CN210947361U - A multi-point hanging prefabricated ceiling installation structure - Google Patents
A multi-point hanging prefabricated ceiling installation structure Download PDFInfo
- Publication number
- CN210947361U CN210947361U CN201921567773.2U CN201921567773U CN210947361U CN 210947361 U CN210947361 U CN 210947361U CN 201921567773 U CN201921567773 U CN 201921567773U CN 210947361 U CN210947361 U CN 210947361U
- Authority
- CN
- China
- Prior art keywords
- calcium silicate
- mounting structure
- ceiling mounting
- clamping
- silicate board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型提供了一种多点吊挂的装配式吊顶安装结构,包括:硅酸钙板,其包括底板和设置于底板两端的连接板,连接板与底板相垂直,硅酸钙板呈“U”型;连接组件,其包括吊杆、卡接件以及连接件,吊杆的底部与卡接件相连接,卡接件与连接件相卡接,连接件与硅酸钙板相连接;连接组件设置为多组,硅酸钙板的块数设置为多块,多块硅酸钙板拼接后,通过连接组件连接墙顶。本实用新型相较于现有技术具有以下优点:不仅方便工人的施工安装,使得吊顶的强度和挠度得以保障,有效防止吊顶出现下坠塌陷的现象发生;同时对施工安装人员无技术经验要求,施工安装效率更高,且保证吊顶板面的拼接工艺缝。
The utility model provides a multi-point hanging prefabricated ceiling installation structure, comprising: a calcium silicate board, which includes a bottom plate and connecting plates arranged at both ends of the bottom plate, the connecting plates are perpendicular to the bottom plate, and the calcium silicate plate is in the shape of a "U"type; connecting assembly, which includes a boom, a clip and a connector, the bottom of the boom is connected with the clip, the clip is clipped with the connector, and the connector is connected with the calcium silicate board; The connection components are set as multiple groups, the number of calcium silicate boards is set as multiple pieces, and after the multiple calcium silicate boards are spliced, the top of the wall is connected through the connection components. Compared with the prior art, the utility model has the following advantages: not only is the construction and installation convenient for workers, the strength and deflection of the suspended ceiling are guaranteed, and the phenomenon of falling and collapse of the suspended ceiling is effectively prevented; The installation efficiency is higher, and the splicing process seam of the ceiling panel surface is guaranteed.
Description
技术领域technical field
本实用新型涉及一种吊顶安装结构,具体而言,涉及一种多点吊挂的装配式吊顶安装结构。The utility model relates to a ceiling installation structure, in particular to an assembled ceiling installation structure for multi-point hanging.
背景技术Background technique
装配式装饰是近年新兴的一种装饰施工形式。装配式装饰顾名思义,即是将装饰所需要使用的各个部品部件在工厂内实现生产完成,然后运输到装饰现场进行组合安装,免去了传统的装饰现场对各部品部件的测量、切割等作业,施工更为简单方便,可以极大地提高装饰现场的施工效率,并且施工现场更为整洁和美观,不会产生过多的装饰材料垃圾,是一种更为绿色环保的装饰施工形式。Prefabricated decoration is an emerging form of decoration construction in recent years. As the name implies, prefabricated decoration is to complete the production of various parts and components required for decoration in the factory, and then transport them to the decoration site for combined installation, eliminating the need for the traditional decoration site to measure and cut each part. The construction is simpler and more convenient, which can greatly improve the construction efficiency of the decoration site, and the construction site is more tidy and beautiful, and will not generate too much decoration material waste, which is a more green and environmentally friendly decoration construction form.
目前,室内装修施工中使用的吊顶材料选用的是6mm规格的硅酸钙板,因硅酸钙板材料有优良的防水性能,也能满足国家要求的A级防火,因此适用于室内吊顶。但硅酸钙板材料质脆,可视面不能打钉外漏,故在连接方式方面存在问题,具有不美观、下坠塌陷等问题;现有的安装方式为不锈钢吊杆配合轻钢龙骨体系进行安装,并依赖铝合金线条平整度,如铝合金线条存在弯曲变形,吊顶同样存在不平整现象。同样,多种材料组成的吊顶系统,额外增加了工时工效,同时增加了材料的损耗。At present, the ceiling material used in interior decoration construction is calcium silicate board with 6mm specification. Because calcium silicate board material has excellent waterproof performance, it can also meet the national requirements of A-level fire protection, so it is suitable for indoor ceiling. However, the calcium silicate board material is brittle, and the visible surface cannot be nailed and leaked, so there are problems in the connection method, such as unsightly, falling and collapse; the existing installation method is stainless steel boom and light steel keel system. The installation depends on the flatness of the aluminum alloy lines. For example, the aluminum alloy lines are bent and deformed, and the ceiling is also uneven. Similarly, the ceiling system composed of multiple materials increases the man-hours and ergonomics, and at the same time increases the loss of materials.
实用新型内容Utility model content
鉴于此,本实用新型提供了一种多点吊挂的装配式吊顶安装结构,不仅方便工人的施工安装,使得吊顶的强度和挠度得以保障,有效防止吊顶出现下坠塌陷的现象发生;同时对施工安装人员无技术经验要求,施工安装效率更高,且保证吊顶板面的拼接工艺缝。In view of this, the present utility model provides a multi-point hanging prefabricated ceiling installation structure, which not only facilitates the construction and installation of workers, but also ensures the strength and deflection of the ceiling, and effectively prevents the ceiling from falling and slumping. The installer has no technical experience requirements, the construction and installation efficiency is higher, and the splicing process seam of the ceiling panel surface is guaranteed.
为此,本实用新型提供了一种多点吊挂的装配式吊顶安装结构,其包括:To this end, the utility model provides a multi-point hanging prefabricated ceiling installation structure, which includes:
包括:include:
硅酸钙板,其包括底板和设置于底板两端的连接板,连接板与底板相垂直,硅酸钙板呈“U”型;A calcium silicate board, which includes a bottom plate and connecting plates arranged at both ends of the bottom plate, the connecting plates are perpendicular to the bottom plate, and the calcium silicate plate is in a "U" shape;
连接组件,其包括吊杆、卡接件以及连接件,吊杆的底部与卡接件相连接,卡接件与连接件相卡接,连接件与硅酸钙板相连接;a connecting assembly, which includes a boom, a clamping piece and a connecting piece, the bottom of the boom is connected with the clamping piece, the clamping piece is clamped with the connecting piece, and the connecting piece is connected with the calcium silicate board;
连接组件设置为多组,硅酸钙板的块数设置为多块,多块硅酸钙板拼接后,通过连接组件连接墙顶。The connection components are set as multiple groups, the number of calcium silicate boards is set as multiple pieces, and after the multiple calcium silicate boards are spliced, the top of the wall is connected through the connection components.
进一步地,上述硅酸钙板的厚度为4mm,硅酸钙板为一体式结构。Further, the thickness of the calcium silicate board is 4 mm, and the calcium silicate board has an integrated structure.
进一步地,上述硅酸钙板的正面设置有饰面层。Further, the front surface of the calcium silicate board is provided with a finishing layer.
进一步地,上述连接件呈“C”型。Further, the above-mentioned connector is in the shape of "C".
进一步地,上述卡接件的底部设置有倒置的“F”型卡接部,所述卡接部成对设置。Further, the bottom of the above-mentioned clip is provided with inverted "F"-shaped clip parts, and the clip parts are arranged in pairs.
进一步地,上述卡接件上设置有腰型孔,吊杆通过腰型孔与卡接件相连接。Further, a waist-shaped hole is provided on the above-mentioned clamping piece, and the suspension rod is connected with the clamping piece through the waist-shaped hole.
进一步地,上述连接件和连接板之间通过紧固螺丝连接。Further, the connecting piece and the connecting plate are connected by fastening screws.
进一步地,上述沿卡接件的长度方向,连接件设置为多个。Further, the above-mentioned connecting pieces are arranged in multiples along the length direction of the clipping pieces.
进一步地,上述卡接件和连接件的材质为铝合金。Further, the material of the above-mentioned clips and connectors is aluminum alloy.
本实用新型所提供的一种多点吊挂的装配式吊顶安装结构,主要包括硅酸钙板和连接组件,多块硅酸钙板拼接后,通过连接组件和墙顶连接;具体的,硅酸钙板包括底板和与其相垂直的连接板,使得硅酸钙板的整体形成“U”型结构,方便进行两侧的拼接安装;连接组件包括吊杆、卡接件以及连接件,连接板和连接件相连接后,连接件与卡接件相卡接,最终将卡接件通过吊杆固定于墙顶。The multi-point hanging prefabricated ceiling installation structure provided by the utility model mainly includes a calcium silicate board and a connecting component. The calcium silicate board includes a bottom plate and a connecting board perpendicular to it, so that the whole calcium silicate board forms a "U"-shaped structure, which is convenient for splicing and installation on both sides; After being connected with the connecting piece, the connecting piece is clamped with the clamping piece, and finally the clamping piece is fixed on the top of the wall through the hanger rod.
通过上述结构,使得本实用新型所提供的一种多点吊挂的装配式吊顶安装结构相较于现有技术主要具有以下优点:Through the above structure, the multi-point hanging prefabricated ceiling installation structure provided by the present invention mainly has the following advantages compared with the prior art:
一、不仅方便工人的施工安装,使得吊顶的强度和挠度得以保障,有效防止吊顶出现下坠塌陷的现象发生;1. It not only facilitates the construction and installation of workers, but also ensures the strength and deflection of the ceiling, and effectively prevents the ceiling from falling and collapsing;
二、对施工安装人员无技术经验要求,施工安装效率更高;2. There is no technical experience requirement for construction and installation personnel, and the construction and installation efficiency is higher;
三、保证吊顶板面的拼接工艺缝,提高硅酸钙板的拼装质量。3. Ensure the splicing process seam of the ceiling panel surface and improve the assembly quality of the calcium silicate board.
附图说明Description of drawings
通过阅读下文优选实施方式的详细描述,各种其他的优点和益处对于本领域普通技术人员将变得清楚明了。附图仅用于示出优选实施方式的目的,而并不认为是对本实用新型的限制。而且在整个附图中,用相同的参考符号表示相同的部件。在附图中:Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The accompanying drawings are only for the purpose of illustrating the preferred embodiments, and are not considered to be a limitation of the present invention. Also, the same components are denoted by the same reference numerals throughout the drawings. In the attached image:
图1为本实用新型实施例提供的一种多点吊挂的装配式吊顶安装结构的侧视图;1 is a side view of a multi-point hanging prefabricated ceiling installation structure provided by an embodiment of the present utility model;
图2为本实用新型实施例提供的一种多点吊挂的装配式吊顶安装结构的俯视图;2 is a top view of a multi-point hanging prefabricated ceiling installation structure provided by an embodiment of the present utility model;
图3为本实用新型实施例中卡接件的侧视图;FIG. 3 is a side view of the clip in the embodiment of the present utility model;
图4为本实用新型实施例中连接件的侧视图;Fig. 4 is the side view of the connector in the embodiment of the utility model;
图5为本实用新型实施例提供的一种多点吊挂的装配式吊顶安装方法步骤一中a步骤的示意图;5 is a schematic diagram of step a in
图6为本实用新型实施例提供的一种多点吊挂的装配式吊顶安装方法步骤一中b步骤的示意图;6 is a schematic diagram of step b in
图7为本实用新型实施例提供的一种多点吊挂的装配式吊顶安装方法步骤一中c步骤的示意图。7 is a schematic diagram of step c in
具体实施方式Detailed ways
下面将参照附图更详细地描述本公开的示例性实施例。虽然附图中显示了本公开的示例性实施例,然而应当理解,可以以各种形式实现本公开而不应被这里阐述的实施例所限制。相反,提供这些实施例是为了能够更透彻地理解本公开,并且能够将本公开的范围完整的传达给本领域的技术人员。Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited by the embodiments set forth herein. Rather, these embodiments are provided so that the present disclosure will be more thoroughly understood, and will fully convey the scope of the present disclosure to those skilled in the art.
实施例一:Example 1:
参见图1至图2,图中示出了本实用新型实施例一提供的一种多点吊挂的装配式吊顶安装结构,包括:硅酸钙板1,其包括底板11和设置于底板11两端的连接板12,连接板12与底板11相垂直,硅酸钙板1呈“U”型;连接组件,其包括吊杆21、卡接件22以及连接件23,吊杆21的底部与卡接件22相连接,卡接件22与连接件23相卡接,连接件23与硅酸钙板1相连接;连接组件设置为多组,硅酸钙板1的块数设置为多块,多块硅酸钙板1拼接后,通过连接组件连接墙顶。Referring to FIGS. 1 to 2 , a multi-point hanging prefabricated ceiling installation structure provided by the first embodiment of the present utility model is shown, including: a
本实施例所提供的一种多点吊挂的装配式吊顶安装结构,主要包括硅酸钙板1和连接组件,多块硅酸钙板1拼接后,通过连接组件和墙顶连接;具体的,硅酸钙板1包括底板11和与其相垂直的连接板12,使得硅酸钙板1的整体形成“U”型结构,方便进行两侧的拼接安装;连接组件包括吊杆21、卡接件22 以及连接件23,连接板12和连接件23相连接后,连接件23与卡接件22相卡接,最终将卡接件22通过吊杆固定于墙顶。A multi-point hanging prefabricated ceiling installation structure provided in this embodiment mainly includes a
通过上述结构,使得本实用新型所提供的一种多点吊挂的装配式吊顶安装结构相较于现有技术主要具有以下优点:Through the above structure, the multi-point hanging prefabricated ceiling installation structure provided by the present invention mainly has the following advantages compared with the prior art:
一、不仅方便工人的施工安装,使得吊顶的强度和挠度得以保障,有效防止吊顶出现下坠塌陷的现象发生;1. It not only facilitates the construction and installation of workers, but also ensures the strength and deflection of the ceiling, and effectively prevents the ceiling from falling and collapsing;
二、对施工安装人员无技术经验要求,施工安装效率更高;2. There is no technical experience requirement for construction and installation personnel, and the construction and installation efficiency is higher;
三、保证吊顶板面的拼接工艺缝,提高硅酸钙板1的拼装质量。3. Ensure the splicing process seam of the ceiling panel surface, and improve the assembly quality of the
实施例二:Embodiment 2:
参见图1至图2,图中示出了本实用新型实施例二提供的一种多点吊挂的装配式吊顶安装结构,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:硅酸钙板1的厚度为4mm,硅酸钙板1为一体式结构;硅酸钙板1的正面设置有饰面层13。通过上述结构的设置,材料性能等同于 6mm硅酸钙板1,满足国家A级防火标准,但在材料重量方面更有优势,重量更轻,便于工人施工安装;饰面层13的设置。Referring to Figures 1 to 2, the figures show a multi-point hanging prefabricated ceiling installation structure provided by the second embodiment of the present invention. This embodiment further makes a The following is an improved technical solution: the thickness of the
实施例三:Embodiment three:
参见图1至图4,图中示出了本实用新型实施例三提供的一种多点吊挂的装配式吊顶安装结构,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:连接件23呈“C”型;卡接件22的底部设置有倒置的“F”型卡接部221,卡接部221成对设置;卡接件22上设置有腰型孔222,吊杆21通过腰型孔222与卡接件22相连接;卡接件22和连接件23的材质为铝合金。通过上述结构的设置,能够提高卡接件22和连接件23的卡接力度,提高连接效果;另外,铝合金材质的卡接件22和连接件23在确保连接效果的同时,质量更轻便;腰型孔222的设置,能够对连接位置进行调节,调整硅酸钙板1的拼接缝。Referring to FIGS. 1 to 4 , a multi-point hanging prefabricated ceiling installation structure provided by the third embodiment of the present invention is shown in the drawings. This embodiment further makes the above-mentioned embodiments. The following is an improved technical solution: the connecting
实施例四:Embodiment 4:
参见图2,图中示出了本实用新型实施例四提供的一种多点吊挂的装配式吊顶安装结构,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:连接件23和连接板12之间通过紧固螺丝3连接;沿卡接件 22的长度方向,连接件23设置为多个。通过上述结构的设置,进一步提高连接件23和硅酸钙板1的连接力度,提高安装质量。Referring to FIG. 2, the figure shows a multi-point hanging prefabricated ceiling installation structure provided by the fourth embodiment of the present invention. This embodiment further makes the following improvements on the basis of the above-mentioned embodiments The technical solution is as follows: the connecting
实施例五:Embodiment 5:
参见图5至图7,图中示出了本实用新型实施例五提供的一种多点吊挂的装配式吊顶安装方法,包括以下安装步骤:Referring to Figures 5 to 7, the figures show a multi-point hanging prefabricated ceiling installation method provided by Embodiment 5 of the present invention, including the following installation steps:
一、预制硅酸钙板1,将硅酸钙板1的两端进行折弯处理,包括以下步骤: a、将硅酸钙板1的正面进行覆膜处理,b、在硅酸钙板1的背面折弯处开V型槽14,并在V型槽14内涂满胶水;c、在V型槽14处进行折弯并固定;1. Prefabricating the
二、拼接硅酸钙板1,将硅酸钙板1的两端通过连接件23和紧固螺丝3 进行连接;2. Splicing the
三、吊装固定,依次将所有连接件23和卡接件22相卡接,并通过吊杆21 固定于墙顶。3. Lifting and fixing, all the connecting
通过上述安装方法,不仅能够方便安装,提高安装效率,同时能够提高吊顶的安装质量;另外,折弯处理后的硅酸钙板1,其挠度比以前单板高,且安装不易变形,运输过程中也有效保护了板材边缘的磕碰,降低了材料的运输破损率。The above installation method can not only facilitate the installation, improve the installation efficiency, but also improve the installation quality of the ceiling; in addition, the
显然,本领域的技术人员可以对本实用新型进行各种改动和变型而不脱离本实用新型的精神和范围。这样,倘若本实用新型的这些修改和变型属于本实用新型权利要求及其等同技术的范围之内,则本实用新型也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present utility model fall within the scope of the claims of the present utility model and their equivalents, the present utility model is also intended to include these modifications and variations.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921567773.2U CN210947361U (en) | 2019-09-20 | 2019-09-20 | A multi-point hanging prefabricated ceiling installation structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921567773.2U CN210947361U (en) | 2019-09-20 | 2019-09-20 | A multi-point hanging prefabricated ceiling installation structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210947361U true CN210947361U (en) | 2020-07-07 |
Family
ID=71386382
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921567773.2U Expired - Fee Related CN210947361U (en) | 2019-09-20 | 2019-09-20 | A multi-point hanging prefabricated ceiling installation structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210947361U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110607871A (en) * | 2019-09-20 | 2019-12-24 | 金螳螂精装科技(苏州)有限公司 | A prefabricated suspended ceiling installation structure and installation method for multi-point suspension |
| CN112431343A (en) * | 2020-11-24 | 2021-03-02 | 苏州美瑞德建筑装饰有限公司 | High-altitude large-size aluminum single plate linear stress hanging design structure and mounting method |
-
2019
- 2019-09-20 CN CN201921567773.2U patent/CN210947361U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110607871A (en) * | 2019-09-20 | 2019-12-24 | 金螳螂精装科技(苏州)有限公司 | A prefabricated suspended ceiling installation structure and installation method for multi-point suspension |
| CN112431343A (en) * | 2020-11-24 | 2021-03-02 | 苏州美瑞德建筑装饰有限公司 | High-altitude large-size aluminum single plate linear stress hanging design structure and mounting method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111005488B (en) | Suspended ceiling assembly and assembled suspended ceiling | |
| CN210216864U (en) | Suspended ceiling falling-level vertical frame installation structure with lamp slot | |
| CN210947361U (en) | A multi-point hanging prefabricated ceiling installation structure | |
| CN111962789A (en) | Wall surface hanging flush joint system and mounting method thereof | |
| CN111851910A (en) | A wall-integrated board-back hanging system and installation method | |
| CN103276870B (en) | A kind of mounting structure of GRG decoration panel | |
| CN111101618A (en) | Multilayer wall system | |
| CN113833196A (en) | Light trough structure and suspended ceiling | |
| CN211523728U (en) | Aluminum pinch plate type film-coated glass magnesium board ceiling board structure | |
| CN215167078U (en) | Clamping formula furred ceiling mounting structure | |
| CN205024928U (en) | Furred ceiling expansion joint structure | |
| CN111075056B (en) | A multifunctional light steel keel and partition wall | |
| CN211774828U (en) | Multifunctional light steel keel and partition wall | |
| CN211229136U (en) | External corner light steel keel structure | |
| CN110607871A (en) | A prefabricated suspended ceiling installation structure and installation method for multi-point suspension | |
| CN219196441U (en) | A suspended ceiling stacked F-shaped keel and its fixed structure | |
| CN108343209A (en) | A kind of wall board connector and matching used wallboard | |
| CN215888839U (en) | Level-falling card inserting type side hanging piece | |
| CN215291179U (en) | Elevator shaft exterior wall installation structure | |
| CN213509355U (en) | Wall surface decoration device | |
| CN212836456U (en) | Assembled fast-assembling wall fossil fragments | |
| CN211369365U (en) | Assembled aluminum alloy combined modeling wall | |
| CN212897339U (en) | Mounting structure of wall is hung to assembled | |
| CN211172643U (en) | Mounting structure of embedded ceiling fastener | |
| CN209353532U (en) | The hold-down support of light steel keel partition |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200707 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
