CN210832281U - Volute cover and mobile air conditioner - Google Patents

Volute cover and mobile air conditioner Download PDF

Info

Publication number
CN210832281U
CN210832281U CN201921942470.4U CN201921942470U CN210832281U CN 210832281 U CN210832281 U CN 210832281U CN 201921942470 U CN201921942470 U CN 201921942470U CN 210832281 U CN210832281 U CN 210832281U
Authority
CN
China
Prior art keywords
drainage
water
rib
side plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921942470.4U
Other languages
Chinese (zh)
Inventor
何博文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
GD Midea Air Conditioning Equipment Co Ltd
Original Assignee
Midea Group Co Ltd
GD Midea Air Conditioning Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, GD Midea Air Conditioning Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201921942470.4U priority Critical patent/CN210832281U/en
Priority to PCT/CN2020/080463 priority patent/WO2021093247A1/en
Priority to EP20888630.9A priority patent/EP4043807A4/en
Application granted granted Critical
Publication of CN210832281U publication Critical patent/CN210832281U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices For Blowing Cold Air, Devices For Blowing Warm Air, And Means For Preventing Water Condensation In Air Conditioning Units (AREA)

Abstract

本实用新型公开了一种蜗壳盖及移动空调器,蜗壳盖包括顶板,所述顶板上设有沿所述顶板长度方向延伸的引水槽;第一侧板和第二侧板,所述第一侧板和所述第二侧板分别设于所述顶板的两端,所述第一侧板设有第一引流结构,以用于引流所述引水槽溢出的水;和/或,所述第二侧板设有第二引流结构,以用于引流所述引水槽溢出的水。移动空调器顶部出风时,顶板上形成的冷凝水会汇聚至引水槽,通过在侧板上设置引流结构,可将从引水槽内流出的冷凝水通过预设路径引流至预设位置,从而可进一步地防止冷凝水肆意乱流,从而可避免冷凝水流至移动空调器内部,以避免对移动空调器内部零件造成损害,从而可提高移动空调器的使用寿命。

Figure 201921942470

The utility model discloses a volute cover and a mobile air conditioner. The volute cover comprises a top plate, the top plate is provided with a water diversion groove extending along the length direction of the top plate; a first side plate and a second side plate, the The first side plate and the second side plate are respectively arranged at both ends of the top plate, and the first side plate is provided with a first drainage structure for drainage of the overflowed water from the drainage tank; and/or, The second side plate is provided with a second drainage structure for drainage of the overflowed water from the drainage groove. When the air is discharged from the top of the mobile air conditioner, the condensed water formed on the top plate will be collected to the water diversion groove. The wanton turbulent flow of the condensed water can be further prevented, so that the condensed water can be prevented from flowing into the interior of the mobile air conditioner, so as to avoid damage to the internal parts of the mobile air conditioner, thereby improving the service life of the mobile air conditioner.

Figure 201921942470

Description

蜗壳盖及移动空调器Volute cover and mobile air conditioner

技术领域technical field

本实用新型涉及空调领域,具体涉及一种蜗壳盖及移动空调器。The utility model relates to the field of air conditioners, in particular to a volute cover and a mobile air conditioner.

背景技术Background technique

移动空调相较于传统的立式空调,挂式空调体型更加小巧,无需安装,移动方便,可随意放置在房屋内不同位置。Compared with the traditional vertical air conditioner, the mobile air conditioner is smaller in size, does not require installation, is easy to move, and can be placed in different positions in the house at will.

移动空调的壳体内有压缩机、排风机、蒸发器、冷凝器和蜗壳组件等装置。蜗壳组件包括设于室内侧换热器上方的顶板,该顶板还用于形成蜗壳组件的送风出口的侧缘;当移动空调顶部出风时,顶板上会凝聚冷凝水,冷凝水会聚集过多后,冷凝水会肆意乱流至移动空调内部,从而容易对移动空调内部零件造成损害,影响移动空调的使用寿命。There are compressors, exhaust fans, evaporators, condensers and volute components in the shell of the mobile air conditioner. The volute assembly includes a top plate arranged above the indoor side heat exchanger, and the top plate is also used to form the side edge of the air outlet of the volute assembly; when the air is discharged from the top of the mobile air conditioner, condensed water will condense on the top plate, and the condensed water will After too much accumulation, the condensed water will flow freely into the interior of the mobile air conditioner, which will easily cause damage to the internal parts of the mobile air conditioner and affect the service life of the mobile air conditioner.

实用新型内容Utility model content

本实用新型的主要目的是提供一种蜗壳盖及移动空调器,旨在解决移动空调器的,室内侧换热器上方的顶板上形成的冷凝水会肆意乱流至移动空调内部而容易对移动空调内部零件造成损害的问题。The main purpose of this utility model is to provide a volute cover and a mobile air conditioner, aiming at solving the problem of the mobile air conditioner that the condensed water formed on the top plate above the indoor side heat exchanger will flow freely into the interior of the mobile air conditioner, and it is easy to damage the mobile air conditioner. The problem of damage caused by moving the internal parts of the air conditioner.

为实现上述目的,本实用新型提出的蜗壳盖,包括:To achieve the above purpose, the volute cover proposed by the present utility model includes:

顶板,所述顶板上设有沿所述顶板长度方向延伸的引水槽;a top plate, the top plate is provided with a water diversion groove extending along the length direction of the top plate;

第一侧板和第二侧板,所述第一侧板和所述第二侧板分别设于所述顶板的两端,所述第一侧板设有第一引流结构,以用于引流所述引水槽溢出的水;和/或,所述第二侧板设有第二引流结构,以用于引流所述引水槽溢出的水。A first side plate and a second side plate, the first side plate and the second side plate are respectively arranged at both ends of the top plate, and the first side plate is provided with a first drainage structure for drainage and/or, the second side plate is provided with a second drainage structure for diverting the overflowed water from the water channel.

在本实用新型的一实施例中,所述第一侧板上设有位于所述引水槽下方的第一风轮安装孔,所述第一引流结构用于引导所述引水槽溢出的水远离所述第一风轮安装孔。In an embodiment of the present invention, the first side plate is provided with a first wind wheel mounting hole located below the water diversion groove, and the first diversion structure is used to guide the overflowing water from the water diversion groove away from the water diversion groove. the first wind wheel installation hole.

在本实用新型的一实施例中,所述第一引流结构包括第一引流筋和第二引流筋,第二引流筋连接于所述第一引流筋的下端,所述第一引流筋设于所述引水槽的一侧,所述第二引流筋向所述引水槽的另一侧倾斜延伸。In an embodiment of the present invention, the first drainage structure includes a first drainage rib and a second drainage rib, the second drainage rib is connected to the lower end of the first drainage rib, and the first drainage rib is provided at the lower end of the first drainage rib. On one side of the water diversion groove, the second diversion rib extends obliquely to the other side of the water diversion groove.

在本实用新型的一实施例中,所述第一风轮安装孔的周缘设有安装环凸,所述第二引流筋的下端与所述安装环凸连接。In an embodiment of the present invention, the peripheral edge of the first wind wheel installation hole is provided with a mounting ring protrusion, and the lower end of the second drainage rib is connected with the mounting ring protrusion.

在本实用新型的一实施例中,所述第一引流结构还包括第三引流筋和第一漏水孔,所述第一漏水孔设于所述第二引流筋的远离所述第一风轮安装孔的一侧,所述第三引流筋的一端与所述第二引流筋连接,另一端与所述第一漏水孔连接,以将水引流至所述第一漏水孔。In an embodiment of the present invention, the first drainage structure further includes a third drainage rib and a first water leakage hole, and the first leakage hole is provided on the second drainage rib away from the first wind wheel On one side of the installation hole, one end of the third drainage rib is connected with the second drainage rib, and the other end is connected with the first leakage hole, so as to drain water to the first leakage hole.

在本实用新型的一实施例中,所述引水槽的底部由所述第二侧板至所述第一侧板的方向向下倾斜。In an embodiment of the present invention, the bottom of the water guiding groove is inclined downward from the direction of the second side plate to the first side plate.

在本实用新型的一实施例中,所述第一侧板上设有引水口,所述引水口与所述引水槽连通。In an embodiment of the present invention, the first side plate is provided with a water diversion opening, and the water diversion opening communicates with the water diversion groove.

在本实用新型的一实施例中,所述第二侧板上设有位于所述引水槽下方的第二风轮安装孔,所述第二引流结构用于引导所述引水槽溢出的水远离所述第二风轮安装孔。In an embodiment of the present invention, the second side plate is provided with a second wind wheel installation hole located below the water diversion groove, and the second diversion structure is used to guide the overflowing water from the water diversion groove away from the water diversion groove. the second wind wheel mounting hole.

在本实用新型的一实施例中,所述第二引流结构包括互相连接的第四引流筋和第五引流筋,所述第四引流筋和第五引流筋分别向所述第二风轮安装孔的两侧倾斜延伸。In an embodiment of the present invention, the second drainage structure includes a fourth drainage rib and a fifth drainage rib that are connected to each other, and the fourth drainage rib and the fifth drainage rib are respectively installed on the second wind wheel Both sides of the hole extend obliquely.

在本实用新型的一实施例中,所述第二引流结构还包括第六引流筋,所述第六引流筋连接于所述第四引流筋的下端,所述述第六引流筋向远离所述第五引流筋的方向延伸。In an embodiment of the present invention, the second drainage structure further includes a sixth drainage rib, the sixth drainage rib is connected to the lower end of the fourth drainage rib, and the sixth drainage rib is directed away from the Extend in the direction of the fifth drainage rib.

在本实用新型的一实施例中,所述第二侧板包括凸设于所述顶板的挡板,所述挡板设于所述引水槽的一端,以阻挡所述引水槽中的水溢出。In an embodiment of the present invention, the second side plate includes a baffle plate protruding from the top plate, and the baffle plate is disposed at one end of the water diversion groove to prevent the water in the water diversion groove from overflowing .

此外,本实用新型还提供了一种移动空调器,包括如上述任一所述的蜗壳盖。In addition, the present invention also provides a mobile air conditioner, comprising the volute cover as described above.

本实用新型的技术方案中,移动空调器顶部出风时,顶板上形成的冷凝水会汇聚至引水槽,从而可避免冷凝水分散下流至移动空调器内部,以防止冷凝水对移动空调器内部零件造成损害,从而可提高移动空调器的使用寿命。而且,通过在侧板上设置引流结构,可将从引水槽内流出的冷凝水通过预设路径引流至预设位置,从而可进一步地防止冷凝水肆意乱流,从而可避免冷凝水流至移动空调器内部,以避免对移动空调器内部零件造成损害,从而可提高移动空调器的使用寿命。In the technical solution of the present invention, when the air is discharged from the top of the mobile air conditioner, the condensed water formed on the top plate will converge to the water diversion groove, so as to prevent the condensed water from dispersing and flowing down to the interior of the mobile air conditioner, so as to prevent the condensed water from affecting the interior of the mobile air conditioner. Parts cause damage, thereby increasing the service life of the mobile air conditioner. Moreover, by arranging a drainage structure on the side plate, the condensed water flowing out of the water diversion groove can be drained to a preset position through a preset path, so as to further prevent the condensed water from flowing indiscriminately, thereby preventing the condensed water from flowing to the mobile air conditioner To avoid damage to the internal parts of the mobile air conditioner, the service life of the mobile air conditioner can be improved.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图示出的结构获得其他的附图。In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are just some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained based on the structures shown in these drawings without any creative effort.

图1为本实用新型实施例的移动空调器的蜗壳组件的结构示意图;1 is a schematic structural diagram of a volute assembly of a mobile air conditioner according to an embodiment of the present utility model;

图2为本实用新型实施例的移动空调器的部分结构示意图;FIG. 2 is a partial structural schematic diagram of the mobile air conditioner according to the embodiment of the present utility model;

图3为本实用新型实施例的移动空调器的蜗壳盖的结构示意图;3 is a schematic structural diagram of a volute cover of a mobile air conditioner according to an embodiment of the present invention;

图4为图3中A部放大图;Fig. 4 is an enlarged view of part A in Fig. 3;

图5为本实用新型实施例的移动空调器的另一部分结构示意图;5 is a schematic structural diagram of another part of the mobile air conditioner according to the embodiment of the present utility model;

图6为本实用新型实施例的移动空调器的蜗壳的结构示意图;6 is a schematic structural diagram of a volute of a mobile air conditioner according to an embodiment of the present invention;

图7为本实用新型实施例的移动空调器的中隔板的结构示意图。7 is a schematic structural diagram of a middle partition plate of a mobile air conditioner according to an embodiment of the present invention.

附图标号说明:Description of reference numbers:

Figure BDA0002268366980000031
Figure BDA0002268366980000031

Figure BDA0002268366980000041
Figure BDA0002268366980000041

本实用新型目的的实现、功能特点及优点将结合实施例,参照附图做进一步说明。The realization, functional characteristics and advantages of the purpose of the present utility model will be further described with reference to the accompanying drawings in conjunction with the embodiments.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型的一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, not all of them. Example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

需要说明,本实用新型实施例中所有方向性指示(诸如上、下、左、右、前、后……)仅用于解释在某一特定姿态(如附图所示)下各部件之间的相对位置关系、运动情况等,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。It should be noted that all directional indications (such as up, down, left, right, front, back...) in the embodiments of the present invention are only used to explain the difference between the various components under a certain posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication also changes accordingly.

另外,在本实用新型中如涉及“第一”、“第二”等的描述仅用于描述目的,而不能理解为指示或暗示其相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。在本实用新型的描述中,“多个”的含义是至少两个,例如两个,三个等,除非另有明确具体的限定。In addition, descriptions such as "first", "second", etc. in the present invention are only used for description purposes, and should not be understood as indicating or implying their relative importance or implicitly indicating the number of indicated technical features. Thus, a feature delimited with "first", "second" may expressly or implicitly include at least one of that feature. In the description of the present invention, "plurality" means at least two, such as two, three, etc., unless otherwise expressly and specifically defined.

在本实用新型中,除非另有明确的规定和限定,术语“连接”、“固定”等应做广义理解,例如,“固定”可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In the present utility model, unless otherwise expressly specified and limited, the terms "connection", "fixed" and the like should be understood in a broad sense, for example, "fixed" can be a fixed connection, a detachable connection, or an integrated; It can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal communication between two elements or the interaction relationship between the two elements, unless otherwise clearly defined. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.

另外,本实用新型各个实施例之间的技术方案可以相互结合,但是必须是以本领域普通技术人员能够实现为基础,当技术方案的结合出现相互矛盾或无法实现时应当认为这种技术方案的结合不存在,也不在本实用新型要求的保护范围之内。In addition, the technical solutions between the various embodiments of the present invention can be combined with each other, but must be based on the realization by those of ordinary skill in the art. When the combination of technical solutions is contradictory or cannot be realized, it should be considered that such technical solutions The combination does not exist and is not within the protection scope required by the present invention.

本实用新型所指的“上”、“下”是以图1所示的方位为基准,即实用新型所指的“上”、“下”对应图1的上、下方位,仅用于解释在图1所示姿态下各部件之间的相对位置关系,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。The "up" and "down" referred to in the utility model are based on the orientation shown in Figure 1, that is, the "up" and "down" referred to in the utility model correspond to the upper and lower positions in Figure 1, and are only used for explanation. In the relative positional relationship between the components in the posture shown in FIG. 1 , if the specific posture changes, the directional indication also changes accordingly.

本实用新型提供了一种蜗壳组件100,如图1、图2和图3所示,蜗壳组件100包括蜗壳盖200,蜗壳盖200包括顶板210,顶板210上设有沿顶板210长度方向延伸的引水槽220,引水槽220包括底壁221以及分别与底壁221连接的第一侧壁222和第二侧壁223,第一侧壁222和第二侧壁223相对设置,引水槽220还包括第一加强筋224,第一加强筋224连接底壁221与第一侧壁222,第一加强筋224与第二侧壁223间隔设置。The present invention provides a volute assembly 100, as shown in FIG. 1, FIG. 2 and FIG. 3, the volute assembly 100 includes a volute cover 200, the volute cover 200 includes a top plate 210, and the top plate 210 is provided with a top plate 210 along the The water diversion groove 220 extending in the length direction comprises a bottom wall 221 and a first side wall 222 and a second side wall 223 respectively connected to the bottom wall 221. The first side wall 222 and the second side wall 223 are arranged opposite to each other. The water tank 220 further includes a first reinforcing rib 224 , the first reinforcing rib 224 is connected to the bottom wall 221 and the first side wall 222 , and the first reinforcing rib 224 is spaced apart from the second side wall 223 .

移动空调器顶部出风时,顶板210上形成的冷凝水会汇聚至引水槽220,从而可避免冷凝水分散下流至移动空调器内部,以防止冷凝水对移动空调器内部零件造成损害,从而可提高移动空调器的使用寿命。When the air is discharged from the top of the mobile air conditioner, the condensed water formed on the top plate 210 will gather to the water diversion groove 220, so that the condensed water can be prevented from being dispersed and flowed down to the interior of the mobile air conditioner, so as to prevent the condensed water from causing damage to the internal parts of the mobile air conditioner, thereby preventing the condensed water from causing damage to the internal parts of the mobile air conditioner. Improve the service life of mobile air conditioners.

而且,通过设置在引水槽220内设置第一加强筋224,能够加强引水槽220和蜗壳盖200的结构强度,同时使第一加强筋224与第二侧壁223间隔设置,可以供冷凝水通过,从而可使汇流在引水槽内的冷凝水可从引水槽的一端流出,以防止引水槽内积留大量的冷凝水。即是说,通过使第一加强筋224与第二侧壁223间隔设置,既可以加强引水槽220和蜗壳盖200的结构强度,又不会影响引水槽220内冷凝水的排放。Moreover, by disposing the first reinforcing rib 224 in the water guiding groove 220, the structural strength of the water guiding groove 220 and the volute cover 200 can be strengthened, and at the same time, the first reinforcing rib 224 and the second side wall 223 can be spaced apart to supply condensed water. Through this, the condensed water converging in the water guiding groove can flow out from one end of the water guiding groove, so as to prevent a large amount of condensed water from accumulating in the water guiding groove. That is to say, by disposing the first reinforcing rib 224 and the second side wall 223 at intervals, the structural strength of the water guiding groove 220 and the volute cover 200 can be strengthened without affecting the discharge of condensed water in the water guiding groove 220 .

具体地,引水槽220还包括第二加强筋225,第二加强筋225连接引水槽220的底壁221和第二侧壁223,第二加强筋225与第一侧壁222间隔设置,进一步加强了引水槽220的结构强度。Specifically, the water diversion groove 220 further includes a second reinforcing rib 225, the second reinforcing rib 225 is connected to the bottom wall 221 and the second side wall 223 of the water diversion groove 220, and the second reinforcing rib 225 is spaced from the first side wall 222 to further strengthen the The structural strength of the water diversion tank 220 is improved.

更具体地,第一加强筋224和第二加强筋225相对设置,以在第一加强筋224和第二加强筋225之间形成过水槽,冷凝水从过水槽流出后,经过蜗壳组件100的引流结构,流入中隔板600的接水槽610中。第一加强筋224和第二加强筋225相对设置,可以使得引水槽220受力均匀,进一步提高结构稳定性。第一加强筋224和第二加强筋225的数量均为多个,多个第一加强筋224均匀地沿第一侧壁222间隔分布设置,多个第二加强筋225均匀地沿第二侧壁223间隔分布设置。在其它实施例中,第一加强筋224与第二加强筋225也可以间隔设置,只要满足冷凝水能够流过即可。More specifically, the first reinforcing rib 224 and the second reinforcing rib 225 are disposed opposite to each other, so as to form a water passage between the first reinforcing rib 224 and the second reinforcing rib 225 , and the condensed water flows out from the water passage and passes through the volute assembly 100 . The drainage structure is formed, and flows into the water receiving groove 610 of the middle partition plate 600. The first reinforcing rib 224 and the second reinforcing rib 225 are disposed opposite to each other, so that the water diversion groove 220 can be uniformly stressed, and the structural stability can be further improved. The number of the first reinforcing ribs 224 and the second reinforcing ribs 225 is multiple, the plurality of first reinforcing ribs 224 are evenly distributed along the first side wall 222, and the plurality of second reinforcing ribs 225 are evenly arranged along the second side The walls 223 are arranged at intervals. In other embodiments, the first reinforcing rib 224 and the second reinforcing rib 225 may also be arranged at intervals, as long as the condensed water can flow through.

蜗壳组件100包括分别设于顶板210两端的第一侧板240和第二侧板250,引水槽220的底壁221由第二侧板250至第一侧板240的方向向下倾斜,即底壁221沿引水槽220的长度方向倾斜设置,更有利于冷凝水沿底壁221流向引水槽220的一端,防止冷凝水堆积在底壁221上。The volute assembly 100 includes a first side plate 240 and a second side plate 250 respectively disposed at both ends of the top plate 210 , and the bottom wall 221 of the water gutter 220 is inclined downward from the second side plate 250 to the first side plate 240 , that is, The bottom wall 221 is inclined along the length direction of the water diversion groove 220 , which is more conducive for the condensed water to flow to one end of the water diversion groove 220 along the bottom wall 221 and prevent the condensed water from accumulating on the bottom wall 221 .

进一步地,第一加强筋224的下端向靠近第一侧板240的方向倾斜设置,第一加强筋224不仅有加强引水槽220结构的作用,还有引流冷凝水的作用。冷凝水经第一加强筋224流入引水槽220的底壁221,再沿倾斜的底壁221流至引水槽220的端部。第二加强筋225的下端也可以向靠近第一侧板240的方向倾斜设置,也能有引流的效果。Further, the lower end of the first reinforcing rib 224 is inclined in a direction close to the first side plate 240. The first reinforcing rib 224 not only has the function of strengthening the structure of the water diversion groove 220, but also the function of diverting condensed water. The condensed water flows into the bottom wall 221 of the water guiding groove 220 through the first reinforcing rib 224 , and then flows to the end of the water guiding groove 220 along the inclined bottom wall 221 . The lower end of the second reinforcing rib 225 can also be inclined in a direction close to the first side plate 240, which can also have the effect of drainage.

更进一步地,顶板210包括设于引水槽220一侧的上延伸板230,上延伸板230与第一侧壁222的上边缘连接,上延伸板230的周缘向上凸设有挡水筋231。室内侧换热器700设置在上延伸板230的下方,室内侧换热器700与移动空调器的进风口500对应设置,上延伸板230的端部可与室内侧换热器700的外侧齐平。蜗壳组件100的内部形成有风机风道,气体通过室内侧换热器700进入风机风道,经过顶部的室内侧出风口进入室内,在蜗壳组件100顶部形成的冷凝水由于挡水筋231的阻挡,冷凝水沿着上延伸板230流入引水槽220中,避免了流入室内侧换热器700,防止冷凝水被吸入风机风道。Furthermore, the top plate 210 includes an upper extension plate 230 disposed on one side of the water diversion groove 220 , the upper extension plate 230 is connected to the upper edge of the first side wall 222 , and a water retaining rib 231 protrudes upward from the periphery of the upper extension plate 230 . The indoor side heat exchanger 700 is arranged below the upper extension plate 230 , the indoor side heat exchanger 700 is arranged corresponding to the air inlet 500 of the mobile air conditioner, and the end of the upper extension plate 230 can be aligned with the outer side of the indoor side heat exchanger 700 . flat. A fan air duct is formed inside the volute assembly 100, the gas enters the fan air duct through the indoor side heat exchanger 700, and enters the room through the indoor side air outlet at the top. The condensed water flows into the water diversion groove 220 along the upper extension plate 230 to prevent the condensed water from flowing into the indoor side heat exchanger 700 and to prevent the condensed water from being sucked into the air duct of the fan.

在本实用新型的一实施例中,挡水筋231包括设于上延伸板230与第一侧壁222连接处的第一挡水筋232,第一挡水筋232设于引水槽220的一端,以将水引流入引水槽220内,第一挡水筋232能防止冷凝水从上延伸板230与第一侧壁222的连接处溢出,引流冷凝水汇入引水槽220中。In an embodiment of the present invention, the water retaining rib 231 includes a first water retaining rib 232 disposed at the connection between the upper extension plate 230 and the first side wall 222 , and the first water retaining rib 232 is disposed at one end of the water diversion groove 220 The first water retaining rib 232 can prevent the condensed water from overflowing from the connection between the upper extension plate 230 and the first side wall 222 , and the condensed water is drained into the water diversion groove 220 .

蜗壳组件100还包括蜗壳300,蜗壳300与蜗壳盖200配合连接以形成风机风道,蜗壳300包括前风道板310,前风道板310的上端与第二侧壁223间隔设置,以在前风道板310的上端与第二侧壁223之间形成送风出口400。蜗壳300与蜗壳盖200拼合形成蜗壳组件100,前风道板310与进风口500对应设置,气体从位于蜗壳组件100侧面的进风口500流入风机风道内,再从位于蜗壳组件100顶部的送风出口400流出,避免了从室内侧出风口吹出的冷空气或热空气直吹在用户身上,防止用户产生过热过冷等不适的感觉。The volute assembly 100 further includes a volute 300 , the volute 300 is cooperatively connected with the volute cover 200 to form a fan air duct, the volute 300 includes a front air duct plate 310 , and the upper end of the front air duct plate 310 is spaced from the second side wall 223 It is arranged to form an air outlet 400 between the upper end of the front air duct panel 310 and the second side wall 223 . The volute 300 and the volute cover 200 are assembled to form the volute assembly 100, the front air duct plate 310 is arranged corresponding to the air inlet 500, and the gas flows into the fan air duct from the air inlet 500 on the side of the volute assembly 100, and then flows from the air inlet 500 on the side of the volute assembly 100. The air outlet 400 at the top of the 100 flows out, preventing the cold air or hot air blown from the indoor side air outlet from blowing directly on the user, preventing the user from feeling overheated and cold.

如图5~图7所示,本实施例的蜗壳300还包括设于前风道板310的下端的挡风底板320,挡风底板320自前风道板310的下端朝远离前风道板310的方向折弯延伸。挡风底板320位于移动空调器的中隔板600上,中隔板600上设有接水槽610、积水槽620和排水槽630,室内侧换热器700放置在接水槽610中,接水槽610与积水槽620连通,积水槽620与排水槽630连通,室外侧换热器位于排水槽630的下方,排水槽630上设有多个排水孔631。引水槽220中的冷凝水首先流入中隔板600的接水槽610中,然后流入积水槽620,再汇入排水槽630,经排水孔631流入室外侧换热器。积水槽620包括第三侧壁621,第三侧壁621和第四侧壁622,第三侧壁621与第四侧壁622抵接在挡风底板320远离前风道板310的一侧,防止冷凝水从挡风底板320流入风机风道中。As shown in FIGS. 5 to 7 , the volute 300 of this embodiment further includes a wind shielding bottom plate 320 disposed at the lower end of the front air duct plate 310 , and the wind shielding bottom plate 320 moves away from the front air duct plate 310 from the lower end of the front air duct plate 310 . The direction of 310 is bent and extended. The windshield bottom plate 320 is located on the middle partition plate 600 of the mobile air conditioner. The middle partition plate 600 is provided with a water receiving groove 610, a water collecting groove 620 and a drainage groove 630. The indoor side heat exchanger 700 is placed in the water receiving groove 610, and the water receiving groove 610 It communicates with the water storage tank 620 , and the water storage tank 620 communicates with the drainage tank 630 . The outdoor heat exchanger is located below the drainage tank 630 , and the drainage tank 630 is provided with a plurality of drainage holes 631 . The condensed water in the water diversion groove 220 first flows into the water receiving groove 610 of the middle partition plate 600 , then flows into the water collecting groove 620 , and then flows into the drainage groove 630 , and flows into the outdoor heat exchanger through the drainage hole 631 . The sump 620 includes a third side wall 621, a third side wall 621 and a fourth side wall 622. The third side wall 621 and the fourth side wall 622 abut on the side of the windshield bottom plate 320 away from the front air duct plate 310. The condensed water is prevented from flowing into the fan air duct from the wind shielding bottom plate 320 .

蜗壳300还包括设于前风道板310的下端的增长板330,增长板330向下延伸,挡风底板320设于增长板330的下端,增长板330的设置使得挡风底板320下移,增大了风机风道的内部空间,提高了空间利用率。The volute 300 further includes a growth plate 330 arranged at the lower end of the front air duct plate 310 , the growth plate 330 extends downward, and the windshield bottom plate 320 is arranged at the lower end of the growth plate 330 , and the arrangement of the growth plate 330 makes the windshield bottom plate 320 move downward. , which increases the internal space of the fan air duct and improves the space utilization rate.

挡风底板320上设有挡风板340,挡风板340向上凸出于挡风底板320的上表面。挡风板340位于第三侧壁621与第四侧壁622之间,能阻止冷凝水被吹入风机风道内,避免了“吹水”现象的发生。The wind shielding bottom plate 320 is provided with a wind shielding plate 340 , and the wind shielding plate 340 protrudes upward from the upper surface of the wind shielding bottom plate 320 . The wind deflector 340 is located between the third side wall 621 and the fourth side wall 622, which can prevent the condensed water from being blown into the air duct of the fan, and avoid the phenomenon of "blowing water".

挡风底板320上形成有挡风隆起部350,挡风板340形成为挡风隆起部350的远离前风道板310的一侧的侧壁;和/或,挡风板340向下凸出于挡风底板320的下表面。挡风隆起部350有引导气体进入风机风道的作用,还有加强挡风底板320结构强度的效果。挡风板340向下凸出能够防止气体进入挡风底板320与排水槽630中的间隙,减少漏风现象,既提高了风量利用率,又减小了因漏风导致的噪音。A wind-shielding bulge 350 is formed on the wind-shielding bottom plate 320, and the wind-shielding plate 340 is formed as a side wall of the side of the wind-shielding bulge 350 away from the front air duct plate 310; and/or, the wind-shielding plate 340 protrudes downwards on the lower surface of the windshield bottom plate 320 . The wind-shielding bulge 350 has the function of guiding the gas into the air duct of the fan, and also has the effect of strengthening the structural strength of the wind-shielding bottom plate 320 . The downward protruding of the wind shield plate 340 can prevent gas from entering the gap between the wind shield bottom plate 320 and the drainage groove 630 , thereby reducing the phenomenon of air leakage, which not only improves the utilization rate of air volume, but also reduces the noise caused by air leakage.

其中,如图1和图2所示,蜗壳盖200包括:Wherein, as shown in FIG. 1 and FIG. 2 , the volute cover 200 includes:

顶板210,顶板210上设有沿顶板210长度方向延伸的引水槽220;The top plate 210, the top plate 210 is provided with a water diversion groove 220 extending along the length direction of the top plate 210;

第一侧板240和第二侧板250,第一侧板240和第二侧板250分别设于顶板210的两端,第一侧板240设有第一引流结构260,以用于引流引水槽220溢出的水;和/或,第二侧板250设有第二引流结构270,以用于引流引水槽220溢出的水。The first side plate 240 and the second side plate 250 are respectively disposed on both ends of the top plate 210 , and the first side plate 240 is provided with a first drainage structure 260 for drainage and drainage. and/or, the second side plate 250 is provided with a second drainage structure 270 for draining the overflowed water from the water tank 220 .

冷凝水流入引水槽220后,经过第一引流结构260和/或第二引流结构270汇入中隔板600的积水槽620的中,若冷凝水流向第一侧板240,则通过第一引流结构260引流,若冷凝水流向第二侧板250,则通过第二引流结构270引流。通过引水槽220以及第一引流结构260和/或第二引流结构270的引流,防止了冷凝水肆意乱流至移动空调器内部,避免对移动空调器内部零件造成损害,提高了移动空调器的使用寿命。After the condensed water flows into the water diversion groove 220, it flows into the water storage groove 620 of the middle partition plate 600 through the first diversion structure 260 and/or the second diversion structure 270. If the condensed water flows to the first side plate 240, it passes through the first diversion structure. The structure 260 is used for drainage. If the condensed water flows to the second side plate 250 , it will be drained through the second drainage structure 270 . Through the drainage of the water drainage groove 220 and the first drainage structure 260 and/or the second drainage structure 270, the condensed water is prevented from flowing into the mobile air conditioner indiscriminately, and damage to the internal parts of the mobile air conditioner is avoided, and the performance of the mobile air conditioner is improved. service life.

如图4所示,第一侧板240上设有位于引水槽220下方的第一风轮安装孔241,第一引流结构260用于引导引水槽220溢出的水远离第一风轮安装孔241。蜗壳300与蜗壳盖200配合连接以形成风机风道,风机风道内安装有风轮,风轮的一端安装于第一风轮安装孔241内。第一引流结构260将水引流至远离第一风轮安装孔241的地方,避免了冷凝水从第一风轮安装孔241吹入风机风道内。As shown in FIG. 4 , the first side plate 240 is provided with a first wind wheel installation hole 241 located below the water guiding groove 220 , and the first air guiding structure 260 is used to guide the water overflowing from the water guiding groove 220 away from the first wind wheel installation hole 241 . The volute 300 is connected with the volute cover 200 to form a fan air duct. A wind wheel is installed in the fan air duct, and one end of the wind wheel is installed in the first wind wheel installation hole 241 . The first diversion structure 260 diverts the water to a place away from the first wind wheel installation hole 241 to prevent condensed water from blowing into the fan air duct from the first wind wheel installation hole 241 .

具体地,如图4所示,第一引流结构260包括第一引流筋261和第二引流筋263,第二引流筋263连接于第一引流筋261的下端,第一引流筋261设于引水槽220的一侧,第二引流筋263向引水槽220的另一侧倾斜延伸。第一侧板240还包括弯折筋262,弯折筋262自引水槽220的一侧壁向另一侧壁延伸,弯折筋262与另一侧壁之间形成引水口226,第一引流筋261连接于弯折筋262,本实施例的弯折筋262与第二侧壁223连接,在其它实施例中,弯折筋262也可以与第二侧壁223连接,弯折筋262的设置使得第一引流筋261的强度更高,且使第一引流筋261更靠近位于下方的第一漏水孔243的位置。第一引流筋261和弯折筋262的上端可以设置为与第二侧壁223的上端齐平,以防止少量冷凝水从第一引流筋261或弯折筋262的上端溢出。在其它实施例中,第一引流筋261还可以直接与第一侧壁222或第二侧壁223连接,只要能将冷凝水引流至第二引流筋263即可。Specifically, as shown in FIG. 4 , the first drainage structure 260 includes a first drainage rib 261 and a second drainage rib 263 , the second drainage rib 263 is connected to the lower end of the first drainage rib 261 , and the first drainage rib 261 is provided on the drainage rib 261 . On one side of the water tank 220 , the second drainage rib 263 extends obliquely toward the other side of the water tank 220 . The first side plate 240 further includes a bending rib 262. The bending rib 262 extends from one side wall of the water diversion groove 220 to the other side wall. A water diversion port 226 is formed between the bending rib 262 and the other side wall. The rib 261 is connected to the bending rib 262. The bending rib 262 in this embodiment is connected to the second side wall 223. In other embodiments, the bending rib 262 can also be connected to the second side wall 223. The arrangement makes the strength of the first drainage rib 261 higher, and makes the first drainage rib 261 closer to the position of the first water leakage hole 243 located below. The upper ends of the first drainage ribs 261 and the bending ribs 262 may be set flush with the upper ends of the second side walls 223 to prevent a small amount of condensed water from overflowing from the upper ends of the first drainage ribs 261 or the bending ribs 262 . In other embodiments, the first drainage rib 261 may also be directly connected to the first side wall 222 or the second side wall 223 , as long as the condensed water can be drained to the second drainage rib 263 .

更具体地,第一风轮安装孔241的周缘设有安装环凸242,第二引流筋263的下端与安装环凸242连接。安装凸环用于安装风轮轴承,第一引流筋261的下端与安装凸环连接,可增加第一引流结构260的强度。More specifically, the peripheral edge of the first wind wheel mounting hole 241 is provided with a mounting ring protrusion 242 , and the lower end of the second drainage rib 263 is connected with the mounting ring protrusion 242 . The mounting convex ring is used to install the fan wheel bearing, and the lower end of the first drainage rib 261 is connected with the mounting convex ring, which can increase the strength of the first drainage structure 260 .

第一引流结构260还包括第三引流筋264和第一漏水孔243,第一漏水孔243设于第二引流筋263的远离第一风轮安装孔241的一侧,第三引流筋264的一端与第二引流筋263连接,另一端与第一漏水孔243连接,以将水引流至第一漏水孔243。第一漏水孔243设置在蜗壳300与蜗壳盖200的连接处,不仅有引流的作用,还有加强蜗壳组件100密封性,防止漏风的作用。第三引流筋264可以包括第三倾斜筋与第三竖直筋,第三倾斜筋与第二引流筋263连接,第三竖直筋与第一漏水孔243对接,第三倾斜筋能将冷凝水引流至远离第一风轮安装孔241的位置,第三竖直筋能使冷凝水更顺利地流入第一漏水孔243中。冷凝水流入第一漏水孔243后,直接落入中隔板600上,然后再流入排水槽630中,或者经过积水槽620后流入排水槽630,从排水槽630的排水孔631流入室外侧换热器。The first drainage structure 260 further includes a third drainage rib 264 and a first water leakage hole 243 . The first water leakage hole 243 is provided on the side of the second drainage rib 263 away from the first wind wheel mounting hole 241 . One end is connected with the second drainage rib 263 , and the other end is connected with the first water leakage hole 243 , so as to drain water to the first water leakage hole 243 . The first water leakage hole 243 is arranged at the connection between the volute 300 and the volute cover 200 , and not only has the function of drainage, but also has the function of strengthening the sealing of the volute assembly 100 and preventing air leakage. The third drainage rib 264 may include a third inclined rib and a third vertical rib, the third inclined rib is connected with the second drainage rib 263, the third vertical rib is butted with the first leakage hole 243, and the third inclined rib can drain the condensation The water is drained to a position away from the first wind wheel installation hole 241 , and the third vertical rib can make the condensed water flow into the first water leakage hole 243 more smoothly. After the condensed water flows into the first water leakage hole 243, it directly falls on the middle partition 600, and then flows into the drainage groove 630, or flows into the drainage groove 630 after passing through the water accumulation groove 620, and flows from the drainage hole 631 of the drainage groove 630 into the outdoor side for replacement. Heater.

其中,引水槽220的底部由第二侧板250至第一侧板240的方向向下倾斜。即大部分冷凝水会沿着冷凝水的底壁221流向第一侧板240上的第一引流结构260,只有少量的冷凝水会流向第二引流结构270。Wherein, the bottom of the water guiding groove 220 is inclined downward from the direction from the second side plate 250 to the first side plate 240 . That is, most of the condensed water will flow to the first drainage structure 260 on the first side plate 240 along the bottom wall 221 of the condensed water, and only a small amount of the condensed water will flow to the second drainage structure 270 .

第一侧板240上设有引水口226,引水口226与引水槽220连通,便于冷凝水流向第一引流结构260,然后落入中隔板600上。The first side plate 240 is provided with a water inlet 226 , and the water inlet 226 communicates with the water inlet groove 220 , so that the condensed water flows to the first drainage structure 260 and then falls onto the middle partition plate 600 .

如图1所示,第二侧板250上设有位于引水槽220下方的第二风轮安装孔251,第二引流结构270用于引导引水槽220溢出的水远离第二风轮安装孔251。第二风轮安装孔251用于安装风轮的另一端,当引水槽220的底壁221向第一侧板240倾斜设置时,大部分冷凝水都会流向第一引流结构260,但是可能仍然有少量的冷凝水流向第二侧板250的方向,因此第二引流结构270的设置避免了冷凝水从第二风轮安装孔251吸入风机风道中。As shown in FIG. 1 , the second side plate 250 is provided with a second wind wheel installation hole 251 located below the water guiding groove 220 , and the second air guiding structure 270 is used to guide the water overflowing from the water guiding groove 220 away from the second wind wheel installation hole 251 . The second wind wheel installation hole 251 is used to install the other end of the wind wheel. When the bottom wall 221 of the water diversion groove 220 is inclined to the first side plate 240, most of the condensed water will flow to the first diversion structure 260, but there may still be some A small amount of condensed water flows toward the direction of the second side plate 250 , so the provision of the second drainage structure 270 prevents the condensed water from being sucked into the fan air duct from the second wind wheel mounting hole 251 .

第二引流结构270包括互相连接的第四引流筋271和第五引流筋272,第四引流筋271和第五引流筋272分别向第二风轮安装孔251的两侧倾斜延伸。第四引流筋271与第五引流筋272形成三角筋,既加强了第二侧板250的结构强度,又能将冷凝水引流至远离第二风轮安装孔251的位置。The second drainage structure 270 includes a fourth drainage rib 271 and a fifth drainage rib 272 connected to each other. The fourth drainage rib 271 and the fifth drainage rib 272 extend obliquely to both sides of the second wind wheel installation hole 251 respectively. The fourth drainage rib 271 and the fifth drainage rib 272 form a triangular rib, which not only strengthens the structural strength of the second side plate 250 but also diverts the condensed water to a position away from the second wind wheel installation hole 251 .

在本实用新型的一实施例中,第二引流结构270还包括第六引流筋273,第六引流筋273连接于第四引流筋271的下端,述第六引流筋273向远离第五引流筋272的方向延伸。第六引流筋273能将冷凝水进一步引流至远离第二风轮安装孔251的位置,且第六引流筋273的上表面为向下倾斜的斜面,有利于将冷凝水向下引流,在第二引流结构270的下端设有第二漏水孔(图未示出),以将冷凝水引流至中隔板600,然后进入接水槽610中。In an embodiment of the present invention, the second drainage structure 270 further includes a sixth drainage rib 273, the sixth drainage rib 273 is connected to the lower end of the fourth drainage rib 271, and the sixth drainage rib 273 is directed away from the fifth drainage rib 272 in the direction of extension. The sixth drainage rib 273 can further drain the condensed water to a position away from the second wind wheel installation hole 251, and the upper surface of the sixth drainage rib 273 is a downward inclined slope, which is beneficial to drain the condensed water downward. The lower end of the second drainage structure 270 is provided with a second leakage hole (not shown in the figure) to drain the condensed water to the middle partition plate 600 and then into the water receiving tank 610 .

第二侧板250包括凸设于顶板210的挡板252,挡板252设于引水槽220的一端,以阻挡引水槽220中的水溢出。由于大部分水会流向第一侧板240,因此在引水槽220靠近第二侧板250的端部设置一块挡板252,能够阻挡冷凝水流向第二侧板250,使得更多的冷凝水经第一引流结构260流入中隔板600的接水槽610中。The second side plate 250 includes a baffle plate 252 protruding from the top plate 210 . The baffle plate 252 is disposed at one end of the water guiding groove 220 to prevent the water in the water guiding groove 220 from overflowing. Since most of the water will flow to the first side plate 240, a baffle plate 252 is provided at the end of the water channel 220 close to the second side plate 250, which can block the condensed water from flowing to the second side plate 250, so that more condensed water passes through the second side plate 250. The first drainage structure 260 flows into the water receiving groove 610 of the middle partition plate 600 .

此外,本实用新型还提供了一种移动空调器,包括壳体和设于壳体内的上述蜗壳组件100,蜗壳组件100包括上述蜗壳盖200。该蜗壳组件100和蜗壳盖200的具体结构参照上述实施例,由于该移动空调器采用了上述所有实施例的全部技术方案,因此至少具有上述实施例的技术方案所带来的所有有益效果,在此不再一一赘述。In addition, the present invention also provides a mobile air conditioner, which includes a casing and the above-mentioned volute assembly 100 disposed in the casing. The volute assembly 100 includes the above-mentioned volute cover 200 . The specific structures of the volute assembly 100 and the volute cover 200 refer to the above-mentioned embodiments. Since the mobile air conditioner adopts all the technical solutions of the above-mentioned embodiments, it has at least all the beneficial effects brought by the technical solutions of the above-mentioned embodiments. , and will not be repeated here.

以上所述仅为本实用新型的优选实施例,并非因此限制本实用新型的专利范围,凡是在本实用新型的构思下,利用本实用新型说明书及附图内容所作的等效结构变换,或直接/间接运用在其他相关的技术领域均包括在本实用新型的专利保护范围内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the scope of the present invention. Under the conception of the present invention, the equivalent structure transformation made by using the contents of the description and drawings of the present invention, or directly / Indirect applications in other related technical fields are included in the scope of patent protection of the present utility model.

Claims (12)

1.一种蜗壳盖,其特征在于,包括:1. a volute cover, is characterized in that, comprises: 顶板,所述顶板上设有沿所述顶板长度方向延伸的引水槽;a top plate, the top plate is provided with a water diversion groove extending along the length direction of the top plate; 第一侧板和第二侧板,所述第一侧板和所述第二侧板分别设于所述顶板的两端,所述第一侧板设有第一引流结构,以用于引流所述引水槽溢出的水;和/或,所述第二侧板设有第二引流结构,以用于引流所述引水槽溢出的水。A first side plate and a second side plate, the first side plate and the second side plate are respectively arranged at both ends of the top plate, and the first side plate is provided with a first drainage structure for drainage and/or, the second side plate is provided with a second drainage structure for diverting the overflowed water from the water channel. 2.如权利要求1所述的蜗壳盖,其特征在于,所述第一侧板上设有位于所述引水槽下方的第一风轮安装孔,所述第一引流结构用于引导所述引水槽溢出的水远离所述第一风轮安装孔。2 . The volute cover according to claim 1 , wherein the first side plate is provided with a first wind wheel mounting hole located below the water diversion groove, and the first diversion structure is used to guide the The water overflowing from the water diversion groove is kept away from the installation hole of the first wind wheel. 3.如权利要求2所述的蜗壳盖,其特征在于,所述第一引流结构包括第一引流筋和第二引流筋,第二引流筋连接于所述第一引流筋的下端,所述第一引流筋设于所述引水槽的一侧,所述第二引流筋向所述引水槽的另一侧倾斜延伸。3. The volute cover according to claim 2, wherein the first drainage structure comprises a first drainage rib and a second drainage rib, and the second drainage rib is connected to the lower end of the first drainage rib, so that the The first drainage rib is arranged on one side of the water drainage trough, and the second drainage rib extends obliquely toward the other side of the water drainage trough. 4.如权利要求3所述的蜗壳盖,其特征在于,所述第一风轮安装孔的周缘设有安装环凸,所述第二引流筋的下端与所述安装环凸连接。4 . The volute cover according to claim 3 , wherein a peripheral edge of the first wind wheel mounting hole is provided with a mounting ring protrusion, and the lower end of the second drainage rib is connected with the mounting ring protrusion. 5 . 5.如权利要求3所述的蜗壳盖,其特征在于,所述第一引流结构还包括第三引流筋和第一漏水孔,所述第一漏水孔设于所述第二引流筋的远离所述第一风轮安装孔的一侧,所述第三引流筋的一端与所述第二引流筋连接,另一端与所述第一漏水孔连接,以将水引流至所述第一漏水孔。5 . The volute cover according to claim 3 , wherein the first drainage structure further comprises a third drainage rib and a first leakage hole, and the first leakage hole is provided on the second drainage rib. 6 . One end of the third drainage rib is connected to the second drainage rib, and the other end is connected to the first water leakage hole, so as to drain water to the first water leakage hole. leak hole. 6.如权利要求1至5中任一项所述的蜗壳盖,其特征在于,所述引水槽的底部由所述第二侧板至所述第一侧板的方向向下倾斜。6. The volute cover according to any one of claims 1 to 5, wherein the bottom of the water guiding groove is inclined downward from the direction of the second side plate to the first side plate. 7.如权利要求6所述的蜗壳盖,其特征在于,所述第一侧板上设有引水口,所述引水口与所述引水槽连通。7 . The volute cover according to claim 6 , wherein a water guide port is provided on the first side plate, and the water guide port communicates with the water guide groove. 8 . 8.如权利要求1至5中任一项所述的蜗壳盖,其特征在于,所述第二侧板上设有位于所述引水槽下方的第二风轮安装孔,所述第二引流结构用于引导所述引水槽溢出的水远离所述第二风轮安装孔。8. The volute cover according to any one of claims 1 to 5, wherein the second side plate is provided with a second wind wheel mounting hole located below the water guiding groove, and the second The diversion structure is used to guide the water overflowing from the diversion groove away from the installation hole of the second wind wheel. 9.如权利要求8所述的蜗壳盖,其特征在于,所述第二引流结构包括互相连接的第四引流筋和第五引流筋,所述第四引流筋和第五引流筋分别向所述第二风轮安装孔的两侧倾斜延伸。9. The volute cover of claim 8, wherein the second drainage structure comprises a fourth drainage rib and a fifth drainage rib connected to each other, and the fourth drainage rib and the fifth drainage rib are directed toward the Both sides of the second wind wheel mounting hole extend obliquely. 10.如权利要求9所述的蜗壳盖,其特征在于,所述第二引流结构还包括第六引流筋,所述第六引流筋连接于所述第四引流筋的下端,所述述第六引流筋向远离所述第五引流筋的方向延伸。10 . The volute cover of claim 9 , wherein the second drainage structure further comprises a sixth drainage rib, the sixth drainage rib is connected to the lower end of the fourth drainage rib, and the The sixth drainage rib extends in a direction away from the fifth drainage rib. 11.如权利要求8所述的蜗壳盖,其特征在于,所述第二侧板包括凸设于所述顶板的挡板,所述挡板设于所述引水槽的一端,以阻挡所述引水槽中的水溢出。11. The volute cover of claim 8, wherein the second side plate comprises a baffle plate protruding from the top plate, the baffle plate is disposed at one end of the water diversion groove to block all the The water in the diversion tank overflows. 12.一种移动空调器,其特征在于,包括如权利要求1~11中任一项所述的蜗壳盖。12. A mobile air conditioner, characterized by comprising the volute cover according to any one of claims 1 to 11.
CN201921942470.4U 2019-11-11 2019-11-11 Volute cover and mobile air conditioner Active CN210832281U (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201921942470.4U CN210832281U (en) 2019-11-11 2019-11-11 Volute cover and mobile air conditioner
PCT/CN2020/080463 WO2021093247A1 (en) 2019-11-11 2020-03-20 Spiral casing assembly, and movable air conditioner
EP20888630.9A EP4043807A4 (en) 2019-11-11 2020-03-20 SPIRAL HOUSING AND MOBILE AIR CONDITIONER ASSEMBLY

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921942470.4U CN210832281U (en) 2019-11-11 2019-11-11 Volute cover and mobile air conditioner

Publications (1)

Publication Number Publication Date
CN210832281U true CN210832281U (en) 2020-06-23

Family

ID=71256632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921942470.4U Active CN210832281U (en) 2019-11-11 2019-11-11 Volute cover and mobile air conditioner

Country Status (1)

Country Link
CN (1) CN210832281U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065776A (en) * 2020-09-07 2020-12-11 珠海格力电器股份有限公司 Fresh air component and fresh air conditioner
CN113251478A (en) * 2021-05-28 2021-08-13 珠海格力电器股份有限公司 Fresh air component, drainage structure and fresh air conditioner
CN113453509A (en) * 2021-06-28 2021-09-28 常州博瑞电力自动化设备有限公司 Air guide sleeve and production method thereof
CN113566405A (en) * 2021-08-11 2021-10-29 珠海格力电器股份有限公司 Air duct mounting structure and air conditioner indoor unit with same
CN114234433A (en) * 2021-12-24 2022-03-25 珠海格力电器股份有限公司 Condensate water treatment device and air-conditioning range hood

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065776A (en) * 2020-09-07 2020-12-11 珠海格力电器股份有限公司 Fresh air component and fresh air conditioner
CN112065776B (en) * 2020-09-07 2025-11-04 格力电器(杭州)有限公司 Fresh air components and fresh air air conditioners
CN113251478A (en) * 2021-05-28 2021-08-13 珠海格力电器股份有限公司 Fresh air component, drainage structure and fresh air conditioner
CN113251478B (en) * 2021-05-28 2025-06-27 珠海格力节能环保制冷技术研究中心有限公司 Fresh air components, drainage structures and fresh air air conditioners
CN113453509A (en) * 2021-06-28 2021-09-28 常州博瑞电力自动化设备有限公司 Air guide sleeve and production method thereof
CN113566405A (en) * 2021-08-11 2021-10-29 珠海格力电器股份有限公司 Air duct mounting structure and air conditioner indoor unit with same
CN114234433A (en) * 2021-12-24 2022-03-25 珠海格力电器股份有限公司 Condensate water treatment device and air-conditioning range hood

Similar Documents

Publication Publication Date Title
CN210832281U (en) Volute cover and mobile air conditioner
CN208059117U (en) Ceiling machine
WO2021093247A1 (en) Spiral casing assembly, and movable air conditioner
WO2020155352A1 (en) Window-type air conditioner
CN215597479U (en) Ceiling and Air Conditioner
CN211345777U (en) Chassis shell and window type air conditioner
CN106907795A (en) Wall-hanging air conditioner all-in-one
CN207006395U (en) Window air conditioner
CN111023545A (en) Chassis case, window air conditioner
CN111189213B (en) Panel structure capable of preventing return air, air conditioner indoor unit and air conditioner
CN210832497U (en) Drain Tray and Mobile Air Conditioner
CN114413464A (en) A water receiving tray assembly and mobile air conditioner
CN211177370U (en) Volute components and mobile air conditioners
CN211261049U (en) window air conditioner
CN211261220U (en) Water pan and window type air conditioner
CN211261051U (en) window air conditioner
CN205048692U (en) Condensed water collection device for air conditioner and air conditioner
CN209819729U (en) Mobile air conditioner
CN219913415U (en) Volute component for air conditioner and air conditioner
CN218379640U (en) Air conditioner indoor unit and air conditioner with same
CN109425026B (en) All-in-one air conditioner
CN210832283U (en) mobile air conditioner
CN205245495U (en) Heat exchanger water connection structure and air conditioner
CN210832264U (en) Wall Mounted Air Conditioning Indoor Units and Air Conditioners
CN108458405A (en) Air conditioner indoor unit and air conditioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant