CN210944595U - Movable self-lifting pipeline hoisting device - Google Patents
Movable self-lifting pipeline hoisting device Download PDFInfo
- Publication number
- CN210944595U CN210944595U CN201921546431.2U CN201921546431U CN210944595U CN 210944595 U CN210944595 U CN 210944595U CN 201921546431 U CN201921546431 U CN 201921546431U CN 210944595 U CN210944595 U CN 210944595U
- Authority
- CN
- China
- Prior art keywords
- wire rope
- rod sleeve
- vertical rod
- pulley block
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种移动式自提升吊装管道装置,双向异步电动机固定安装在移动型钢基座上,钢丝绳组件固定安装在移动型钢基座上,双向异步电动机驱动钢丝绳组件转动,立杆套筒固定安装在移动型钢基座上,立杆套筒为空心结构,立杆套筒底部固定安装有底部转向滑轮组,吊臂固定安装在立杆套筒顶部,吊臂上对应于立杆套筒顶部位置处安装有第一转向滑轮组,吊臂端头位置处安装有第二转向滑轮组,钢丝绳组件上缠绕有钢丝绳,钢丝绳端头依次绕过底部转向滑轮组、立杆套筒、第一转向滑轮组和第二转向滑轮组后竖直向下设置,钢丝绳端头处固定安装有吊钩。本实用新型通过电动机联合钢丝绳滑轮组件、垂直可调式套筒、吊臂形成垂直吊装路由,完成机械化提升操作,减少投入。
A mobile self-lifting hoisting pipeline device, the two-way asynchronous motor is fixedly installed on the movable steel base, the wire rope assembly is fixedly installed on the movable steel base, the two-way asynchronous motor drives the wire rope assembly to rotate, and the vertical rod sleeve is fixedly installed on the movable steel base. On the base, the vertical rod sleeve is a hollow structure, the bottom of the vertical rod sleeve is fixedly installed with the bottom steering pulley block, the boom is fixedly installed on the top of the vertical rod sleeve, and the boom is installed at the position corresponding to the top of the vertical rod sleeve. A diverting pulley block, a second diverting pulley block is installed at the end of the boom, the wire rope assembly is wound with a wire rope, and the end of the wire rope goes around the bottom diverting pulley block, the pole sleeve, the first diverting pulley block and the second diverting pulley block in turn. It is set straight down, and a hook is fixedly installed at the end of the wire rope. The utility model forms a vertical hoisting route by combining the electric motor with the wire rope pulley assembly, the vertically adjustable sleeve and the jib to complete the mechanized hoisting operation and reduce the investment.
Description
技术领域technical field
本实用新型公开一种吊装管道装置,特别是一种移动式自提升吊装管道装置,属于建筑工程安装机械技术领域。The utility model discloses a hoisting pipeline device, in particular a mobile self-lifting hoisting pipeline device, which belongs to the technical field of construction engineering installation machinery.
背景技术Background technique
随着经济的发展,社会的进步,能源节约已经成为必然和社会共识。各种机具越来越朝向节省能源、使用方便、节约空间、安全高效的方向发展。With economic development and social progress, energy conservation has become an inevitable and social consensus. Various machines and tools are increasingly developing towards the direction of energy saving, convenient use, space saving, safety and efficiency.
在实际机电安装工程施工过程中,尤其是楼层机电管道安装时,传统的管道垂直吊装大都是采用人工吊装的方式,当管道切割完成运输至现场,需要多人配合由人力从地面抬升至操作平台,再从操作平台协助安装至指定标高。整个安装过程因为管道受力较重,工人吊装借助操作平台时存在安全隐患;而且人力抬升管道效率慢,影响工程工序的进度要求。即目前的建筑机电安装施工中,需要多人配合完成管道的吊装工作,施工周期较长,施工效率低下且存在安全隐患。In the actual construction of electromechanical installation projects, especially when installing electromechanical pipelines on floors, the traditional vertical hoisting of pipelines is mostly manual hoisting. , and then assist the installation to the specified elevation from the operating platform. During the whole installation process, due to the heavy force on the pipeline, there are potential safety hazards when workers hoist with the help of the operating platform; and the efficiency of manual lifting of the pipeline is slow, which affects the progress requirements of the engineering process. That is to say, in the current construction of building electromechanical installation and construction, multiple people are required to cooperate to complete the hoisting work of the pipeline, the construction period is long, the construction efficiency is low, and there are potential safety hazards.
发明内容SUMMARY OF THE INVENTION
针对上述提到的现有技术中的机电安装工程施工过程中采用人工吊装方式进行管道提升,存在安全隐患以及施工周期长的缺点,本实用新型提供一种移动式自提升起吊管道装置,其通过一种双向异步电动机、吊绳滚轴、万向轮、滑轮、型钢基座、立管套筒等制备一套移动式自提升起吊管道装置,机械化配合现场施工,不仅节约了劳动力需求,提高了管道安装的效率,更是大大降低了竖向抬升安装管道的安全风险。In view of the above-mentioned disadvantages of manual hoisting method for pipeline lifting during the construction of electromechanical installation engineering in the prior art, which has potential safety hazards and long construction period, the utility model provides a mobile self-lifting hoisting pipeline device, which adopts A set of mobile self-hoisting hoisting pipeline device is prepared by a two-way asynchronous motor, hanging rope roller, universal wheel, pulley, profiled steel base, riser sleeve, etc. The mechanization cooperates with on-site construction, which not only saves labor requirements, but also improves the The efficiency of pipeline installation greatly reduces the safety risk of vertically lifting and installing pipelines.
本实用新型解决其技术问题采用的技术方案是:一种移动式自提升吊装管道装置,吊装管道装置包括移动型钢基座、双向异步电动机、钢丝绳组件、立杆套筒和吊臂,双向异步电动机固定安装在移动型钢基座上,钢丝绳组件固定安装在移动型钢基座上,双向异步电动机驱动钢丝绳组件转动,立杆套筒固定安装在移动型钢基座上,立杆套筒为空心结构,立杆套筒底部固定安装有底部转向滑轮组,吊臂固定安装在立杆套筒顶部,吊臂上对应于立杆套筒顶部位置处安装有第一转向滑轮组,吊臂端头位置处安装有第二转向滑轮组,钢丝绳组件上缠绕有钢丝绳,钢丝绳端头依次绕过底部转向滑轮组、立杆套筒、第一转向滑轮组和第二转向滑轮组后竖直向下设置,钢丝绳端头处固定安装有吊钩。The technical scheme adopted by the utility model to solve the technical problem is as follows: a mobile self-lifting hoisting pipeline device, the hoisting pipeline device comprises a movable steel base, a two-way asynchronous motor, a steel wire rope assembly, a vertical pole sleeve and a boom, and a two-way asynchronous motor It is fixedly installed on the movable steel base, the wire rope assembly is fixedly installed on the movable steel base, the two-way asynchronous motor drives the wire rope assembly to rotate, the vertical rod sleeve is fixedly installed on the movable steel base, and the vertical rod sleeve is a hollow structure. The bottom steering pulley block is fixedly installed at the bottom of the rod sleeve, the boom is fixedly installed on the top of the vertical rod sleeve, the first steering pulley block is installed on the boom corresponding to the top position of the vertical rod sleeve, and the first steering pulley block is installed at the position of the boom end. Two steering pulley blocks, the steel wire rope assembly is wound with a steel wire rope, and the end of the steel wire rope bypasses the bottom steering pulley block, the vertical rod sleeve, the first steering pulley block and the second steering pulley block in turn, and then is set vertically downward. The end of the steel wire rope is fixedly installed with a hanging hook.
本实用新型解决其技术问题采用的技术方案进一步还包括:The technical scheme adopted by the utility model to solve the technical problem further includes:
所述的移动型钢基座下方四角位置分别焊接有一个可移动万向轮。A movable universal wheel is respectively welded at the four corners below the movable section steel base.
所述的移动型钢基座内部固定焊接有第一横梁、第二横梁和第三横梁,第一横梁、第二横梁和第三横梁分别平行设置,双向异步电动机固定安装在第一横梁上,钢丝绳组件固定安装在第二横梁上,可调式立杆套筒固定安装在第三横梁上。The first beam, the second beam and the third beam are fixedly welded inside the movable steel base, the first beam, the second beam and the third beam are respectively arranged in parallel, the two-way asynchronous motor is fixedly installed on the first beam, The assembly is fixedly installed on the second beam, and the adjustable vertical rod sleeve is fixedly installed on the third beam.
所述的钢丝绳组件包括外壳和芯轴,钢丝绳组件外壳通过焊接或螺钉固定安装在第二横梁上,钢丝绳组件芯轴安装在外壳内。The wire rope assembly includes a casing and a mandrel, the casing of the wire rope assembly is fixed on the second beam by welding or screws, and the mandrel of the wire rope assembly is installed in the casing.
所述的钢丝绳组件与双向异步电动机平行设置,双向异步电动机与钢丝绳组件之间通过皮带连接。The wire rope assembly is arranged in parallel with the bidirectional asynchronous motor, and the bidirectional asynchronous motor and the wire rope assembly are connected by a belt.
所述的第三横梁上固定安装有固定座,立杆套筒底部通过法兰与固定座安装在一起。A fixing seat is fixedly installed on the third beam, and the bottom of the vertical rod sleeve is installed with the fixing seat through a flange.
所述的立杆套筒包括相互插接在一起的两段以上的套筒,立杆套筒上开设有插销孔,插销孔内插装有套筒调节插销。The vertical rod sleeve includes more than two sections of sleeves that are inserted together with each other, the vertical rod sleeve is provided with a plug hole, and the plug hole is inserted with a sleeve adjustment plug.
所述的吊臂采用槽钢焊接制成,第一转向滑轮组和第二转向滑轮组均安装在槽钢内。The boom is made of channel steel welded, and both the first steering pulley group and the second steering pulley group are installed in the channel steel.
所述的移动型钢基座上固定安装有防护杆,防护杆采用立杆,防护杆设置一个或两个。A protective rod is fixedly installed on the movable steel base, the protective rod is a vertical rod, and one or two protective rods are arranged.
所述的移动型钢基座上固定安装有辅助扶手。An auxiliary handrail is fixedly installed on the movable section steel base.
本实用新型的有益效果是:本实用新型通过电动机联合钢丝绳滑轮组件、垂直可调式套筒、吊臂形成垂直吊装路由,完成机械化提升操作,减少人工投入,提供效率;本实用新型通过可移动是定型型钢基座,实现建筑机电的公共走到区域移动施工需求,提高周转效率;且本实用新型通过防护立杆,更加安全的保证管道的竖向吊装。The beneficial effects of the utility model are as follows: the utility model forms a vertical hoisting route through the motor combined with the wire rope pulley assembly, the vertical adjustable sleeve and the jib, completes the mechanized lifting operation, reduces the manual input, and provides efficiency; The shaped steel base can meet the construction requirements of building electromechanical public moving to the area, and improve the turnover efficiency; and the utility model can ensure the vertical hoisting of the pipeline more safely through the protective pole.
下面将结合附图和具体实施方式对本实用新型做进一步说明。The present utility model will be further described below with reference to the accompanying drawings and specific embodiments.
附图说明Description of drawings
图1为本实用新型立体结构示意图。Figure 1 is a schematic diagram of the three-dimensional structure of the present invention.
图中,1-双向异步电动机,2-钢丝绳组件,21-第一转向滑轮组,22-吊钩,23-第二转向滑轮组,3-移动型钢基座,31-可移动万向轮,32-辅助扶手,33-第一横梁,34-第二横梁,35-第三横梁,36-固定座,4-可调式立杆套筒,41-套筒调节插销,42-插销孔,5-吊臂,6-防护杆,7-管道。In the figure, 1- bidirectional asynchronous motor, 2- wire rope assembly, 21- first steering pulley block, 22- hook, 23- second steering pulley block, 3- movable steel base, 31- movable universal wheel, 32- Auxiliary handrail, 33-first beam, 34-second beam, 35-third beam, 36-fixed seat, 4-adjustable pole sleeve, 41-sleeve adjustment bolt, 42-bolt hole, 5-hang Arm, 6-Guard Bar, 7-Pipe.
具体实施方式Detailed ways
本实施例为本实用新型优选实施方式,其他凡其原理和基本结构与本实施例相同或近似的,均在本实用新型保护范围之内。This embodiment is a preferred embodiment of the present invention, and other principles and basic structures that are the same as or similar to those of this embodiment are within the protection scope of the present invention.
本实用新型的目的在于提供适用于施工管道移动安装的、可调式自提升管道装置实现机械化配合现场施工,完成楼层主干管的吊装安装作业,减少安装管道的劳动力,提升施工效率,提高施工安全保障。The purpose of this utility model is to provide an adjustable self-elevating pipeline device suitable for mobile installation of construction pipelines to realize mechanization to cooperate with on-site construction, to complete the hoisting and installation of floor trunk pipes, to reduce labor for installing pipelines, to improve construction efficiency, and to improve construction safety. .
请参看附图1,本实用新型主要包括移动型钢基座3、双向异步电动机1、钢丝绳组件2、立杆套筒和吊臂5,双向异步电动机1固定安装在移动型钢基座3上,钢丝绳组件2固定安装在移动型钢基座3上,双向异步电动机1驱动钢丝绳组件2转动,立杆套筒固定安装在移动型钢基座3上,本实施例中,立杆套筒为空心结构,可使钢丝绳从立杆套筒中穿过,立杆套筒底部固定安装有底部转向滑轮组(图中未标出),吊臂5固定安装在立杆套筒顶部,吊臂5上对应于立杆套筒顶部位置处安装有第一转向滑轮组21,吊臂5端头位置处安装有第二转向滑轮组23,钢丝绳组件2上缠绕有钢丝绳,钢丝绳端头依次绕过底部转向滑轮组、第一转向滑轮组21和第二转向滑轮组23后竖直向下设置,钢丝绳端头处固定安装有吊钩22,用于吊取管道。Please refer to accompanying
本实施例中,移动型钢基座3采用钢材焊接而成,尺寸为1M*1.5M,具体实施时,也可以根据实际需要,选用其他尺寸,移动型钢基座3下方四角位置分别焊接有一个可移动万向轮31,可通过万向轮31推动本实用新型到处移动,使用灵活、方便。移动型钢基座3内部固定焊接有第一横梁33、第二横梁34和第三横梁35,第一横梁33、第二横梁34和第三横梁35分别平行设置,双向异步电动机1固定安装在第一横梁33上,钢丝绳组件2固定安装在第二横梁34上,可调式立杆套筒4固定安装在第三横梁35上,本实施例中,双向异步电动机1通过焊接或螺钉固定安装在第一横梁33上,钢丝绳组件2包括外壳和芯轴,钢丝绳组件2外壳通过焊接或螺钉固定安装在第二横梁34上,钢丝绳组件2芯轴安装在外壳内,可相对外壳转动,钢丝绳缠绕在芯轴上,本实施例中,钢丝绳组件2与双向异步电动机1平行设置,双向异步电动机1与钢丝绳组件2 的芯轴之间通过皮带连接,通过皮带带动钢丝绳组件2 的芯轴转动,具体实施时,也可以采用连杆、链条或其他驱动形式。本实施例中,第三横梁35上固定安装有固定座36,立杆套筒底部通过法兰与固定座36安装在一起。In this embodiment, the
本实施例中,立杆套筒采用可调式结构,即立杆套筒包括相互插接在一起的两段以上的套筒,立杆套筒上开设有插销孔42,插销孔42内插装有套筒调节插销41,可调节立杆套筒的相对位置,从而调节吊臂5的高度,当其调整到适当高度后,在插销孔42内插入套筒调节插销41,维持其相对位置固定。In this embodiment, the vertical rod sleeve adopts an adjustable structure, that is, the vertical rod sleeve includes more than two sections of sleeves that are inserted into each other, and the vertical rod sleeve is provided with a
本实施例中,吊臂5采用槽钢焊接制成,第一转向滑轮组21和第二转向滑轮组23均安装在槽钢内。In this embodiment, the
本实施例中,在移动型钢基座3上固定安装有防护杆6,防护杆6采用立杆,可根据实际需要设置一个或两个,以防止管道7不慎脱落对操作者造成伤害,还可起到防止管道在吊装过程中外摆等过大位移,起到一定的安全防护作用。本实施例中,在移动型钢基座3上固定安装有辅助扶手32,可通过辅助扶手32人为对本实用新型进行推动或固定。In this embodiment, a
本实用新型在使用时,启动双向异步电动机1,将吊钩22放下,通过吊钩22勾住管道7,控制双向异步电动机1反向转动,将钢丝绳缠绕在钢丝绳组件2的芯轴上,通过钢丝绳向上提起管道7,完成管道安装。When the utility model is in use, start the two-way
本实用新型通过双向异步电动机,结合滑轮组机构组织实现垂直方向的管道吊装作业,减少人工投入,提高效率;The utility model organizes and realizes the pipe hoisting operation in the vertical direction through the bidirectional asynchronous motor combined with the pulley block mechanism, thereby reducing the manual input and improving the efficiency;
本实用新型通过电动机配合1MX1.5M规格可移动型钢基座实现装置的灵活周转,实现在一般房建公共走道区域的灵活移动;The utility model realizes the flexible turnover of the device through the cooperation of the motor with the 1MX1.5M movable steel base, and realizes the flexible movement in the public corridor area of general housing construction;
本实用新型通过竖向可伸缩套筒实现吊装的标高调节。The utility model realizes the elevation adjustment of hoisting through the vertical telescopic sleeve.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921546431.2U CN210944595U (en) | 2019-09-18 | 2019-09-18 | Movable self-lifting pipeline hoisting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921546431.2U CN210944595U (en) | 2019-09-18 | 2019-09-18 | Movable self-lifting pipeline hoisting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210944595U true CN210944595U (en) | 2020-07-07 |
Family
ID=71375710
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921546431.2U Expired - Fee Related CN210944595U (en) | 2019-09-18 | 2019-09-18 | Movable self-lifting pipeline hoisting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210944595U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114476984A (en) * | 2022-02-09 | 2022-05-13 | 陕西建工第一建设集团有限公司 | Movable elevator |
-
2019
- 2019-09-18 CN CN201921546431.2U patent/CN210944595U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114476984A (en) * | 2022-02-09 | 2022-05-13 | 陕西建工第一建设集团有限公司 | Movable elevator |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112196159B (en) | Glass curtain wall construction structure and construction method thereof | |
| CN106698208B (en) | A kind of hanging device and hanging method for being transported outside high-rise building | |
| CN113968543B (en) | An assembled building lifting device | |
| CN108560510B (en) | Movable overhaul platform for surface runner of hydropower station | |
| CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
| CN212251443U (en) | Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device | |
| CN208916647U (en) | A kind of height-adjustable Pipe installing lifting device of movable type | |
| CN210944595U (en) | Movable self-lifting pipeline hoisting device | |
| CN219863986U (en) | Electric erecting device for building scaffold | |
| CN215479134U (en) | A pipeline installation elevator | |
| CN211110825U (en) | Automatic feeding machine for pipeline installation | |
| CN205634625U (en) | Remove top tube device | |
| CN220884745U (en) | Manual installation of special scaffolding for ship construction | |
| CN220470817U (en) | Auxiliary butt joint device for heat supply pipeline | |
| CN107235422A (en) | It is exclusively used in the crane device of lifting steel pipes and welding | |
| CN218841564U (en) | Pipeline installation lifting device in limited space | |
| CN206955487U (en) | It is exclusively used in lifting steel pipes and the crane device of welding | |
| CN217947613U (en) | Well lid migration device | |
| CN214570286U (en) | Convenient type slat wall installation assists utensil | |
| CN216552972U (en) | A lifting tool for construction of exterior walls with overhanging eaves structure | |
| CN210885083U (en) | Cable trench cover carrying device | |
| CN211078241U (en) | Auxiliary device for dismounting jack between relays | |
| CN117284452B (en) | Scaffold tool special for building on ship | |
| CN221459708U (en) | Movable type slab wall hoisting and installing vehicle | |
| CN219950345U (en) | Lifting device for installing electromechanical equipment and pipeline |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200707 |