CN210944568U
CN210944568U CN201921649353.9U CN201921649353U CN210944568U CN 210944568 U CN210944568 U CN 210944568U CN 201921649353 U CN201921649353 U CN 201921649353U CN 210944568 U CN210944568 U CN 210944568U
Authority
CN
China
Prior art keywords
electric hoist
distance
heavy objects
rope
heavy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921649353.9U
Other languages
Chinese (zh)
Inventor
陈志敏
肖南
田毅
赵兰海
芦亮
沈翔
张卉
杜君
吴鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd
Wuhan Bridge Special Technology Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd
Wuhan Bridge Special Technology Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd, Wuhan Bridge Special Technology Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd
Priority to CN201921649353.9U priority Critical patent/CN210944568U/en
Application granted granted Critical
Publication of CN210944568U publication Critical patent/CN210944568U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型公开了一种用于重物多级连续吊装的装置包括吊绳,其底端用于与重物连接;N个连接件,其中N≥2,N个连接件设置在吊绳上并沿吊绳的长度方向间隔分布,且N个连接件由吊绳的顶端至底端依次标号;第一电动葫芦,其一端悬挂于梁底,另一端用于按照从吊绳的顶端至底端的顺序,依次与标号为奇数的连接件相连,并起吊重物,以使重物每次上升第一距离;第二电动葫芦,其一端悬挂于梁底,另一端用于按照从吊绳的顶端至底端的顺序,依次与标号为偶数的连接件依次相连,并起吊重物,以使重物每次上升第二距离;装置具有工作状态,当处于工作状态时,交替使用第一电动葫芦和第二电动葫芦起吊重物,直至将重物由桥下提升至梁底。

Figure 201921649353

The utility model discloses a device for multi-level continuous hoisting of heavy objects. The device comprises a hanging rope, the bottom end of which is used to connect with the heavy object; It is distributed at intervals along the length of the sling, and the N connecting pieces are numbered sequentially from the top to the bottom of the sling; one end of the first electric hoist is suspended from the bottom of the beam, and the other end is used to follow the sequence from the top to the bottom of the sling. The order of the ends is connected to the odd-numbered connecting pieces in turn, and the heavy objects are lifted to make the heavy objects rise the first distance each time; one end of the second electric hoist is suspended at the bottom of the beam, and the other end is used to follow the direction from the suspending rope. The order from the top to the bottom is connected to the connecting pieces with even numbers in turn, and the heavy objects are lifted to make the heavy objects rise a second distance each time; the device has a working state, and when it is in the working state, the first electric hoist is used alternately. And the second electric hoist lifts the heavy objects until the heavy objects are lifted from under the bridge to the bottom of the beam.

Figure 201921649353

Description

一种用于重物多级连续吊装的装置A device for multi-level continuous hoisting of heavy objects

技术领域technical field

本实用新型涉及桥梁施工技术领域,具体涉及一种用于重物多级连续吊装的装置。The utility model relates to the technical field of bridge construction, in particular to a device for multi-level continuous hoisting of heavy objects.

背景技术Background technique

运营中的桥梁在使用过程中,桥梁部分结构或附属设施老化,需要更换改造。改造更换时涉及到结构物的起重吊装作业,但由于桥梁条件限制,需将材料或设备等重物由桥下提升至梁底,同时受到桥面通车及梁底操作空间的限制、考虑到材料设备自重较重,无法采用汽车吊、卷扬机等大型吊装设备或人工对材料或设备进行吊装。During the use of bridges in operation, part of the structure or ancillary facilities of the bridges are aging and need to be replaced. Reconstruction and replacement involves lifting and hoisting of structures. However, due to the limitation of bridge conditions, it is necessary to lift heavy objects such as materials or equipment from under the bridge to the bottom of the beam. At the same time, it is limited by the opening of the bridge deck and the operating space at the bottom of the beam. The material equipment is heavy, so it is impossible to use large hoisting equipment such as truck cranes, hoists, or manual hoisting of materials or equipment.

实用新型内容Utility model content

针对现有技术中存在的缺陷,本实用新型的目的在于提供一种用于重物多级连续吊装的装置,可满足在狭窄的空间下进行高空吊装作业的情况。In view of the defects existing in the prior art, the purpose of the present invention is to provide a device for multi-level continuous hoisting of heavy objects, which can meet the situation of high-altitude hoisting operation in a narrow space.

为达到以上目的,本实用新型采取的技术方案是:In order to achieve the above purpose, the technical scheme adopted by the present utility model is:

一种用于重物多级连续吊装的装置,包括:A device for multi-level continuous hoisting of heavy objects, comprising:

吊绳,其底端用于与重物连接;Suspension rope, the bottom end of which is used to connect with heavy objects;

N个连接件,其中N≥2,N个所述连接件设置在所述吊绳上并沿所述吊绳的长度方向间隔分布,且N个所述连接件由所述吊绳的顶端至底端依次标号;N connecting pieces, wherein N≥2, N pieces of the connecting pieces are arranged on the suspending rope and distributed at intervals along the length direction of the suspending rope, and the N pieces of the connecting pieces are from the top of the suspending rope to the The bottom ends are numbered sequentially;

第一电动葫芦,其一端悬挂于梁底,另一端用于按照从所述吊绳的顶端至底端的顺序,依次与标号为奇数的连接件相连,并起吊所述重物,以使所述重物每次上升第一距离;One end of the first electric hoist is suspended from the bottom of the beam, and the other end is used to connect with the odd-numbered connecting pieces in sequence from the top end to the bottom end of the suspending rope, and lift the heavy object, so that the Each time the heavy object rises the first distance;

第二电动葫芦,其一端悬挂于梁底,另一端用于按照从所述吊绳的顶端至底端的顺序,依次与标号为偶数的连接件依次相连,并起吊所述重物,以使所述重物每次上升第二距离;The second electric hoist, one end of which is suspended at the bottom of the beam, and the other end is used to connect with the connecting pieces with even numbers in sequence from the top end to the bottom end of the suspending rope, and lift the heavy objects, so that all Describe the weight rising a second distance each time;

所述装置具有工作状态,当处于所述工作状态时,交替使用所述第一电动葫芦和所述第二电动葫芦起吊所述重物,直至将所述重物由桥下提升至梁底。The device has a working state. When in the working state, the first electric hoist and the second electric hoist are alternately used to lift the heavy object until the heavy object is lifted from under the bridge to the bottom of the beam.

在上述技术方案的基础上,所述第一距离不大于所述第一电动葫芦的行程。On the basis of the above technical solutions, the first distance is not greater than the stroke of the first electric hoist.

在上述技术方案的基础上,所述第一距离等于所述第一电动葫芦的行程。On the basis of the above technical solution, the first distance is equal to the stroke of the first electric hoist.

在上述技术方案的基础上,所述第二距离不大于所述第二电动葫芦的行程。On the basis of the above technical solution, the second distance is not greater than the stroke of the second electric hoist.

在上述技术方案的基础上,所述第二距离等于所述第二电动葫芦的行程。On the basis of the above technical solution, the second distance is equal to the stroke of the second electric hoist.

在上述技术方案的基础上,N个所述连接件将所述吊绳位于第一个和第N个连接件之间的部分分成N-1个吊绳节段,且N-1个所述吊绳节段由所述吊绳的顶端至底端按照1~N-1的顺序依次排列,其中序数为奇数的吊绳节段与所述第一距离相等,序数为偶数的吊绳节段与所述第二距离相等。On the basis of the above technical solution, the N pieces of the connecting pieces divide the part of the suspending rope between the first and the Nth connecting piece into N-1 pieces of suspending rope, and N-1 pieces of the suspending rope are The suspending rope segments are arranged in sequence from the top end to the bottom end of the suspending rope in the order of 1 to N-1, wherein the suspending rope segments with odd ordinal numbers are equal to the first distance, and the suspending rope segments with even numbers are the same distance. is equal to the second distance.

在上述技术方案的基础上,所述连接件为卸扣。On the basis of the above technical solution, the connecting piece is a shackle.

在上述技术方案的基础上,位于所述吊绳最下方的连接件用于连接所述重物。On the basis of the above technical solution, the connecting piece located at the bottom of the hanging rope is used to connect the heavy object.

在上述技术方案的基础上,所述吊绳的长度等于由桥下至梁底的距离。On the basis of the above technical solution, the length of the hanging rope is equal to the distance from the bottom of the bridge to the bottom of the beam.

与现有技术相比,本实用新型的优点在于:Compared with the prior art, the advantages of the present utility model are:

本实用新型中的用于重物多级连续吊装的装置由电动葫芦、吊绳组合成,重量轻便,便于安装拆除及转移,可满足在狭窄的空间下进行高空吊装作业的情况。且由于桥下至梁底的距离大于第一电动葫芦和第二电动葫芦的行程,因此若只使用一个电动葫芦无法将重物一次性提升至梁底,所以采用交替使用两个电动葫芦的方式实现多级提升重物。The device for multi-level continuous hoisting of heavy objects in the utility model is composed of an electric hoist and a suspending rope. And because the distance from the bridge to the bottom of the beam is greater than the stroke of the first electric hoist and the second electric hoist, if only one electric hoist is used, the heavy object cannot be lifted to the bottom of the beam at one time, so the method of using two electric hoists alternately is adopted. Realize multi-level lifting of heavy objects.

附图说明Description of drawings

图1为本实用新型实施例中用于重物多级连续吊装的装置的结构示意图。FIG. 1 is a schematic structural diagram of a device for multi-level continuous hoisting of heavy objects in an embodiment of the present invention.

图中:1-重物,2-吊绳,20-吊绳节段,3-连接件,4-第一电动葫芦,5-第二电动葫芦。In the picture: 1-weight, 2-slinging rope, 20-slinging rope segment, 3-connecting piece, 4-first electric hoist, 5-second electric hoist.

具体实施方式Detailed ways

以下结合附图对本实用新型的实施例作进一步详细说明。The embodiments of the present utility model will be described in further detail below with reference to the accompanying drawings.

参见图1所示,本实用新型实施例提供一种用于重物多级连续吊装的装置,该装置用于将重物1从桥下提升至梁底,该装置包括吊绳2、N个连接件3、第一电动葫芦4和第二电动葫芦5。其中吊绳2的底端与重物1连接;N个连接件3设置在吊绳2上并沿吊绳2的长度方向间隔分布,N≥2,且N个连接件3由吊绳2的顶端至底端依次标号,标记为1、2、3、4……N;第一电动葫芦4的一端悬挂于梁底,在使用时,第一电动葫芦4的另一端按照从吊绳2的顶端至底端的顺序,依次与标号为奇数的连接件3相连,并起吊重物1,以使重物1每次上升第一距离;第二电动葫芦5的一端悬挂于梁底,使用时,第二电动葫芦5的另一端按照从吊绳2的顶端至底端的顺序,依次与标号为偶数的连接件3依次相连,并起吊重物1,以使重物1每次上升第二距离;同时,装置具有工作状态,当处于工作状态时,交替使用第一电动葫芦4和第二电动葫芦5起吊重物1,直至将重物1由桥下提升至梁底。Referring to FIG. 1 , an embodiment of the present invention provides a device for multi-level continuous hoisting of heavy objects. The device is used to lift the heavy object 1 from under the bridge to the bottom of the beam. The device includes 2 hanging ropes, N The connecting piece 3 , the first electric hoist 4 and the second electric hoist 5 . The bottom end of the hanging rope 2 is connected with the weight 1; The top to the bottom are numbered sequentially, marked as 1, 2, 3, 4...N; one end of the first electric hoist 4 is suspended from the bottom of the beam. The sequence from the top to the bottom is connected with the odd-numbered connector 3 in turn, and the weight 1 is lifted to make the weight 1 rise by the first distance each time; one end of the second electric hoist 5 is suspended at the bottom of the beam, and when in use, The other end of the second electric hoist 5 is sequentially connected to the even-numbered connector 3 in the sequence from the top end to the bottom end of the suspending rope 2, and lifts the weight 1, so that the weight 1 rises a second distance each time; At the same time, the device has a working state. When in the working state, the first electric hoist 4 and the second electric hoist 5 are alternately used to lift the heavy object 1 until the heavy object 1 is lifted from under the bridge to the bottom of the beam.

本实用新型的使用工作原理为:先将第一电动葫芦4与标号为1的连接件3相连,并提升重物1,以使重物1向上提升第一距离,重物1提升第一距离之后,保证标号为2的连接件3上升至能被第二电动葫芦5连接,再使用第二电动葫芦5与标号为2的连接件3相连,松开第一电动葫芦4与标号为1的连接件3之间的连接,并提升重物1,以使重物1向上提升第二距离,重物1提升第二距离之后,保证标号为3的连接件3上升至能被第一电动葫芦4连接,然后使用第一电动葫芦4与标号为3的连接件3相连,并提升重物1,以使重物1向上提升第一距离,如此交替使用第一电动葫芦4和第二电动葫芦5起吊重物1,直至将重物1由桥下提升至梁底,由于桥下至梁底的距离大于第一电动葫芦4和第二电动葫芦5的行程,因此若只使用一个电动葫芦无法将重物1一次性提升至梁底,所以采用交替使用两个电动葫芦的方式实现多级提升重物1,且电动葫芦、吊绳2组合成的吊具装置,重量轻便,便于安装拆除及转移,可满足在狭窄的空间下进行高空吊装作业的情况。The working principle of the utility model is as follows: firstly connect the first electric hoist 4 with the connecting piece 3 marked as 1, and lift the weight 1, so that the weight 1 is lifted upward by a first distance, and the weight 1 is lifted by a first distance After that, make sure that the connecting piece 3 labeled 2 rises until it can be connected by the second electric hoist 5, and then use the second electric hoist 5 to connect with the connecting piece 3 labeled 2, and loosen the first electric hoist 4 and the connecting piece labeled 1. The connection between the connecting pieces 3, and lift the weight 1, so that the weight 1 is lifted up by the second distance, after the weight 1 is lifted by the second distance, make sure that the connecting piece 3 labeled 3 is lifted up to the point where it can be lifted by the first electric hoist 4 Connect, then use the first electric hoist 4 to connect with the connecting piece 3 marked 3, and lift the weight 1, so that the weight 1 is lifted up the first distance, so alternately use the first electric hoist 4 and the second electric hoist 5 Lift the heavy object 1 until the heavy object 1 is lifted from under the bridge to the bottom of the beam. Since the distance from the bottom of the bridge to the bottom of the beam is greater than the stroke of the first electric hoist 4 and the second electric hoist 5, it is impossible to use only one electric hoist. The heavy object 1 is lifted to the bottom of the beam at one time, so the multi-level lifting of the heavy object 1 is realized by alternately using two electric hoists. The transfer can meet the situation of high-altitude hoisting work in a narrow space.

可选的,第一距离不大于第一电动葫芦4的行程,由于不同型号的电动葫芦的行程是固定的,所以第一电动葫芦4的每次提升的第一距离不能大于第一电动葫芦4的行程。Optionally, the first distance is not greater than the stroke of the first electric hoist 4. Since the strokes of different types of electric hoists are fixed, the first distance of each lift of the first electric hoist 4 cannot be greater than that of the first electric hoist 4. 's itinerary.

优选的,第一距离等于第一电动葫芦4的行程,这样第一电动葫芦4每次将重物1提升最大极限的距离,实现第一电动葫芦4的充分利用。Preferably, the first distance is equal to the stroke of the first electric hoist 4 , so that the first electric hoist 4 lifts the heavy object 1 by a maximum distance each time, so as to fully utilize the first electric hoist 4 .

可选的,第二距离不大于第二电动葫芦5的行程,由于不同型号的电动葫芦的行程是固定的,所以第二电动葫芦5的每次提升的第二距离不能大于第二电动葫芦5的行程。Optionally, the second distance is not greater than the stroke of the second electric hoist 5. Since the strokes of different types of electric hoists are fixed, the second distance of each lift of the second electric hoist 5 cannot be greater than that of the second electric hoist 5. 's itinerary.

优选的,第二距离等于第二电动葫芦5的行程,这样第二电动葫芦5每次将重物1提升最大极限的距离,实现第二电动葫芦5的充分利用。Preferably, the second distance is equal to the stroke of the second electric hoist 5 , so that the second electric hoist 5 lifts the heavy object 1 by the maximum distance each time, so as to fully utilize the second electric hoist 5 .

可选的,N个连接件3将吊绳2位于第一个和第N个连接件3之间的部分分成N-1个吊绳节段20,且N-1个吊绳节段20由吊绳2的顶端至底端按照1~N-1的顺序依次排列,其中序数为奇数的吊绳节段20与第一距离相等,序数为偶数的吊绳节段20与第二距离相等。在设计连接件3在吊绳2上的间隔时,从吊绳2的顶端至底端,将标号为1和标号为2的连接件3之间的吊绳节段20标记为1,将标号为2和标号为3之间的连接件3之间的吊绳节段20标记为2,以此类推,将N-1个吊绳节段20进行标号,当第一电动葫芦4与标号为1的连接件3相连,将重物1提升第一距离,此时标记为2的连接件3也向上移动第一距离,然后第二电动葫芦5与标号为2的连接件3相连,将重物1提升第二距离,此时标记为3的连接件3也向上提升第二距离。Optionally, the N connecting pieces 3 divide the portion of the suspending rope 2 between the first and the Nth connecting piece 3 into N-1 suspending rope segments 20, and the N-1 suspending rope segments 20 are composed of The top end to the bottom end of the suspending rope 2 are arranged in sequence from 1 to N-1, wherein the suspending rope segments 20 with odd ordinal numbers are equal to the first distance, and the suspending rope segments 20 with even ordinal numbers are equal to the second distance. When designing the spacing of the connecting piece 3 on the suspending rope 2, from the top end to the bottom end of the suspending rope 2, the suspending rope segment 20 between the connecting pieces 3 marked 1 and 2 is marked 1, and the marking The suspending rope segment 20 between 2 and the connecting piece 3 labeled 3 is labeled 2, and so on, N-1 suspending rope segments 20 are labeled, when the first electric hoist 4 is labeled with The connector 3 of 1 is connected, and the weight 1 is lifted by the first distance. At this time, the connector 3 marked with 2 also moves up the first distance, and then the second electric hoist 5 is connected with the connector 3 marked with 2 to lift the weight. The object 1 is lifted up by the second distance, and the connector 3 marked with 3 is also lifted up by the second distance.

可选的,连接件3为卸扣,由于第一电动葫芦4提升重物1后,第二电动葫芦5再次提升重物1,第一电动葫芦4要解除与连接件3的连接,连接件3采用卸扣,方便电动葫芦与连接件3之间的拆卸和安装。Optionally, the connecting piece 3 is a shackle, because after the first electric hoist 4 lifts the heavy object 1, the second electric hoist 5 lifts the heavy object 1 again, and the first electric hoist 4 is to be disconnected from the connecting piece 3, and the connecting piece 3. The shackle is used to facilitate the disassembly and installation between the electric hoist and the connecting piece 3.

可选的,位于吊绳2最下方的连接件3用于连接重物1。使得整根吊绳2受力,提升重物1更省力。Optionally, the connecting piece 3 at the bottom of the hanging rope 2 is used to connect the weight 1 . The whole hanging rope 2 is stressed, and the lifting of the heavy object 1 is more labor-saving.

可选的,吊绳2的长度等于由桥下至梁底的距离。能保证重物1能提升到梁底,防止出现提升至一半吊绳2不够长的情况。Optionally, the length of the hanging rope 2 is equal to the distance from the bottom of the bridge to the bottom of the beam. It can ensure that the heavy object 1 can be lifted to the bottom of the beam, preventing the situation that the lifting rope 2 is not long enough to be lifted to half.

本实用新型不仅局限于上述最佳实施方式,任何人在本实用新型的启示下都可得出其他各种形式的产品,但不论在其形状或结构上作任何变化,凡是具有与本实用新型相同或相近似的技术方案,均在其保护范围之内。The present utility model is not limited to the above-mentioned best embodiment, and anyone can draw other various forms of products under the inspiration of the present utility model. The same or similar technical solutions are all within the scope of its protection.

Claims (9)

1.一种用于重物多级连续吊装的装置,其特征在于,包括:1. a device for multi-level continuous hoisting of heavy objects, is characterized in that, comprising: 吊绳(2),其底端用于与重物(1)连接;a hanging rope (2), the bottom end of which is used to connect with the heavy object (1); N个连接件(3),其中N≥2,N个所述连接件(3)设置在所述吊绳(2)上并沿所述吊绳(2)的长度方向间隔分布,且N个所述连接件(3)由所述吊绳(2)的顶端至底端依次标号;N connecting pieces (3), wherein N≥2, N pieces of the connecting pieces (3) are arranged on the suspending rope (2) and are distributed at intervals along the length direction of the suspending rope (2), and N pieces The connecting piece (3) is numbered sequentially from the top end to the bottom end of the hanging rope (2); 第一电动葫芦(4),其一端悬挂于梁底,另一端用于按照从所述吊绳(2)的顶端至底端的顺序,依次与标号为奇数的连接件(3)相连,并起吊所述重物(1),以使所述重物(1)每次上升第一距离;The first electric hoist (4), one end of which is suspended at the bottom of the beam, and the other end is used for connecting with the odd-numbered connecting piece (3) in sequence from the top end to the bottom end of the suspending rope (2), and hoisting the weight (1), so that the weight (1) rises a first distance each time; 第二电动葫芦(5),其一端悬挂于梁底,另一端用于按照从所述吊绳(2)的顶端至底端的顺序,依次与标号为偶数的连接件(3)依次相连,并起吊所述重物(1),以使所述重物(1)每次上升第二距离;The second electric hoist (5), one end of which is suspended at the bottom of the beam, and the other end is used to connect with the connecting pieces (3) with even numbers in sequence from the top end to the bottom end of the suspending rope (2), and Lifting the weight (1) so that the weight (1) rises a second distance each time; 所述装置具有工作状态,当处于所述工作状态时,交替使用所述第一电动葫芦(4)和所述第二电动葫芦(5)起吊所述重物(1),直至将所述重物(1)由桥下提升至梁底。The device has a working state, and when in the working state, the first electric hoist (4) and the second electric hoist (5) are alternately used to lift the heavy object (1) until the heavy object is lifted. Object (1) is lifted from under the bridge to the bottom of the beam. 2.如权利要求1所述的用于重物多级连续吊装的装置,其特征在于,所述第一距离不大于所述第一电动葫芦(4)的行程。2. The device for multi-level continuous hoisting of heavy objects according to claim 1, wherein the first distance is not greater than the stroke of the first electric hoist (4). 3.如权利要求2所述的用于重物多级连续吊装的装置,其特征在于,所述第一距离等于所述第一电动葫芦(4)的行程。3. The device for multi-level continuous hoisting of heavy objects according to claim 2, wherein the first distance is equal to the stroke of the first electric hoist (4). 4.如权利要求1所述的用于重物多级连续吊装的装置,其特征在于,所述第二距离不大于所述第二电动葫芦(5)的行程。4. The device for multi-level continuous hoisting of heavy objects according to claim 1, wherein the second distance is not greater than the stroke of the second electric hoist (5). 5.如权利要求4所述的用于重物多级连续吊装的装置,其特征在于,所述第二距离等于所述第二电动葫芦(5)的行程。5. The device for multi-level continuous hoisting of heavy objects according to claim 4, wherein the second distance is equal to the stroke of the second electric hoist (5). 6.如权利要求1所述的用于重物多级连续吊装的装置,其特征在于,N个所述连接件(3)将所述吊绳(2)位于第一个和第N个连接件(3)之间的部分分成N-1个吊绳节段(20),且N-1个所述吊绳节段(20)由所述吊绳(2)的顶端至底端按照1~N-1的顺序依次排列,其中序数为奇数的吊绳节段(20)与所述第一距离相等,序数为偶数的吊绳节段(20)与所述第二距离相等。6. The device for multi-level continuous hoisting of heavy objects according to claim 1, characterized in that, the N connecting pieces (3) connect the suspending rope (2) between the first one and the Nth one. The part between the pieces (3) is divided into N-1 hanging rope segments (20), and the N-1 hanging rope segments (20) are 1 from the top to the bottom of the hanging rope (2). The order of ~N-1 is arranged in sequence, wherein the odd-numbered suspending rope segments (20) are equal to the first distance, and the even-numbered suspending rope segments (20) are equal to the second distance. 7.如权利要求1所述的用于重物多级连续吊装的装置,其特征在于,所述连接件(3)为卸扣。7. The device for multi-level continuous hoisting of heavy objects according to claim 1, wherein the connecting member (3) is a shackle. 8.如权利要求1所述的用于重物多级连续吊装的装置,其特征在于,位于所述吊绳(2)最下方的连接件(3)用于连接所述重物(1)。8. The device for multi-level continuous hoisting of heavy objects according to claim 1, characterized in that, the connecting piece (3) at the bottom of the suspending rope (2) is used to connect the heavy object (1) . 9.如权利要求1所述的用于重物多级连续吊装的装置,其特征在于,所述吊绳(2)的长度等于由桥下至梁底的距离。9. The device for multi-stage continuous hoisting of heavy objects according to claim 1, characterized in that, the length of the suspending rope (2) is equal to the distance from the bottom of the bridge to the bottom of the beam.
CN201921649353.9U 2019-09-29 2019-09-29 Device for multistage continuous hoisting of heavy object Expired - Fee Related CN210944568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921649353.9U CN210944568U (en) 2019-09-29 2019-09-29 Device for multistage continuous hoisting of heavy object

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921649353.9U CN210944568U (en) 2019-09-29 2019-09-29 Device for multistage continuous hoisting of heavy object

Publications (1)

Publication Number Publication Date
CN210944568U true CN210944568U (en) 2020-07-07

Family

ID=71379670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921649353.9U Expired - Fee Related CN210944568U (en) 2019-09-29 2019-09-29 Device for multistage continuous hoisting of heavy object

Country Status (1)

Country Link
CN (1) CN210944568U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116717067A (en) * 2023-04-25 2023-09-08 广州机施建设集团有限公司 A construction platform for vertical openings in a building and its use method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116717067A (en) * 2023-04-25 2023-09-08 广州机施建设集团有限公司 A construction platform for vertical openings in a building and its use method

Similar Documents

Publication Publication Date Title
CN201686432U (en) 800 tons of hanging row
CN203159047U (en) Hydraulic span and height adjustable gantry crane
CN204917648U (en) Turbine rotor lifts by crane instrument
CN109095343A (en) Assembled hanger
CN202717497U (en) Lifting device of prefabricated composite floor slab
CN203833540U (en) Movable heavy object hoisting device
CN216971705U (en) Steel box girder sling
CN204847755U (en) Guide rail hoist and mount frock
CN205132903U (en) Steel wire slings
CN204689351U (en) A kind of H profile steel structural elements suspender
CN205472249U (en) Converter sublance balance hanger
CN112456305A (en) Linear segmented turning-over method
CN106480822A (en) A kind of suspension bridge sling replacing system and the method changing sling of suspension bridge
CN216889678U (en) Rectangular steel reinforcement cage hoisting system
CN214031441U (en) Hoisting equipment suitable for multiple traveling cranes and asymmetric balanced loads
CN208103767U (en) Tackling system
CN203833484U (en) Magnetic force internal-expanding type lifting device for steel parts
CN205312875U (en) Cement pole lifts by crane instrument
CN203095395U (en) Steel plate lifting rigging
CN206438402U (en) A kind of suspension bridge sling replacing system
CN208916608U (en) Special hoisting frame beam for prefabricated laminated slab
CN205023729U (en) Gallows frame
CN208022590U (en) One kind overhauling hoisting frame based on steel construction boiler plant
CN204454262U (en) A kind of folding arm suspension hook group
CN217921012U (en) Lifting appliance for stairs

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200707