CN211007377U - A steel stair structure for PC stairwell - Google Patents
A steel stair structure for PC stairwell Download PDFInfo
- Publication number
- CN211007377U CN211007377U CN201921631792.7U CN201921631792U CN211007377U CN 211007377 U CN211007377 U CN 211007377U CN 201921631792 U CN201921631792 U CN 201921631792U CN 211007377 U CN211007377 U CN 211007377U
- Authority
- CN
- China
- Prior art keywords
- steel staircase
- integral
- integral steel
- utility
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型公开了一种用于PC楼梯间的钢楼梯结构,包括整体式钢楼梯以及固定在整体式钢楼梯两侧的整体式栏杆,在整体式钢楼梯的上下两端分别安装有两对可调顶托;所述可调顶托包括焊接在整体式钢楼梯上端或下端的套管以及穿入套管内的螺柱,在螺柱上螺纹连接有调节座,套管置于调节座上方。本实用新型通过调节可调顶托,可微调整体式钢楼梯与楼层的水平度及高度,保证整体式钢楼梯的梯台阶面与楼板平行,方便施工人员行走,同时提高整体式钢楼梯的稳定性。此外,本实用新型整体式钢楼梯和整体式栏杆的各组成构件在连接处均采用焊接形式,组成构件间形成牢固有效的连接,提高了钢楼梯的可靠性和稳定性。
The utility model discloses a steel staircase structure for PC staircases, which comprises an integral steel staircase and integral railings fixed on both sides of the integral steel staircase. Adjustable jack; the adjustable jack includes a sleeve welded on the upper or lower end of the integral steel staircase and a stud threaded into the sleeve, an adjustment seat is threaded on the stud, and the sleeve is placed above the adjustment seat . By adjusting the adjustable top support, the utility model can fine-tune the levelness and height of the integral steel staircase and the floor, ensure that the step surface of the integral steel staircase is parallel to the floor, facilitate the construction personnel to walk, and at the same time improve the stability of the integral steel staircase sex. In addition, each component of the integrated steel staircase and the integrated railing of the utility model adopts the welding form at the joints, forming a firm and effective connection between the components, which improves the reliability and stability of the steel staircase.
Description
技术领域technical field
本实用新型涉及一种用于PC楼梯间的钢楼梯结构,属于建筑施工工具技术领域。The utility model relates to a steel stair structure for PC stairwells, belonging to the technical field of building construction tools.
背景技术Background technique
进入PC操作层时,通常在外墙或采光井处搭设安全通道或在楼层处搭设临时楼梯,在进入过程中极易出现踩空的情况,且存在侧滑等不安全隐患。临时通道或临时楼梯安拆过程工作量大,花费时间大,易导致安全事故及项目工期延误。而且在外墙或采光井安装安全通道需要大量的工字钢、钢管及钢笆片,占用施工场地过大,且安装安全通道结构复杂,不利于安装的同时容易出现安全隐患。When entering the PC operation floor, safety passages are usually set up at the outer walls or lighting wells or temporary stairs are set up at the floors. During the entry process, it is very easy to step on the empty space, and there are unsafe hidden dangers such as side slip. The installation and dismantling of temporary passages or temporary staircases requires a lot of work and takes a lot of time, which can easily lead to safety accidents and delays in the project construction period. In addition, the installation of safety passages on outer walls or lighting wells requires a large number of I-beams, steel pipes and steel fences, which occupies too much construction site, and the installation of safety passages is complicated in structure, which is not conducive to installation and prone to safety hazards.
实用新型内容Utility model content
本实用新型目的在于提供一种方便快捷、降低劳动成本、安全系数高的用于PC楼梯间的钢楼梯结构,以克服现有技术中的不足。The purpose of the utility model is to provide a steel stair structure for PC stairwells, which is convenient and quick, reduces labor costs and has a high safety factor, so as to overcome the deficiencies in the prior art.
为了实现上述目的,本实用新型采用了如下技术方案:一种用于PC楼梯间的钢楼梯结构,包括整体式钢楼梯以及固定在整体式钢楼梯两侧的整体式栏杆,在整体式钢楼梯的上下两端分别安装有两对可调顶托。In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a steel staircase structure for PC stairwell, including integral steel staircase and integral railings fixed on both sides of the integral steel staircase, in the integral steel staircase Two pairs of adjustable top brackets are respectively installed on the upper and lower ends of the device.
进一步,所述可调顶托包括焊接在整体式钢楼梯上端或下端的套管以及穿入套管内的螺柱,在螺柱上螺纹连接有调节座,套管置于调节座上方。Further, the adjustable jack includes a sleeve welded on the upper or lower end of the integral steel staircase and a stud threaded into the sleeve, an adjustment seat is threadedly connected to the stud, and the sleeve is placed above the adjustment seat.
更进一步,所述螺柱的下端焊接有“U”形板,在“U”形板的底部设置有木方。Further, the lower end of the stud is welded with a "U"-shaped plate, and a wooden square is arranged at the bottom of the "U"-shaped plate.
进一步,所述整体式栏杆的下部通过螺栓固定在整体式钢楼梯上。Further, the lower part of the integral railing is fixed on the integral steel staircase by bolts.
由于采用了上述技术方案,本实用新型的具有以下优点:Owing to adopting the above-mentioned technical scheme, the utility model has the following advantages:
1、本实用新型通过调节可调顶托,可微调整体式钢楼梯与楼层的水平度及高度,保证整体式钢楼梯的梯台阶面与楼板平行,方便施工人员行走,同时提高整体式钢楼梯的稳定性。1. The utility model can fine-tune the levelness and height of the integral steel staircase and the floor by adjusting the adjustable top support, ensuring that the step surface of the integral steel staircase is parallel to the floor, which is convenient for construction personnel to walk, and at the same time improves the overall steel staircase. stability.
2、本实用新型整体式钢楼梯和整体式栏杆的各组成构件在连接处均采用焊接形式,组成构件间形成牢固有效的连接,提高了钢楼梯的可靠性和稳定性。2. The components of the integrated steel staircase and the integrated railing of the present utility model are welded at the joints, forming a firm and effective connection between the components, which improves the reliability and stability of the steel staircase.
3、本实用新型的整体式钢楼梯和整体式栏杆通过螺栓进行可靠连接,简化了钢楼梯的安装步骤。3. The integral steel staircase and the integral railing of the present invention are reliably connected by bolts, which simplifies the installation steps of the steel staircase.
4、整体式钢楼梯便于快速吊装,节省安装时间。4. The integral steel staircase is convenient for quick hoisting and saves installation time.
附图说明Description of drawings
图1是本实用新型的整体结构示意图。Figure 1 is a schematic diagram of the overall structure of the present invention.
图2是可调顶托的结构示意图。Figure 2 is a schematic structural diagram of an adjustable jack.
图3是本实用新型实施时的结构示意图。FIG. 3 is a schematic structural diagram when the utility model is implemented.
附图标记说明:1-可调顶托,2-整体式钢楼梯,3-整体式栏杆,4-螺栓,1.1-套管,1.2-可调螺柱,1.3-木方,1.4-“U”形板,1.5-螺柱。Description of reference numerals: 1-Adjustable top bracket, 2-Integral steel stairs, 3-Integral railing, 4-Bolt, 1.1-Sleeve, 1.2-Adjustable stud, 1.3-Wooden square, 1.4-"U ” shaped plate, 1.5-stud.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
本实用新型的实施例:请参阅图1及图2,一种用于PC楼梯间的钢楼梯结构,包括整体式钢楼梯2以及固定在整体式钢楼梯2两侧的整体式栏杆3,在整体式钢楼梯2的上下两端分别安装有两对可调顶托1。所述可调顶托1包括焊接在整体式钢楼梯2上端或下端的套管1.1以及穿入套管1.1内的螺柱1.5,在螺柱1.5上螺纹连接有调节座1.2,套管1.1置于调节座1.2上方;所述螺柱1.5的下端焊接有“U”形板1.4,在“U”形板1.4的底部设置有木方1.3。所述整体式栏杆3的下部通过螺栓4固定在整体式钢楼梯2上。Embodiments of the present utility model: please refer to FIG. 1 and FIG. 2 , a steel staircase structure for PC stairwells includes an
参见图3,安装时,首先将整体式钢楼梯2吊装至PC楼梯间的现浇板和预浇板之间,然后调节可调顶托1,调整体式钢楼梯2与楼层的水平度及高度,保证整体式钢楼梯2的梯台阶面与楼板平行,方便施工人员行走,同时提高整体式钢楼梯2的稳定性;此时,将整体式栏杆3通过螺栓4固定在整体式钢楼梯2的两侧,确保施工人员安全抵达操作层。Referring to Figure 3, when installing, first hoist the
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921631792.7U CN211007377U (en) | 2019-09-28 | 2019-09-28 | A steel stair structure for PC stairwell |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921631792.7U CN211007377U (en) | 2019-09-28 | 2019-09-28 | A steel stair structure for PC stairwell |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211007377U true CN211007377U (en) | 2020-07-14 |
Family
ID=71468843
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921631792.7U Expired - Fee Related CN211007377U (en) | 2019-09-28 | 2019-09-28 | A steel stair structure for PC stairwell |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211007377U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116733178A (en) * | 2023-05-30 | 2023-09-12 | 中国建筑第四工程局有限公司 | Be used for assembled stair construction steel cat ladder |
-
2019
- 2019-09-28 CN CN201921631792.7U patent/CN211007377U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116733178A (en) * | 2023-05-30 | 2023-09-12 | 中国建筑第四工程局有限公司 | Be used for assembled stair construction steel cat ladder |
| CN116733178B (en) * | 2023-05-30 | 2026-02-27 | 中国建筑第四工程局有限公司 | A steel ladder for prefabricated staircase construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209907773U (en) | Assembled precast concrete stair | |
| CN205476401U (en) | Elevator well type steel protection construction platform | |
| CN211007377U (en) | A steel stair structure for PC stairwell | |
| CN207609153U (en) | A kind of elevator liftable construction operation platform | |
| CN201695668U (en) | An assembled slow-walking platform | |
| CN204753397U (en) | Temporary mounting hanger for steel box bridge | |
| CN202220434U (en) | Aluminum-alloy building formwork component | |
| CN116005949A (en) | Double-layer concrete beam template erecting device for stairway and use method | |
| CN102392534B (en) | Aluminum alloy building template assembly | |
| CN212359061U (en) | PC staircase safety protection operation platform | |
| CN212836354U (en) | Steel construction stair | |
| CN209568688U (en) | A kind of elevating construction platform | |
| CN207314692U (en) | A kind of precast stair | |
| CN114991531A (en) | Temporary stair for prefabricated concrete structure and construction method thereof | |
| CN115075530B (en) | Cantilever structure and construction method thereof | |
| CN207314793U (en) | Operating platform between a kind of regularization precast stair | |
| CN204418715U (en) | A kind of removable operating platform of encorbelmenting | |
| CN204059962U (en) | Embedded side formwork for cast-in-place concrete stair treads | |
| CN219528337U (en) | A prefabricated stairwell assembly construction operation platform | |
| CN109403609B (en) | Wall-supporting type triangular support frame | |
| CN207863444U (en) | Independent attached wall mounting column | |
| CN214330012U (en) | Can have enough to meet need instrument formula stair and prevent railing temporarily | |
| CN218990718U (en) | A modular building staircase structure | |
| CN113833312A (en) | Combined temporary construction stair used in assembly type stair | |
| CN212507124U (en) | Steel assembled stair |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200714 |