CN211007377U - A steel stair structure for PC stairwell - Google Patents

A steel stair structure for PC stairwell Download PDF

Info

Publication number
CN211007377U
CN211007377U CN201921631792.7U CN201921631792U CN211007377U CN 211007377 U CN211007377 U CN 211007377U CN 201921631792 U CN201921631792 U CN 201921631792U CN 211007377 U CN211007377 U CN 211007377U
Authority
CN
China
Prior art keywords
steel staircase
integral
integral steel
utility
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921631792.7U
Other languages
Chinese (zh)
Inventor
华春雷
姚亮
刘鹏辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Engineering Bureau Construction and Development Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Engineering Bureau Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Fourth Engineering Bureau Construction and Development Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201921631792.7U priority Critical patent/CN211007377U/en
Application granted granted Critical
Publication of CN211007377U publication Critical patent/CN211007377U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种用于PC楼梯间的钢楼梯结构,包括整体式钢楼梯以及固定在整体式钢楼梯两侧的整体式栏杆,在整体式钢楼梯的上下两端分别安装有两对可调顶托;所述可调顶托包括焊接在整体式钢楼梯上端或下端的套管以及穿入套管内的螺柱,在螺柱上螺纹连接有调节座,套管置于调节座上方。本实用新型通过调节可调顶托,可微调整体式钢楼梯与楼层的水平度及高度,保证整体式钢楼梯的梯台阶面与楼板平行,方便施工人员行走,同时提高整体式钢楼梯的稳定性。此外,本实用新型整体式钢楼梯和整体式栏杆的各组成构件在连接处均采用焊接形式,组成构件间形成牢固有效的连接,提高了钢楼梯的可靠性和稳定性。

Figure 201921631792

The utility model discloses a steel staircase structure for PC staircases, which comprises an integral steel staircase and integral railings fixed on both sides of the integral steel staircase. Adjustable jack; the adjustable jack includes a sleeve welded on the upper or lower end of the integral steel staircase and a stud threaded into the sleeve, an adjustment seat is threaded on the stud, and the sleeve is placed above the adjustment seat . By adjusting the adjustable top support, the utility model can fine-tune the levelness and height of the integral steel staircase and the floor, ensure that the step surface of the integral steel staircase is parallel to the floor, facilitate the construction personnel to walk, and at the same time improve the stability of the integral steel staircase sex. In addition, each component of the integrated steel staircase and the integrated railing of the utility model adopts the welding form at the joints, forming a firm and effective connection between the components, which improves the reliability and stability of the steel staircase.

Figure 201921631792

Description

一种用于PC楼梯间的钢楼梯结构A steel stair structure for PC stairwell

技术领域technical field

本实用新型涉及一种用于PC楼梯间的钢楼梯结构,属于建筑施工工具技术领域。The utility model relates to a steel stair structure for PC stairwells, belonging to the technical field of building construction tools.

背景技术Background technique

进入PC操作层时,通常在外墙或采光井处搭设安全通道或在楼层处搭设临时楼梯,在进入过程中极易出现踩空的情况,且存在侧滑等不安全隐患。临时通道或临时楼梯安拆过程工作量大,花费时间大,易导致安全事故及项目工期延误。而且在外墙或采光井安装安全通道需要大量的工字钢、钢管及钢笆片,占用施工场地过大,且安装安全通道结构复杂,不利于安装的同时容易出现安全隐患。When entering the PC operation floor, safety passages are usually set up at the outer walls or lighting wells or temporary stairs are set up at the floors. During the entry process, it is very easy to step on the empty space, and there are unsafe hidden dangers such as side slip. The installation and dismantling of temporary passages or temporary staircases requires a lot of work and takes a lot of time, which can easily lead to safety accidents and delays in the project construction period. In addition, the installation of safety passages on outer walls or lighting wells requires a large number of I-beams, steel pipes and steel fences, which occupies too much construction site, and the installation of safety passages is complicated in structure, which is not conducive to installation and prone to safety hazards.

实用新型内容Utility model content

本实用新型目的在于提供一种方便快捷、降低劳动成本、安全系数高的用于PC楼梯间的钢楼梯结构,以克服现有技术中的不足。The purpose of the utility model is to provide a steel stair structure for PC stairwells, which is convenient and quick, reduces labor costs and has a high safety factor, so as to overcome the deficiencies in the prior art.

为了实现上述目的,本实用新型采用了如下技术方案:一种用于PC楼梯间的钢楼梯结构,包括整体式钢楼梯以及固定在整体式钢楼梯两侧的整体式栏杆,在整体式钢楼梯的上下两端分别安装有两对可调顶托。In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a steel staircase structure for PC stairwell, including integral steel staircase and integral railings fixed on both sides of the integral steel staircase, in the integral steel staircase Two pairs of adjustable top brackets are respectively installed on the upper and lower ends of the device.

进一步,所述可调顶托包括焊接在整体式钢楼梯上端或下端的套管以及穿入套管内的螺柱,在螺柱上螺纹连接有调节座,套管置于调节座上方。Further, the adjustable jack includes a sleeve welded on the upper or lower end of the integral steel staircase and a stud threaded into the sleeve, an adjustment seat is threadedly connected to the stud, and the sleeve is placed above the adjustment seat.

更进一步,所述螺柱的下端焊接有“U”形板,在“U”形板的底部设置有木方。Further, the lower end of the stud is welded with a "U"-shaped plate, and a wooden square is arranged at the bottom of the "U"-shaped plate.

进一步,所述整体式栏杆的下部通过螺栓固定在整体式钢楼梯上。Further, the lower part of the integral railing is fixed on the integral steel staircase by bolts.

由于采用了上述技术方案,本实用新型的具有以下优点:Owing to adopting the above-mentioned technical scheme, the utility model has the following advantages:

1、本实用新型通过调节可调顶托,可微调整体式钢楼梯与楼层的水平度及高度,保证整体式钢楼梯的梯台阶面与楼板平行,方便施工人员行走,同时提高整体式钢楼梯的稳定性。1. The utility model can fine-tune the levelness and height of the integral steel staircase and the floor by adjusting the adjustable top support, ensuring that the step surface of the integral steel staircase is parallel to the floor, which is convenient for construction personnel to walk, and at the same time improves the overall steel staircase. stability.

2、本实用新型整体式钢楼梯和整体式栏杆的各组成构件在连接处均采用焊接形式,组成构件间形成牢固有效的连接,提高了钢楼梯的可靠性和稳定性。2. The components of the integrated steel staircase and the integrated railing of the present utility model are welded at the joints, forming a firm and effective connection between the components, which improves the reliability and stability of the steel staircase.

3、本实用新型的整体式钢楼梯和整体式栏杆通过螺栓进行可靠连接,简化了钢楼梯的安装步骤。3. The integral steel staircase and the integral railing of the present invention are reliably connected by bolts, which simplifies the installation steps of the steel staircase.

4、整体式钢楼梯便于快速吊装,节省安装时间。4. The integral steel staircase is convenient for quick hoisting and saves installation time.

附图说明Description of drawings

图1是本实用新型的整体结构示意图。Figure 1 is a schematic diagram of the overall structure of the present invention.

图2是可调顶托的结构示意图。Figure 2 is a schematic structural diagram of an adjustable jack.

图3是本实用新型实施时的结构示意图。FIG. 3 is a schematic structural diagram when the utility model is implemented.

附图标记说明:1-可调顶托,2-整体式钢楼梯,3-整体式栏杆,4-螺栓,1.1-套管,1.2-可调螺柱,1.3-木方,1.4-“U”形板,1.5-螺柱。Description of reference numerals: 1-Adjustable top bracket, 2-Integral steel stairs, 3-Integral railing, 4-Bolt, 1.1-Sleeve, 1.2-Adjustable stud, 1.3-Wooden square, 1.4-"U ” shaped plate, 1.5-stud.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

本实用新型的实施例:请参阅图1及图2,一种用于PC楼梯间的钢楼梯结构,包括整体式钢楼梯2以及固定在整体式钢楼梯2两侧的整体式栏杆3,在整体式钢楼梯2的上下两端分别安装有两对可调顶托1。所述可调顶托1包括焊接在整体式钢楼梯2上端或下端的套管1.1以及穿入套管1.1内的螺柱1.5,在螺柱1.5上螺纹连接有调节座1.2,套管1.1置于调节座1.2上方;所述螺柱1.5的下端焊接有“U”形板1.4,在“U”形板1.4的底部设置有木方1.3。所述整体式栏杆3的下部通过螺栓4固定在整体式钢楼梯2上。Embodiments of the present utility model: please refer to FIG. 1 and FIG. 2 , a steel staircase structure for PC stairwells includes an integral steel staircase 2 and integral railings 3 fixed on both sides of the integral steel staircase 2. Two pairs of adjustable top brackets 1 are respectively installed on the upper and lower ends of the integral steel staircase 2 . The adjustable jack 1 includes a casing 1.1 welded on the upper or lower end of the integral steel staircase 2 and a stud 1.5 penetrating into the casing 1.1. An adjustment seat 1.2 is threadedly connected to the stud 1.5, and the casing 1.1 is placed on the stud 1.5. Above the adjustment seat 1.2; the lower end of the stud 1.5 is welded with a "U"-shaped plate 1.4, and a wooden square 1.3 is arranged at the bottom of the "U"-shaped plate 1.4. The lower part of the integral railing 3 is fixed on the integral steel staircase 2 by bolts 4 .

参见图3,安装时,首先将整体式钢楼梯2吊装至PC楼梯间的现浇板和预浇板之间,然后调节可调顶托1,调整体式钢楼梯2与楼层的水平度及高度,保证整体式钢楼梯2的梯台阶面与楼板平行,方便施工人员行走,同时提高整体式钢楼梯2的稳定性;此时,将整体式栏杆3通过螺栓4固定在整体式钢楼梯2的两侧,确保施工人员安全抵达操作层。Referring to Figure 3, when installing, first hoist the integral steel staircase 2 between the cast-in-place slab and the pre-cast slab in the PC stairwell, and then adjust the adjustable top support 1 to adjust the level and height of the integral steel staircase 2 and the floor. , to ensure that the step surface of the integral steel staircase 2 is parallel to the floor, which is convenient for construction personnel to walk, and at the same time improves the stability of the integral steel staircase 2; On both sides, to ensure that construction workers reach the operation floor safely.

Claims (4)

1. The utility model provides a steel stair structure for PC stairwell, includes integral steel stair (2) and fixes integral railing (3) in integral steel stair (2) both sides, its characterized in that: two pairs of adjustable jacking supports (1) are respectively arranged at the upper end and the lower end of the integral steel stair (2).
2. The steel stair structure for a PC stair well according to claim 1, wherein: the adjustable jacking (1) comprises a sleeve (1.1) welded at the upper end or the lower end of the integral steel stair (2) and a stud (1.5) penetrating into the sleeve (1.1), the stud (1.5) is connected with an adjusting seat (1.2) in a threaded manner, and the sleeve (1.1) is arranged above the adjusting seat (1.2).
3. The steel stair structure for a PC stair well according to claim 2, wherein: the lower end of the stud (1.5) is welded with a U-shaped plate (1.4), and a batten (1.3) is arranged at the bottom of the U-shaped plate (1.4).
4. The steel stair structure for a PC stair well according to claim 1, wherein: the lower part of the integrated railing (3) is fixed on the integrated steel stair (2) through a bolt (4).
CN201921631792.7U 2019-09-28 2019-09-28 A steel stair structure for PC stairwell Expired - Fee Related CN211007377U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921631792.7U CN211007377U (en) 2019-09-28 2019-09-28 A steel stair structure for PC stairwell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921631792.7U CN211007377U (en) 2019-09-28 2019-09-28 A steel stair structure for PC stairwell

Publications (1)

Publication Number Publication Date
CN211007377U true CN211007377U (en) 2020-07-14

Family

ID=71468843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921631792.7U Expired - Fee Related CN211007377U (en) 2019-09-28 2019-09-28 A steel stair structure for PC stairwell

Country Status (1)

Country Link
CN (1) CN211007377U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116733178A (en) * 2023-05-30 2023-09-12 中国建筑第四工程局有限公司 Be used for assembled stair construction steel cat ladder

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116733178A (en) * 2023-05-30 2023-09-12 中国建筑第四工程局有限公司 Be used for assembled stair construction steel cat ladder
CN116733178B (en) * 2023-05-30 2026-02-27 中国建筑第四工程局有限公司 A steel ladder for prefabricated staircase construction

Similar Documents

Publication Publication Date Title
CN209907773U (en) Assembled precast concrete stair
CN205476401U (en) Elevator well type steel protection construction platform
CN211007377U (en) A steel stair structure for PC stairwell
CN207609153U (en) A kind of elevator liftable construction operation platform
CN201695668U (en) An assembled slow-walking platform
CN204753397U (en) Temporary mounting hanger for steel box bridge
CN202220434U (en) Aluminum-alloy building formwork component
CN116005949A (en) Double-layer concrete beam template erecting device for stairway and use method
CN102392534B (en) Aluminum alloy building template assembly
CN212359061U (en) PC staircase safety protection operation platform
CN212836354U (en) Steel construction stair
CN209568688U (en) A kind of elevating construction platform
CN207314692U (en) A kind of precast stair
CN114991531A (en) Temporary stair for prefabricated concrete structure and construction method thereof
CN115075530B (en) Cantilever structure and construction method thereof
CN207314793U (en) Operating platform between a kind of regularization precast stair
CN204418715U (en) A kind of removable operating platform of encorbelmenting
CN204059962U (en) Embedded side formwork for cast-in-place concrete stair treads
CN219528337U (en) A prefabricated stairwell assembly construction operation platform
CN109403609B (en) Wall-supporting type triangular support frame
CN207863444U (en) Independent attached wall mounting column
CN214330012U (en) Can have enough to meet need instrument formula stair and prevent railing temporarily
CN218990718U (en) A modular building staircase structure
CN113833312A (en) Combined temporary construction stair used in assembly type stair
CN212507124U (en) Steel assembled stair

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200714