CN210835391U - A 5G optical fiber communication cable installation auxiliary equipment - Google Patents
A 5G optical fiber communication cable installation auxiliary equipment Download PDFInfo
- Publication number
- CN210835391U CN210835391U CN201921435856.6U CN201921435856U CN210835391U CN 210835391 U CN210835391 U CN 210835391U CN 201921435856 U CN201921435856 U CN 201921435856U CN 210835391 U CN210835391 U CN 210835391U
- Authority
- CN
- China
- Prior art keywords
- optical fiber
- lifting platform
- fiber communication
- guide rod
- communication cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Light Guides In General And Applications Therefor (AREA)
- Mechanical Coupling Of Light Guides (AREA)
Abstract
本实用新型公开了一种5G光纤通信线缆安装辅助设备,包括底座、丝杆和升降台,底座上端一侧通过螺纹连接有导向杆,导向杆上端设置有轴套,导向杆一侧设置有步进电机,步进电机的传动输出端设置有丝杆,导向杆上设置有导向套,导向套外围设置有升降台,升降台中部设置有回转支承,回转支承内设置有旋转台。有益效果在于:本实用新型通过设置导向杆、轴套、导向套、步进电机和丝杆,使升降台可携带5G光纤通信线缆的线辊以及安装工具根据工作人员的安装需要便捷的进行升降,使用十分便捷,提高了安装辅助设备的使用便捷性。
The utility model discloses a 5G optical fiber communication cable installation auxiliary equipment, which comprises a base, a screw rod and a lifting platform. A guide rod is connected with a thread on one side of the upper end of the base, a shaft sleeve is arranged on the upper end of the guide rod, and one side of the guide rod is provided with a guide rod. Stepping motor, the transmission output end of the stepping motor is provided with a screw rod, a guide sleeve is provided on the guide rod, a lifting platform is arranged on the periphery of the guide sleeve, a slewing bearing is arranged in the middle of the lifting platform, and a rotary table is arranged in the slewing bearing. The beneficial effect is that: the utility model is provided with a guide rod, a shaft sleeve, a guide sleeve, a stepping motor and a screw rod, so that the lifting platform can carry the line roller of the 5G optical fiber communication cable and the installation tool conveniently according to the installation needs of the staff. Lifting and lowering is very convenient to use, which improves the convenience of installation of auxiliary equipment.
Description
技术领域technical field
本实用新型涉及通信线缆安装技术领域,具体涉及一种5G光纤通信线缆安装辅助设备。The utility model relates to the technical field of installation of communication cables, in particular to an auxiliary device for installation of 5G optical fiber communication cables.
背景技术Background technique
5G即第五代移动通信技术是最新一代蜂窝移动通信技术,是4G、3G(UMTS、LTE)和2G(GSM)系统后的延伸,5G的性能目标是高数据速率、减少延迟、节省能源、降低成本、提高系统容量和大规模设备连接,在5G光纤通信线缆的安装过程中需要使用辅助设备对工作人员进行辅助。5G, the fifth generation mobile communication technology, is the latest generation of cellular mobile communication technology. It is an extension of 4G, 3G (UMTS, LTE) and 2G (GSM) systems. The performance goals of 5G are high data rate, reduced delay, energy saving, To reduce costs, increase system capacity, and connect large-scale equipment, auxiliary equipment needs to be used to assist staff during the installation of 5G optical fiber communication cables.
现有的5G光纤通信线缆安装辅助设备在进行线缆安装时多是将线辊固定住进行线缆收放,线辊和安装工具难以对着工作人员的安装需要进行高度调整,使用不便,而且现有的5G光纤通信线缆安装辅助设备通过焊接或螺栓固定的方式使各部件进行连接,拆卸维护不便。The existing 5G optical fiber communication cable installation auxiliary equipment mostly fixes the wire rollers for cable retraction during cable installation. In addition, the existing 5G optical fiber communication cable installation auxiliary equipment connects various components by welding or bolting, which is inconvenient to disassemble and maintain.
实用新型内容Utility model content
(一)要解决的技术问题(1) Technical problems to be solved
为了克服现有技术不足,现提出一种5G光纤通信线缆安装辅助设备,解决了现有的5G光纤通信线缆安装辅助设备在进行线缆安装时多是将线辊固定住进行线缆收放、线辊和安装工具难以对着工作人员的安装需要进行高度调整、使用不便以及现有的5G光纤通信线缆安装辅助设备通过焊接或螺栓固定的方式使各部件进行连接、拆卸维护不便的问题。In order to overcome the deficiencies of the existing technology, a 5G optical fiber communication cable installation auxiliary equipment is proposed, which solves the problem that the existing 5G optical fiber communication cable installation auxiliary equipment mostly fixes the wire roller for cable receiving during cable installation. It is difficult to adjust the height of the installation, line rollers and installation tools for the staff, which is inconvenient to use, and the existing 5G optical fiber communication cable installation auxiliary equipment is inconvenient to connect, disassemble and maintain the various components by welding or bolting. question.
(二)技术方案(2) Technical solutions
本实用新型通过如下技术方案实现:本实用新型提出了一种5G光纤通信线缆安装辅助设备,包括底座、丝杆和升降台,所述底座上端一侧通过螺纹连接有导向杆,所述导向杆上端设置有轴套,所述导向杆一侧设置有步进电机,所述步进电机的传动输出端设置有所述丝杆,所述导向杆上设置有导向套,所述导向套外围设置有所述升降台,所述升降台中部设置有回转支承,所述回转支承内设置有旋转台,所述旋转台上端中部设置有立柱,所述回转支承两侧设置有置物槽。The utility model is realized by the following technical solutions: the utility model proposes a 5G optical fiber communication cable installation auxiliary equipment, which includes a base, a screw rod and a lifting platform. The upper end of the rod is provided with a shaft sleeve, one side of the guide rod is provided with a stepper motor, the transmission output end of the stepper motor is provided with the screw rod, the guide rod is provided with a guide sleeve, and the periphery of the guide sleeve is provided The lifting platform is provided, a slewing bearing is arranged in the middle of the lifting platform, a rotating platform is arranged in the slewing bearing, a column is arranged in the middle of the upper end of the rotating platform, and storage slots are arranged on both sides of the slewing bearing.
进一步的,所述底座下端四角处焊接有支撑腿,所述支撑腿下端通过螺栓固定有轮座,所述轮座下端通过螺栓固定有万向轮,所述万向轮一侧转动连接有轮锁。Further, the four corners of the lower end of the base are welded with support legs, the lower end of the support legs is fixed with a wheel seat by bolts, the lower end of the wheel seat is fixed with a universal wheel by bolts, and a wheel is rotatably connected to one side of the universal wheel. Lock.
通过采用上述技术方案,通过所述万向轮可使设备能够便捷移动,通过所述轮锁可将所述万向轮锁死,从而使设备固定。By adopting the above technical solution, the device can be moved conveniently through the universal wheel, and the universal wheel can be locked by the wheel lock, so that the device can be fixed.
进一步的,所述轴套与所述导向杆通过螺纹连接,所述步进电机与所述底座通过螺栓连接。Further, the bushing and the guide rod are connected by threads, and the stepping motor and the base are connected by bolts.
通过采用上述技术方案,所述轴套可与所述导向杆便捷拆分,所述轴套可防止所述升降台从所述导向杆和所述丝杆上滑脱。By adopting the above technical solution, the shaft sleeve can be easily disassembled from the guide rod, and the shaft sleeve can prevent the lifting platform from slipping off the guide rod and the lead screw.
进一步的,所述步进电机的传动输出端与所述丝杆键连接,所述丝杆与所述升降台通过螺纹连接。Further, the transmission output end of the stepping motor is connected with the lead screw key, and the lead screw is connected with the lifting platform through a thread.
通过采用上述技术方案,所述步进电机在工作时可带动所述丝杆进行转动,由于所述丝杆与所述升降台通过螺纹连接,所述丝杆在转动时可使所述升降台在所述丝杆上进行升降。By adopting the above technical solution, the stepping motor can drive the lead screw to rotate during operation. Since the lead screw and the lifting platform are connected by threads, the lead screw can make the lifting platform rotate when the lead screw rotates. Lift up and down on the screw rod.
进一步的,所述导向套与所述升降台过盈连接,所述导向杆与所述导向套滑动连接。Further, the guide sleeve is connected with the lifting platform by interference, and the guide rod is slidably connected with the guide sleeve.
通过采用上述技术方案,所述导向台采用耐磨材料制成,所述导向杆和所述导向套可为所述丝杆提供辅助,使所述升降台在所述丝杆上升降时能够保持平稳。By adopting the above technical solution, the guide table is made of wear-resistant material, and the guide rod and the guide sleeve can provide assistance to the screw rod, so that the lifting table can maintain smooth.
进一步的,所述回转支承与所述升降台以及所述旋转台均为过盈连接,所述立柱与所述旋转台焊接。Further, the slewing bearing, the lift table and the rotary table are all connected by interference, and the column is welded to the rotary table.
通过采用上述技术方案,所述回转支承是新型机械零部件,由内外圈、滚动体等构成,所述回转支承是一种能够承受综合载荷的大型轴承,可以同时承受较大的轴向、径向负荷和倾覆力矩,所述旋转台可通过所述回转支承便捷的进行转动,光纤通信线缆的线辊可通过所述立柱放置在所述旋转台上,通过所述旋转台的转动可使线辊上的线缆能够被便捷的拉出。By adopting the above technical solutions, the slewing bearing is a new type of mechanical parts, consisting of inner and outer rings, rolling elements, etc. The slewing bearing is a large bearing that can bear comprehensive loads, and can bear large axial and radial To the load and overturning moment, the rotary table can be easily rotated through the slewing bearing, the wire roller of the optical fiber communication cable can be placed on the rotary table through the vertical column, and the rotation of the rotary table can make The cable on the reel can be easily pulled out.
进一步的,所述置物槽成型于所述升降台上。Further, the storage slot is formed on the lifting platform.
通过采用上述技术方案,所述置物槽内可放置线缆安装工具等物品。By adopting the above technical solution, items such as cable installation tools can be placed in the storage slot.
(三)有益效果(3) Beneficial effects
本实用新型相对于现有技术,具有以下有益效果:Compared with the prior art, the utility model has the following beneficial effects:
1、为解决现有的5G光纤通信线缆安装辅助设备在进行线缆安装时多是将线辊固定住进行线缆收放,线辊和安装工具难以对着工作人员的安装需要进行高度调整,使用不便的问题,本实用新型通过设置导向杆、轴套、导向套、步进电机和丝杆,使升降台可携带5G光纤通信线缆的线辊以及安装工具根据工作人员的安装需要便捷的进行升降,使用十分便捷,提高了安装辅助设备的使用便捷性;1. In order to solve the problem that the existing 5G optical fiber communication cable installation auxiliary equipment mostly fixes the wire rollers for cable retraction during cable installation, it is difficult for the wire rollers and installation tools to adjust the height of the installation staff. , the problem of inconvenience in use, the utility model is provided with a guide rod, a shaft sleeve, a guide sleeve, a stepping motor and a screw rod, so that the lifting platform can carry the line roller of the 5G optical fiber communication cable and the installation tool according to the installation needs of the staff. It is very convenient to use for lifting and lowering, which improves the convenience of installing auxiliary equipment;
2、为解决现有的5G光纤通信线缆安装辅助设备通过焊接或螺栓固定的方式使各部件进行连接,拆卸维护不便的问题,本实用新型中设备的底座、导向杆、升降台、轴套、丝杆均可便捷拆分,使设备的维护和修理十分简单便捷,降低了设备的维护成本。2. In order to solve the problem of inconvenient disassembly and maintenance of the existing 5G optical fiber communication cable installation auxiliary equipment by welding or bolting to connect various components, the base, guide rod, lifting platform, and shaft sleeve of the equipment in the utility model are , the screw can be easily disassembled, which makes the maintenance and repair of the equipment very simple and convenient, and reduces the maintenance cost of the equipment.
附图说明Description of drawings
图1是本实用新型所述一种5G光纤通信线缆安装辅助设备的结构示意图。FIG. 1 is a schematic structural diagram of a 5G optical fiber communication cable installation auxiliary device according to the present invention.
附图标记说明如下:The reference numerals are explained as follows:
1、底座;2、导向杆;3、轴套;4、步进电机;5、丝杆;6、导向套;7、升降台;8、回转支承;9、旋转台;10、立柱;11、置物槽;12、支撑腿;13、轮座;14、万向轮;15、轮锁。1. Base; 2. Guide rod; 3. Shaft sleeve; 4. Stepper motor; 5. Screw rod; 6. Guide sleeve; 7. Lifting table; 8. Slewing bearing; 9. Rotary table; 10. Upright column; 11 , storage slot; 12, support legs; 13, wheel seat; 14, universal wheel; 15, wheel lock.
具体实施方式Detailed ways
为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solutions and advantages of the present utility model more clearly understood, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not intended to limit the present invention.
如图1所示,本实施例中的一种5G光纤通信线缆安装辅助设备,包括底座1、丝杆5和升降台7,底座1上端一侧通过螺纹连接有导向杆2,导向杆2上端设置有轴套3,导向杆2一侧设置有步进电机4,步进电机4的传动输出端设置有丝杆5,导向杆2上设置有导向套6,导向套6外围设置有升降台7,升降台7中部设置有回转支承8,回转支承8内设置有旋转台9,旋转台9上端中部设置有立柱10,回转支承8两侧设置有置物槽11,底座1下端四角处焊接有支撑腿12,支撑腿12下端通过螺栓固定有轮座13,轮座13下端通过螺栓固定有万向轮14,万向轮14一侧转动连接有轮锁15,通过万向轮14可使设备能够便捷移动,通过轮锁15可将万向轮14锁死,从而使设备固定,轴套3与导向杆2通过螺纹连接,步进电机4与底座1通过螺栓连接,轴套3可与导向杆2便捷拆分,轴套3可防止升降台7从导向杆2和丝杆5上滑脱,步进电机4的传动输出端与丝杆5键连接,丝杆5与升降台7通过螺纹连接,步进电机4在工作时可带动丝杆5进行转动,由于丝杆5与升降台7通过螺纹连接,丝杆5在转动时可使升降台7在丝杆5上进行升降,导向套6与升降台7过盈连接,导向杆2与导向套6滑动连接,导向台采用耐磨材料制成,导向杆2和导向套6可为丝杆5提供辅助,使升降台7在丝杆5上升降时能够保持平稳,回转支承8与升降台7以及旋转台9均为过盈连接,立柱10与旋转台9焊接,回转支承8是新型机械零部件,由内外圈、滚动体等构成,回转支承8是一种能够承受综合载荷的大型轴承,可以同时承受较大的轴向、径向负荷和倾覆力矩,置物槽11成型于升降台7上,置物槽11内可放置线缆安装工具等物品。As shown in FIG. 1 , a 5G optical fiber communication cable installation auxiliary device in this embodiment includes a base 1, a screw rod 5 and a lifting platform 7. A
如图1所示,在本实施例中,旋转台9可通过回转支承8便捷的进行转动,光纤通信线缆的线辊可通过立柱10放置在旋转台9上,通过旋转台9的转动可使线辊上的线缆能够被便捷的拉出,步进电机4在工作时可带动丝杆5进行转动,从而使升降台7在导向杆2和导向套6的辅助下进行升降,以将线辊和置物槽11内的物品升降至便于安装使用的高度。As shown in FIG. 1 , in this embodiment, the rotary table 9 can be easily rotated through the
如图1所示,在本实施例中,导向杆2可与底座1便捷拆分,导向杆2、升降台7、轴套3、丝杆5均可便捷拆分,使设备的维护和修理十分简单便捷,降低了设备的维护成本。As shown in FIG. 1 , in this embodiment, the
本实施例的具体实施过程如下:设备使用外接电源,并被外部设备控制,在使用装置时光纤通信线缆的线辊可通过立柱10放置在旋转台9上,置物槽11内可放置线缆安装工具等物品,通过万向轮14可使设备能够便捷移动,通过轮锁15可将万向轮14锁死,从而使设备固定,步进电机4在工作时可带动丝杆5进行转动,从而使升降台7在导向杆2和导向套6的辅助下进行升降,以将线辊和置物槽11内的物品升降至便于安装使用的高度,这样工作人员可便捷的对线缆和安装工具等物进行取放,使5G光纤通信线缆的安装工作更加便捷,设备的底座1、导向杆2、升降台7、轴套3、丝杆5均可便捷拆分,使设备的维护和修理十分简单便捷,降低了设备的维护成本。The specific implementation process of this embodiment is as follows: the device uses an external power supply and is controlled by an external device. When the device is used, the line roller of the optical fiber communication cable can be placed on the rotating table 9 through the
上面所述的实施例仅仅是对本实用新型的优选实施方式进行描述,并非对本实用新型的构思和范围进行限定。在不脱离本实用新型设计构思的前提下,本领域普通人员对本实用新型的技术方案做出的各种变型和改进,均应落入到本实用新型的保护范围,本实用新型请求保护的技术内容,已经全部记载在权利要求书中。The above-mentioned embodiments merely describe the preferred embodiments of the present invention, and do not limit the concept and scope of the present invention. Under the premise of not departing from the design concept of the present invention, various modifications and improvements made by those of ordinary skill in the art to the technical solutions of the present invention shall fall within the protection scope of the present invention, and the technology claimed by the present invention shall be protected. The content has been fully described in the claims.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921435856.6U CN210835391U (en) | 2019-08-31 | 2019-08-31 | A 5G optical fiber communication cable installation auxiliary equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921435856.6U CN210835391U (en) | 2019-08-31 | 2019-08-31 | A 5G optical fiber communication cable installation auxiliary equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210835391U true CN210835391U (en) | 2020-06-23 |
Family
ID=71251663
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921435856.6U Expired - Fee Related CN210835391U (en) | 2019-08-31 | 2019-08-31 | A 5G optical fiber communication cable installation auxiliary equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210835391U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112331414A (en) * | 2020-11-09 | 2021-02-05 | 安徽信息工程学院 | Electrical cable positioning device |
-
2019
- 2019-08-31 CN CN201921435856.6U patent/CN210835391U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112331414A (en) * | 2020-11-09 | 2021-02-05 | 安徽信息工程学院 | Electrical cable positioning device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206751338U (en) | Emergent photovoltaic apparatus that is a kind of removable and just storing | |
| CN212454477U (en) | Supporting device for tunnel maintenance | |
| CN210835391U (en) | A 5G optical fiber communication cable installation auxiliary equipment | |
| CN207406014U (en) | A kind of wallboard machine | |
| CN206860378U (en) | It is a kind of to embrace tower apparatus for wind-power tower maintenance | |
| CN106287105B (en) | A kind of large-scale pipeline internal installation device | |
| CN202358850U (en) | Light lift-type cantilever crane | |
| CN216890002U (en) | Lifting device of electric power high-low voltage equipment | |
| CN101327903A (en) | Triangular hoisting jack | |
| CN113697689B (en) | Pole setting lifting device of transformer substation high altitude equipment | |
| CN102505587B (en) | Special steel rail hoisting device for railway classification yard | |
| CN201240817Y (en) | Triangular hoisting jack | |
| CN219507474U (en) | Gantry crane capable of being used in confined space | |
| CN112520609B (en) | Transfer device and method for high-voltage test reactor | |
| CN113117774A (en) | Elevating platform for physics experiments of high stability ability | |
| CN112520592B (en) | A reactor transfer device and method in a substation system | |
| CN114406594A (en) | Multi-functional tower section of thick bamboo gimbal mechanism that can diversely rotate | |
| CN201309729Y (en) | Extensible belt conveyor | |
| CN223061453U (en) | A temporary support device for erecting a steel structure bridge | |
| CN207309920U (en) | A kind of cooler modularization installation mobile device | |
| CN221759377U (en) | A lifting device for mechanical maintenance | |
| CN216912917U (en) | Auxiliary device for rapid deep hole drilling of rocker arm drill | |
| CN219408992U (en) | Portable handling device | |
| CN219363073U (en) | Building equipment installs loop wheel machine | |
| CN221917194U (en) | Wind power generation maintenance and load protection winch |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20200714 Address after: 214029 Qihang building, No.999 gaolang East Road, Wuxi City, Jiangsu Province Patentee after: WUXI TIANZE YIXUN IOT TECHNOLOGY Co.,Ltd. Address before: 341208 No.1, Hanwu group, Shangwan village, Yingqian Town, Shangyou County, Ganzhou City, Jiangxi Province Patentee before: Han Yuanping |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200623 |