CN211006729U - Be suitable for interlock formula prefabricated plate for constructing temporary cushion in reverse construction method construction - Google Patents

Be suitable for interlock formula prefabricated plate for constructing temporary cushion in reverse construction method construction Download PDF

Info

Publication number
CN211006729U
CN211006729U CN201921815244.XU CN201921815244U CN211006729U CN 211006729 U CN211006729 U CN 211006729U CN 201921815244 U CN201921815244 U CN 201921815244U CN 211006729 U CN211006729 U CN 211006729U
Authority
CN
China
Prior art keywords
construction
plate
rigid
frame
prefabricated plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921815244.XU
Other languages
Chinese (zh)
Inventor
周广
胡野
陈廷柱
吴廷勇
郭瑞
王涛
施磊
宋伟
孙颢原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN201921815244.XU priority Critical patent/CN211006729U/en
Application granted granted Critical
Publication of CN211006729U publication Critical patent/CN211006729U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a be suitable for build interim interlock formula prefabricated plate for bed course in reverse construction, include the prefabricated plate that comprises rigidity frame, board reinforcing bar, rigid sleeve pipe and concrete stopping, fill interconnection component of wanting by reinforcing bar or round steel and contain the rings subassembly of suspension loop seat and buckle. The temporary cushion layer formed by the plurality of prefabricated plates which are connected with each other through occlusion of the plurality of interconnection members is used for replacing a temporary floor in the construction of the existing reverse construction method, has the advantages of simplifying the construction process, improving the construction efficiency, saving raw materials, shortening the construction period, reducing the investment of manpower and material resources, obviously reducing the construction cost and the like, is simple, scientific and reasonable in structure, convenient to manufacture and low in cost, saves time and labor in field installation and disassembly and can be reused, overcomes the defect of serious waste of manpower, material resources and resources in the aspect of constructing the underground relay temporary floor through the existing reverse construction method, and has strong practicability and a valuable market application prospect.

Description

Be suitable for interlock formula prefabricated plate for constructing temporary cushion in reverse construction method construction
Technical Field
The utility model relates to a reverse construction method capital construction facility technical field, especially one kind is suitable for and builds interlock formula prefabricated plate for interim bed course in the reverse construction method construction.
Background
The reverse construction method is a new foundation pit construction technology which is published in recent years and is suitable for the construction of underground multi-layer structures of high-rise buildings, and is characterized in that a floor system structure, beams, plates, columns and outer walls of a basement are used as foundation pit retaining and foundation construction supporting structures, and the construction of a covered and excavated closed basement structure is carried out from top to bottom under the support of a horizontal supporting system and a retaining system in a pit. Because the construction can be carried out simultaneously with the upper structure of the high-rise building without mutual interference, the construction method has the advantages of high efficiency, social resource saving, environmental protection, construction period shortening of the building and the like, and the application is increasingly popularized. The construction of the basement structure mainly comprises the steps of firstly, pouring a first-layer temporary floor on a clean foundation ground, and arranging a first-layer soil taking opening on the first-layer temporary floor; then, underground excavation of a space of a first layer of floor through a first layer of plate soil taking opening, pouring of a temporary floor of the underground layer, and then opening of a plate soil taking opening; then, underground second-layer space is dug through a first-layer plate soil taking opening, and an underground second-layer temporary floor is poured; and performing construction as required, or continuing to excavate the lower-layer space after the upper soil taking port is opened, or using the lower-layer space as a lowest-layer temporary bottom plate of the underground building, and performing basic facility construction such as pile head construction, elevator shaft construction, formal floor pouring and the like on the upper surface as required. The temporary floors poured during the construction period are transitional, and can be broken into construction waste which needs to be transported outside through a soil taking opening when the construction of basic facilities is carried out according to needs, so that labor and time are wasted, and a large amount of resources are wasted, so that the construction mode is not scientific and reasonable, and is not ideal from the aspects of economy, practicability and environmental protection.
Disclosure of Invention
The utility model discloses a change the unreasonable construction mode of the serious waste of manpower, material resources and resources that exist in the aspect of the current reverse construction method construction of building secret temporary floor, provide a temporary cushion layer who builds by the concatenation and fill the temporary floor in traditional reverse construction method construction, convenient in the scene assemble or dismantle, can have enough to meet the need used repeatedly, be favorable to simplifying construction process, shorten construction cycle, reduce construction cost and improve resource utilization's interlock formula prefabricated plate.
The utility model discloses be suitable for and build interlock formula prefabricated plate for interim bed course in reverse construction, including prefabricated plate and interconnection component, characterized in that: the lifting ring assembly is also included; the temporary cushion layer is used as a temporary floor in the reverse construction method and is formed by a plurality of prefabricated plates which are meshed and interconnected by a plurality of interconnecting members; prefabricated plate main part include frame, board reinforcing bar, rigid sleeve pipe and concrete filler are transferred to the rigidity, wherein:
the lifting ring assembly comprises a lifting ring seat made of steel bars and a retaining ring welded on the lifting ring seat;
the rigid box-shaped bow is characterized in that the main body of the rigid box-shaped bow is in a flat box shape and is formed by fixedly welding and interconnecting the end parts of frame plates made of four equal-length steel channels, and at least two limiting mounting holes are formed in the frame plates;
the plate steel bar is flatly laid and embedded in the rigid I.V. frame, and a plurality of lifting ring seats are fixedly welded and distributed on the plate steel bar;
the rigid sleeve is filled by a metal pipe or a PVC pipe, one end of the rigid sleeve is fixedly installed in the limiting installation hole, and the rest part of the rigid sleeve extends to the inner side of the frame plate and is embedded and fixedly arranged in the rigid weichi frame;
the concrete filling material is fully poured and filled in a cavity of the Chinese character wei-wei;
the interconnecting component is filled by reinforcing steel bars or round steel bars, the diameter of which is consistent with the aperture of the limiting mounting hole in an inserted manner, and the length of the interconnecting component is greater than that of the rigid sleeve and less than twice of that of the rigid sleeve.
Based on the above concept the utility model relates to a be suitable for build interlock formula prefabricated plate for interim bed course in reverse construction method construction, because rationally design the prefabricated plate and the interconnection component that are convenient for directly assemble as required at the scene, interlock interconnection, can accompany the underground construction operation of digging earth progressively in proper order, the extension concatenation, the operation that makes the underground basement space of digging is high-efficient expansion under dry and the even state in ground, the limit is dug earth in having avoided prior art construction, the limit extension, it wastes time and energy to waste and pour interim floor, and need abolish again after, export the building rubbish that produces from this again, and when continuing the construction downwards earlier local abolish on interim floor, excavate the trouble that sets up the soil pick-up mouth again. Therefore, utilize the utility model discloses a prefabricated plate is built temporary cushion and is replaced the temporary floor in the construction of traditional reverse construction method, obviously have and simplify construction process, improve the efficiency of construction, practice thrift raw and other materials, reduction of erection time, reduce manpower and materials input, and greatly reduce a great deal of advantages such as construction cost, simple structure and scientific and reasonable, the preparation is convenient and with low costs, the installation all saves time and laborsaving and can also reuse with the dismantlement, the manpower that exists in the aspect of effectively having overcome the construction of current reverse construction method and building underground relay temporary floor, material resources and the serious extravagant drawback of resource, therefore there are very strong practicality and valuable market perspective.
Drawings
Fig. 1 is a schematic diagram of the basic structure of the embodiment of the present invention;
FIG. 2 is a side view of FIG. 1;
fig. 3 is a schematic structural view of a suspension ring assembly according to an embodiment of the present invention;
fig. 4 is an occlusion assembling schematic diagram of the embodiment of the present invention.
In the drawings
1. Precast slab 11. rigid box 111. frame plate 112. limiting mounting hole 12. plate reinforcing steel bar
13 rigid sleeve 14, concrete filling 2, interconnecting member 3, suspension ring assembly
31. Hanging ring seat 32, snap ring
Detailed Description
The invention will be further described with reference to the accompanying drawings and exemplary embodiments.
In fig. 1, 2, 3 and 4, the present invention is suitable for constructing an engagement type prefabricated slab for a temporary cushion in a reverse construction, which includes a prefabricated slab 1 and an interconnecting member 2, and is characterized in that: also comprises a lifting ring component 3; the temporary cushion layer is used as a temporary floor in the reverse construction method and is formed by a plurality of interconnecting members 2 and a plurality of prefabricated plates 1 which are meshed and interconnected; 1 main part of prefabricated plate include rigid frame 11, board reinforcing bar 12, rigid sleeve 13 and concrete filler 14, wherein:
the hoisting ring component 3 comprises a hoisting ring seat 31 made of steel bars and a retaining ring 32 welded on the hoisting ring seat 31;
the main body of the rigid box 11 is in a flat box shape and is formed by fixedly welding and interconnecting the end parts of a frame plate 111 made of four equal-length steel channels, and at least two limiting mounting holes 112 are formed in the frame plate 111;
the plate steel bar 12 is flatly laid and embedded in the rigid first-aid frame 11, and a plurality of lifting ring seats 31 are fixedly welded and distributed on the plate steel bar;
the rigid sleeve 13 is formed by a metal pipe or a PVC pipe, one end of the rigid sleeve is fixedly installed in the limiting installation hole 112, and the rest of the rigid sleeve extends to the inner side of the frame plate 111 and is embedded and fixedly arranged in the rigid frame 11;
the concrete filling material 14 is fully poured and filled in the cavity of the first-aid frame 11, after solidification, the prefabricated slab 1 is smooth in bottom surface, the retaining ring 32 is exposed on the upper surface, the limiting mounting hole 112 is exposed on the first-aid frame, and the plate steel bar 12, the rigid sleeve 13 and the suspension ring seat 31 are embedded in the prefabricated slab 1;
the interconnecting component 2 is filled by reinforcing steel bars or round steel bars, the diameter of which is consistent with the diameter of the limiting installation hole 112 in an inserted mode, the length of which is greater than that of the rigid sleeve 13 and is less than twice of that of the rigid sleeve 13.

Claims (1)

1. An interlocking precast slab for constructing a temporary cushion in a top-down construction method, comprising a precast slab (1) and interconnecting members (2), characterized in that: also comprises a lifting ring component (3); the temporary cushion layer is used as a temporary floor in the reverse construction method and is formed by a plurality of interconnected members (2) and a plurality of prefabricated plates (1) which are meshed and interconnected; prefabricated plate (1) main part include rigidity frame (11), board reinforcing bar (12), rigid bushing (13) and concrete filler (14), wherein:
the hoisting ring assembly (3) comprises a hoisting ring seat (31) made of steel bars and a retaining ring (32) welded on the hoisting ring seat (31);
the rigid clocktop frame (11) is in a flat square frame shape and is formed by fixedly welding and interconnecting the end parts of a frame plate (111) made of four equal-length channel steels, and at least two limiting mounting holes (112) are formed in the frame plate (111);
the plate steel bars (12) are flatly laid and embedded in the rigid bow frame (11), and a plurality of lifting ring seats (31) are fixedly welded and distributed on the plate steel bars;
the rigid sleeve (13) is filled by a metal pipe or a PVC pipe, one end of the rigid sleeve is fixedly arranged in the limiting mounting hole (112), and the rest part of the rigid sleeve is extended to the inner side of the frame plate (111) and is embedded and fixedly arranged in the rigid box (11);
the concrete filling material (14) is fully poured and filled in a cavity of the Chinese character wei-wei (11), after solidification, the prefabricated plate (1) is formed, the bottom surface of the prefabricated plate is flat, the buckling ring (32) is exposed on the upper surface of the prefabricated plate, the limiting mounting hole (112) is exposed on the Chinese character wei-wei;
the interconnecting component (2) is filled by reinforcing steel bars or round steel bars, the diameter of which is consistent with the diameter of the limiting mounting hole (112), the length of which is greater than that of the rigid sleeve (13) and less than twice of that of the rigid sleeve (13).
CN201921815244.XU 2019-10-28 2019-10-28 Be suitable for interlock formula prefabricated plate for constructing temporary cushion in reverse construction method construction Expired - Fee Related CN211006729U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921815244.XU CN211006729U (en) 2019-10-28 2019-10-28 Be suitable for interlock formula prefabricated plate for constructing temporary cushion in reverse construction method construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921815244.XU CN211006729U (en) 2019-10-28 2019-10-28 Be suitable for interlock formula prefabricated plate for constructing temporary cushion in reverse construction method construction

Publications (1)

Publication Number Publication Date
CN211006729U true CN211006729U (en) 2020-07-14

Family

ID=71470481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921815244.XU Expired - Fee Related CN211006729U (en) 2019-10-28 2019-10-28 Be suitable for interlock formula prefabricated plate for constructing temporary cushion in reverse construction method construction

Country Status (1)

Country Link
CN (1) CN211006729U (en)

Similar Documents

Publication Publication Date Title
CN106854873B (en) Engineering method of prefabricated spliced open caisson type parking garage and parking garage
CN107313517B (en) Connecting node for laminated wall and laminated floor slab in middle layer
CN205975626U (en) Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN208072415U (en) Deep foundation pit reinforced concrete support part changes structure
CN104878776A (en) Full-automatic parking garage body structure at shallow underground layer
CN107761759B (en) L-shaped concrete retaining wall
CN106958259B (en) A kind of concrete towers column foundation and its construction method
CN209855277U (en) Conversion layer structure for underground added layer of existing building
CN114703861A (en) Double-foundation-pit construction method with shared supporting piles
CN111764578B (en) Reverse construction pile column structure and construction method thereof
CN211006729U (en) Be suitable for interlock formula prefabricated plate for constructing temporary cushion in reverse construction method construction
CN204703190U (en) A kind of underground shallow layer automatic parking garage storehouse body structure
CN101666086B (en) Cement cast-in-situ pile of prefabricated part and construction method thereof
CN115324104A (en) Permanent and temporary combined assembly type station and construction method thereof
CN110606435B (en) Suspension type electric hoist suitable for reverse construction method soil taking port transferring materials
CN112575771B (en) Environment-friendly construction method for vertical support system of reverse-acting underground engineering steel concrete with piles and columns
CN114482070A (en) Construction tool and construction method for secant pile of deep foundation pit of high-speed rail-bound line
CN211447882U (en) Elevator shaft with bottom plate prefabricated reinforcement cage
CN114000514A (en) Construction method of deep foundation pit angle support pile column component
CN114000513A (en) Assembled precast concrete hollow supporting beam
CN208184021U (en) A kind of construction wall
CN219753293U (en) Efficient retaining wall skeleton structure free of form removal
CN216640596U (en) Assembled combination concrete porous sheet pile supports reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200714

CF01 Termination of patent right due to non-payment of annual fee