开关(9),所述气缸包括相应工位上的横向气缸(10)、上下气缸(11),所述横向气缸(10)固定安装在相应工位上的第一支架(7)上,所述上下气缸(11)固定安装在相应工位上的第二支架(701)上;所述第一支架(7)固定安装在安装底板(2)上;所述横向气缸(10)的伸缩端与相应的第二支架(701)固定连接,所述第二支架(701)与相应的第一支架(7)滑动配合;A magnetic switch (9) is fitted on the cylinders, and the cylinders include a horizontal cylinder (10) and an upper and lower cylinder (11) on the corresponding working position, and the lateral cylinder (10) is fixedly installed on the corresponding working position. On the first bracket (7), the upper and lower cylinders (11) are fixedly installed on the second bracket (701) on the corresponding workstation; the first bracket (7) is fixedly installed on the installation bottom plate (2); The telescopic end of the transverse cylinder (10) is fixedly connected with the corresponding second bracket (701), and the second bracket (701) is slidingly matched with the corresponding first bracket (7); 所述退料工位(012)通过相配合设置的上下退料气缸(0121)、横向退料气缸(0122)进行顶出、推出动作,所述上下退料气缸(0121)通过第一支架(7)固定安装在安装底板(2)上,所述横向退料气缸(0122)固定安装在固定台(4)上,且所述安装底板(2)上固定安装有一与横向退料气缸(0122)相配合对应的退料槽(0123),所述上下退料气缸(0121)、横向退料气缸(0122)上均安装有磁性开关(9)。The unloading station (012) is ejected and pushed out through the upper and lower unloading cylinders (0121) and the horizontal unloading cylinders (0122). 7) It is fixedly installed on the installation base plate (2), the horizontal discharge cylinder (0122) is fixedly installed on the fixing table (4), and a horizontal discharge cylinder (0122) is fixedly installed on the installation base plate (2). ) is matched with the corresponding unloading chute (0123), a magnetic switch (9) is installed on the upper and lower unloading cylinders (0121) and the horizontal unloading cylinder (0122). 2.根据权利要求1所述的一种用于电梯开关盒多工位自动化装配生产装置,其特征在于:2. a kind of multi-station automatic assembly production device for elevator switch box according to claim 1, is characterized in that: 所述下壳体安装工位(01)上的气缸包括相应的横向气缸(10)、上下气缸(11)、下壳体夹取气缸(0112);The cylinders on the lower casing installation station (01) include corresponding transverse cylinders (10), upper and lower cylinders (11), and lower casing clamping cylinders (0112); 所述下壳体夹取气缸(0112)安装在一L形支架上,且L形支架与上下气缸(11)的伸缩端固定连接,所述L形支架与第二支架(701)滑动配合;The lower shell clamping cylinder (0112) is mounted on an L-shaped bracket, and the L-shaped bracket is fixedly connected with the telescopic ends of the upper and lower cylinders (11), and the L-shaped bracket is slidingly matched with the second bracket (701); 所述下壳体安装工位(01)上的待料槽为与下壳体夹取气缸(0112)相配合对应的下壳体输送槽(0111),所述下壳体输送槽(0111)固定安装在第一支架(7)上。The waiting trough on the lower casing installation station (01) is a lower casing conveying groove (0111) corresponding to the lower casing clamping cylinder (0112), and the lower casing conveying groove (0111) It is fixedly mounted on the first bracket (7). 3.根据权利要求1所述的一种用于电梯开关盒多工位自动化装配生产装置,其特征在于:3. a kind of multi-station automatic assembly production device for elevator switch box according to claim 1, is characterized in that: 所述四方螺母安装工位(02)上的气缸包括相应的横向气缸(10)、上下气缸(11)、螺母夹取气缸(022);The cylinder on the square nut installation station (02) includes a corresponding transverse cylinder (10), an upper and lower cylinder (11), and a nut clamping cylinder (022); 所述螺母夹取气缸(022)安装在一直角板上,且所述直角板与上下气缸(11)的伸缩端固定连接,所述直角板与第二支架(701)滑动配合;The nut clamping cylinder (022) is mounted on a right-angle plate, and the right-angle plate is fixedly connected with the telescopic ends of the upper and lower cylinders (11), and the right-angle plate is slidingly fitted with the second bracket (701); 所述四方螺母安装工位(02)上的待料槽设置在螺母料道(021)的端部,且与螺母夹取气缸(022)的位置相配合对应,所述螺母料道(021)固定安装在第一支架(7)上;The waiting trough on the square nut installation station (02) is arranged at the end of the nut runner (021), and corresponds to the position of the nut clamping cylinder (022). The nut runner (021) fixedly mounted on the first bracket (7); 所述螺母料道(021)下方安装有一直震(12)。A direct vibration (12) is installed below the nut material channel (021). 4.根据权利要求1所述的一种用于电梯开关盒多工位自动化装配生产装置,其特征在于:4. a kind of multi-station automatic assembly production device for elevator switch box according to claim 1, is characterized in that: 所述左弹片安装工位(03)、右弹片安装工位(04)的结构相同且呈相对设置;The left shrapnel installation station (03) and the right shrapnel installation station (04) have the same structure and are arranged oppositely; 所述左弹片安装工位(03)上的气缸包括相应的横向气缸(10)、上下气缸(11)、压料气缸(032)、限位气缸(033);The cylinder on the left shrapnel installation station (03) includes a corresponding horizontal cylinder (10), an upper and lower cylinder (11), a material pressing cylinder (032), and a limit cylinder (033); 所述上下气缸(11)的端部通过支架安装有一推杆;A push rod is installed on the end of the upper and lower cylinders (11) through a bracket; 所述压料气缸(032)的端部固定安装有压针,所述压料气缸(032)固定安装在一Z形支架上,所述Z形支架通过一连接板安装在固定台(4) 上;A pressing needle is fixedly installed at the end of the material pressing cylinder (032), the material pressing cylinder (032) is fixedly installed on a Z-shaped bracket, and the Z-shaped bracket is installed on the fixing table (4) through a connecting plate superior; 所述限位气缸(033)的端部固定有一推杆,所述限位气缸(033)通过一板件安装在第一支架(7)上;A push rod is fixed at the end of the limiting cylinder (033), and the limiting cylinder (033) is mounted on the first bracket (7) through a plate; 所述左弹片安装工位(03)、右弹片安装工位(04)上的待料槽设置在弹片料道(031)的端部,且与上下气缸(11)、压料气缸(032)、限位气缸(033)的位置相配合对应,所述弹片料道(031)下方安装有一直震(12);The waiting troughs on the left shrapnel installation station (03) and the right shrapnel installation station (04) are arranged at the ends of the shrapnel material passage (031), and are connected with the upper and lower air cylinders (11) and the material pressing cylinder (032). , the position of the limiting cylinder (033) is matched and corresponding, and a direct shock (12) is installed under the shrapnel material channel (031); 所述直震(12)固定安装在安装底板(2)上。The direct vibration (12) is fixedly installed on the installation base plate (2). 5.根据权利要求1所述的一种用于电梯开关盒多工位自动化装配生产装置,其特征在于:5. a kind of multi-station automatic assembly production device for elevator switch box according to claim 1, is characterized in that: 所述左带垫螺丝安装工位(05)、右带垫螺丝安装工位(06)的结构相同且呈相对设置;The left screw mounting station (05) and the right screw mounting station (06) have the same structure and are oppositely arranged; 所述左带垫螺丝安装工位(05)上的气缸包括相应的横向气缸(10)、上下气缸(11)、第一气缸(052);The cylinders on the left screw mounting station (05) include corresponding transverse cylinders (10), upper and lower cylinders (11), and first cylinders (052); 所述第一气缸(052)的伸缩端固定连接有一安装板,所述安装板上通过一抱箍安装有一电动螺丝批(053),所述第一气缸(052)固定安装在第二支架(701)上;A mounting plate is fixedly connected to the telescopic end of the first cylinder (052), an electric screwdriver (053) is mounted on the mounting plate through a hoop, and the first cylinder (052) is fixedly mounted on the second bracket ( 701) on; 所述电动螺丝批(053)下方设有一吸嘴(13),所述吸嘴(13)设于一角形板上,所述角形板与上下气缸(11)的端部固定连接;A suction nozzle (13) is arranged below the electric screwdriver (053), the suction nozzle (13) is arranged on an angular plate, and the angular plate is fixedly connected with the ends of the upper and lower cylinders (11); 所述安装板、角形板均与相应的第二支架(701)滑动配合;Both the mounting plate and the angle plate are in sliding fit with the corresponding second brackets (701); 所述左带垫螺丝安装工位(05)、右带垫螺丝安装工位(06)上的待料槽设置在带垫螺丝料道(051)的端部,且与上下气缸(11)、第一气缸(052)的位置相配合对应,所述带垫螺丝料道(051)下方安装有一直震(12);The waiting troughs on the left screw installation station (05) and the right screw installation station (06) are arranged at the ends of the screw feed channel (051), and are connected with the upper and lower cylinders (11), The positions of the first air cylinders (052) correspond to each other, and a direct vibration (12) is installed under the screw feed channel (051) with a pad; 所述直震(12)固定安装在安装底板(2)上。The direct vibration (12) is fixedly installed on the installation base plate (2). 6.根据权利要求1所述的一种用于电梯开关盒多工位自动化装配生产装置,其特征在于:6. a kind of multi-station automatic assembly production device for elevator switch box according to claim 1, is characterized in that: 所述压力杯安装工位(07)上的气缸包括相应的横向气缸(10)、上下气缸(11)、压力杯夹取气缸(072);The cylinder on the pressure cup installation station (07) includes a corresponding transverse cylinder (10), an upper and lower cylinder (11), and a pressure cup clamping cylinder (072); 所述压力杯夹取气缸(072)安装在一L形板上,且L形板与相应的上下气缸(11)的伸缩端固定连接,所述L形板与相应的第二支架(701)滑动配合;The pressure cup clamping cylinder (072) is mounted on an L-shaped plate, and the L-shaped plate is fixedly connected with the telescopic ends of the corresponding upper and lower cylinders (11), and the L-shaped plate is connected to the corresponding second bracket (701) sliding fit; 所述压力杯安装工位(07)上的待料槽为与压力杯夹取气缸(072)相配合对应的压力杯料道(071),所述压力杯料道(071)下方安装有一直震(12),所述直震(12)固定安装在安装底板(2)上。The waiting trough on the pressure cup installation station (07) is a pressure cup feed channel (071) corresponding to the pressure cup clamping cylinder (072), and a feeder channel (071) is installed below the pressure cup feed channel (071). The direct vibration (12) is fixedly installed on the installation base plate (2). 7.根据权利要求1所述的一种用于电梯开关盒多工位自动化装配生产装置,其特征在于:7. a kind of multi-station automatic assembly production device for elevator switch box according to claim 1, is characterized in that: 所述波形垫片安装工位(08)上的气缸包括相应的横向气缸(10)、上下气缸(11)、第一顶针导向气缸(081);The air cylinder on the wave washer installation station (08) includes a corresponding transverse air cylinder (10), an upper and lower air cylinder (11), and a first thimble guide air cylinder (081); 所述第一顶针导向气缸(081)通过一板件固定安装在安装底板(2)上;The first thimble guide cylinder (081) is fixedly installed on the installation bottom plate (2) through a plate; 所述上下气缸(11)的伸缩端固定连接有一角板,所述角板上安装有吸嘴(13);A corner plate is fixedly connected to the telescopic ends of the upper and lower cylinders (11), and a suction nozzle (13) is installed on the corner plate; 所述角板与相应的第二支架(701)滑动配合。The gussets are slidably fitted with the corresponding second brackets (701). 8.根据权利要求1所述的一种用于电梯开关盒多工位自动化装配生产装置,其特征在于:8. a kind of multi-station automatic assembly production device for elevator switch box according to claim 1, is characterized in that: 所述盘头螺丝安装工位(09)上的气缸包括相应的横向气缸(10)、上下气缸(11)、第二顶针导向气缸(091);The air cylinder on the pan head screw installation station (09) includes a corresponding transverse air cylinder (10), an upper and lower air cylinder (11), and a second thimble guide air cylinder (091); 所述第二顶针导向气缸(091)通过一板件固定安装在安装底板(2)上;The second thimble guide cylinder (091) is fixedly mounted on the mounting base plate (2) through a plate; 所述上下气缸(11)的伸缩端固定连接有一角板,所述角板上安装有吸嘴(13),所述角板与相应的第二支架(701)滑动配合。A corner plate is fixedly connected to the telescopic ends of the upper and lower cylinders (11), a suction nozzle (13) is installed on the corner plate, and the corner plate is slidably matched with the corresponding second bracket (701). 9.根据权利要求1所述的一种用于电梯开关盒多工位自动化装配生产装置,其特征在于:9. a kind of multi-station automatic assembly production device for elevator switch box according to claim 1, is characterized in that: 所述上盖安装工位(010)上的上下气缸(11)的伸缩端连接有一压块,所述压块安装在一直角架上;A pressure block is connected to the telescopic ends of the upper and lower cylinders (11) on the upper cover installation station (010), and the pressure block is installed on a right angle frame; 所述直角架与相应的第二支架(701)滑动配合。The right-angle frame is slidably fitted with the corresponding second bracket (701). 10.根据权利要求1所述的一种用于电梯开关盒多工位自动化装配生产装置,其特征在于:10. a kind of multi-station automatic assembly production device for elevator switch box according to claim 1, is characterized in that: 所述定位模具(14)呈矩形结构,且定位模具(14)内开设有开关盒容腔,容腔底部开设有与安装槽(301)贯通且与上下退料气缸(0121)相配合对应的推料孔;The positioning mold (14) has a rectangular structure, and the positioning mold (14) is provided with a switch box cavity, and the bottom of the cavity is provided with a mounting groove (301) passing through and corresponding to the upper and lower material discharging cylinders (0121). push hole; 所述定位模具(14)嵌入相应的安装槽(301)并通过定位模具(14)两侧的凸耳固定安装在转盘(3)上。The positioning mold (14) is embedded in the corresponding installation groove (301) and fixedly mounted on the turntable (3) through the lugs on both sides of the positioning mold (14).
CN201921626635.7U 2019-09-27 2019-09-27 Be used for automatic assembly apparatus for producing of elevator switch box multistation Expired - Fee Related CN211102639U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921626635.7U CN211102639U (en) 2019-09-27 2019-09-27 Be used for automatic assembly apparatus for producing of elevator switch box multistation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921626635.7U CN211102639U (en) 2019-09-27 2019-09-27 Be used for automatic assembly apparatus for producing of elevator switch box multistation

Publications (1)

Publication Number Publication Date
CN211102639U true CN211102639U (en) 2020-07-28

Family

ID=71721083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921626635.7U Expired - Fee Related CN211102639U (en) 2019-09-27 2019-09-27 Be used for automatic assembly apparatus for producing of elevator switch box multistation

Country Status (1)

Country Link
CN (1) CN211102639U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110614505A (en) * 2019-09-27 2019-12-27 浙江理工大学 Be used for automatic assembly apparatus for producing of elevator switch box multistation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110614505A (en) * 2019-09-27 2019-12-27 浙江理工大学 Be used for automatic assembly apparatus for producing of elevator switch box multistation
CN110614505B (en) * 2019-09-27 2024-08-27 浙江理工大学 A multi-station automated assembly production device for elevator switch boxes

Similar Documents

Publication Publication Date Title
CN107398724B (en) Automatic assembly equipment for elastic steel balls of sleeve conversion head
CN106736354A (en) Multistation screw feeding system
CN106112463A (en) Electromagnetic valve assembles the nut feed mechanism of equipment
CN107378469A (en) Cantilever screw machine
CN110394851A (en) A fully automatic punching machine for LED lamp tubes
CN211102639U (en) Be used for automatic assembly apparatus for producing of elevator switch box multistation
CN110614505B (en) A multi-station automated assembly production device for elevator switch boxes
CN106736802A (en) A kind of multistation automatic loading/unloading process equipment
CN103341776A (en) Feeding mechanism for connecting full-automatic tapping machine and switch box bottom plates formed in automatic-punching mode
CN108555572B (en) Automatic assembly line for elastic sheet
CN203726707U (en) Full-automatic plug inner bracket injection molding system
CN103786306A (en) Full-automatic plug inner rack injection system
CN105108116A (en) Intelligent rotary disc metal casting and nozzle separation integrated machine and operating method thereof
CN207681891U (en) A kind of feeding device of screw tightening machine
CN206702564U (en) Pipe clamp automatic assembling machine
CN104493477A (en) Lamp automatic screwing equipment
CN211192366U (en) Full-automatic cap tapping machine
CN210415854U (en) Multi-station screen printing machine for producing mobile phone glass cover plate
CN207205078U (en) A kind of clamping device for single point incremental forming of sheet metal
CN215358509U (en) Equipment for producing ceiling nail
CN208117202U (en) A potentiometer base assembly machine
CN210052972U (en) A fully automatic plastic shell lower cover lead soldering machine
CN103978353A (en) Fully-automatic copper sleeve assembling machine
CN214562601U (en) Injection mold for producing electronic dartboard
CN210453756U (en) Heart support seal wire thread rolling pyrocondensation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728

CF01 Termination of patent right due to non-payment of annual fee