CN211004169U - Net piece hanging beam - Google Patents

Net piece hanging beam Download PDF

Info

Publication number
CN211004169U
CN211004169U CN201922171162.2U CN201922171162U CN211004169U CN 211004169 U CN211004169 U CN 211004169U CN 201922171162 U CN201922171162 U CN 201922171162U CN 211004169 U CN211004169 U CN 211004169U
Authority
CN
China
Prior art keywords
hanging beam
chain
net piece
hanging
couple
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922171162.2U
Other languages
Chinese (zh)
Inventor
张立煌
陈勇
刘小斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Runding Intelligent Equipment Technology Co ltd
Original Assignee
Jiangsu Runding Intelligent Equipment Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Runding Intelligent Equipment Technology Co ltd filed Critical Jiangsu Runding Intelligent Equipment Technology Co ltd
Priority to CN201922171162.2U priority Critical patent/CN211004169U/en
Application granted granted Critical
Publication of CN211004169U publication Critical patent/CN211004169U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a net piece hanging beam, including hanging beam and hoist, hanging beam and hoist are connected, the hanging beam includes first hanging beam and second hanging beam, first hanging beam passes through expansion plate and second hanging beam fixed connection, install first chain in the first hanging beam, first chain lower extreme is connected with a plurality of first couples, install the second chain in the second hanging beam, second chain lower extreme and a plurality of second couple are connected, open at second couple middle part has hollow structure, the hoist includes the lug, the lug passes through fixed block and davit fixed connection, the lug is connected with first chain through first couple, the fixed block other end passes through the connecting rod and is connected with the stopper, the connecting rod passes through the second couple and is connected with the second chain. The utility model discloses need not change the hanging beam after the net piece has been pretreated, lift the back off the net piece that will handle, load on new net piece again and can handle once more, realize the circulation and handle, use convenient high-efficient, efficient.

Description

Net piece hanging beam
Technical Field
The utility model relates to a building production technical field, especially a net piece hanging beam.
Background
The construction method is characterized in that building materials such as reinforced concrete and plates need to be used in building construction, meshes need to be inserted into the raw materials for structural reinforcement treatment in the materials such as the reinforced concrete and the plates, the meshes need to be pretreated in advance, such as anticorrosion treatment and drying treatment, the meshes in the prior art are hoisted into a drying box together with a hanging beam, and the meshes are hoisted out of the drying box together with the hanging beam after being dried, so that the use efficiency is low.
For example, chinese utility model patent No. 201721561263.5 discloses a drying device with multilayer conveying chain, includes: the drying box is rectangular and provided with a box cover, and the box cover consists of a plurality of detachable cover plates; the first conveying chain is positioned in the drying box; the second conveying chain is positioned in the drying box and arranged on the upper part of the first conveying chain, and the third conveying chain is positioned above the box cover of the drying box.
Although the drying device using the multilayer conveying chain can save the production cost, the net piece cannot rotate on the hanging beam in a circulating mode in the using process, the hanging beam needs to be replaced, the use is not convenient and fast, and the efficiency is not high.
Disclosure of Invention
The utility model aims to solve the technical problem that a hanging beam is provided, use this kind of hanging beam can be with the net piece at the hanging beam circulation rotation, need not to change the hanging beam, use convenient high-efficient.
The utility model provides a technical scheme of above-mentioned technical problem is: the utility model provides a net piece hanging beam, includes hanging beam and hoist, hanging beam and hoist are connected, the hanging beam includes first hanging beam and second hanging beam, first hanging beam passes through expansion plate and second hanging beam fixed connection, install first chain in the first hanging beam, first chain lower extreme is connected with a plurality of first couples, install the second chain in the second hanging beam, second chain lower extreme is connected with a plurality of second couples, open at second couple middle part has hollow structure, the hoist includes the lug, the lug passes through fixed block and davit fixed connection, the lug is connected with first chain through first couple, the fixed block other end passes through the connecting rod and is connected with the stopper, the connecting rod passes through the second couple and is connected with the second chain.
As an optimized technical scheme of the utility model, the davit lower extreme is the sawtooth structure.
As an optimal technical scheme of the utility model, the second is hung the roof beam inboard and is passed through dead lever and motor fixed connection.
As an optimized technical scheme of the utility model, the expansion plate upside is connected with the telescopic link.
Because the utility model discloses a behind such structure, the collaborative work through first hanging oneself from a beam and second hanging oneself from a beam can rotate the net piece on the hanging oneself from a beam, need not change the hanging oneself from a beam after the net piece has been handled in advance, lift the back off the net piece that will handle, load on new net piece again and can handle, realize the circulation and handle, use convenient high efficiency, it is efficient.
Drawings
Fig. 1 is a bottom view of the mesh hanging beam of the present invention.
Fig. 2 is a cross-sectional view of a mesh hanging beam of the present invention.
Fig. 3 is a schematic view of the structure of the first chain.
Fig. 4 is a schematic view of the structure of the second chain.
Fig. 5 is a front view of a mesh suspension beam of the present invention.
In the figure: 1 is the hanging beam, 2 is the hoist, 3 is first hanging beam, 4 is the second hanging beam, 5 is first chain, 6 is first couple, 7 is the second chain, 8 is the second couple, 9 is the expansion plate, 10 is the lug, 11 is the davit, 12 is the fixed block, 13 is the connecting rod, 14 is the stopper, 15 is the dead lever, 16 is the motor, 17 is the telescopic link.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
As shown in figure 1, the mesh hanging beam of the utility model comprises a hanging beam 1 and a hanging tool 2, wherein the hanging beam 1 is connected with the hanging tool 2, the hanging beam 1 comprises a first hanging beam 3 and a second hanging beam 4, the first hanging beam 3 is fixedly connected with the second hanging beam 4 through a retractable plate 9, as shown in figures 2-4, a first chain 5 is arranged in the first hanging beam 3, the lower end of the first chain 5 is connected with a plurality of first hooks 6, a second chain 7 is arranged in the second hanging beam 4, the lower end of the second chain 7 is connected with a plurality of second hooks 8, the middle part of the second hook 8 is provided with a hollow structure, the hanging tool 2 comprises a lifting lug 10, the lifting lug 10 is fixedly connected with a hanging arm 11 through a fixed block 12, the lifting lug 10 is connected with the first chain 5 through the first hook 6, the other end of the fixed block 12 is connected with a limit block 14 through a connecting rod 13, the connecting rod 13 is connected with the second chain 7 through a second hook 8. The mesh on the lifting appliance 2 can be smoothly conveyed through the cooperative work of the first suspension beam 3 and the second suspension beam 4, meanwhile, the mesh does not need to be replaced after being treated, only the treated mesh needs to be dismounted, and a new mesh is mounted on the lifting arm 11 again for secondary treatment, so that the time is saved, the lifting beam can be recycled, and the efficiency is high; through being connected of first couple 6 and lug 10, second couple 8 and connecting rod 13 can strengthen hoist 2 stability on the one hand, avoid rocking of net piece in the transportation, on the other hand can avoid davit 11 breaking occur when the too much net piece of hoist, uses convenient high efficiency.
As shown in FIG. 2, the lower end of the suspension arm 11 is of a sawtooth structure. The suspension arm 11 with the sawtooth structure can enhance the friction force between the mesh and the suspension arm 11, so that the mesh is prevented from falling off from the suspension arm 11, and the use is convenient.
As shown in fig. 1, the inner side of the second suspension beam 4 is fixedly connected with a motor 16 through a fixing rod 15, and the upper side of the expansion plate 9 is connected with an expansion rod 17. The two motors 16 are respectively connected with the first chain 5 and the second chain 7, so that long-time running conditions can be provided for the first chain 5 and the second chain 7; the telescopic rod 17 can be extended or shortened according to the size of the net piece, the large net piece is prevented from being dragged on the ground in the transportation process, the large net piece is prevented from being damaged or falling off from the suspension arm 11, the use is convenient, and the practicability is good.
The description and applications of the present invention are illustrative and are not intended to limit the scope of the invention to the embodiments described above. Variations and modifications of the embodiments disclosed herein are possible, and practical alternatives to and equivalents of the various components of the embodiments are known to those of ordinary skill in the art. It will be clear to those skilled in the art that the present invention may be embodied in other forms, structures, arrangements, proportions, and with other elements, materials, and components, without departing from the spirit or essential characteristics thereof. Other variations and modifications of the embodiments disclosed herein may be made without departing from the spirit or essential characteristics of the invention.

Claims (4)

1. The utility model provides a net piece hanging beam, includes hanging beam (1) and hoist (2), characterized by: the lifting beam (1) is connected with a lifting appliance (2), the lifting beam (1) comprises a first suspension beam (3) and a second suspension beam (4), the first suspension beam (3) is fixedly connected with the second suspension beam (4) through a telescopic plate (9), a first chain (5) is installed in the first suspension beam (3), the lower end of the first chain (5) is connected with a plurality of first hooks (6), a second chain (7) is installed in the second suspension beam (4), the lower end of the second chain (7) is connected with a plurality of second hooks (8), the middle of each second hook (8) is provided with a hollow structure, the lifting appliance (2) comprises a lifting lug (10), the lifting lug (10) is fixedly connected with the lifting arm (11) through a fixed block (12), the lifting lug (10) is connected with the first chain (5) through the first hook (6), and the other end of the lifting lug (12) is connected with a limit block (14) through a connecting rod (13), the connecting rod (13) is connected with the second chain (7) through a second hook (8).
2. The mesh panel hanging beam of claim 1, wherein: the lower end of the suspension arm (11) is of a sawtooth structure.
3. The mesh panel hanging beam of claim 1, wherein: the inner side of the second suspension beam (4) is fixedly connected with a motor (16) through a fixing rod (15).
4. The mesh panel hanging beam of claim 1, wherein: the upper side of the expansion plate (9) is connected with an expansion rod (17).
CN201922171162.2U 2019-12-06 2019-12-06 Net piece hanging beam Active CN211004169U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922171162.2U CN211004169U (en) 2019-12-06 2019-12-06 Net piece hanging beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922171162.2U CN211004169U (en) 2019-12-06 2019-12-06 Net piece hanging beam

Publications (1)

Publication Number Publication Date
CN211004169U true CN211004169U (en) 2020-07-14

Family

ID=71469264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922171162.2U Active CN211004169U (en) 2019-12-06 2019-12-06 Net piece hanging beam

Country Status (1)

Country Link
CN (1) CN211004169U (en)

Similar Documents

Publication Publication Date Title
CN207276111U (en) Large space light cellular partition board mast-up
CN211004169U (en) Net piece hanging beam
CN207046729U (en) A kind of arm-tie bracket
CN108466968A (en) Firm multifunctional lifting platform
CN220642225U (en) Automatic hoisting mechanism for building construction
CN204612622U (en) Extra-deep-hole blasting means for loading
CN204823717U (en) From steady formula hydraulic grab mechanism
CN208071090U (en) Row of hanging
CN205442452U (en) Convenient hoisting accessory of substation equipment safety
CN211338608U (en) Novel roof hangs balance arm and upper bracket connection structure
CN203976211U (en) Marine drilling platform portable multi-function combined sling
CN208486406U (en) A kind of mounting structure of assembled wallboard
CN209367649U (en) A kind of superimposed sheet hanger
CN209226411U (en) A kind of suspender lifting vertical miller transmission shaft
CN201729604U (en) Aerogenerator set part-replacement hoisting structure
CN206384703U (en) The hoisting connecting piece of architectural prefab
CN203939249U (en) Wallboard hanger structure
CN215322701U (en) Engineering building material transfer device
CN219708895U (en) Lifting cover plate for wind power equipment
CN104925663A (en) Self-stabilizing type hydraulic grab bucket mechanism
CN216262587U (en) Matrix type flue gas desulfurization dust removal belt cleaning device of platform is overhauld in sharing lift
CN214786355U (en) Transmission device for suspension cable suspension bridge of ball curtain stage
CN215101585U (en) Gantry crane with fixing function
CN220317074U (en) Top lifting device for shallow round bin construction
CN220664246U (en) High-efficient grain depot leveling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant