CN210887979U - A wall brick laying fixing bracket - Google Patents
A wall brick laying fixing bracket Download PDFInfo
- Publication number
- CN210887979U CN210887979U CN201921556847.2U CN201921556847U CN210887979U CN 210887979 U CN210887979 U CN 210887979U CN 201921556847 U CN201921556847 U CN 201921556847U CN 210887979 U CN210887979 U CN 210887979U
- Authority
- CN
- China
- Prior art keywords
- bracket
- support base
- wall
- bolt
- fixing bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
本实用新型涉及建筑技术领域,具体公开了一种墙砖铺设固定支架,包括支撑底座,在支撑底座上设置有第一支架,第一支架内设有第二支架,第一支架与第二支架通过螺栓固定连接,可通过螺栓调节固定支架的高度,灵活性高,且便于搬运;在第一支架上增加了定位支架,防止固定支架的发生倾斜,保证使用过程中铺设墙砖高度一致;在第一支架与支撑底座之间设有加固块,防止第一支架与支撑底座之间出现断裂,提高使用寿命,本实用新型结构简单牢固、使用方便、灵活性高、准确度高。
The utility model relates to the technical field of construction, and specifically discloses a wall tile laying and fixing bracket, which comprises a support base, a first bracket is arranged on the support base, a second bracket is arranged in the first bracket, the first bracket and the second bracket Through the bolted connection, the height of the fixed bracket can be adjusted by bolts, which has high flexibility and is easy to handle; a positioning bracket is added to the first bracket to prevent the inclination of the fixed bracket and ensure that the height of the wall tiles is consistent during use; A reinforcing block is arranged between the first bracket and the support base to prevent breakage between the first bracket and the support base and to improve the service life. The utility model has simple and firm structure, convenient use, high flexibility and high accuracy.
Description
技术领域technical field
本实用新型涉及建筑技术领域,具体公开了一种墙砖铺设固定支架。The utility model relates to the technical field of construction, and specifically discloses a fixing bracket for laying wall tiles.
背景技术Background technique
工人在铺设墙体时,一般采用水平线来铺设每一层砖块,或者采用目测的方式判断砖块是否水平,固定砖块时一般采用木头之类管状物品用于支撑,故砖块的铺设是否水平难以保证,在铺设的过程中墙体容易发生倾斜,导致墙砖铺设易出现误差。When laying walls, workers generally use horizontal lines to lay each layer of bricks, or use visual inspection to determine whether the bricks are level. When fixing bricks, tubular objects such as wood are generally used for support, so whether the bricks are laid is whether it is horizontal or not. The level is difficult to guarantee, and the wall is prone to incline during the laying process, resulting in errors in the laying of wall tiles.
中国实用新型专利CN201620438771.3公开了一种墙砖铺设支撑装置,包括螺杆、与螺杆螺纹连接的螺母,所述的螺杆底部连接有作为高度基准的圆盘体,螺母底面固定有Z形块,待铺设墙砖置于Z形块的的下平板上的墙砖高度统一,从而实现了支撑墙砖及调整高度的功能,以此保证了所铺设墙砖高度的水平一致,有利于提高墙面的整体装修效果,第一,此实用新型在使用时,铺设墙砖的地面一般是不平整的,移动时支撑装置易发生倾斜导致墙砖在铺设的过程中出现高度不一致;第二,由于此实用新型采用螺杆螺纹与螺母相互配合调节高度,一旦需要调整较大的调整时,旋转螺母调节高度较繁琐,使用很慢,影响工作的效率;第三,有时候需要铺设墙砖离地面的高度较高时,螺杆长度是固定值,就无法使用,且此实用新型搬运不便,灵活性低;第四,螺杆底部与圆盘体之间易出发生变形,影响使用寿命。Chinese utility model patent CN201620438771.3 discloses a wall tile laying support device, comprising a screw rod and a nut threadedly connected with the screw rod, the bottom of the screw rod is connected with a disc body as a height reference, and a Z-shaped block is fixed on the bottom surface of the nut, The wall bricks to be laid are placed on the lower plate of the Z-shaped block with a uniform height, so as to realize the functions of supporting the wall bricks and adjusting the height, thus ensuring that the height of the wall bricks to be laid is consistent, which is conducive to improving the wall surface. First, when the utility model is in use, the ground on which the wall tiles are laid is generally uneven, and the support device is prone to incline when moving, resulting in inconsistent height of the wall tiles during the laying process; second, due to this The utility model adopts the screw thread and the nut to cooperate with each other to adjust the height. Once a larger adjustment is required, it is cumbersome to rotate the nut to adjust the height, and the use is very slow, which affects the efficiency of work. Third, sometimes it is necessary to lay the height of the wall tiles from the ground. When it is higher, the screw length is a fixed value, so it cannot be used, and the utility model is inconvenient to carry and has low flexibility; fourth, deformation occurs between the bottom of the screw and the disc body, which affects the service life.
实用新型内容Utility model content
本实用新型针对上述现有技术的不足而提供一种结构设计合理的墙砖铺设固定支架。Aiming at the deficiencies of the above-mentioned prior art, the utility model provides a wall tile laying fixing bracket with reasonable structural design.
本实用新型为解决上述问题所采用的技术方案如下:一种墙砖铺设固定支架,包括支撑底座,所述支撑底座上设有第一支架,所述第一支架上垂直方向设有多个等距离的第二螺孔,所述第一支架上还设有定位支架,所述第一支架远离所述支撑底座内设有第二支架,所述第二支架上垂直方向设有多个等距离的第三螺孔,所述第二支架上设有L型架,所述L型架一端设有砖块定位板,所述第二螺孔内还设有第二螺栓,所述第一支架与所述第二支架通过所述第二螺栓连接。所述定位支架上设有多个等距离的第一螺孔,所述第一螺孔内设有第一螺栓,所述定位支架通过所述第一螺栓固定在所述第一支架上。The technical solution adopted by the present invention to solve the above problems is as follows: a wall tile laying and fixing bracket includes a support base, the support base is provided with a first support, and the first support is provided with a plurality of etc. The first bracket is also provided with a positioning bracket, the first bracket is far from the support base and there is a second bracket, and a plurality of equidistant distances are arranged on the second bracket in the vertical direction. The third screw hole of the second bracket is provided with an L-shaped frame, one end of the L-shaped frame is provided with a brick positioning plate, and a second bolt is also arranged in the second screw hole, and the first bracket is connected with the second bracket through the second bolt. The positioning bracket is provided with a plurality of equidistant first screw holes, the first screw holes are provided with first bolts, and the positioning bracket is fixed on the first bracket through the first bolts.
进一步的,所述第二支架上设有第三螺栓,所述L型架上设有螺孔,所述L型架通过所述第三螺栓固定在所述第二支架上。Further, the second bracket is provided with a third bolt, the L-shaped bracket is provided with a screw hole, and the L-shaped bracket is fixed on the second bracket by the third bolt.
进一步的,所述第一支架与所述支撑底座设有加固块。Further, the first bracket and the support base are provided with reinforcement blocks.
进一步的,所述第一支架直径大于所述第二支架直径。Further, the diameter of the first stent is larger than the diameter of the second stent.
进一步的,所述墙砖铺设固定支架为不锈钢墙砖铺设固定支架。Further, the wall brick laying fixing bracket is a stainless steel wall brick laying fixing bracket.
综上所述,本实用新型的有益效果在于:本实用新型一种墙砖铺设固定支架,包括支撑底座,在支撑底座上设置有第一支架,第一支架内设有第二支架,第一支架与第二支架通过螺栓固定连接,可通过螺栓调节固定支架的高度,灵活性高,且便于搬运;在第一支架上增加了定位支架,防止固定支架的发生倾斜,保证使用过程中铺设墙砖高度一致;在第一支架与支撑底座之间设有加固块,防止第一支架与支撑底座之间出现断裂,提高使用寿命,本实用新型结构简单牢固、使用方便、灵活性高、准确度高。To sum up, the beneficial effects of the present invention are as follows: a wall tile laying and fixing bracket of the present invention includes a support base, a first support is arranged on the support base, a second support is arranged in the first support, and the first support is provided on the support base. The bracket and the second bracket are fixedly connected by bolts, and the height of the fixed bracket can be adjusted by bolts, which has high flexibility and is easy to handle; a positioning bracket is added to the first bracket to prevent the inclination of the fixed bracket and ensure that the wall is laid during use. The height of the bricks is the same; a reinforcing block is arranged between the first bracket and the support base to prevent the breakage between the first bracket and the support base and improve the service life. The utility model has simple and firm structure, convenient use, high flexibility and accuracy high.
附图说明Description of drawings
图1为本实用新型一种墙砖铺设固定支架第一立体图;1 is a first perspective view of a wall tile laying fixing bracket of the present invention;
图2为本实用新型一种墙砖铺设固定支架第二立体图。FIG. 2 is a second perspective view of a fixing bracket for laying wall tiles according to the present invention.
附图中的标记为:支撑底座1、加固块2、定位支架3、第一螺孔301、第一螺栓4、第一支架5、第二螺孔501、第二螺栓6、第二支架7、第三螺孔701、第三螺栓8、L型架9、砖块定位板10。The symbols in the drawings are: support base 1,
具体实施方式Detailed ways
下面结合附图具体阐明本实用新型的实施方式,附图仅供参考和说明使用,不构成对本实用新型专利保护范围的限制。The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, which are for reference and illustration purposes only, and do not limit the scope of protection of the present invention.
在本实用新型中,为了更清楚的描述,作出如下说明:观察者面对附图1进行观察,观察者左侧设为后,观察者右侧设为前,观察者前方设为左,观察者后方设为右,观察者上面设为上,观察者下面设为下,应当指出文中的术语“上端”、“内部”、“上方”、“下方”等指示方位或位置关系为基于附图所设的方位或位置关系,仅是为了便于清楚地描述本实用新型,而不是指示或暗示所指的结构或零部件必须具有特定的方位、以特定的方位构造,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”仅用于为了清楚或简化描述的目的,而不能理解为指示或暗示相对重要性或数量。In the present utility model, for a clearer description, the following description is made: the observer observes the accompanying drawing 1, the left side of the observer is set as the rear, the right side of the observer is set as the front, the front of the observer is set as the left, and the observation The rear is set to the right, the top of the observer is set to the top, and the bottom of the observer is set to the bottom. It should be pointed out that the terms "upper", "inside", "above" and "below" in the text indicate the orientation or positional relationship based on the attached drawings. The set orientation or positional relationship is only for the convenience of clearly describing the present utility model, rather than indicating or implying that the structure or components referred to must have a specific orientation or be constructed in a specific orientation, so it cannot be understood as a reference to the present utility model. limits. Furthermore, the terms "first" and "second" are only used for the purpose of clarity or simplification of the description and should not be construed to indicate or imply relative importance or quantity.
参照图1至图2所示,本实用新型为解决上述问题所采用的技术方案如下:本实用新型提供一种墙砖铺设固定支架,包括支撑底座1,支撑底座1上设有第一支架5,第一支架5上垂直方向设有多个等距离的第二螺孔501,第一支架5上还设有定位支架3,第一支架5远离支撑底座1内设有第二支架7,第二支架7上垂直方向设有多个等距离的第三螺孔701,第二支架7上设有L型架9,L型架9一端设有砖块定位板10,第二螺孔501内还设有第二螺栓6,第一支架5与第二支架7通过第二螺栓6连接,定位支架3上设有多个等距离的第一螺孔301,第一螺孔301内设有第一螺栓4,定位支架3通过第一螺栓4固定在第一支架5上,第一支架5与第二支架7通过第二螺栓 6固定连接,可通过第二螺栓6调节固定支架的高度,灵活性高,且便于搬运。1 to 2, the technical solution adopted by the present invention to solve the above problems is as follows: The present invention provides a wall tile laying and fixing bracket, including a support base 1, and a
作为本实施例一种优选实施的,第二支架7上设有第三螺栓8, L型架9上设有螺孔301,L型架9通过第三螺栓8固定在第二支架7 上,防止固定支架的防止倾斜,保证使用过程中铺设墙砖高度一致,第一支架5与支撑底座1设有加固块2,防止第一支架5与支撑底座 1之间出现断裂,提高使用寿命,第一支架5直径大于第二支架7直径,便于第二支架7在第一支架5内伸缩。As a preferred implementation of this embodiment, the second bracket 7 is provided with a
此外,墙砖铺设固定支架为不锈钢墙砖铺设固定支架,由于工地上一般潮湿,不锈钢防止生锈从而影响使用。In addition, the fixing brackets for laying the wall tiles are stainless steel wall tiles. Since the construction site is generally wet, the stainless steel prevents rusting and affects the use.
本实用新型一种墙砖铺设固定支架,包括支撑底座,在支撑底座上设置有第一支架,第一支架内设有第二支架,第一支架与第二支架通过螺栓固定连接,可通过螺栓调节固定支架的高度,灵活性高,且便于搬运;在第一支架上增加了定位支架,防止固定支架的发生倾斜,保证使用过程中铺设墙砖高度一致;在第一支架与支撑底座之间设有加固块,防止第一支架与支撑底座之间出现断裂,提高使用寿命,本实用新型结构简单牢固、使用方便、灵活性高、准确度高。The utility model relates to a fixing bracket for laying wall tiles, which comprises a support base, a first bracket is arranged on the support base, a second bracket is arranged in the first bracket, the first bracket and the second bracket are fixedly connected by bolts, and the bolts can Adjust the height of the fixed bracket, high flexibility, and easy to carry; a positioning bracket is added to the first bracket to prevent the inclination of the fixed bracket and ensure the same height of wall tiles during use; between the first bracket and the support base A reinforcement block is provided to prevent the breakage between the first bracket and the support base and to improve the service life. The utility model has the advantages of simple and firm structure, convenient use, high flexibility and high accuracy.
上述实施例为本实用新型较佳的实施方式,但本实用新型的实施方式并不受上述实施例的限制,其他的任何未违背本实用新型的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包括在本实用新型的保护范围之内。The above-mentioned embodiments are preferred embodiments of the present utility model, but the embodiments of the present utility model are not limited by the above-mentioned embodiments, and any other changes, modifications, and substitutions made under the spirit and principle of the present utility model are not violated. , combination and simplification, all should be equivalent replacement methods, which are all included in the protection scope of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921556847.2U CN210887979U (en) | 2019-09-19 | 2019-09-19 | A wall brick laying fixing bracket |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921556847.2U CN210887979U (en) | 2019-09-19 | 2019-09-19 | A wall brick laying fixing bracket |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210887979U true CN210887979U (en) | 2020-06-30 |
Family
ID=71312348
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921556847.2U Expired - Fee Related CN210887979U (en) | 2019-09-19 | 2019-09-19 | A wall brick laying fixing bracket |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210887979U (en) |
-
2019
- 2019-09-19 CN CN201921556847.2U patent/CN210887979U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN212053244U (en) | Simple adjustable support bracket | |
| CN211373583U (en) | Pour ground leveling device | |
| CN210887979U (en) | A wall brick laying fixing bracket | |
| CN211341907U (en) | Civil engineering construction support | |
| CN204510255U (en) | A kind of levelling device | |
| CN207109522U (en) | The circular formwork support meanss of adjustable coordinate elevation | |
| CN107675867A (en) | High-precision leveling unit for floor leveling | |
| CN206308961U (en) | A kind of floor tile Level tune part | |
| CN207194480U (en) | A kind of wall is laid bricks perpendicularity fixator | |
| CN212539169U (en) | Space straight line lofting tool | |
| CN208455656U (en) | A hoop support device | |
| CN211816998U (en) | A kind of concrete embedded parts for construction | |
| CN204401983U (en) | Floater for building | |
| CN210922607U (en) | Perpendicularity detection device for masonry engineering | |
| CN207131092U (en) | Floor concrete casting operation platform is built in a kind of room | |
| CN209066441U (en) | A kind of steel cage installation guide device for pile foundation construction | |
| CN216890790U (en) | Device for leveling layer flatness construction of coke oven top plate | |
| CN206829474U (en) | A kind of vertical loading board attachment structure of steel construction suspended ceiling | |
| CN215114561U (en) | A device that uses laser to adjust the verticality of the dam body's upside-down pre-embedded pipe | |
| CN214250988U (en) | A marking device for architectural decoration engineering design | |
| CN209511533U (en) | Novel ground finish observes and controls appearance fixed bolster | |
| CN220954710U (en) | Concrete floor leveling device with double rollers | |
| CN211949671U (en) | Prefabricated vertical member hoisting box | |
| CN220566921U (en) | A level gauge for building construction | |
| CN221148696U (en) | Simple measuring device for concrete slump detection |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200630 Termination date: 20210919 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |